Repacking after TO confirmation

I have a HU managed warehouse and delivery. Picking and packing has been done and TO has been confirmed so the stock is at 916.
During loading the operator discovers that there was an error in the packing and wants to transfer material from pallet A to pallet B.
This should be simple but SAP keeps telling me the HU are assigned to a delivery. how can I move the material to the correct pallet?
Thanks

Hello,
If the sloc is HU managed and TO confirmation = Picking complete then there is  way to reverse. You have to play trick. Proceed as below steps
(1) Go to packing tab. Then go to item tab in general view of packing screen.
(2) Select the HU line -----> Go to header HU------ > select delete assignment. HU assignment will be deleted. You will get message as document assignment of handling units cancelled
What happens in the system?
HU is unpacked and hence packed qty= 0. But HU is not deleted it is still there.
(3) Now go back by clicking on back tab at header which is beside save tab to get delivery view.
(4) Now in the delivery screen go to edit and click on copy packed qty as delivery qty. You will get warning message as delivery qty must be entered by the item.
(5) Ignore this message and click on enter key. Delivery qty will become blank and pick qty become zero
(6) Now enter manually del qty as actual pick qty and click on enter
(7) Overall Picking status will be changes as  A
(8) You are now ready to proceed further to perform further activity as per your choice. You can even delete the OBD and recreate it again.
Regard and all the best!!
Milind Chaudhari

Similar Messages

  • Production order status was not changed to 'CNF' after final confirmation.

    Hi guru.
    I experienced very special case that production order status was not changed to CNF after final confirmation.
    I did final confirmation and canceled confirmation. (CNF -> REL)
    And I did final confirmation again because of fixing activity quantity.
    the strange thing is that production order status wasn't changed from REL to CNF.
    I did  confirmation again with 0 activity, thereby  I solved this problem
    BUT i don't know why this case happened.
    Please, explain the reason.
    Thanks.

    Hi,
    As per my observation, their is not any change in the status of the order REL with confirmation CNF, instead of this, it has change from CRTD & then to TECO.
       Sequence of the status of the order as below
    1) CRTD MANC NMAT SETC
    2) REL  NMAT SETC - Changes from CRTD to REL after releasing of the order
    3) REL  CNF  PRC  CSER ERTR OPGN SETC -  After confirmation, it updated after the order REL status.
    Rgd,
    Chetan

  • Maint order should get TECO automatically after final Confirmation

    Hi Gurus,
    My customer requirement is that, Maint order should get TECO automatically after final Confirmation (in IW41) of last operation. Is it possible? If yes, plz let me know the steps which I need to do.
    Thanks in Advanceu2026
    Amol.

    Hi,
    This functionality is not available in std. SAP. You may go for enhancement. please check the following user exits for achieving your requirement. 
    CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
    IWO10009 PM Order: Customer Check for 'Save' Event
    Praveen

  • Automatic logout in SAP System after Pressing Confirm button

    Dear all,
    We have Stock confirmation Transaction(ZTransaction) coming from SAP System through ITS. Our Issue is When user click on Confirm button in that transaction, background process will run. It is more like running Replenishment in ICH. Then user will be able to see the order pager after 45 min,after pressing Stock confirmation button. but the user is still alive in backend system, this will causing load on the backend system. So want to set automatic logout from that system after pressing confirm button in that transaction.
    Can anyone help me or guide the logic to implement in ABAP Program.
    Note: User will access this Transaction through Portal.
    Rgds
    PRadeep

    Dear all,
    There are two function modules are available...they are as follows.
    TH_DELETE_MODE(Session will delete)
    TH_DELETE_USER( Total login will delete)
    Rgds
    PRadeep

  • I paid my order right after the confirmation came in, but i don't get a confirmation that i paid, and i paid it about one and a half week ago, what can i do?

    I paid my order right after the confirmation came in, but i don't get a confirmation that i paid, and i paid it about one and a half week ago, what can i do?

    Download from Download CS5 products
    Install then enter your serial number.

  • WBS Forecast dates disappears during scheduling after final confirmation

    Hi dear Experts.I faced a problem with WBS dates.
    The system overwrites forecast and basic dates on WBS after final confirmation of attached activities. And start to schedule wbs dates from dates of activities with no confirmation. Is there any way to solve this prolem?
    In other words i need my WBS to take into scheduling ALL the operations forecast date. Moreover how the system can overwrite the forecast dates wich were entered manually by user?
    Green - actual dates
    Yellow (orange) - forecast dates
    Bue - Basic dates
    Please help.

    Hi Kirill,
    Please check the control parameters for WBS Scheduling. Check if the scheduling method over here is WBS Determines Dates. If this is the case, irrespective of the scheduling that was carried out at the activity level, the system overwrites the basic and forecast dates present at the WBS level. May be in your case the scheduling method that had been used was "Network determines dates".
    . Please change this and let me know if this helps.
    Regards
    Varun

  • Label print after TO confirmation

    Hi ,
    I have specific requirment and wonder if there is a standard way to trigger labels after TO is confirmed? Requirement is that we validate SH to from a custom table on staging. If SH matches then we print lable otherwise not.
    Thanks

    I think Yazmin is referring to partner function "SH" ship-to party Manish. If that's the case I believe its possible to print based on a select ship to customer numbers (NACE entries) but it really depends on what output type and other details,
    We need better details please Yazmin
    Where is this output coming from after TO confirmation? (TO, HU, Delivery, Shipment)?
    Is this a custom output type if not what output is it?
    Is the requirement to print or not based on an existing custom table or are you just mentioning custom table as a possible way to access a list of SH partners that you want to print the output for?
    Please provide as many details as possible to get the best answer to your query.
    Kind regards

  • Order Component quantity gets changed after operation confirmation

    Order Component quantity gets changed after operation confirmation.
    We are using CO27 to issue the Material to the Order.
    When we do the confirmation of  operation. Component quantity attached to operation get changed.
    Any solution for this.

    Dear
    Please Follow the Steps
    1. Go into Co02 there u do production order with qty select the Component overview u find the Materials there please check hhow much is the qty of that particular material
    EX: Production order qty for Header Material is 10 ea
    then ur Compannets Qty is 10 or 20
    depends on the Componet Qty the Operation takes place that is because u have maintatined a base qty in Routing and BOM
    With Regards
    Pushpalas

  • Pairing devices fails after install of osx 10.8.5.. It fails at my Iphone and Ipad touch during the pairing about 5 seconds after I confirm the 6 digit number. Does this make sense? Thanks for considering this.

    Pairing devices fails after install of osx 10.8.5.. It fails at my Iphone and Ipad touch during the pairing about 5 seconds after I confirm the 6 digit number. Does this make sense?  Whats the fix? I am moderately computer literate. Thanks for considering this.

    The following entry may indicate a failing harddrive, so doing backups and replacing the harddrive may be in order.
    Disk Information:
              TOSHIBA MK7559GSXF disk0 : (750,16 GB)
              S.M.A.R.T. Status: Failing                                  <-----------
    A little bit about drive S.M.A.R.T. status:
    "The most basic information that SMART provides is the SMART status. It provides only two values: "threshold not exceeded" and "threshold exceeded". Often these are represented as "drive OK" or "drive fail" respectively. A "threshold exceeded" value is intended to indicate that there is a relatively high probability that the drive will not be able to honor its specification in the future: that is, the drive is "about to fail". The predicted failure may be catastrophic or may be something as subtle as the inability to write to certain sectors, or perhaps slower performance than the manufacturer's declared minimum."
    http://en.wikipedia.org/wiki/S.M.A.R.T.

  • Goods Receipt after Completion Confirmation for Service Order

    Hi,
    We have a scenario in which a Notification is used to create a Sales Order & a Service Order using the action button.
    The Sales Order has a old/used product as a line item which we will consume along with some other new parts(added in the components tab in Service Order) to make a remanufactured product which we will obtain after using IW42 for Completion Confirmation. (The Service order is to carry the cost of refabrication/refurburishment & additional parts as well)
    We need to do Goods receipt of this remanufactured product to bring it into stock so that we can deliver the same using the same sales order.
    Is this possible? We have tried using Refurbishment order both CS/PM but have not been successful in inwarding the remanufactured product using IW8W.
    Kindly do suggest possibility of using a Service Order(created through a notification) with a GR feature for the above process of inwarding. Any alternate suggestions would also be very helpful.
    If this functionality can be achieved with some enhancement(custom exit, BADI etc) & some amongst you have worked on something similar , please do share your valuable inputs
    Thanks & Best Wishes
    Vishal

    Hi
    I dont think you will be able to do Goods receipt against prodcution order using inbound delivery VL31N. Inbound deliveries are normally created for Purchase orders and then GR can be posted wrt to the inbound delivery.
    Prod order is normally within warehouse only so you can use MB31 and post GR directly against Prod order.
    If you can explain more about your scenario hope we may help
    Please let us know
    thanks

  • Where to find Pick Release Date After Ship Confirm in Order to Cash cycle

    Dear All,
    In Order to Cash cycle how to find Pick Release Date. After performing the Ship Confirm Transaction, how to view when we have performed Pick Release Transaction?
    Thanks in Advance.
    Regards,
    Aditya

    Run the Diagnostic OM order Information report against the order. In the report you can the find the picked date.
    Can I know you are using the transact move order ?
    Thanks

  • Preventing additional component consumption after final confirm in PM Order

    Hi,
    I am trying to block the consumption of additional components after the final confirmation in a PM order, this is causing erroneous component consp. especially in orders with multiple operations.
    The user may choose a confirmed operation while recording a component, system gives an error but it does not prevent the recording of that component, I want the users to get an error and stop there in such a case.
    I hope I made myself clear, thanks in advance
    IW32 Screen: https://picasaweb.google.com/koray.tulumen/Paylasacaklarim#5707123654338971234

    OK once more I thought I should add screens to better tell what I was trying to ask, I could not do that with the old forum layout. Anyways, could I get that result (in the screens) thru customization. There have been other comments relying on Orders' user statuses but with multiple operations they are not usable, every operation is confirmed individually and order status does either let or deny material movements thru the whole order (all operations)
    Here are the screens, thanks again.

  • GR cancellation after TO confirmation

    Dear all,
    After QM usage Decision TO created and confirmed also....sometime user cancels the goods receipt . in that case how to proceed in  WM part.(how to reverse the WM stock) could you guide the process flow....
    Thanks
    Muthuraman.D

    To reverse GR after UD, you have to reverse UD which is not standard functionality provided by SAP - refer to note 175842.
    Alternatives is to create a return PO item to send the received stock back to supplier. Once you post GR for the return PO item (movement type 161), the system will create a negative quant in 916 storage type. Depending on the customizing, a TR might be created to pick the stock from normal storage type to 916. Otherwise, manually create a TO to pick the stock to be returned. Once TO is confirmed, the negative quant will be balanced to zero which completes the process.

  • Userexit for Qty Changing after TO Confirmation and before PGI

    Hi Experts,
    I am seeking help for a scenario as below.
    1. The delivery has a situation where after the Transfer order is confirmed and before the PGI is done, I have to put a check of Qty for non-stock items (they are not relevant for Transfer order) based on the confirmed Qty of the normal items.
    I want to find the proper user-exit / form for the same.
    Currently I am thinking about using Program MV50AFZ1 ( FORM userexit_save_document) assuming that this will be called when we click the PGI button.
    Please suggest if this is the correct place or is there a better user-exit for usage.

    Try with USEREXIT_SAVE_DOC_BEFORE_PREP in program MV50AFZ1 which is called before the deliveries are saved
    G. Lakshmipathi

  • User Exit After Saving in CO11N (After Get Confirmation counter AFRU-RMZHL)

    Hi All.
    I need a user exit for PP confirmation (T-code co11n)
    what I need is action after saving which gives me confirmation counter for table AFRU colum RMZHL.
    I need all data that will be inserted in table AFRU since I want to duplicate Afru wth Z-Table when user does confirmation
    in short explanation is When co11n writes data to AFRU, it need to write data to ZTable too (exactly same data, but less field in ztable)
    I've tried these exits but none of these success
    CONFPI02
    CONFPI04
    CONFPM05
    CONFPP02
    CONFPP04
    CONFPP05
    CONFPP06
    Thanks
    Vicky S

    Hi Nabheet Madan
    If I'm not mistaken, you mean
    I should prepare background job that collect data from AFRU into Z-table
    is it right?
    Thanks

Maybe you are looking for