Relevance of Sales Order tagged with Production Order

Hi,
In the Production Order, there is an option to tag any sales order with it and the Customer Code follows. Is this for an information purpose only? How does the cycle differ from running a Production Order without a Sales Order? Does it have any reports or flows related/linked?
Regards
Sudatt

Hi.......
Yes this is only for information.
There is a term as per industries Make To Order and Make To Stock.
Make To Order means if you are doing production against Sales Order
and Make To Order means if you are doing production against Stock.
This is just an information against which SO (Make To Order) you have made production......
Regards,
Rahul

Similar Messages

  • Sales order field in production order

    Hi Gurus,
    I see there is a field sales order assigned to production order. In my scenario when we create a sales order production order gets created automatically in background due to the strategy group. So in production order, i see a field sales order and also i can see the sales order number in that field which is fine.
    But when we create a sales order with reference to quote, then in production order i see the quote number displayed in sales order field in the production order.
    My client wanted to have sales order number rather quote.
    Please suggest.
    Thanks,
    Quantum.

    Hi,
    Please note that if sales order stock has already been assigned to a quotation, the stock of the resulting orders is also managed under the quotation number.
    If you require to tag the sale order no to the production order then define the requirement type not as the make to order. This you can control at item category level also. While for sales order make requirement type make to order related.
    While doing so please note that you have to use the special rule to determine the requirement type which will based on the item category and mrp type.
    Hope this will help you.
    Thanks and regards,
    Atul

  • Sales Order Conversion to Production Order

    Dear All,
    I am from SD and have a doubt reg SD - PP ...
    If i have 3 sales orders and each sales order has 3 line items. Now i need to make a production order --- the production order to have 1 line item from each sales order so in all 3 production orders for the 3 sales orders and each production order has 3 line items and each line item is from diffrent sales orders i.e as above 3 sales orders.
    is it possible and how ?
    I am awaiting for a suitable solution ASAP...
    Thnks
    krishna

    Hi,
    In PP always 1 production order is for only 1 product ( if no co-product is added in BOM).
    In your scenario, If the PP settings & master data are maintained perfectly.
    System will create 9 production orders ( this may vary with respect to the lotsizing procedure used).
    Reward points if useful
    Thanks & regards
    Mahesh babu
    Edited by: Mahesh Babu MG on Jan 30, 2008 7:19 PM

  • Sales Order Text to Production Order Text

    Dear Experts,
    When creating a sales order in VA01, I added in some comments in the item level Texts tab.
    How can I configure the system so that when a production order is created from this sales order, the comments entered in the sales order will be automatically populated in the Long Text tab of Production Order header.
    This is because during the creation of sales order, there may be certain comments and/or instructions that need to be passed to the production line. We want the texts to flow through to the production order automatically.
    Any ideas?
    Thanks in advance.

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • Question about the rescheduling of a Sales Order and its Production Order

    Hello Everybody,
    I experience something strange with the rescheduling of a Sales Order and its corresponding Production Order.
    It will be easier to explain with an example...
    For a material, I have created a Sales Order.
    And from this Sales Order, I have now a Production Order converted from a Planned Order generated by the MRP Run.
    This is what I have in transaction MD04:
    SALES ORDER
    AV DATE: 20/02/2008
    GR DATE: 20/02/2008
    PRODUCTION ORDER
    AV DATE: 20/02/2008
    GR DATE: 18/02/2008    (GR process time is 2 days).
    ==> OK !
    Now, I have to reschedule the Sales Order one week sooner.
    SALES ORDER
    AV DATE: 13/02/2008
    GR DATE: 13/02/2008
    After transaction COHV to reschedule the Production Order, I have:
    PRODUCTION ORDER
    AV DATE: 15/02/2008
    GR DATE: 13/02/2008
    But I expected to have:
    PRODUCTION ORDER
    AV DATE: 13/02/2008
    GR DATE: 11/02/2008
    Do you have an idea about what is wrong?
    Thanks in advance for your help on this subject.
    Regards,
    Rudy

    Hello.
    Thank you for your reply.
    But in fact, I am doing some tests on a test platform, which is using an "old" copy of production database.
    So, there can't be data already scheduled for the dates I am using.
    Moreover, I just tried now to do the same with dates in November 2008, exactly with the same results.
    In production platform, they experience this problem too.
    Summary of my new test:
    Before rescheduling:
    SALES ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 20/11/2008
    PROD. ORDER:
    AV. DATE = 20/11/2008
    GR. DATE = 18/11/2008
    After rescheduling of one week sooner:
    SALES ORDER:
    AV. DATE = 13/11/2008
    GR. DATE = 13/11/2008
    PROD. ORDER:
    AV. DATE = 15/11/2008  (ipo  13/11/2008)
    GR. DATE = 13/11/2008  (ipo  11/11/2008)
    I really don't understand why I don't have the same kind of dates as the ones I get before the rescheduling...
    In my mind, I expect to have all these dates set back of one week...
    Regards
    Rudy
    Rudy

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • Updating Sales Order no in Production Order

    we have csenario for Sales Order :  Inquery - Quotation - Sales Order .
    In PP we have MTO scenarion . when i run MRP and convert the plan order to Production Order , in place of Sales Order it was updatin Quotation in Production Order .
    we have checked SD config for sales doc Item category =TAC and in Material Master we will used Item Category = NORM
    Please suggest is there any other setting for updating Sales Order no in Production Order .
    Thnx.

    Hi,
    I assume that you are using the strategy 20 (MTO). Go to OVZG here select the class 040 Indiv.cust.w/o cons., keep BLANK for account assignment consumption and rerun the whole cycle and check.
    Thanks
    Hrishi

  • Goods Receipt with production order in WM

    Hi all,
              My client requirement is whenever i am issuing  goods to the production order the stock reserved to production order, once i confirmed the  TO stock level  reduced.Once production  completed when i put the goods receipt with production order the stock increased for finished goods only at storage location level not  upto warehouse level.
    when i put goods receipt with others the stock increased in  warehouselevel upto my destination bin(as i configured).My requirement is how to move goods to my  destination bin when goods receipt for production order. any configuration required? solve my issue
    i am maintaining configuration as
    i)in omlj iam using movt type-103, source as 901(scr checked),dest as 003,reqirement type-orders.
    ii)in omlr i am assigning 103wm mov type to 101 im type.
    whether  my configuration is correct or i have to do any other configuration ?..i am not maintain any production staging process is it necessary?
    appreciate your help always
    ramesh

    To consolidate your requirements once again
    You want imediate TO creation for components. (It is configured & working fine now)
    You dont want imediate TO creation for finished goods, only in the case of GR for Productio order. Right?
    If Yes, you need to have a small configuration setting (if it is missing)
    In OMLR Create TO immediately Indicator should be space "Do not initiate TO creation" (not X) for 101 F - 103

  • Copy variant characteristics from Sales Order/Item to Production Order

    Dear All,
    I have a requirement wherein I have to copy variant characteristics fromSales Order/Item to Production Order. In this regard I was looking at Enhancement "CLFM0002". Is it possible to copy the variant characteristics automatically from the Sales Order/Item to Production Order?
    Thanks,
    Pravat.

    Pravant,
    If you are implementing Variant Configuration, or using configurable material in that case you will have to maintain
    Characteristics in CT04
    Classes in CL02
    Configuration Profile CU41
    The material that you are mentioning must have class and charcteristics activated or mentioned in material master. undre classification view. In production you maintain Configurable material BOM  we will be using the same material
    Regards
    Sathya

  • Diff between with production orders

    Hi Friends,
    pls explain dif between planned orders & Production orders.
    Regards
    Jagadeeshwar.B

    Hi,
    Planned orders are results of running MRP. Shortages of materials that are set to internal procurement will create planned orders, which can be converted into production orders. Production orders are like "hard copies", they cannot be adjusted by MRP anymore.  Well that's for a discrete environment, not sure about repetitive manufacturing.
    One we firm the planned order changes will be not reflected in the subsequent MRP, correct. e.g. BOM change. New components will not be recommended for firm planned order.
    I'm assuming when you ask about when to use planned vs production orders you are asking when to use Repetitive Mfg (with PE planned orders) vs Discrete Mfg (with production orders). We use both and while we're not perfect in our approach yet we are gaining a better appreciation for the two.
    For repetitive, the planning is much simpler, you basically run MRP against your demand and you get planned orders. You can change and firm these manually or you can use time fence strategies, and you can have multiple operations running through multiple work centres. They are very simple to maintain and use. Repetitive is normally run against shorter lead time build, where we don't need a high level of control. If we have the option we go with Repetitive.
    Where we want a better level of control we go with discrete. Planned (LA) orders are created from a run of MRP against your demand. These are converted to production orders, released, and processed. There is a lot more control (and work) with this order type than we see with Repetitive planned orders. We can link documents to the order, we can change the routing and the BOM on the order, and we have better visibility of the individual orders while they are in manufacturing. Costing is against the order as opposed to Repetitive where the costs (and variances) are seen against the cost collector. After everything is complete, you still have a record against the build. The order stays intact, though it may be complete and closed, you still the retain history.         
    Reward Points if found helpfull..
    Cheers,
    Chandra Sekhar.

  • Issue for Production Report With Production Order Details and Batch Number

    Hi Guys,
    I am looking for a  batch report.I have tried it but i didnt get the desired results.Pls any body give me some solution.
    I need to include the Batch number  in this report and when i have done the same  the values are repeating  and also need to display the Item Description for (Description in Production Order - Parent Item)
    SELECT  distinct t0.docnum,T0.[DocDate], t4.IssuedQty as 'Consumed Qty', T1.[ItemCode] as 'Circle Codee',T1.[Dscription] as 'Circle Name',t3.itemcode
    FROM [dbo].[OIGE]  T0
    INNER JOIN [dbo].[IGE1]  T1 ON T0.DocEntry = T1.DocEntry
    LEFT JOIN owor t3 on t1.baseref = t3.docnum
    left  join wor1 t4 on t3.docentry=t4.docentry
    INNER JOIN OITM T5 ON T1.ItemCode = T5.ItemCode
    INNER JOIN OITB T6 ON T5.ItmsGrpCod = T6.ItmsGrpCod
    INNER JOIN IBT1 T7 ON T5.ItemCode = T7.ItemCode
    INNER JOIN OIBT T8 ON T7.BatchNum = T8.Batchnum and T7.ItemCode = T8.itemcode
    where t0.docdate between  [%0] and [%1] and T6.[ItmsGrpNam] = 'Raw Materials' and t0.JrnlMemo = 'Issue for Production'
    Any body provide me some idea for achieving this....
    Regards,
    Vamsi.

    Hi Bala.
    Thanks for the query but still  not acheived the result.
    The Scenario is to know the quantity of the Coil (Raw MAterial) used IN making a product in different stages and from which batch and Whse the RawMaterial is Consumed in making of the Product(Production Order Parent Item)
    ------------- (Issue for Production )-----------------------|    Production Order Qty(IssuedQty)    Production Order       |  BatchNum
    DocNo/Date      | ( RawMaterial/Coil Code/Desription)  |   (Quantity issued for RM)                  ItemCode/Description | Batchnum
    Regards,
    Vamsi..
    Edited by: VamsamP on Dec 1, 2010 5:06 PM

  • Copy purchase order text to production order text

    Hello,
    purchase order text should be copied to production order text so that the end user can see and edit the text before saving the production order. I'm trying to do it with exit PPCO0006. I can read the purchase order text with read_text but cannot show it on prod order long text tab page. And cannot save it because the production order does not have a number yet.
    How should this be done? If I copy the text to clipboard can it be pasted to production order long text somehow? Or is there a long text object in production order which I could call and insert the text in it? Or what?

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

  • BAPI - Goods receipt and then create transfer order for a production order

    Hello Everyone
    We need to do goods receipt and then create transfer order for a production order (Material for WM scenario)
    We are using BAPI 'BAPI_GOODSMVT_CREATE'
          i_items-orderid = wa_afpo-aufnr .
          i_items-order_itno = wa_afpo-posnr.
          i_items-mvt_ind = 'F'.
          i_items-stge_loc   = wa_afpo-lgort.
         i_items-stge_type = '901'. "wf_styp.
         i_items-stge_bin = wf_sbin.
          i_items-entry_qnt  = wf_qty.
          i_items-entry_uom = wa_afpo-meins.
          i_items-entry_uom_iso = wa_afpo-meins.
          i_items-batch      = wa_zmobtag-charg.
          i_items-move_type  = '101'.
          i_items-move_reas  = wl_3131.
    We are passing i_items (like line of goodsmvt_item) along with other parameters to BAPI and its creating material document and Transfer order automatically. Problem is the TO created is showing destination storage bin as default storage bin( from material master).
    The field goodsmvt_item-stge_bin is just changing the Source bin details. There is no field for bin in the BAPI so that we can change the Destination storage bin as per our requirement.
    My requirement : Creating material doc and then TO. Material should move to specified storage bin.
    Please let me know any alternate way( No BDC) so that my requirement is achieved.
    Regards
    Swetabh

    Hi ,
    can u check these fields ,
    STGE_TYPE_PC     UBTYP     CHAR     3     0     Storage type for transfer posting
    STGE_BIN_PC     UBPLA     CHAR     10     0     Storage bin for transfer posting
    Regards
    Prabhu

Maybe you are looking for

  • RAM Issues + High disk usage on MSI GE60

    Recently I've noticed that my system slowly eats up RAM. It starts off at 21% and can go as high up as 80% or more. When I'm playing games on it the RAM does not clear up properly either, it stays at 50% or so. This was an issue before that I somehow

  • Acrobat 9.5.5 does not keep preferences Setting Page & Ruler Units to Centimeters on Win7

    Hi, I have Win7 Pro x64 and i have problem with Acrobat 9.5.5 Standard Polish. Units and Guides: Setting Page & Ruler Units default option is Inches I change option to Centimeters or Milimeters.    => After restart program (close and open) settings a

  • Two Computer G5 and macbook pro

    i have 2 computers. and i want to transefer some files between these 2 computers with my wlan. sometimes i see the other computer in my finder so i can connect with the tab go and connect to server. but Now i cannot see the other computer. any idea,

  • Enhancement spot in VL02N.

    Dear all, I have to apply following check... In transaction VL02n---> before post goods issue they have to check whether serial number should not blank for line item whose item type is 'ZBAN'. For that I have checked include MV50AFZ1 and sarch FCODE

  • IDoc ORDERS05 structure

    Hi all, Anybody can tell me where I could find a full description of the structure/segments/fields of IDoc ORDERS05? I cannot find the full documentation anywhere. Many thanks, Aldo