Replicate delta from R/3 to a new BW System

Hello all.
I need some help in a complex question I have to answer, the scenario is as follows:
We have currently a live BW server, let´s call it L1. My technical team is proposing to split this server in to 2, so we will have a new BW server called L2.
The question is, if the L2 server is a copy from L1, is there a way to keep deltas whoch were initialized in L1 to go also to L2?
Thnaks in advance.
regards,
Alfonso.

When it comes to delta, source system also merent, matter. When you copy L1 to L2, if the source system is the same, you are fine. If the source system for L2 is different, then delta will be messed up. In that case, you need to delete the data in L2 ( for delta extractors) reinitialise the delta and proceed from there.
Ravi Thothadri

Similar Messages

  • Move SUP role from Server 2008 R2 to new Site System running Server 2012 R2

    Is it possible to move the primary SUP role which is currently running on a separate site system under Server 2008 R2 (WSUS 3.0 SP2) and move it to a new site system running Server 2012 R2 using the same SUSDB? I've moved the SUP role
    around before by setting up a secondary SUP (using the same DB) then removing the primary SUP role which causes the secondary SUP to become the Primary but that was using the same version of OS and WSUS. With the version of WSUS being different
    on Server 2012 R2, I was thinking this may not be possible since the documentation says the WSUS versions must be the same when creating multiple SUP roles.  

    Hi,
    >>I was thinking this may not be possible since the documentation says the WSUS versions must be the same when creating multiple SUP roles.  
    As the document indicated, "When you have multiple software update points at a site, ensure that they are all running the same version of WSUS." So the scenario you decribed should be not supported.
    Reference:Prerequisites for Software Updates in Configuration Manager
    Best Regards,
    Joyce
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact [email protected]

  • Older macbook from early 08' needs a new operating system

    I bought an ipod nano7 and it is not compatable with the old itunes and i cant update itunes because my OS is too old. Is it possible to put a newer OS on this macbook? Im pretty sure the newest available OS isnt compatable. Thanks.

    Hi,
    Firstly, you have posted in the wrong area. This is the area for Mac OS X Server. You'll probably get more help if you go to the correct area.
    But in the meantime, find the serial number for your macbook:
    http://support.apple.com/kb/HT1366
    Then go to this website:
    http://www.appleserialnumberinfo.com
    Enter the serial number for your laptop into the field at the top, and press enter.
    Then scroll down and look for this field: "Maximum OS:". That will tell you the latest OS your computer is capable of.
    I'm guessing that you can probably run Mac OS X 10.7, and that'll allow you to use itunes to sync your ipod nano.
    If you're not able to follow the instructions that I've posted, then you should probably bring your macbook to your local apple retailer / apple store for assistance.
    Best Regards,
    TigerKR

  • I can't login to email since updating from ATT classic to the new email system.

    I recently updated the Att.net email software from classic and now when it goes to login it just runs incessently without ever logging in and retrieving email from the home page. And now I can't find a link to go back to classic email with att.net. Is there something in the settings of Firefox that I can adjust? Or help me get back to classic email.

    Clear the cache and the cookies from sites that cause problems.
    "Clear the Cache":
    * Tools > Options > Advanced > Network > Offline Storage (Cache): "Clear Now"
    "Remove Cookies" from sites causing problems:
    * Tools > Options > Privacy > Cookies: "Show Cookies"

  • We would like to test old deltas from the source system( copied to new)

    Hi Gurus,
    The scenario is
    They will make a DB copy of the Prod system onto a QA system, the Copied system will have
    its system ID changed(SID) to a new one.
    There will be deltas available in the RSA7, as this is a copy of the  3 weeks old prod
    system. Now the delta's will be available on the Copied system pointing to the BW Prod system.
    We would like to test these delta's to BW Dev. why we would like to do the delta's to the
    BW dev system is to check whether we can do system copies without clearing the delta's on
    the source system.
    After the system copy we will do all the activities necessary to reflect the system changes
    a. Like BDLS, We20, we21,ALE checks, RFCDES, RSLOGSYSDEST, RSBASIDOC, etc on the source system to
    reflect the changes of the BW Prod system to BW Dev system.
    b. Likewise, we will perform all the above activities on the BW dev system by changing the
    existing source system to the new source system( performing BDLS,we0, we21, etc)to reflect
    the new Source system with the new (SID).
    c. We will check the source system connection
    d. Replicate the datasources on the new source system
    e. Activate the Transfer rules for the new source system.
    Now for us to do delta's from the new source system to the Bw dev system we need to change
    underlying tables in source system to point the delta's, arfc TID's etc to the BW dev system.
    We can change the entries in the TRFCQOUT, ARFCCSTATE, ARFCDATA tables to point the LUW's and
    destination to the BW dev system.
    What I presume is if we run the BDLS on the Copied system to change the BW prod system to BW
    and also  the underlying Tables for the LUW's and etc will still be pointing to BW Dev. I would
    like to know if this is the case .
    Lastly, appreciate if anyone can say if this is possible to do without having to clear the
    BW delta queue on the source system.

    Hi Ramesh,
    Appreciate a lot for your response, but i would like to know if we can reflect the entries in table RSSDLINIT(Last Valid Initializations to an OLTP Source) and RSSDLINITSEL(Last Valid Initializations to an OLTP Source)  in the BW system on the copied source system
    tables ROOSPRMSC(Control Parameter Per DataSource Channel), ROOSPRMSF(Control Parameter Per DataSource Channel) by executing the ABAP program RSSM_OLTP_INIT_DELTA_UPDATE after we do the BDLS conversion on the new copied source system.
    After the BDLS conversion I reckon the entries in the RSA7 queue, ARFCCSTATE, TRFCQOUT tables willl reflect the BW Development system instead of the BW Production system isnt it.
    response much appreciated.
    Kalyan

  • Replicate Delta download of Product Categories Error

    Hi
    Running Sudo-Extended classic. I have replicated product categories from the backend into SRM successfuly. Now I need to alter 20 P.Categories.
    In R/3 I coped the category, changed it and saved it. eg from 1200000 to 120000. Now I am replicating this new P.Category back into SRM.
    R3AR2 to create delta download for 2 tables T023 and T023
    R3AR4 to replicate the file above, Source R/3 and Target system is CRM/SRM..
    My issue is I dont see anything in R3AM1.
    Also whe I run SMQ1 I see my delta request but is has a status:SYSFAIL the issue seems to R/3.
    Question:DO i have to delete my old P.Categories in SRM frist? It wont allow me coz they were created in R/3.
    My SMQ1 and SMQ2 are clear before i began all this.
    I try SM59 and my RFC seems to be working??
    ANY iDEAS out there????
    NO P.Categories seem to be comming in from R/3
    cheers
    alex [email protected]

    Hi,
       The delta load does not work for product categories but only products.So to bring in the new product categories into SRM you will need to start the load of the object DNL_CUST_PROD1 again.
    BR,
    Disha.
    Pls reward points for helpful answers.

  • Transferred itunes library from Windows XP PC to new Windows 7 PC. plugged in 3rd gen Ipod. Ipod icon appears along with playlists, music etc. Songs are grayed out and won't play. Please help!

    I recently transferred itunes library from windows XP PC to new Windows 7 PC. The transfer was successful, however when I plug my 3rd gen Ipod Nano into the new PC, the Ipod icon appears along with the music, playlists, etc. The songs are shown but are 'grayed out' and wont play or sync.The 'Devices & Printers' window in new PC shows icon for Ipod driver & is OK. The icon for the Ipod appears but depicts a delta shaped warning icon that states that the Ipod is'not operating properly'. Tried troubleshooting. The troubleshooting message states the the Ipod is 'disconnecting'. Can you help me with this problem?        

    Then, I dropped the entire itunes file from the old PC (XP) into an empty external drive.
    That "itunes file from the old PC"?  Is that the iTunes folder, from the old PC, that was in the user home folder's Music folder?
    All of the library, playlists, etc. from the ipod as they always have been are shown, by they are 'grayed out' and will not open or play.
    That's on the iPod, correct?  Are all of your old playlists in iTunes, from the old PC, still there in iTunes on the new PC?  Are the songs in iTunes still playable?
    This document provides the steps to transfer a complete iTunes library between two computers.  See the section called External drive.
    iTunes: How to move your music to a new computer - Apple Support
    There are many steps, but this is a summary.  (1) On the old PC, consolidate all of your iTunes data into the iTunes folder.  (2) Copy this iTunes folder to the external drive.  (3) On the new PC (that has iTunes installed but NOT running), replace its existing iTunes folder with the one from the old PC (on the external drive).  When you run iTunes, it uses the iTunes folder from the old PC, and it should look like iTunes on the old PC (with all the playlists, ratings, play count, etc.), and your iPod will see the iTunes library as the same iTunes library (because it is the same library).
    If you did something different, and the old PC is still accessible, you may want to try it using the method from the linked document.

  • How to replicate PO from SRM to ECC

    Hi all,
    I'm new to SRM.
    I work on SRM 5 and ECC 6.
    I have to configure the extended classic scenario for replicate PO from SRM to ECC.
    Can anyone give a step by step guide/support for this configuration?
    thanks in advantage
    enzo

    Hi,
    Please use the search feature of this forum to get the configuration tips
    Kind regards,
    Yann

  • Delta are pointing Old BW system instead of new BW system

    Hi,
    We are doing upgrade and as part of upgrade BI 7.0 we have copied existing BW system into new BW system.
    I have a extracted data from R/3 to BI system.All the full loads went through successful except Delta data load into BI system.
    Delta data source are pointing Old BW system instead of new BW system.
    I have checked RSA7 where all the deltas are pointing to Old BW system instaed of new BW syste.
    I beleive some thing might have happend during System copy from Old BW system to New BW system.
    Please correct me if i am wrong about my scenario
    I would like to delete delta init which is pointing to BW old system and would like to do new delta .
    For that i would like to delte entries in R/3 source table ROOSPRMSF,ROOSPRMSC.
    In BW side RSSDLINIT and will extract data using full update and then will do delta init without data transfer and do delta on it.
    Please some advise me which is best way
    to check with basis do ask them to correct it,other wise deleting deltafrom delta queue.
    Its urgent

    Hi,
    You have to check the TRFCQOUT table to see if the Delta queues are still pointing to the old system ID.
    Using ABAP program you can change the System ID. you can use the below code by creating a custom report( executable Program) you can change the System ID's . You should have done this before pulling delta's
    anyway, you can try to change and see if you can pull deltas.
    Tables:  TRFCQOUT, RFCATTRIB.
    Data:  count type i.
    parameters:
           ssystem like trfcqout-dest obligatory default 'Production System Id here',
           tsystem like RFCATTRIB-rfcdest obligatory default 'Non Production System Id here',
           tmod as checkbox default 'X'.
    if ( sy-sysid = 'R/3 Production system id here' or sy-sysid = 'BW production system id here' ).
      write:/ 'You are not permitted to run this program in production.'.
      stop.
    endif.
    if tmod = 'X'.
      Select count( * ) into count from TRFCQOUT where dest = ssystem.
      if sy-subrc <> 0.
        write:/  'Cannot process request, return code ', sy-subrc.
        stop.
      else.
        write:/ count, 'entries in TRFCQOUT will be converted.'.
      endif.
    else.
    This will update the qRFC queue by changing all specified queues
    related to a source logical system to a target logical system.
    This enables the copied systems to remain consistent without
    having to run any loads.
      UPDATE TRFCQOUT SET   DEST = tsystem
                      WHERE DEST = ssystem.
      if sy-subrc <> 0.
        write:/ 'Examine return code not equal to zero.'.
        stop.
      else.
        write:/ sy-dbcnt, 'entries were updated in table TRFCQOUT.'.
      endif.
    endif.
    Thanks

  • Transporting into a new BW system from a shared dev system

    We are currently in the process of setting up a new BW system in the same landscape as our existing one where both boxes will share the same dev system.  Our existing one is used by many different applications and has tonnes of shared objects on it.  Our new box will only be used for SEM-BCS and thus does not need everything else that the other box contains.  Since many objects are dependant on others (attributes and such) I am finding it hard to get transports into the new system.  There always seems to be something missing even when I try to just move a single object.  I also seem to be having troubles with InfoObject Catalogs where they cannot be moved if the InfoObjects are not there and the InfoObjects a cannot be moved with the Catalogs not there.  This is all starting to give me a serious headache.
    Has anyone delt with transporting to separate systems from a common development system?  What is the best approach to this to ensure we only move what we need to the new system?

    The transporting is the same, however there are a lot of dependant objects that also need to be brought into our system.  I'm looking for a way to minimize what I need to transport into our new system.
    Collecting automatically doesn;t seem to be working for me since it does not collect everything I need and when I add that missing object I then seem to be missing another list of objects.  It seems to be a never ending cycle.

  • Short Dump while loading Delta from ODS to ODS

    Hi Experts,
    I have run into a short dump error while loading delta from one ODS to another via a process chain.
    Following is the error message:
    Error analysis                                                                               
    Short text of error message:                                                                 
        Request 0000259294 is not completely activated. Please activate it again                     
    Technical information about the message:                                                     
         Diagnosis                                                                               
    Activation of request 0000259294 has terminated, or is not yet                          
             complete.                                                                               
    System response                                                                               
    Procedure                                                                               
    If the process has terminated, all of the requests that the system                      
             was unabe to activate in the most recent activation process have to                     
             be reactivated before the new requests can be activated.                                
             If you are not able to carry out this activation step, delete the                       
             relevant requests from the administration of the ODS object (on the                     
             Requests tabstrip).                                                                     
         Procedure for System Administration                                                         
        Message classe...... "RSM1"                                                                  
        Number.............. 180                                                                     
        Variable 1.......... 0000259294                                                              
        Variable 2.......... " "                                                                     
        Variable 3.......... " "                                                                     
        Variable 4.......... " "                                                                     
        Variable 3.......... " "                                                                     
        Variable 4.......... " "                                                                     
    Can someone help me resolve this?
    Thank you

    Check the status of request SID 259294  in ODS, whether the Activation got completed or not. If not wait till the activation completes.
    If there is any problem in the activation process, correct that complete the activation process and load the ne request that you want to load..
    Regards
    VJ

  • Can't replicate vendors from ECC

    Hi,
    We are setting up a new EBP environment where I can't replicate vendors from ECC to SRM via BBPGETVD. In the application log I get the error message no BBP_VENR005. It says that there is an error in the PD-org structure; only one organizational unit permitted per beckend - purchase org.
    I have of course specified the backend system as well as the purchase organization.
    We have created a root and one node in the org structure of the vendors.
    Can anybody help with this issue?
    Best Regards
    Ulf Gewers

    Hi
    Did you influence any error message there BBP_VENR ?
    or Are now the vendor is available in PPOSV_BBP ?
    red or yellow in slg1.Did you select internal no range or r/3 number range.
    Are you transfering from multiple backend sytem with srm.
    Hope that your organisation is consistent with green.
    regards
    Muthu
    Edited by: Muthuraman Govindasamy on Sep 29, 2008 11:59 AM

  • Repeat a DELTA from a DSO to InfoCube

    I have a process chain that runs once a month, so it ran 2 days ago and loaded everything perfectly. One of the steps is a DELTA loads from a DSO to InfoCube. Today i transported some changes to the PROD system with changes to my Infocube (added 2 new infoobjects and to the modified the Update Rules to fill these new infoobjects). So now i have to wait a whole month to have a data in my new infoobjects.
    The question is, is there a way to repeat the last DELTA from DSO to InfoCube so the DELTA would pass throuhg my new Update Rules and would fill the new infoobjects in my InfoCube.
    I considered the option of deleting the needed request and then launch the Restructuring, but there no PSA, so if i delete the request i won't be able to recover it again.
    Any thoughts?

    Hi ,
    1. If ur facing any problem while changing the statu of the request in CUBE, just delete the request from the cube .
    2. Go to ODS and see data mart status is there are not, if still exists manually delete it( click on data mart status, it will open small window, click on DELETE button)
    3.  copy this ODS name
    4. goto datasources  in Modeling
    5. search for the datasrc it shud be prefixed with ' 8 ' and ODSNAME.
    6. Under that select Infopackage for delta update, trigger this Infopackage .
    7. it will load to CUBE AND Datamart status also update.
    Hope it will help .
    Cheers
    Leena

  • Doubt on Deltas from ODS to CUBE

    Hello Experts.
    I have few Questions on Deltas.  from ODS to CUBE
    I have 3 Cubes ( X, Y, Z )  which gets Deltas from ODS ( A ) .  i have extended the cube X so i have deleted data and Reloaded it.  I have to do Deltas from ODS to Cubes from now on.
    in the ODS manage ( there is Tick all connected data Targets to this Request is been Delted now ). 
    if i reinitalize the delta with out Data Transfer.  will only the data which come now on to ODS(  A ) will be going to cubes( X,Y,Z ) are all the data in ODS will go to Cubes.
    Please Advice me.
    Thanks
    Sharp

    Hi,
    When you are loading the delta from the ODS, the data is taken from the changelog. These records are the + and - records generated as a result of the new data loaded and activated in the ODS. So, if there were any changes made to the existing records these will flow to the cubes as well.
    If you do the init without data transfer, you need to couple that with the full load to create the initial status of data in the cubes.
    Hope this helps...

  • BACKUP FROM OLD SERVER & RESTORE TO NEW SERVER

    Hi ,
    i have install SAP on New Server (ADM X86) , it has good hardware. that why i want to shiftout from old deveopment Server to new Server . From old server i want to take backup through DB13 and restore through Brtools on new server. backup will be on disk.
    please guide me which type of backup should be taken ?
    and what is difft b/t whole backup and full backup ?
    NEW SERVER with 2 Quard core processor, 24 GB RAM
    OS= SOLARIS 10
    DB= Oracle 10.2.0.4 with 39 Interim opatch
    SAP= Ecc 6.0
    Hostname=sapdev
    System No.=00
    OLD Server(SPARK) WITH 1 Dual Core Processor , 6 GB RAM
    OS= SOLARIS 10
    DB= Oracle 10.2.0.4 with 39 Interim opatch
    SAP= Ecc 6.0
    Hostname=devsap
    System No.=00
    Best Regard
    Imran Khan

    Hi Imran,
    In you have a full backup, using this existing backup further you can take incremental backups. The incremental backup is based on the previous full backup. The full and incremental backups is controlled by RMAN (Recovery manager).
    You can take a full backup and restore the same in your new server and later take an incremental backup from your old server and restore it to the new server for all the delta changes made. By this you can make sure that your production data is made consistent in the new server.
    If you have sufficient dowtime then, you can take a whole DB backup with redo log files and restore them in your new server.
    There is no difference between whole backup and full backup, with respect to the database data.
    784118 - System Copy Java Tools
    check the OraBrcopy tool in this note. It might help you.
    regards,
    chandru.