Report for cost component wise standard cost

Dear All,
I can view cost component structure wise breakup of cost for materials through various options in controlling.
But, I can view that only material wise, I am unable to find any report which can allow me to view cost component structure wise breakup for say 1000 odd materials at one go.
Kindly let me know if there is any report which allows me to view cost component structure wise breakup for mutilple materials.
Regards
SM

Hi
Refer S_P99_41000111 ... If that helps.. It does not provide cost componnets
Most of companies develop their own report using tables KEKO, KEPH, MARC, MBEW,etc.. there is no Std report in SAP which can give you Cost Comp Wise view for multiple materials due to technical limitations
refer Note 149261 - Problems with customer reports tables KKBC, KKBE. ..., which confirms the same point
br, Ajay M

Similar Messages

  • Valuation Type Wise Standard Cost

    Hi SAP Experts,
    I can not update the valuation type wise standard cost. It is going updated only at the Header level in the material master.
    We have activated the batch valuatin and also the split valuation for materials.
    At the header level in the material master there is a varialble price control and at the lower level we have defiend the valuation type with the standard price control. But when i am running the standard cost system update the cost only at the header level in the material master and not at the lower level.
    Can any one help on this issue?
    Thanks in advance
    Regards,
    Trushit

    Hi thank you for your answer.But if we maintain the valuation type default in split valuation then for all materials valuation types becomes mandatroy field, if we are going to open the batch but there may be the cases where batch is only going to be opend but not the valuation type.
    Regards,
    Trushit

  • Cost Updating and Standardized cost difference apportion

    Dear All,
    1、 Cost updating:Standardized cost or average cost change is updated across all sub-inventory simultaneously, but the update should exclude the inventory that lends stocks (we do not want to update the cost of lending stock).
    2、Standardized cost difference apportion:Standardized cost difference apportion is operated manually without system support (we want to do the apportion when stocks are delivered).
    I am stuck up with these question ..
    please let me know the solution or the workaround to achive this
    Appriciate your help
    Thanks
    Satyam

    Hi Abhishek,
    Further to discussion on the subject,
    Find enclosed link which elaborates the accounting
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/08/513e4243b511d182b30000e829fbfe/frameset.htm
    In a nut shell u can consider that cost elemnts are providing u the documentation  for Financial reporting & legal entries of a company.
    Cost centres are cost collectors for different expense/revenues generated within the organisation with repsct to controlling part (Internal documenation) of the compny for better controlling the business scenarios.
    Further cost centres are used for product costing.
    Ramesh

  • Difference between cost component structure and cost component split

    can anyone explain me the difference between cost component structure and cost component split with simple example
    thanks
    santosh

    Hi ,
    cost component structure
    Definition
    Number that identifies the structure.
    Use
    In Product Cost Controlling, the cost component structure determines how the results of material costing are updated. The cost component structure groups the costs for each material according to cost component (such as material costs, internal activities, external activities, and overhead). If the material is used in the production of another material, the cost component split (which breaks down the costs according to material costs, internal activities, external activities, overhead, and so forth) remains in the system when the costs are rolled up.
    In the cost component split, you also define the following for material costing:
    Which part of the costs are fixed costs
    Which costs are
    cost of goods manufactured and what are sales and administration costs
    Which costs are relevant for stock valuation, commercial inventory valuation and tax inventory valuation
    When the cost component structure is assigned to the organizational units, you can specify that two cost component splits are created:
    Main cost component split
    This is the principal cost component split, meaning that it is used in the standard cost estimate, which can be used to update the material master. The main cost component split can be a cost component split for cost of goods manufactured or a primary cost component split.
    Auxiliary cost component split
    This can exist in addition to the main cost component split, and is not used in the standard cost estimate. It can be used for analysis purposes, in that it can be displayed with the cost estimate and passed on to Profitability Analysis.
    In Cost Center Accounting, the cost component structure determines how the results of the activity price calculation are updated. The cost component structure groups the costs for each activity type of the cost center according to components (such as material costs and labor costs). If an internal activity allocation is carried out, the cost component split (which breaks down the costs according to material, labor costs, and so forth) is retained at cost rollup.
    If the cost component split is not to be retained, you can create a switching structure for the cost component structure for Cost Center Accounting. In the switching structure, you specify which sender cost component goes into which receiver cost component.
    <b>require a cost component structure to calculate prices using cost component split.</b>
    For each cost component structure you define a component such as energy, personnel, or raw materials. The components combine all costs occuring for a particular cost element area. In this way, you ensure greater cost transparency in activity price calculation when putting together the activity type prices - for example, it becomes easier to find how much of the activity price is taken up by the material costs.
    In activity allocation, the cost component structure remains constant, meaning that the receiver takes on the sender cost elements and that the allocated costs are posted in the same cost components in the receiver as in the sender.
    A cost component structure can have a maximum of 40 defined cost components.
    Cost components are assigned to cost elements. You thereby determine which cost elements go to which rows in the structure, and how these components are updated in price calculation.
    Hope ths helps
    Please rewad points
    Sunil

  • Report for Issued component Quantity vs Subcontracting PO component qntity

    Dear Expert,
    My client wants to know a report on issued Component quantity (what is issued against a Sub- contraction PO) with PO component quantity (what is maintained in a subcontracting PO component).
    Is there any standard report available for the same?
    Please suggest if any query report can be built or not.
    Thanks in Advance
    Regards
    Rajib Debnath

    Do you change child qty consumption in p.o BOM ?
    Check it in mb51 541 mvmt for material for issued component quantity.
    Also check reports MBLB,ME2O.
    Can you explain term
    Report for Issued component Quantity vs Subcontracting PO component qntity

  • Standard cost estimate (ck11n) &standard cost (ck24)

    hello sir ,
    how to do stadard cost estimate and standard cost in sap
    Thanks& Regards

    Hi
    Try below link
    http://help.sap.com/bp_iasifrsv1470/BBlibrary/Documentation/I56_BPP_EN_DE.doc
    http://help.sap.com/bp_blv1500/BL_US/documentation/Scenarios/V8Q_BPP_EN_US.doc
    http://help.sap.com/bestpractices/BBLibrary/Documentation/J74_BPP_EN_KO.doc
    VVR
    Edited by: Ramana on Jan 2, 2008 1:09 PM

  • How to get Cost element for a component in co03 cost analysis report

    Hi,
    I'm using table COSP to find the quantity for a production order component.  However, I need to identify the cost element first to get the unique data.  In CO03 cost analysis report, there is cost element for the component.  Does anyone know how to get it ?
    Thanks.

    CSKA stores the basic info about the cost element
    There is no data in CSKB.
    I'm trying to use different tables to get the cost element.
    AUFK, AFKO, AFPO, RESB, ...but no luck...

  • Cost component wise value is not showing

    Hi,
    I have created one costcomponenent structure and cost component created like 10,20,30,40 and 50 and each we have assigned saprate GL's. I  runned standard cost estimate for one material and i checked the cost component breakup, system is not giving the breakup as per my GL assignment. In 10 i have assigned raw material gl and 20 i have assigned semimaterial but in the costing update rawmaterial and semimaterial values are updated in 10. It is not updating 10 and 20 respectively. Can you guide me to solve this issue. Total value of the material is correct.(valuation class of the materials is different for rawmaterial and semimaterial)
    govind

    hi govindh..
      You do not have to creat cost component for Semi finished material produced inhouse because Primary raw materials for manufacturing this item has already cost component and when this semis will be used in subsequent process cost will be rolled up to respective raw material components used to manufacture the semis.
      But if you have purchased Semis, you can ctreat seperate cost component as Purchased SEMIS and assign consumption GL of purchased SEmis in that component to view it seperately.
    We have such senerio.
      thanks.
    kkumar

  • Internal Order Report - For the documnets when the cost ele. was not create

    Hi,
    We created internal orders for tracking capital expenditure relating to assets. At that time, we were not created asset GL's as cost element. Recently we created asset GL's as cost elements (category 90).
    Now we are getting the internal order report after creation of cost element for the transactions done thereafter. We mentioned the internal order number in PO but not in accounting document earlier. Now we are maintaining internal order number in accounting document also.
    So when we run OKBA we are getting CO document but, it is not tracking against internal order (since order number was not mentioned earlier). We executed one MM document in which internal order was mentioned through OKBB but there is no change in the internal order report.
    Is there any possibility to get the internal order report for the transactions done before creation of cost element.
    Please guide me
    Best Regards
    Madhusekhar Gupta G

    Hi,
    Thanks for your quick replies.
    Can we get the report as follows.
    1. Total Po's value for the internal Order (through Table EKKN)                                                      xxx
    Less: Value already posted to Internal order after creation of cost elements (S_alr_87013019)  xxx
    Less: Total Value to be invoiced (Tcode -ME2N)                                                                             xxx
    Net amount to be posted to Internal Order manually                                                                        xxx
    Is it correct?
    Regards
    Madhusekhar Gupta G
    Edited by: gms gupta on Feb 20, 2012 4:33 PM

  • Costing sheet and standard cost estimate

    Hi
    I am trying to use Costing sheet for overhead calculation .
    But in costing run I am not getting the overhead amount calculated .
    I created the costing sheet and assigned that to valuation variant .
    Where from the actual / Plan values being picked up for over head calculation .
    More over I need to understand on what basis the %age for overhead can be calculted to be aborbed to material cost .
    In costing run I am having ZERO values for overhead .
    I have followed the following steps
    Costing Sheet: Components
    Define Calculation Bases
    Define Percentage Overhead Rates
    Define Quantity-Based Overhead Rates
    Define Credits
    Define Overhead Keys
    Define Overhead Groups
    Even then the Production overhead is not being calculated at the time of Cost Run
    for standard cost estimate .
    regards

    Do you enter overhead  group in the material master.
    Key that groups together materials to which the same overhead is applied.
    Procedure
    In costing with and without quantity structure, and when costing production orders and run schedule headers, you can apply percentage overhead charges by means of an overhead key if you:
    Assign a costing sheet to your production order or run schedule header, or to the valuation variant for the cost estimate
    Enter overhead charges in this costing sheet that use the overhead key field
    Assign the overhead key to an overhead group
    Enter this overhead group in the material master record of the material

  • Report for Storage location wise Stock with value..?

    Hi guru's
    Can anybody explain me what is T.code i want to use to get a report for STORAGE LOCATION STOCK  with VALUE..?
    Urgent reply me  ..
    Thanks
    sap-mm

    Sorry Mr chetan,
    I want to see only the stock available in my company with Value and storage location wise..
    Please try to get report for this
    Thanks
    sap-mm

  • 1099 Misc reporting for US in SAP Standard report not containing any value

    HI All,
    In my current clients requirement is to get the SAP Standard reprort for 1099 Misc reporting for US
    1) Accordingly i have done configuration for Withholding tax for US with tax type FE
    2) There are 14 WHT Tax codes under FE , like 01 = Rent , 02 = royalty, 03 = other income etc.
    3) Assigned Tax type  with Co. Code
    4) Activated WHT tax at Co. code
    5) Created WHT country US
    And also assign WHT tax type FE and respective tax code to vendors in Accounting info in Vendor Master
    Posted couple of vendor invoices and made payment for those also
    Then after this when i run the SAP Standard report for 1099 Misc reporting for US , then the output contains with no data..  but only contains vedor names and WHT tax code which i have assigned..
    I think i have missed some configuration may be . Can any one let me know the detail step by step config and process how to get proper out put in 1099 Misc reporting for US in Standard reporting..
    Regards,
    Sandip

    Hello auroar,
    I followed the path that you provided and that lead me to this part of the tree: Define File Format for Withholding Tax Reporting...This is where I found the information that I needed.
    Thank you very much.
    -Patrick
    Edited by: Patrick Smith on Oct 22, 2009 8:41 PM

  • Report for Material consumption quantity  & its cost in Repetitive MFG.

    Hello,
    Is there any Standard Report available in SAP to check the Quantity of raw / intermediate material consumed & their cost in Repetitive manufacturing Backflush transaction MFBF?
    Thanks

    Here I'm interesed in the MFBF Qty & against which the consumption of Raw Materials & their cost.
    The reports which you asked me to check are all structures & not much of use for individual analysis.
    My requirement: When we access the material document(MB51) of the individual MFBF we get all the Raw material Consumption Qty & from there we can go to FI Doc (A/c Document).In A/c documet  we get the cost of all Raw materials consumed alongwith the Qty.
    Is there any report or I need to develope a new report?

  • PIE chart report for planned, Actual and variants cost

    Hi Gurus,
    Is there any report provides information of Plan cost, Actual cost and Variants cost for sales order or production Plan in PIE CHART format or any other chart diagram.
    Regards,
    Ram Krishna

    Hello,
    Go to relevant S_ALR* report.
    For example execute
    S_ALR_87013611
    Settings ==> Options
    Office Integration => Microsoft Excel
    Remove Worksheet Protection
    ignore the warning message.
    Go to insert tab on the MS excel.
    Select the report data.
    Click on pie chart.
    You will be able to see the pie chart.
    Regards,
    Ravi

  • Standard report for bussiness area wise expenses

    Hi to all
    I have a little query in our plant we have 4 bussiness area named as ba11,ba12,ba13,ba14.
    now i want to know that is there any standard report to know business area wise expenses and bussiness area wise purchasing.

    Hi,
    U can design ur own report by using tcode:GRR2 report painter
    please consult with ur FICO consultant
    Thanks
    sreeni

Maybe you are looking for

  • HT204053 Issue with Apple ID iPhone 4S iOS 6.0.1

    There is an issue, with Apple ID on iPhone 4S Apple ID, by entering wrongly Apple ID at the first time, it can't be changed anymore, or I just can't find where to change it, for proper use of App Store application and update of other apps.

  • How to change the mailto address in Acrobat X Pro

    Have a pdf form that I need to put on a website so people can fill it out and submit it. Need to change the email address where it is to be sent to when they click on the Submit button. I have looked and looked, and can't figure out where to change t

  • WRT54GSv5 stuck in a bootloop

    Hello all, Here is a timeline of my adventures in broken-router land: T+0:00-Informed of WRT54GSv5 problem: power led is flashing at a steady 500ms or so rate. Reset twice. No internet access. I determined that IP was non-static; pinging to router's

  • Query on BTCTRNS1 and BTCTRNS2

    Hi This is Atul I have following doubts for running the BTCTRNS1 and 2 1.  How is the process , Are there any chances of harming batch jobs in the system? 2. what happen with the jobs which are active when we run this program. 3. what are the import

  • Cs5.5 media encoder

    I see that the media encoder for CS5.5 advertises as being faster. I am wondering if this is a repeat of the original advertisement for CS5.0 or is it really faster? The CS5.0 media encoder can take 36 hours to encode my blu ray media out of Premiere