Release time for production order

HI
   Want to know  the release time of the production order.Is it possible in any of the base reports
regards,
PradeepM.

Display the production order, press the "I" icon on the status line, position the cursor on the "REL" status line, and go to menu option "Extras", choose "Change Documents --> for status".
Mario

Similar Messages

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Query for releasing and closing Production order ststus in bulk

    Hi
    Releasing planed to released
    1. i want to release all those production orders entered in system which are in planned status.I want to apply one query for that which should change the status of Prod orders to release in systems automatically by applying this query.Please give me that suitable query and how to use it for proper result.
    closing released to planned
    2. Same like above i want to close all those Production orders whose receipt quantity is equal to planned quantity. i.e i want one query which should change the status of production order from release to closed on condition that receipt quantity is equal to the planned quantity.Please give me that suitable query and how to use it for proper result.
    Thanks

    For point 1 and 2:  It should not be tried and using a Query does not comply with SAP Support policy.  Doing so would lead you to lose SAP Support.

  • Run MRP for production order/maintenance order has been release

    Hi all,
    please tell me how to configure for running mrp for production order/maintenance order has been release. as you know, i want production order has not release will not appear in MD04. I think that is the way for running mrp will not take care about this production order has not release
    Thanks all

    Hi Hoai,
    It is impossible to exclude production order from net requirement calculation in MRP run. You may take a look at the online documentation under the PP-MRP area.
    Material Requirements Planning (PP-MRP)
       Planning Process
         Net Requirements Calculation
           Net Requirements Calculation for MRP
    But there is a way to temporarily exclude production order from MRP. That is you can set the 'delivery completed' indicator in 'Goods receipt' Tab in in production order. Please note that this order will not appear in MD04. Actually to some degree, this order could be considered as completed because ticking the indicator could set status 'DLV' for the order. But you still can execute confirmation, goods issue and goods receipt activities. This way is just a workaround. You may
    consider it.
    Or maybe you can consider the useage of BADI: MD_CHANGE_MRP_DATA to change the MRP run data to see if this could fulfill your requirement.
    Regards,
    Rachel

  • User exit for Production Order release

    Hi Experts,
    Any User eixt for Prouction Order Mass processing.
    Before releasing the production order i have to do some checks. Can you please provide right user exit. More reward points with best solutions.
    Thanks
    Cris

    Hi,
              check the following userexits and BADI's for Production Order
    Enhancement/ Business Add-in Description
    Enhancement
    PPCO0010 Enhancement in make-to-order production - Unit of measure
    PPCO0012 Production Order: Display/Change Order Header Data
    PPCO0013 Change priorities of selection crit. for batch determinati
    PPCO0015 Additional check for document links from BOMs
    PPCO0016 Additional check for document links from master data
    PPCO0017 Additional check for online processing of document links
    PPCO0018 Check for changes to production order header
    PPCO0019 Checks for changes to order operations
    PPCO0021 Release Control for Automatic Batch Determination
    PPCO0022 Determination of Production Memo
    PPCO0023 Checks Changes to Order Components
    STATTEXT Modification exit for formatting status text lines
    PPCO0009 Enhancement in goods movements for prod. process order
    CCOWB001 Customer exit for modifying menu entries
    COIB0001 Customer Exit for As-Built Assignment Tool
    COZF0001 Change purchase req. for externally processed operation
    COZF0002 Change purchase req. for externally procured component
    PPCO0001 Application development: PP orders
    PPCO0002 Check exit for setting delete mark / deletion indicator
    PPCO0003 Check exit for order changes from sales order
    PPCO0004 Sort and processing exit: Mass processing orders
    PPCO0005 Storage location/backflushing when order is created
    PPCO0006 Enhancement to specify defaults for fields in order header
    PPCO0007 Exit when saving production order
    PPCO0008 Enhancement in the adding and changing of components
    Business Add-in
    AFABD_CHANGE Change Relationship
    CAUFVD_CHANGE BAdI: Overall Network Scheduling with Selection
    PPPI_SEL_ORD_EXT_REL
    SIDAT_UPDATE Change date of price simulation
    Regards

  • Time Ticket for Production Order

    Hi All...
    I was entered Time Ticket for Production Order. Am I enter Time Ticket for Production Order with same confirmaton number?? Please help....
    Best Regard,
    Dwi

    Hi,
    Your question is not clear,Pls clarify
    If you are talking about CO1V
    then you dont need to take this much pain you click on "Other view" then you can see order field here you can enter the Order no rather than searching for confirmation nos
    Revert if you have further query
    Regards,
    SVP
    Edited by: SVP on May 9, 2008 11:03 AM

  • Enhancement for Production Order Release and Batch Fixing.

    Hi Experts,
    I have assigned a enhancement for production order.The user exit is also given in the req as PPCO0001 through which i have to call a Z-Program for Batch fixing using Trans CO01 and release the order before saving once it is assigned to components.
    Now my probs is where to start working for the enhancement -is it possible to use any BAPI instead of Batch (BDC) or I can use any BADI instead User Exit.
    So if you guys have similar scenario worked on it or have similar example approach to solve it.Please do help.I will reward for all helpful answers.

    I figured out thr friends !
    Thanks,
    SriRam

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH

  • Batch Determination for  production orders

    Hi Experts,
    How do we set up batch determination strategy for production order.My requirement is" Batch Determination at the time of releasing the orders using : - the FIFO strategy on finished product , - the LIFO strategy on components (raw material)".
    Please help me to setup this requirement.
    Thanks,
    Ravi.M

    Just some simple hints:
    You must create a batch class to classify the materials with a characteristcs for the expiration date.
    There exist std characteristic for this.
    In the material master you have a setting to trigger batch determination at release.
    You must create sort rules sorting this characteristic ascending for FIFO and descendign for LIFO. (CU70)
    For component in production/processs order:
    You have to create a search strategy with of a type included in the search procedure defined in production/process ordeer dependent parametersy og your choice. Tc COB1
    In this you use the sort rule and the batch class as selection class.
    Your finished goods goes to a sales order so you have to craete a strategy there as well.
    It follows similar procedure as above but relates to sales order types and other search procedure.
    Good luck!
    Regards,
    Tor Holter

  • Batch Determination at the time of Production Order Confirmation

    Hi,
    I am working with Batch Determination at Item Level.
    I already have configured system to generate Batch Automatically at the Time of Production Order Release.
    But now i want to generate Batch Automatically at the Time of Production Order Confirmation
    Please help me with the necessary Configurations which would be required into achieving the same.
    Thanks in advance.
    Harris

    Hi,
    I have maintained the same for my Order Type in OPJ2 but still the same is not being picked at the time of Order Confirmation and it is being put to COGI mentioning the error as No batch specified in production order
    Also if i try to Manually Select the Batch through in Goods Movt. of CO15 it is giving a msg that No Strategy could be found.
    I have done following settings:
    1. Have maintained Condn Records in MBC1 for the component whose batch is to be determined.
    2. In material master in MRP2 Batch Determination: 2
    3. In OPL8: Batch determination search procedure
    4. In OPJ2: BD ticked for that relevant Order Type
    5. In OPKP: Automatic Batch creation kept as BLANK.
    Please support
    Thanks
    Harris

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • Wrong GL at the time of Production order

    Hello
    At the time of Production order settlement....its showing error that this GL is not possible to post automatically............there wrong GL(recon ac) have been assigned....where can i check this assignment in the system.................I have already checked it in OBYC.......but there i hv not found anything.......
    regards

    Hi Pari
    Check the following accounts for the relevant Val Class
    PRD-PRF (Variance acct) / GBB-AUA or AUF (COGM) /
    Also check WIP Account as well as Change in WIP assigned in IMG
    br, Ajay M

  • Error at the time of Production order cancellation.

    Hi PP Gurus,
    The transactions happened when Sales order costing was activated
    1. Sales order created
    2. Production order creation, release
    3. Production order confirmation and QM lot created
    4. QM lot cleared with Result recording and UD has taken
    5. While doing PGI system started to ask about Sales order costing
    Now as per CO requirements all the documents has to be reversed and Sales order has to be deleted. But when I'm trying to cancel production order confirmation, it's giving error that Stock of Sales order quantity is deficit in Quality stock (As it is already moved to unrestricted Sales stock). And when we reversed it through Movement type 322 its giving error like UD has already taken for partial lot....
    We tried following options.
    1. Another Sales order irrelevant to Sales order costing created and we tried to move stock from old sales order to new sales order through movement type 413E but got the same Sales order costing error.
    2. We tried to move stock from old Sales order to unrestricted use, same error we got.
    As per my knowledge UD can't be reversed in Standard system.... What could be done in that case... Please help if some one faced the same situation.
    Thanks & Regards,
    Abu Arbab

    Dear,
    If you want to change UD code, it is very simple from QA12. But if you want to reverse goods movements also, it is some thing big process. please check OSS notes 175842.
    Please check SAP note note 33924 Reversing the UD and 175842-QM lot stock reversal.
    Please refer my reply in this thread also,
    UD cancellation or reverse after GR
    Please go through the transaction CO09, you enter your plant,Material, MRP area (Plant) and Checking rule then execute, it will take you to next screen there you can able to see what are the conformed quantities for the Sales document wise(Reservations), and also you can see the current stock possition (Cummiletive ATP Quantity).
    Regards,
    R.Brahmankar

  • BADI for MIGO ( Material document change for Production Order goods Receipt

    Hey experts,
    I am actually stuck up with MIGO BADI.
    There are many BADI's available but i dont think any one would suit my requirement.
    here goes my requirement.
    When a Production Order is created in transaction CO01 , the system picks the value of the moving  material and multiplies it with the quantity .
    But when the production order is being confirmed thru CO11N , again the system picks the present moving price of the material and multiplies it with the quantity. This goods receipt is done through MIGO transaction by selecting goods receipt for order that is 101 movement type. I have been asked to get the value of the material at the time of production order create and then change the dmbtr value of MSEG table, this can be done in the badi at the time of creation of material document number but the BADI's MB_DOCUMENT_BEFORE_UPDATE,  MB_DOCUMENT_UPDATE do not allow me to change the values .
      The BADI MB_DOCUMENT_BEFORE_UPDATE does not allow any changes to be made for XMSEG table
    and MB_DOCUMENT_UPDATE is passed by value and hence the changes are not affected after it comes out of the method.
    Guys please help me as this creating a hell lot of problem here and i would surely reward the max points if answered.
    here is the example to be more precise.
    Material : Pen
    Quantity : 10.
    date : 01.06.2008.
    TYransaction co01.
    lets say at the time of creation the value of the material was 5 rs
    a material document would be created with the value  : 50 rs.
    Now for this prod. order goods receipt is being done on 01.07.2008.
    Let the value be 4 rs now.
    so the Material document would be created with a value of 40 rs.
    I need to make this 50 rs.
    I have got all the data to do it but i am not gettin the coreect BADI, i just want the BADI name to change the DMBTR value at the time of creation of material Document.
    Thanks in Advance.

    User-exit /BADI to change mseg during migo
    https://forums.sdn.sap.com/click.jspa?searchID=-1&messageID=5435559
    try this links

Maybe you are looking for

  • Azure Site to Site VPN with Cisco ASA 5505

    I have got Cisco ASA 5505 device (version 9.0(2)). And i cannot connect S2S with azure (azure network alway in "connecting" state). In my cisco log: IP = 104.40.182.93, Keep-alives configured on but peer does not support keep-alives (type = None) Gro

  • Sub:Stock report with sales unit of measurement - reg.,

    Hi guru's we have a requirement to have the stock report with sales unit of measure instead of base unit of measure can anybody guide me how to do this. thanks in advance tulja singh.

  • How to set-up Guest Client Wireless Access "PIN" with Restricted Access ???

    This is my first time, and, I am not familiar with the rules. Is it possible for someone to answer a slightly different question... I just bought a TC and hooked it up to my cable modem. I have 3 computers that I want to configure, with the following

  • Configuration Manager Console - Baselines Blank

    Hello everyone.  I have a strange problem in SCCM 2012 R2 console  - Environment: Server, Console and client running SCCM 2012 R2 CU3.  In all consoles, the Configuration Baselines appear blank, with ScopeID in details as attached photo.  Anyone been

  • Process chain problem - urgent

    Hi my process chain is got error at update from psa,it is showing yellow. the data has loaded into the dsos but it is not activated how can i activate it from process chain itself because if i do manually i have to do delete index,create index and co