Hi
Product A . production order qty is 100.
It has 4 operations.10,20,30,40.
for operation 10 confirmed qty 100
operation 20 confirmed qty 80
operation 30 confirmed qty 85
40 100
I want a report in which i want pull all the orders with this kind of confirmations so that it is easy for me to correct it.
In coois report we can see all the orders and it is very difficult to check each and every order weather it is confirmed properly or not.Please help.
Dear,
Go to COOIS,
List :- Opertion
Select Order Type :- PP01
Plant = 1000
Syst. Status REL and CNF Exclude Tick
And execute the report go inside and change lay out Here add two filed Operation quantity and Yield and save the lay out now you will have all required details that you want just try and come back.
Edited by: R Brahmankar on Jan 28, 2011 12:22 PM
Similar Messages
-
Barcode for operation confirmation
My client is using barcode for operation confirmation. Please advise How to configure this in PP Discrete orders? Pls mentin the possible steps to implement this?
Hi,
In routing, the control key should have the Tick of print. Then the printer should be configured to print the operation details. After releasing the production order, the BARcode will be printed, then the same bar code can be scanned for the confirmation. The BARcode scanner should read the BARcode details and it has to update in CO11N transaction.
Better you can discuss with your ABAP consultant. He can guide you more clearly.
Regards,
V. Suresh -
Line itemwise report for operational WCD
Hi,
We are using the Mechanical and process isolations in the operational WCD. one WCD for Mechanical isolation and another one for process isoaltion.
There are multiple Isolation points used for process isolation. Example: 20 process isolation points in a WCD for a particular equipment.
The standard list editing operational WCD transaction (WCL4) provides a report which is a single line on the WCD level.
Where as we are interested to track on the individual line item i.e. individual isolation points status with in a WCD to track how many isolations are tagged, how many are still to be tagged, how many are untagged, how many are closed etc..
Proposed layout:
WCD number Line item # Status
30000010 10 Tag printed
30000010 20 Tag printed
30000010 30 Tagged
30000010 40 Tagged
30000010 50 Untagged
30000010 60 Untagged
Is there any way to enhance the standard report (WCL4) or we need to develop a custom report.
Thanks in advance.
Regards,
RajHi Harshvrdhan,
Thanks for your immediate reply.
I am using the functionality what you have proposed. With WCL4 transaction I can bring all the line items for WCD but the status field is not available hence it is available only on the header level.
The user has requested that they need line itemwise status report for all the shutdown related WCDs to be downloaded into excel fiel for status monitoring and management reporting purpose.
However, I was reading one of the document written by Michael lesk i.e. 8103_Function_Enhancements_EN.
As he mentioned, with SAP EhP5 there are more functionalities available with BADIs for WCM list processing.
Hopefully by implementing the BADIs mentioned in the document we should be able to get the additional custom fields.
Special thanks to Uwe Kirchner and Michael lesk for their continuous effort in enhancing the WCM processes and the dedicated user support.
Regards,
Raj -
How to pass parameter to a report for Operator 'LIKE'
I need to pass a parameter to a report for "LIKE" operator. the parameter for "equal to or is in" operator is 'eq':
'https://secure-ausomxfts.crmondemand.com/OnDemand/user/analytics/saw.dll?Go&Path=/shared/Company_AFTA-D78SR_Shared_Folder/Work Order Asset Lookup&Options=r&Action=Navigate&P0=2&P1=eq&P2=Account.TEXT_61&P3=&p4=
What would 'p1' value for 'LIKE' operator?
ThanksHi, Hope the below helps
neq - Not equal to or not in
lt - Less than
gt - Greater than
ge - Greater than or equal to
le - Less than or equal to
bwith - Begins with
ewith - Ends with
cany - Contains any (of the values in &P3)
call - Contains all (of the values in &P3)
like - Is like (Type %25 rather than the % wildcard)
top - In the top n (&P3 contains 1+n, where n is the number of top items)
bottom - In the bottom n (&P3 contains 1+n, where n is the number of bottom
items)
bet - Between (&P3 must have two values)
null - Is null (&P3 must be 0 or omitted)
nnul - Is not null (&P3 must be 0 or omitted)
Venky CRMIT -
Special report for tracking confirmations
Hey,
i am adding internal processing activty in my proj for tracking amount of work confirmned only.. and not for costing, cap pllnning purposes,,,, i can provide a report of cnfmations to ma customer, but the demand rite now is like this as follows....
suppose the work is 100 kms digging... my first km is named position 1200, after 10 km i would be at position 1210 and so on... can we achieve this in ps ... i am thinking to feed this data in some user field in wbs and get some abap report to achieve the same.. can i do this ... or is there some other solution.... also i am not able to see remaining work in the report.. how to do the same.....pls assist
RahulThis can be achieved by using partial confiration, Final confirmation & degree of processing.
The degree of processing of a partial confirmation inidates to what percent the activity has been processed. System calculate degree of processing from the proportation of actaul amt of work that has already been confirmed for an activity to it's planned or forcasted total work.
you can also define alternative degree of processing manually in confirmation.
you can also use workcenter actaul work & remaining work ( forcasted ) fields in partial confirmation to document which workcenter has performed which degree of work & how much still to be performed.
you can use CN48N report for viewing the confirmation.
Prerequisite for Actvity confirmation is
the activity must be released
control key of the activity must allow the confirmation.
In customising you must have to defined the confirmation parameters which controlls the properties of the confirmation.
Regards
Nitin -
Report for operation cost wise
Hi All,
We have a report where we need to display the operation text against that cost.Cna you please help in finding out the link where we can display the cost against that particular operations.Hi please see this, regarding the Operation level costing:
Re: Costs by operation in service order
The last reply there may help you avoid using operation level costing, however, I have not been able to find a 100% reliable link between the operations and the costs (meaning DB keys). I have a reliable procedure which won't result in duplicate costs, or otherwise inaccurate cost report, but I have only empirical evidence to prove it - basically I've tested a lot.
In addition, there is a document on SAP tables (I think it's widely spread, I found it googling) which lists some useful PP tables, like PLKO or PLPO, which hold details of operation components. You obtain the necessary keys by looking at BOM for the operation in question. Unfortunately, this didn't work in my case, but it's worth looking into.
I am inclined to believe further link may be achieved using available fields in CO tables, but will need some extra exit development in posting/cost evaluation procedures. I am still looking into this... btw, I'm a tech person, so any functional consultants may feel free to support or reject this theory.
Regards,
SD -
Work center design and operation confirmation
Hi All,
In my scenario im grouping the similar m/c to a work center
say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
my customer wants the traceability in which m/c the job is done
So i had designed in such a way that
1 LatheALL -4 cap(this will be additional wc)
2. lathe1 - 1cap
3.lathe2 - 1cap
4.lathe3-1cap
5.lathe4-1cap
in the routing only latheALL will be given., this will help customer in planning
when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2 or etc.. this will help prodn dept for traceability in which m/c the work is done
this is method i have informed to client .,
pls advice is this approach is correct ?
also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
Regards
Anand SrinivasanHi Anand,
this is method i have informed to client .,
pls advice is this approach is correct ?
yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
Regards,
Sankaran -
Operation confirmation without inspection results - not working
Hi All,
We have 4 operations for one production order.
1st operation has 5 MICs
2nd operation - no MICs
3rd operation - no MICs
4th operation - 1 MIC.
In tcode OPK4 I have configured error message if QM results are not recorded.
Before result recording I tried to do 1st operation confirmation (tcode CO11n). I got error QM data for operation missing (as expected).
Now for the first operation (having 5 MICs), I have recorded values for only 1 MIC (out of 5). Then it is not giving error for 1st operation confirmation.
Our requirement is- all 5 MICs must be recorded for operation confirmation.
How to handle this. Please Help.
Thanks & regardsThe configuration setting you have made doesn't give error message during confirmation even when one of the MIC assigned to one Operation is recorded and remaining MIC's assigned are not recorded.
Hence we can use User Exit during Confirmation screen and do the necessary coding to throw a error message if RR is not done.
Best Regards,
K. Raghavendra Nayak -
Standart report for confirmation
Dear all,
I need to enter task list number and items and need to list in which pm orders and by whom it is confirmed?
Any standard report for that? if no can i create a query? by joining which tables?
thanks
JMQhi
in standard you are confirming only through order with combination of operation or confirmation number ,i think it is not possible to get in standard.
you can create the query but whether the output you required will display iam not sure, while creating the Query try creating using logical database and check
regards
thyagarajan -
Table name& field name for production order & operation confirmation
Hi All,
I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
Thanks and Regards,
PSSHi there,
CORU(R/3 Application development: PP Confirmations )
AFFW Goods movements with errors from confirmatio
AFRC Table of planned changes to conf.: Automatic
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRP1 Table of planned changes to conf.: Automatic
AFRP2 Table of planned changes for confirmation: B
AFRP3 Table of planned changes for confirmation: C
AFRP4 Table of planned changes to confirmatn: Data
AFRU Order completion confirmations
AFWI Subsequently posted goods movements for conf
TAFWD CORU: Messages that are not interpreted as e
TCORD Table for field-dependent check routines
TCORU Parameters for order confirmations
TCORV Table with Routines for structureing variabl
TCORW Confirmation: Window Control
TPARU Control parallelized confirmation processes
TPRRU Control table for process chain for confirma
TPRRUT Text table for process control of confirmati
TRUGS User status caused by deviation
CO(R/3 Application development: PP Production orders )
AFBP CIM order: Batch print requests
AFFL Work order sequence
AFKO Order header data PP orders
AFPO Order item
AFVC Operation within an order
AFVU DB structure of the user fields of the opera
AFVV DB structure of the quantities/dates/values
FAPW Index of production-/issuing plant for produ
FTIND Missing parts index
ORDCOM Communication control Operation download
T024F Production scheduler
T399X Parameters dependent on order type
T441C Profile - availability check
T441CT Texts for Profile "Display Availability Chec
T490 Transactions PP - orders - order category
T496B CIM order: Assigning document types to refer
T496D CIM: Destination/lists/spool parameters per
T496F CIM order: Form description of the list
T496K CIM order: Entity table of possible table id
T496N CIM order: List descriptions
T496P Print PP documents: Determination of output
T496R Print PP shop papers: Report control
T496T Print PP shop papers: Transaction control
T496V PP Print: Default Value for Printing Online
T496Z CIM order: Table-controlled table access
TC32 Assigning subscreen to processing location
TC34 Allocating operation to object type for the
TC62 Sequence of detail screens when processing h
TCO01 Sequence/operations control in logicstics or
TCO03 CIM order: Texts for TCO01, Description of o
TCO04 Table for controlling the screen sequence gr
TCO05 CUA status depending on panel, trans. type,
TCO06 Exclusive functions for PP orders
TCO09 CIM order: Text IDs of objects in orders
TCO10 Valuation variant for order costing
TCO11 Control table for production orders - availa
TCO12 Control table production orders - stock dete
TCO36 PP orders: Control table for calling up pop-
TCO41 CIM order: Default values for generating ope
TCO43 PP-SFC order profile
TCO43T Description of production scheduler profile
TCO60 Sequence keys for input facility and verific
TCO61 Sequence key for PP orders
TCO62 Defining screen sequences for input facility
TCO63 Sequence of detail screens when maintaining
TCODB Database fields development class CO per ord
TCOF Profile for missing parts info system
TCOFF Profile for Missing Parts Info System: Displ
TCOFFT Texts for Missing Parts Info System: Display
TCOFG Profile for missing parts info system: crite
TCOFGT Texts for Missing Parts Info System: Criteri
TCOFK Texts for functions in milestones/trigger po
TCOFS Profile for Missing Parts Info System: Sort
TCOFST Texts for Missing Parts Info System: Sort Cr
TCOFT Texts for Missing Parts Info System
TCOKO Constants for PP orders
TCOKT Account assignment categories for order
TCOP Field selection profile
TCOPS Field selection profile
TCOPT Description of Profile for Field Selection
TDUMMY Dummy structure of a table for READ with VER
TRUG Reason for variances in completion confirmat
TRUGT Text describing the reason for a variance in
TXPR1 XPRA control - missing parts info system
Regards
Hemant G -
Report for mass interruption of partially confirmed orders in PPDS?
Hi gurus,
our client has a lot of partially confirmed orders in the past, and this is giving us problems with the optimizer.
Is there a report for mass interruption of this orders?
We can do it one by one in the DS planning board, but there are too many!
would appreciate any help,
PabloHi Pablo,
I would suggest you can close the partially confirmed orders at R/3 itself
so that it will update in APO via CIF.
There is delivery complete indicator in R/3 production/process order which
upon checking will close the order.
Regards
R. Senthil Mareeswaran. -
Standard Report for missing parts at production order operation level?
Hi PP Gurus,
We have standard report for missing parts at production orders level.
For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
Please help.
Thanks,
Reddy.Hi Arvind,
Thanks for for your response.
1. List: Components, Layout: Standard layout set the Missing part
It shows the component requirement/withdrawn quantity for each operation of production order. It is not showing the commit quantity.
2. List: Components, Layout: Pick list set the Missing part
It shows the component requirement/withdrawn quantity for each production order.
3. List: Components, Layout: Missing Parts List-Material View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
4. List: Components, Layout: Missing Parts List-Order View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
We are unable to get the solution from all these 1 to 4 reports from COOIS.
Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
If avilable, what is the procedure to be followed?
Thanks,
Reddy. -
Scheduled report failure - Not enough memory for operation
Crystal Reports Server XI R2 SP4
SQL Server 2005
Hi,
I have a report that is scheduled. Most of the times it runs successfully, however for one parameter setting I continuously get the following error mesage:
Status: Failed
Printer: The instance is not printed.
External Destination: Copy the instance with default filename to the directory '//10.2.25.24/polling_in'.
Creation Time: 03/04/2009 05:00
Start Time: 03/04/2009 05:00
End Time: 03/04/2009 05:00
Server Used: BWAQTSREP-1.reportjobserver
Error Message: Not enough memory for operation.
Why would this happen, and how can I resolve? I can run the report successfully in Infoview.
Thanks!
PennyHi Penny,
do you run the report successfully in the infoview using the same parameter setting?
If it does please try to reschedule the report and monitor (using the task manager) the memory consumption on your windows server.
Please also make sure that there is enough disk space available on both your server and the destination directory ( '//10.2.25.24/polling_in'. )
Regards,
Stratos -
SC Report for Confirmation Details
Hi All
We are in SRM 7 EHP 2.
We are doing Confirmations in SRM Portal only
We have a requirement to create as Custom Report for Confirmation Details with below fields.
1. Company Code
2, Purchasing Organization
3. Account Assignment
4. Confirmation Name
5. Status
6. Requester
7. PO Number
How can I do it, Please advice
Thanks
AjitHi Ajit,
Explore the possibility of achieving this with a new POWL query?
Use the existing POWL in the confirmation screen as a starting point to see what can be modified to suit your requirement.
- Sai. -
Confirmation report for shipment tracking
Dear experts,
how can i generate a confirmation report for shipment tracking-vendor wise ???
Regards,
Durgesh Tambat.Hi Durgesh Tambat;
Please search in SCN before create a thread , i hope that you will reach your solution.
Regards.
M.Ozgur Unal
Maybe you are looking for
-
Airport Extreme 2nd Gen - can not retrieve or assign an IP address
I had two 2nd gen Airport Extreme base stations. One connects to the internet, the other bridges the network to my office where I have wired devices connected. The office base station was no longer allowing me to connect to my USB drive for time mach
-
I can't get my Ical birthday list to upload to a new calendar in Iphoto.
Under settings it ives me the option box of the birthday list I want. Iv'e checked it and reimported and I get nothing. Is it a Ical sharing issue or setting that I need to change?
-
Remote Procedure Call Failed - Verifying Account prior to establishing PIN as sign in option
PC Settings / Accounts / Sign in options / PIN / Verify Account info / : I enter my Microsoft Account password and receive the following message: "Remote procedure call failed" Cannot cancel - screen keeps reappearing. I have successfully establishe
-
Dear Gurus, I am taking mrp run for variant material and dependent requirement is generated but not any purchase requisition is created for raw material. I have set collective requirement in mrp4 view and and i dont have stock for raw material. Plea
-
Dynamic variable to identify system env
Hello All, I would like to know if there is any dynamic varibale which can be used in PI message mapping to indenty which env i am currently. Like Dev, Q or Prod. Please let me know if anyone can help. Regards, Vikrant