Rem product cost collector

Hai gurus,
I have one doubt in REM product cost calculation.
1) when I am running PCC for REM I met with following error as  - Routing does not match with selection
    ID 01.
How to correct the error.
Regards,
sekar chand.

Dear Sekar,
1.While creating product cost collector,use Production version as the controlling level.
2.Check RM01 is the order type and ensure your production version is without any errors.
3.Ensure you have selected rate routing in the task list type in the production version.
4.Check what routing selection id is assigned in MRP parameters in OPPQ and also in the scheduling
parameters in OPU5 for the order type PE.
5,Your routing selection id should be a one which gives the first priority to the rate routing R.
Now check and come back with your further queries.
Regards
Mangalraj.S

Similar Messages

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Use of Product cost collector in REM

    Hi All,
    I am new to PP module, I got some doubts when working on costing of the product.
    1. In REM scenario why do we need an extra step of creating product cost collector ??
    2. when a product is produced will the prod cost collector is used for both debiting(raw and semi) and crediting(finished prod) ?

    Dear Reddy,
    1.Product cost collector is the cost collecting object for a period based production or in a REM - repetitive manufacturing
    scenario.
    2.Without having any product cost collector you cannot carryout production confirmation(assembly backflush) for a product.
    3.So for all the products for which production confirmation will be declared requires a individual product cost collector.
    4.Prior to this you require a production version for the material.
    5.Production version and a product cost collector is also the master data for a REM scenario.
    Now check and revert back.
    Regards
    Mangalraj.S

  • Automatic product cost collector in REM

    Hi,
    Could someone please let me know if there exists any functional module / BAPI to create product cost collector auomatically in background ?
    Many thanks
    Regards
    Seshu

    Hi Satish,
    Thanks for the response,
    I have come across a functional module KK_F_PKOSA_CREATE which creates product cost collector.
    Have you / someone in the forum come across this functional module ?
    Also please let me know if we can schedule KKF6M in background for all REM materials and plants to create product cost collector ?
    Look forward for the response
    Thanks
    Regards
    Seshu

  • How to see materials which donot comes under product cost collector

    hello every body,
    can any one help me in finding  materials which donot comes under product cost collector.
    thanks for all the people who are supporting me
    regards,
    Bh.krishna mohan

    Dear Krishna,
    1.Usally the product cost collectors will be maintained for the materials which are executed using a REM scenario.
    2.Check in table MARC for the materials for which REM profile does not exists(means this field should be empty) for a given plant.
    3.After executing download this and if needed pass it to MARA table to get the FERT and HALB materials.
    4.So only those materials for which REM profile is empty ,the product cost collector does not exists.
    Check and revert with your queries.
    Regards
    S Mangalraj

  • Essence of product cost collectors

    In REM
    what is essence of product cost collector (KKF6n), {As I understand production cost collectors
    are cost carrying elements}, but needs to have more insights like how it captures
    production costs ( i.e through activities, price maintained in accounting view....)
    Does it make any difference if product cost collector is executed before MRP run, or it has
    to be executed only after MRP run

    Dear Eshwer,
    1.Product Cost collector is one of the master data in REM scenario.
    2.This product cost collector is no where related to MRP.
    3.Product Cost collector is used as a cost object in REM scenario,which means all the cost will be
    booked under this product cost collector for that material.
    4.Whatever the confirmations that are done in MFBF or MF41 or MF42N,the cost will get debited or
    credited accordingly for that material and the impact will be seen in the product cost collector.
    5.This product cost collector will be having an order number which will be used for order settlement and
    variance calculation.
    6.For creating a product cost collector you will require a production version.
    7.so whenever you do an assembly or activity or component backflush,the cost will be booked under
    this product cost collector.
    8.So as such there's no relation between MRP and a product cost collector.
    I hope this pints will help you to some extent.
    Revert back with your further queries.
    Regards
    Mangalraj.S

  • Question in Product Cost Collectors

    Hi All,
    I have one question in Product Cost Collectors.
    We are using REM and we have multiple products with same BOM routing. Is it possible to assign several materials to to one Product Cost Collector inorder to reduce number of cost collectors.
    For example, for routing we can create  a Group and assign serveral materials to a group.
    Thanks and Regards
    Purushothaman

    Hi Purushottam,
    In REM, it is required to create it for every material.
    Even if material has more than one production version, need to create separate Product Cost Collector.
    Some more explanation on Product Cost Collector -
    u2022 Object in cost accounting used in Repetitive Manufacturing.
    u2022 A separate product cost collector can be created for each production version or material. The collected costs are settled to inventory at the end of the period.
    u2022 The functions performed for product cost collector during the period end closing process include :
    u2022     Work in process (WIP) caculation
    u2022     Variance calculation
    u2022     Settlement
    u2022 In Repetitive Manufacturing, all costs attributed to the production of a material are collected on a product cost collector and settled periodically (period-based Controlling).                                                             
    u2022 The product cost collector is settled periodically according to the posting period  (for example monthly) .                                                       
    u2022 For a material , product cost collector is made for each  version
    u2022 The actual cost collected can be viewed through product cost collector.
    Hope it is clear now.
    Srini

  • MFBF run before updating product cost collector

    Dear Sir,
    I have done cost run through CK40N and not updated the Product cost collector. So system should stop me doing MFBF (Backflashing).
    But without update to Product cost collector system is allowing to do MFBF (Backflashing).
    Can u guide what could be the problem. Either it is

    Hi,
      In your REM profile you might have defined to backflush using Prel. cost estimate rather than std. cost estimate, please check and revert back.
    Regards
    Ramana

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Error while creating Product Cost Collector

    Hi SAP Gurus,
    While creating Product Cost Collector I am getting the following Error:
    Enter a distribution rule for Order without a validity limit
    Message no. KD059
    Diagnosis
    The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
    Procedure
    Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
    You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
    Can any one help where exactly i need to maintain this.
    The settlement profile settings are fine.
    I am getting this error only after i have changed the scenario to Reproting point back flushing

    Dear Suryanarayana
    Please check the corresponding settlement profile for product orders.
    In most of the cases message KD059 means that no distribution rule is assigned to your production order.
    This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
    I hope this helps resolve the issue for you. I wish you the best in your endeavours.
    Kind Regards,
    Brendan

  • Transfer of Costs in Product Cost Collector to COPA

    Dear Experts,
    Please can you advise me on this current issue I'm having. Below is a description of problem:
    Customer is currently using report designed in COPA (KE30) to derive P&L report for using Plant as a characteristic.
    This was being done at a time when Product Costing functionality was not being used
    All costs (administrative, sales and production costs) were being collected in cost centers
    At end of month assessment of cost center values to COPA is executed (KEU5)
    Customer is then able to derive P&L report per Plant characteristic
    However with implementation of Product Costing, all Production related costs are captured in Product Cost Collectors and not Cost Center
    Hence we have no way of assessing or transferring total production costs from Product Cost Collector to CO-PA
    We have tried to configure FI/MM PA transfer structure (KEI1) and default account assignment (OKB9) for automatic transfer of costs on goods receipt/issue, however this is not working because the product cost collector is used as the default account assignment for the transactions
    So far only material cost valuation of sales/billed materials are possible (which does not address concern)
    As a result we have a gap and customer is unable to derive P&L by Plant from CO-PA.
    Can you advise if there is a way out, in order to have all Production Cost transferred to CO-PA.
    Thanks,
    Ola.

    Hi Ola
    Your Cost centers would be categorized as below
    1. MFG Cost Centers (In Plant)
    2. Service Cost Centers (In Plant)
    3. Few Cost centers (outside plant) Eg: Sales, Marketing, Sales offices etc
    At period end
    1. Allocate the Costs from SER CC to MFG CC using Distribution / Assessment cycle.
    This will make SER CC as zero
    2. Calculate actual activity price in MFG CC (KSS2 / KSII)
    3. After this, do revaluation of PCC using CON2.. This will make balance in MFG CC as zero
    4. Allow the Variances to be updated to COPA by ticking the "Variances to Costing based COPA" in your settlement profile
    5. In short, what remains for you to allocate to COPA is the 3rd category of CC.. i.e. you should allocate those CC to COPA whose cost is not included in the cost of product using COPC module
    Br. Ajay M

  • Report to analyze multiple product cost collectors

    Hi,
    Is there any report which can be used be analyze more than one product cost collector (material) on actual and target cost and usage,
    Basically just as KKBC_PKO can be used to analyze a single material at a time
    Is there anyway to use it for more than one material ?

    Built a Z-Report
    The Z-report can be reused for any other sap instance also

  • CO88 - Collective Settlement Processing for Product cost collectors

    Hello Gurus,
    I have couple of Settlement related problems. Please advice if you have any solution to fix these problems.
    1.We are using CO88 - Collective Settlement Processing for Product cost collectors but some of the cost collectors are not settling fully. Where as the same cost collector settled individually without any problem.
    2. Some cost collectors are settled but very small amounts are still there as un-settled.
    Thanks in advance.
    Vishwanath.

    Hi
    Welcome to SDN! We hope your 1st experience here is good
    Issue 1: It depends on the error that you got at the time of settlement... Many times, when a PCC is being posted to from Production while you are trying to settle, it can give you error...
    later on it can be settled w/o any issues
    Issue 2: Ideally there does not remain any amount after settlement.. May be the amount which you are seeing pertains to the next month.. You can shift to periodic view using CtrlShiftF11 and see if any balance really exists
    BR,Ajay M

Maybe you are looking for

  • Windows doesn´t recognize iphone

    Hello i have this problem whit my iphone 3Gs 32GB when i plug it on my Lap Top windows doesn´t recognize im pluggin it so i can´t sync my iphone whit iTunes and worst i tried to restore my iphone now i got that screen when you need to restore iphone

  • Users Responsibility END DATE

    Hello Gurus, I required a script which will check the END_DATE of the responsibilities assigned of a particular user. Also how can I extend the END_DATE of the assigned responsibility from backend. Please suggest. Thanks- Pokhraj Das

  • EIS - OLAPICMD Question.

    Hi, In EIS, when using the olapicmd -f<esbfile> command to load data into Essbase, all the rejected records will be logged to a fixed dataload.txt file under a dynamically generated folder name under 'loadinfo' folder on the server. Is there a way to

  • Keyboard Tabs doesn't work in PDF

    Hi, I'm working on Accessibility in pdf forms, the PDF forms generated from LiveCycle Designer doesn't work for the TAB keystrokes, is there a way to do it in order to use tabs in keyboard when viewing pdf in Adobe reader. -Sri

  • [SOLVED] Disable Secure Boot on Asus Zenbook UX32A

    Hi all, I hope I have posted in the right section, please move it otherwise. I'm trying to install Arch on an Asus Zenbook, but I cannot boot installation media (an USB stick, in this case), as it requires the EFI binary to be signed, and only simple