REM - Reporting Point error during Backflushing

Hai PP Gurus,
            When i am backflushing in REM (MFBF), System shows following error..
    Error reading reporting point information
    Message no. RM111
           And then system suggests the following reasons...
   The repetitive manufacturing profile has been changed in the current session.
   You have not defined any milestone operations in the routing.
    When creating the product cost collector, no reporting points were created.
          But i checked all those things. But the system shows the same error.I could not found anything wrong what the system shows.What would be the reason beyond these.
        (Actually first system reads the RP correctly.After that i changed one of the UOM in the BOM component.That particular material is purchased with EA & issued by using Meters.So first i used EA & then chamged to M.For this i maintained unit of issue in material master for that material.Now i changed all those things that means Unit of issue & UOM for the BOM component.So the position comes like prevoius. But the system shows the above mentioned error...)  
          Expecting your answers...
Thanks & Regards,
S.Ganeshraja

Dear Ganesh,
this is the help  given by the SAP,  while  " Error reading reporting point information" is coming
Two alternative solutions are possible:
1.Assign a repetitive manufacturing profile with no reporting point procedure to the material in the material master record. or
2. Recreate the reporting points by recosting the product cost collector. To do this, the following prerequisites must be met:
In the material master record, in the production version, you must enter a routing under either detailed planning (first priority) or under rate-based planning (second priority).
Milestone operations must exist in this routing. The system ususally automatically creates the reporting points from these milestones when creating a product cost collector or when creating a production version.
To recoast the PCC Goto KKF6N -> select material Number -> select active  production version -> select change icon-> select COST.
After getting message , use Goto option select dispaly cost estimate then select itemization from COST menu.
here u can, whwther the required operations have been selected or not.
then goto MFBF now you can do reporting backflush.
please try, if any error comes letus know..
regards
pradeep

Similar Messages

  • REM Reporting point confirmation- shiftwise

    Hi All,
    We have a requirement to use REM reporting point backflush for each shift. Presently confirmation is done in a non –SAP system and transferred to SAP as Idocs for REM reporting point backflush.We need to configure this to do reporting point backflush shift wise in SAP. There were some suggestion in this forum to use user exit XMRM0001/ FM EXIT_SAPLBARM_001.
    Can I know how this user exit can be used to popup for filling shift data? Our technical consultant had explored this user exit but they say it will validate/check header text but they are unable to create popup with this user exit as suggested in thread REM - Shiftwise Confirmation (Oct 1/2007). It will be helpful if some one can give more details from implementation or share the coding which will help us in adopting for our use.
    My mail Id is [email protected] and [email protected]
    Thanks & regards

    Rajesha,
    Thank you very much for the valuable information you gave.It was really helpful in solving the issue
    Thanks & regards
    Ganeshan

  • Execution of Reports phase error during SAP EHP4 upgrade with EHPi

    I started getting an error message in the "Execution of reports after put" phase
    (within the Downtime phase) during the SAP EHP4 upgrade with Enhancement
    Package Installer.
    ***** LIST OF ERRORS
    AND RETURN CODES *****
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~XPRA ERRORS and RETURN CODE in SAPRB70104.OPQ
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1AETR012XProgram terminated (job: "RDDEXECL", no.: "09064300") Long
    text: Cause Program "&V#&", which was started in the background, was
    terminated abnormally. System Response The system created a job log for
    the terminated program. What to do Proceed as follows: Log onto the
    system in which the program was executed. The system is specified at the
    beginning of the transport log. Then call transaction SM37 to display the
    job log. Enter "&V#&" as job name and "DDIC" as user name. Restrict the
    starting date to the starting date specified in the transport log. For
    the other selection criteria, select only jobs with the status
    "cancelled". Then press <LS>Execute</>. A list of the jobs satisfying the
    selection criteria is displayed. You can display the log by pressing
    <LS>Job log</>. If the list contains several jobs, you can select the job
    with the ID " &V#&" with <LS>Display</> -> <LS>Job details</> or define
    further details for the selection criteria in the initial screen of
    transaction SM37. If the ABAP processor reports cancellation,
    double-clicking on the corresponding message in the job log branches to
    the display of the corresponding short dump. 1AEPU320 See job
    log"RDDEXECL""09064300""OPQ" 1 ETP111 exit code : "12" >>> PLEASE READTHE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<< XPRAs are
    application reports that run at the end of an upgrade.
    Most XPRA reportshave a report documentation that explains what the report does and how
    errors can be corrected. Call transaction se38 in the SAP system, enter
    the report name, select 'Documentation' and click the 'Display' button.
    >>> The problematic XPRAs are mentioned in messages of type PU132 above
    <<<
    I tried to follow the instructions in note 1269960, but the enhancement spot
    CLASSIFICATION_TOOL was already active. I activated it again and reran the phase
    but got the same error. Also, I couldn't implement the note using SNOTE because it is
    the middle of the upgrade process.
    I also found the following long text in ST22
    "Internal error during syntax check: ("//bas/710_REL/src/krn/gen/scsymb.c#11"
    Processing had to be terminated because an internal error
    occurred when generating the ABAP/4 program
    "CL_CLS_BADI_CHARACTERIZATION==CP".
    The internal system error cannot be fixed by ABAP means only."
    I am on a 64 bit System with CentOS Linux. 8 GB RAM, 250 GB HD with 20 GB free space.
    So far, I could not find any information on this. Any help would be greatly appreciated!
    Thanks,
    Victor

    Hi Victor,
    Go to SM37 and put in the username as DDIC and see the job log.
    Also check  Sm50 and see whether you have BTC processes available.
    Last but not the least check your filesystem space  usage too.
    Gerard

  • REM Reporting Point line item with operation number 9999

    Dear guru,
    I run MFBF with a REM Profile that post Automatic GR and Activities.
    I have four operation in the material routing (10,20,30,40)
    For the first three operations I want to confirm them with target activities
    I define Third Operation with operation number 30 as "Reporting Point Operation"  and
    set the necessary settings for Reporting Point at Rem Profile.
    After the confirmation I check MF12 (display document log information).
    I see two reporting point line item : one for operation number 30 and one for operation number 9999
    The system update in table AFRU only operation 30.
    So I donu2019t know the activities confirmed with operation 10 and 20.
    Do you help me ?
    Thanks in advance.

    Hi dude:
    Once I had this problem, and was due to a wrong definition of the parameters used in the formula for calculating the activities in to the operations.
    You can chek it in the next path:
    IMG route
    Production > Basic Data > Work Center > Costing > Work Center Formulas > Define formula parameters for work centers & Define formulas for work centers
    Make sure that these parameters are correctly linked to the formulas.
    Please, let me know if this info was useful for you.
    Regards
    Omar Perea

  • Reporting Point Error

    Hi everyone,
    My Reporting Service role is reporting an error "The report server service is not running on Reporting Service Point server "HQSVR5.CONTOSO.com"; start the service to enable reporting."
    I have researched about the error and they're suggesting upgrade of SQL 2008 R2 to SP1, mine is running CCM 2012 with SQL 2008 R2 SP2 (Ver. 10.50.4000.0). on server 2012
    How do i resolve the error?
    Meshack

    Yes and when i try browsing the default sites i get the errors below
    http://hqsvr5/ReportServer
    Reporting Services Error
    An error occurred when invoking the authorization extension. (rsAuthorizationExtensionError)
    Get Online Help
    For more information about this error navigate to the report server on the local server machine, or enable remote errors
    SQL Server Reporting Services
    http://hqsvr5/Reports/Pages/Folder.aspx
    SQL Server Reporting Services
    Error
    An error occurred when invoking the authorization extension. (rsAuthorizationExtensionError)
    Get Online Help
    For more information about this error navigate to the report server on the local server machine, or enable remote errors
    Home
    Meshack

  • Reporting point in REM

    Please explain the basis of the reporting point in REM.
    And what's the advantage of using reporting points?
    Thanks.

    Dear Omar,
    Reporting Point Backflush is used when working with Longer Lead Times.
    Reporting point backflush
    Controls whether you can carry out reporting point backfushes when backflushing in make-to-stock repetitive manufacturing.
    Use
    Using the reporting point backflush:
    You can withdraw the components close to the operation for which they are required which is very useful when working with longer lead times.
    You can calculate the number of incomplete products (work in process).
    You can post scrap quantities directly at the appropriate operation.
    You can carry out a reporting point backflush at every operation defined as a milestone in the routing. In the repetitive manufacturing profile, you can also decide whether you want to make the reporting point backflush mandatory or optional.
    Dependencies
    The reporting point backflush is carried out in the same way as the milestone confirmation.
    For this in the REM Profile RP Backflush settings must be included.
    Regards
    Mangalraj.S

  • What is reporting point in REM mfg ?

    Hi PP expertise,
    Can someone explain what is reporting point in routing/backflush ?
    how to know the routing use reporting point ?
    Thanks

    Dear,
    Reporting Point Backflush is used when working with Longer Lead Times.
    Reporting point backflush
    Controls whether you can carry out reporting point backfushes when backflushing in make-to-stock repetitive manufacturing.
    Use
    Using the reporting point backflush:
    You can withdraw the components close to the operation for which they are required which is very useful when working with longer lead times.
    You can calculate the number of incomplete products (work in process).
    You can post scrap quantities directly at the appropriate operation.
    You can carry out a reporting point backflush at every operation defined as a milestone in the routing. In the repetitive manufacturing profile, you can also decide whether you want to make the reporting point backflush mandatory or optional.
    Dependencies
    The reporting point backflush is carried out in the same way as the milestone confirmation.
    Steps to be follw:-
    1)You must assign a suitable repetitive manufacturing profile in the material master record to be able to backflush a material using either the mandatory or the optional reporting point backflush function.
    2)You must set the optional or the mandatory reporting point backflush in the repetitive manufacturing profile.
    3)This type of backflushing corresponds to the milestone confirmation in make-to-order production. Therefore, in the routing, you must select a control key which has indicator 1 (= milestone confirmation) in the confirmation field.
    4)You must enter the routing in the production version of the material. The system first looks for the routing entered in the detailed planning section. If no entry exists here, the system then uses the routing from the rate-based planning section.
    5)You must carry out a version-specific or a standard cost estimate.
    6.You are recommended to use the version-specific cost estimate which can be carried out in shorter intervals than the standard cost estimate.
    7In MFBF screen you can flag the "RP Backflush " check box which means reporting point backflush and enter the Reporting point that is the operation #.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Reporting Point Backflush Error

    Hi Friends,
    I have a specific question. I am using a material in which Batch Mangement is active. Now when I use MF42N as collective backflush, I enter following data
    Scene 1: Input Data in MF42N Screen
    Plant
    Posting Data & Document Date (Current Date)
    Material
    backflush Qty
    Version
    Reporting Point
    When I enter this data System posts it without asking me Batch Number though Batch Management is active in Material Master.
    Scene 2: Input Data in MF42N Screen
    Plant
    Posting Data & Document Date (Current Date)
    Material
    backflush Qty
    Version
    When I enter this data (No Reporting Point), then System gives me error as Enter Batch (Which is correct as Batch Management is Active in Material Master)
    Please tell me why system is not giving error in Scene 1 where I am not entering Batch details.
    Please let me know if you want any more details on this.

    Dear Nilesh,
    In this case I feel may be by debugging we may be able to identify why the system is allowing you to post the material along
    with batch without mentioning the reporting point without error.
    Logically it should look for both the objects like reporting point as well as batch number(provided if you have assigned a REM
    profile with reporting point and activated the batch management for the product).Is the REM profile containing the reporting point
    as mandatory or optional?
    Regards
    Mangalraj.S

  • Reporting Point Backflush in REM

    Dear all,
    Consider the following scenario for RP backflushing in REM:
    Total quantity produced on the line : 2 pc
    There is one intermediate reporting point and one final reporting point.
    REM profile <b>0004:Report. points with activities</b> is  being used.
    Now, at the intermediate RP i confirmed 1 pc.
    At the final RP the system allows me to confirm 2 pc with a warning.
    How do i prevent this? I want the system to only allow as much quantity to be confirmed as has been confirmed at the previous RP.
    Kindly advice.
    Regards,
    Sumeet

    Dear Sumeet Vaidya,
    Please give a try with this user exit <b>XMRM0001</b>.We used for a different
    purpose  during backflushing.
    I'm not sure whether this user Exit works for this reason.
    Please check with your ABAP consultant for more details.
    Please check & confirm
    Regards
    Mangal

  • Reporting points - REM

    Hai PP Experts!!
               I created reporting points in rate routing by assiging the control key with milestone confirmation.But in the MFBF screen during reporting point selection system shows error "reporting points are not maintained in PCC" . I also maintained suitable REM Profile (ie., i activated RP in the profile)
               So pls throw some light on creation of reporting points, required customization and sequence of steps....
    Advace thanks.............
    Ganeshraja

    Dear Mr.Ganesh raja,
    Check in customizing-Control data for REM profile under control data 1,whether GI backflush at GR posting,if it's so deselect that and select RP backflush,then only the system allows you to use RP backflush.
    You have to assign the same REM profile for the material which you want to use RP backflush.
    And also in MFBF,plz include a tick mark in RP backflush field.
    <b>If useful reward points.</b>
    Regards
    Mangal

  • "Error reading reporting point information" message no. RM111

    Hello friends,
    I am doing the Reporting point backflush for a material and getting the error "Error reading reporting point information", message no. RM111.
    i have given the milestone confirmation for the last operation in the rate routing for that material.
    Even in REM Profile, Mandatory Reporting time backflush is activated.
    In the production version of that material i have given the group of rate routing created for that material in Rate Routing field.
    I have created the product cost collector for that material and production version. With costing lot size 1, even i have calculated the cost for that product cost collector. Though regarding costing couple of errors came, than also i saved it.
    I am not sure whether system has created the reporting point while creating the product cost collector.How to check it?
    Now for that material we have created the planned order.
    Now when i am doing the backflush in MFBF t.c  by giving the material code,plant and production version, system is throwing the error " Error reading reporting point information.
    Thanks and Regards,
    Jitendra

    Hello siva,
    i executed the transaction MF30 as suggested by you, there system displayed following costing errors:
    "No control record for Activity type PLVD/1301/ASBY in version 000 / 2010 activity planning/qty planning
    Message no. KL023
    Diagnosis
    No activity planning or quantity planning has been carried out for Activity type PLVD/1301/ASBY in version 000 and fiscal year 2010.
    Procedure
    Activity Type Planning for cost centers or
    Planning Quantities and Prices for business processes.
    Even system is not picking the component prices, system throwing the error NO price could be determined for the material and  batch so and so.
    We are using the Preliminary cost estinmate.
    is because of this system is not able to create reporting point in product cost collector?
    Please Replay

  • The reporting point backflush is not possible for make-to-stock repetitive

    Hi All,
    we are using the assembly backflush in the MTS REM process. we are need to do the reporting point backflush
    if we tick against the RP backflush. what will be the effect in the process while confirmation.
    i read the sap library . it say like
    The reporting point backflush is not possible for make-to-stock repetitive manufacturing.
    is it correct.
    Thanks
    VRaj

    Hi mangal,
    i did all the setting as you said. but when click on the reporting point.
    system thru error
    Error reading reporting point information
    Message no. RM111
    Diagnosis
    The repetitive manufacturing profile is set for the reporting point procedure. However, either no reporting points exist for the material or they are incorrect. Two common reasons for this are:
    The repetitive manufacturing profile has been changed in the current session.
    You have not defined any milestone operations in the routing.
    When creating the product cost collector, no reporting points were created.
    Procedure
    Two alternative solutions are possible:
    Assign a repetitive manufacturing profile with no reporting point procedure to the material in the material master record.
    Recreate the reporting points by recosting the product cost collector. To do this, the following prerequisites must be met:
    In the material master record, in the production version, you must enter a routing under either detailed planning (first priority) or under rate-based planning (second priority).
    Milestone operations must exist in this routing. The system ususally automatically creates the reporting points from these milestones when creating a product cost collector or when creating a production version.
    how to create the REPORTING POINT

  • GR with backflush not for reporting point logic with autom. GR option

    Dear Experts,
    While doing backflashing though MFBF we are getting following error
    "GR with backflush not for reporting point logic with autom. GR option"
    We have maintained 5 production version for this material while calling with first production version we are getting the error.
    Rate routing & BOM maintanied for the FERT material
    Thanks

    Did you check the BackFlash option are actuvated in the following places ?
    1. In the Rate routing, the backflush indicator is set in the component assignment.-CA22
    2. In the material master record, the backflush indicator has the characteristic "Always backflush".-MRP3
    3. In the material master record, the backflush indicator has the characteristic "Work center decides", the indicator being set in the work center.-CR21-Basic Data View .
    4.Goto-MM02-MRP4 View -Select the PV-Goto Details -Check particularly this production version REM Allowed or not
    5.You should use REM-Profile -0004/0003  where RP and Auto GR with RP at last Back Flashing Activated .
    6.Check Rate Routing Operation Control Key -Auto GR  with indicator Confirmation required
    Regards
    JH
    Edited by: Jiaul Haque on Jun 22, 2010 11:19 AM

  • Reporting-Point Backflushing

    Hi experts,
    Could anyone please let me know that in case of reporting point backflushing how i can set reporting points
    What are the diff. reporting point types?
    What are the mandatory config. settings required for that?
    thnx in advnce

    Dear Madhur Nigam,
    Reporting Point backflush:
    1.Individual operations which are having the control key for the milestone confirmation will be confirmed in MFBF.Check in OP67
    the control key is having the value 1 for confirmation.
    2.In the REM profile,in OSP2 check box for RP backflush must be included and automatic GR posting at last RP when
    backflushing.So the operation's GI and activities will get posted in MFBF and during last operation confirmation only GR happens.
    3.This reporting point backflush will be applicable for make to stock production and not to make to order production.
    4.This will be suitable for the products which has a longer lead time.
    Check this link to explore more,
    https://forums.sdn.sap.com/click.jspa?searchID=28211317&messageID=7453795
    Check and revert back.
    Regards
    Mangalraj.S

  • Error reading reporting point information

    Dear All,
    While i m  doing backflashing with the tcode mfbf recving a error messge in reporting piont this -
      Error reading reporting point information    kindlly update me how can i resolve this
    regards
    pritpal

    Dear pritpal.
    Check the rem profile at MRP view of Material master (MM02). the correct profile has been selected  sotaht it allows the RP backflush.
    To check  Rem profile allows RP back flush at OPS2.
    For Milestone confirmation  check wth controlkey which has  assigned at Routing operation (CA02)
    For Product cost collecter check with KKF6N.
    Regards
    Pradeep

Maybe you are looking for

  • Need help installing camera raw plug-in for Photoshop CS6

    I have a Raw photo that won't open in my Photoshop CS6. The error message and online documentation say the same thing...They recommend going under Help > Updates and following the instructions. Problem is, "Updates" is not actually a choice under the

  • How to manage Shared Inbox Permissions with a Group

    I am trying to manage a shared inbox access rights and send as permissions with a security group.  My server is a 2013 CU7.  What I did is create a mailbox called HR.  Then I created a security group called HR Group.  I then assigned the HR Group to

  • Vendor payment and customer recipts across company codes

    Hi all, We are having 4 company codes in US.The vendors and customers are spread across company codes. 1st scenario: Vendor "abc" has a debit balance os 5000 in company code A. In company code B, the same vendor has credit balance of 10000. How can w

  • RFC problem through BIZTALK

    Hello, I have created a RFC. Biztalk server is calling this RFC. In this RFC, I used BDC for confirmation of production order OPERATION (CO11N). When I manually run this RFC in SAP, it is working fine, But when Biztalk is calling this rfc, an error i

  • Setting Custom printer to default