Remove status "control recipe created"

Hi
I have a problem with a process order, this was canceled after confirmation and now i can't change to Tecnically complete because the status "Control Recipe Created" i can't remove. I verify the message status on CO54 and i don't have pending to be sent..
How i can correct this?

Hi,
First send the control recipe to process control system through CO53. then delete the PI sheet as per the procedure mentioned below. Once done you can  change the status of process order to TECO..
Control Recipe/PI sheet deletion procedure
Thanks
Kumar

Similar Messages

  • No control recipe created messge in PPPI

    Dear gurus ,
    I am trying different combinations of process instruction categories. But when i creating process order for some cobinations control recipe is not creating.
    Error log is showing that "No control recipe is created"
    Please reply can i see the exact reason for the not creating the recipe.
    Thanks in advance .
    Abhi

    Hi Abhi,
    Check In master Recipe ,in the PI Tab,There must be some PI category is assigned and in that PI Category,this PI Charactiristic has been assigned.
    First goto that Phase of the Master Recipe and then goto PI tab and then find the PI category.
    Regards,
    R.Brahmankar

  • Error in CO54 Control recipe.

    Dear Experts,
    I am not able to do TECO for process order as auto control recipe is being created,this is the status of my process order.
    I have created massage through T-Code CO57 with massage category PI_CRST, Process order number,but I don't know which control recipe I have to select so that the when I am doing massage posting through T-Code CO54, it is giving error massage that it can not be posted. I have tried some of the control recipe number from F4, in CO57, but again the system gives the error massage while proceeding with CO54.
    This is very critical as my client plant is nearly down as far as SAP is concerned.
    Please do the needful by giving the detail steps to over come this error as TECO for this process order is a must.
    Regards,
    Rajesh.

    Dear,
    The error given is as follows.
    2.Destination PI04 COCI_CONFIRM_MATERIAL_CONSUMPTION cannot process the message
    3.Message is not sent to and destination.
    This error is because of CO57 where I don't know to select which Control recipe along with process order number in CO57. I tried selecting some of the control recipe from F4, but was of no use.
    I just want to do TECO for the process order where status is control recipe created (which is being created automatically), so I am selecting Massage Category PI_CRST. But I don't know which control recipe to be selected along with Process order number for field Contol Recipe in CO57.
    Regards,
    Rajesh Prasad.

  • How to avoide the control recipe creation step and control recipe complete

    Hi
    in process order procedure has configured in our syayrm ...like
    orde creation,release,control recipe created at time orede release, then order conformation ,order inal conformation, control recipe comlete , order TECH., ...Like ths our order process configured..
    here we not useing any control recipe functions ... and control recipr complte ...so how to remove this step from order process...pls could any one guide inthis issue.
    Rgards
    HGVD

    Dear HGVD,
    Assuming there is only one order type(process order type) is used in both the manufacturing plants,then create plant specific
    production scheduling profile in CORY,for the plant 2000,assign the prod.schd.profile with the default order type and
    do not include the check box for generate control recipe and save the data,but in the same CORY,assign the same order
    type,with including the check box for generate control recipe.
    Check by this way and revert back.
    Regards
    Mangalraj.S

  • How to delete Control Recipe

    Hi ,
    Can Control Recipe can be deleted eventhough Incomplete.
    In our scenario sometimes control recipe is auto generate at the time of process order release.So some times due to circumstances order can not proceed further in this case that generated control recipe creates problem to make order TECO or delete.

    Dhaval,
    The standard practice is to manually trigger a Process message to the order, to have the status CRFI - Control recipe finished.
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Use Transaction CO54 to send the Message to the process order.
    Regards,
    Prasobh

  • Control Recipe Status

    Hi Everyone...
    Need your help urgently.
    When creating a process order; after i have only released the order and not saved it; a control recipe is created. Can anyone tell me what is the status of the control recipe at this juncture and how exactly is this getting this status.. technically any idea where this status is being assigned in the code? I checked with transaction CO53 for seeing this control recipe but it isn't here.. only once the process order is saved is it coming up here with Status displayed on the report as Created. So only after this does the status become created or when i release itself this control recipe gets created but since the process order is not saved it doesn't appear in CO53. Please help. Awaiting your replies on this.
    Thank you,Regards

    You can set this in customization for process order type that during release the control recipe is to be created or during the creation of the process order.
    Once the Control recipe is created until unless it is released it will not be visible in CO53, You have to go to the change mode of the process order and go to the list of control recipes and release it.
    When a Control recipe is created it gets the status of CRTD as of a process order and when it is released it will be with status released, when Completed it will be with Completed, during processing with status of In process.
    When you release the Control recipe it will be available in CO53 then you can process the PI sheet.
    Hope this may help you.

  • Control Recipie Status in a process order

    Dear PP Gurus
    How can i clear Control Recipie Status in a process order, without that TECHO is not allowing....can u pls suggest..??
    Regards
    Ragesh

    Ragesh,
    It looks like you are trying to TECO the order without processing the control recipe. If my memory goes it is the status "CRCR" which would prevent this.
    In your case Control Recipe is already created, so you need to send a process message to set the status of the control recipe to finished. "CRFI". Follow the steps below,
    Transaction CO57, to trigger manually a process message with message Category PI_CRST for the process order and Control reciepe combination.
    Then use Transaction CO54 to send the Message to the process order.
    Hope this would resolve the problem....Reward full points and close the thread,
    Regards,
    Prasobh

  • Control Recipe not created

    Hi PP Gurus,
              I have issue of Control recipe not created while creating the process order. So that log on PI generation/ ctrl recipe creation is empty. It is not possible to enter data for PI sheet as it is not generated while creating process order.
             Could you please suggest, what are the probable reasons which are leading to this issue?
    Thanks,
    Reddy

    Hi Pankaj,
            Thanks for your response. I have tested control recipe creation from the process order, before posting the issue. It seems few issues related to process instructions.
    I have got a solution for creating Control recipe and PI sheet by spending some time on this issue.
    I am closing this issue.
    Thanks,
    Reddy

  • Creating control recipe

    Can you plz let me know the reasons for not creating control recipe at the time process order.
    Thanks,
    SAP PQ

    Hi,
    All created orders may not convert into actual production all the time. Basically releasing is the final authorisation by the senior person by checking all capacities, materials etc. So after releasing of order only control recipe is generated.
    Regards,
    Suhas

  • XStep- creation of two control recipes

    Hi,
    I am using the Ecc 6.0 Enp 3.0
    I have created a Xtsep structure with parameters and checked. so errors found.
    XStep is copied into Routing. Production Order is created. during Control recipe generation, there are 2 control recipes are generated. first control recipe do not have Production Order header material and status.
    The second control recipe has the all details which are captured from XStep.
    Why First control recipe getting created.. am I doing something wroing in setup..
    Thanks,
    JK

    Why don't you just create a custom view object? There's even an example or 2 in the docs:
    http://docs.oracle.com/cd/E16162_01/web.1112/e16182/intro_tour.htm#CHDGDIEC (check out "View object on refcursor" example)
    Edit: you are aware that you can create a View Object based on more than one table?
    John

  • Control recipe destination not available in Process order

    Hi PP-PI Gurus,
    When i am sending the process maessages to destinations,i am getting the error"No control receipe destination available in process order".
    When we create master recipe using X-steps, there is no option to enter comtrol recipe destination. Infact we asssign the destination in X-step tree.
    When the control recipe is created for a process order using x-steps, the operations overview will not have the control recipe destination.
    When the status of the control recipe is sent to destination(PI02),the system throws the above error.
    Any help on  how to resolve this error.
    Thanks in advance.
    Mani

    Hi Dhavel,
    Whether it is PI_CRST or PI_CRST2 i am getting the same error message.
    When i am working with Conventional Characterestics based process instructions in my recipe, everything is working fine.
    When i use X-steps instead of process instructions in master recipe to create the control recipe, i am facing this error.
    So it is clear that , when we are using Execution steps(X-steps) to create PI sheet,there needs some extra settings.
    Any body working with X-steps in process order ,request your help please to resolve this issue.
    Mani.

  • Control recipe

    dear experts,
    can anyone tell me about control recipe in process industry?
    WHAT'S THE FUNCTION OF CONTROL RECIPE IN pp-pi

    Hi Ganesh,
                           Control Recipe is an element that, assigned to a Master Recipe, will take part of a PI Sheet. It is used in Production Planning for Process Industries models.
    You create a control recipe by configuring process messages using general characteristics, under a cover of a process specification. The collection of process specification assigned to a destination generates a Controle Recipe, and could be sent to generate PI Sheet after a Process Order is released.
    In addition to the above reply, i would also like to discuss one issue related to Process industries-
    while doing TECO(technically complete), the system is showing an error message "System status CRCR is active (ORD 1000001)" and i am not able to do it successfully.
    Please come with valuable suggestions/advices.
    Immediate replies will be appreciated.
    Regards
    chandra
    Edited by: Saraswati chandra on Mar 7, 2011 8:36 AM

  • Control recipe and PI sheet creation creation

    HI frnds,
    Please explain me the configuration and  path of creating control recipe and PI sheet.
    thanks in advance
    Daniel

    HI,
    plz respond as earliest
    Daniel

  • Removing the Control Characters from a text file

    Hi,
    I am using the java.util.regex.* package to removing the control characters from a text file. I got below programming from the java.sun site.
    I am able to successfully compile the file and the when I try to run the file I got the error as
    ------------------------------------------------------------------------D:\Debi\datamigration>java Control
    Exception in thread "main" java.util.regex.PatternSyntaxException: Illegal repet
    ition
    {cntrl}
    at java.util.regex.Pattern.error(Pattern.java:1472)
    at java.util.regex.Pattern.closure(Pattern.java:2473)
    at java.util.regex.Pattern.sequence(Pattern.java:1597)
    at java.util.regex.Pattern.expr(Pattern.java:1489)
    at java.util.regex.Pattern.compile(Pattern.java:1257)
    at java.util.regex.Pattern.<init>(Pattern.java:1013)
    at java.util.regex.Pattern.compile(Pattern.java:760)
    at Control.main(Control.java:24)
    Please help me on this issue.
    Thanks&Regards
    Debi
    import java.util.regex.*;
    import java.io.*;
    public class Control {
    public static void main(String[] args)
    throws Exception {
    //Create a file object with the file name
    //in the argument:
    File fin = new File("fileName1");
    File fout = new File("fileName2");
    //Open and input and output stream
    FileInputStream fis =
    new FileInputStream(fin);
    FileOutputStream fos =
    new FileOutputStream(fout);
    BufferedReader in = new BufferedReader(
    new InputStreamReader(fis));
    BufferedWriter out = new BufferedWriter(
    new OutputStreamWriter(fos));
         // The pattern matches control characters
    Pattern p = Pattern.compile("{cntrl}");
    Matcher m = p.matcher("");
    String aLine = null;
    while((aLine = in.readLine()) != null) {
    m.reset(aLine);
    //Replaces control characters with an empty
    //string.
    String result = m.replaceAll("");
    out.write(result);
    out.newLine();
    in.close();
    out.close();

    Hi,
    I used the code below with the \p, but I didn't able to complie the file. It gave me an
    D:\Debi\datamigration>javac Control.java
    Control.java:24: illegal escape character
    Pattern p = Pattern.compile("\p{cntrl}");
    ^
    1 error
    Please help me on this issue.
    Thanks&Regards
    Debi
    // The pattern matches control characters
    Pattern p = Pattern.compile("\p{cntrl}");
    Matcher m = p.matcher("");
    String aLine = null;

  • Control Recipe and PI sheet

    Hi, All,
    Can I know what's the difference between master recipe and PI sheet? And what's difference between master recipe and control recipe?
    I know control recipe is generated from process order. What's the output of master receipe? But how to generate PI sheet? what's the PI sheet output?
    Thanks

    Hi,
    Master recipe will contain the Resources to be used and the duration of the process.
    Process order will generate control recipe. Control contains process Instructions.While creating / Releasing the process order control recipe will be created. It can be created automatically or manually. We shall discuss the manual creation.
    PI Sheet:
    process Instructions can be attached to the Master Recipe. Process Instructions assigned in master recipe will generate control recipe.
    Regards,
    Mohan

Maybe you are looking for

  • Cm29 with 256 colors at least

    Dear Experts. I have the following request. The graphical capacity table (tr CM29 Program RCCRY000) which actually shows a box sized according to the amount of the process order, planned order is required to show a specific color according to the mat

  • Convert Oeb to EPub

    Hi, I work for a big publisher that made a large number of Oeb files (OEBPS 1.x packages) with conversion service companies. We also made thousands of PDF's, mostly with Distiller. Is there a way to automatically convert either of these formats to EP

  • Intercompany export sale process

    Dear Experts, Scenario is Customer located in Germany One Company located in Korea Second company located in Germany We want to implement intercompany sale process for the below scenario ,Please suggest pros and cons Sales order on in Korea company =

  • I upgraded my ipad 3 to ios 8.1.3 and a few big probs

    I hope someone can help. After upgrading to ios 8.1.3 today I am having a couple of probs. 1)  the biggest issue which is rendering using it for me totally useless is: it is running very slow in safari. Typing in huge delay that I have to give up. Fo

  • Hpqdirec.exe has stopped working

    Hi guys, we have a Officejet L7590 and a Notebook with Win7 64bit. A colleague of mine using this stuff complained that this hpqdirec.exe always popps up with a message and I made a Teamviewer session on the machine and saw that this message comes fr