Report for Reorder point, safety stock, current stock and fixed lot size
Hi,
Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
Thanks in Advance.
Regards,
Shankar Goud.
Hi,
There is no standard report because this is meant to be managed by the MRP run.
The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
Are you using MRP?
If so then please use the standard functions in MRP to get this.
If not, then WHY NOT?
Steve B
Similar Messages
-
MM Report for Reorder and lead time
Hi,
Can anyone suggest me a report that can show information by materail such as min./max. quantity, re-order or safety stock, and replensihment lead time.
Thanks
Atifyou can create the query using MARC or just go se16 adn enter the MARC table and pull the data.\
Displayed Fields: 8 of 8 Fixed Columns: 2 List Width 0900
Material Plant Reorder Point Safety stock Min. lot size Max. lot size Total RL time Min SafetyStock
MATERIAL Z001 0.000 0.000 5,000.000 350,000.000 0 0.000 -
Fixed lot size key has no effect on planned orders generated for VC PIRu2019s
Hello gurus,
does anyone have an idea why the fixed lot size key is not having an effect on the planned orders that are generated for the Planned Independent Requirements (PIR) for MTO configurable materials. My client is using planning strategy 56.
I have copied & customized the Fixed lot size key FX to suit the MTO production (u201CLot size as in short-term periodu201D activated) that works nicely even with configurable materials when a planned order is generated for a sales order. But the planned orders in the preplanning segment, i.e. that were generated for PIR's, are still created equally to the PIR quantity.
Is this behavior an error or an SAP feature? Though, I have reviewed the OSS Note 437098 that might be related to this. Can anyone tell me if it is related to this issue?
Regards,
MikkoGot the answer fro SAP:
Please consider the following note, which provides the explanation about this behavior of the lot-size, when VSE requirements are used:
125498 - MRP/Docu: Planning segment and lot-for-lot order quantity
The following section of the note describes your scenario in detail:
"The planned independent requirements for a material are in a separate
planning segment (planning strategy planning without final assembly,
requirements type VSE, VSEV).
You enter a rounding value or a rounding profile or an lot size that is
not exact in the material master.
Material Requirements Planning:
In Material Requirements Planning, planned orders are generated for the
planned independent requirements. The lot size settings (such as fixed
lot size or minimum lot size) are also not taken into account." -
Revision: 3278
Author: [email protected]
Date: 2008-09-19 16:49:01 -0700 (Fri, 19 Sep 2008)
Log Message:
Fix min size for button skin to be 23, 23 and make default size 70,23
Modified Paths:
flex/sdk/trunk/frameworks/projects/flex4/src/flex/skin/ButtonSkin.mxmlRevision: 3278
Author: [email protected]
Date: 2008-09-19 16:49:01 -0700 (Fri, 19 Sep 2008)
Log Message:
Fix min size for button skin to be 23, 23 and make default size 70,23
Modified Paths:
flex/sdk/trunk/frameworks/projects/flex4/src/flex/skin/ButtonSkin.mxml -
What will happen to the battery if i let my Ipod touch 4th Gen charging for 8 hours?I'm editing and fixing my ITunes in my P.C,and It's two days old.Thank you.
Make an appointment at the Genius Bar of an Apple store. If under warranty, as you say (the warranty is transferable) and not abused Apple will exchange it at no cost.
Apple Retail Store - Genius Bar -
Dear All
Can I have a report on Rorder Point and a safety stock for the material.
Regards
Manojhi
use MARC table in SE16 for reorder level
MINBE Reorder Point
EISBE Safety Stock
Vishal... -
Standard reports for materials begning,purchase,sale,closing stock
Dear Experts,
Is there any standard report for
Opening stock
Purchase
Sale
Closing stock
in terms of QTY and value for all materials.
regards
RRHi
you can use MB5B (with Non hierarchial Display) and MB5L
br, Ajay M -
Crystal Reports for Visual Studio Service Pack 1 didn't fix my issue
I have been working for some time on a web application project which is using Crystal Reports for some of its reporting features. I installed Service Pack 1 on the server but it failed to resolve the following issue:
ADAPT00638965
Description: Using the Crystal Report Webform Viewer to search for a string that exists on the current page of a report does not return the correct result.
I installed the same service pack on my development machine and it DID fix the problem. I cannot understand the reason why. I was oping someone may have had experience with this and may know why it isn't working or, more importantly, how to fix it. Please help!Not a problem. Essentially, we have two choices since it looks like the SP you ran on the server did not update the runtime. So, we can determine the dlls that are different by using the modules utility and replace the old dlls (not my prefered way) or create a new deployment project using the patched merge modules (way prefered). Since you are using CR 9.1(?) that bundles with .NET 2003, the application was deployed to the server. Somehow, the correct CR runtime had to also have been deployed. Since CR 9.1 does not have an MSI file, you have to create your own deployment project (either an setup.exe or an MSI) using the CR 9.1 merge modules. All of this assumes that your development computer and the web server do indeed have the same application (version and all. e.g.; if the app on the server uses CR 10, the patch for CR 9.1 will do nothing for you). The merge modules for CR 9.1 can be downloaded from here:
https://smpdl.sap-ag.de/~sapidp/012002523100006009302008E/cr_net_2003_mm_en.zip
This White Paper has more details on how to create a deployment project:
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10ae17a6-a41d-2b10-eb9f-8dfb2a88dc7e
Ludek -
BAPI Name For Reorder point (minbe)
I have custom table, i have order-point(minbe) for many articles , I have to update those values to MARC table, which BAPI is best to do this work. I am new to ABAP anyone can help me .... ?
Thanks ........BAPI_MATERIAL_SAVEDATA
-
Standard SAP Report for Vendors to dispaly Vendor No, Name and Balance
Hi Experts,
Can any one help me to display Vendor Report which contains Vendor No, Vendor Name and Vendor Balance from SAP Standard Reports (Not Customized Report). I have checked with all SAP Standard Reports, It seems that all SAP Standard Reports displays with only Vendor No not with Vendor Name.
Best Regards,
ChandraHi,
You can use the following report, actually it is a drill down report. You can drill down the report in the way you want.
S_ALR_87012079
Rgds
Murali. N -
Report for total IR value total GR value and Total P.O value
Is there is any report to get IR value GR value and P.O value as well............?
i don't need balance i want completed P.O and GR IR value with quantity.......
Please help me to get this kind of report in SAP
Thanks
NehaHi,
You can find change view option in ME80FN by executing the report and its available near by print and change layout button.
Click on the change view > select purchase order history.
You will get the required report then.
Also you can make the Z enhancement with the help of abapor.
Thanks & Regards,
Sandesh Sawant -
Reorder Point Planning VB where GI against reservation not happening
HI Every one,
Manual re order materials which has got created
Manual Re order Level 50
Safety Stock 30
Stock exists 54
Reservation created when only 4 stock was there after that received 50 quantity.Now Creating Goods issue against that reservation But system issues error Message M7 181...ATP stock available only 4.
And No Planning materials GI against reservation happening properly
Let me know what will be the problem..
Thanks,
BinduHi Jurgen,
Now i am explaining you clearly in detailed with MD04 and CO09 details....
Material XYZ with Manual Re order level VB 600 and Lox Size FX and Fixed Lot Size 400 Maintained.
Reservations created with 52 Qty on 02-09-2008,104 Qty on 16-09-2008,52 Qty on 07-10-2008,52 Qty on 18-10-2008,52 Qty on 25-10-2008,52 Qty on 28-10-2008,80 Qty on 03-11-2008,50 Qty on 24-11-2008,100 Qty on 24-12-2008,80 Qty on 25-01-2009,180 Qty on 08-02-2009,80 Qty on 24-02-2009
Total 12 reservations created with 834 Qty and Present available Quantity is 520... which is showing in MD04 and in CO09 there are 3 TABS Rec Reqd Qty - 520 and Confirmed - Nil and *** ATP Qty =0 ....
When i am creating Goods Issue against first reservation the system issues error message as 2 qty available..on 26-02-2009 as M7 181 ATP Qty not available...
Please let me know the solution why the system issuing error message eventhough 520 Qty available.
Regards,
Bindu -
Manual Reorder point planning stock is not showing in MD04
HI,
Would any one help me when i plan for reorder point planing the details furnished below.
Mrp type: V1
Lot size :HB
ROP : 30
Max stock level :1000
in Material master settings.But when i run the MRP using MD03 system is not showing available stock in MD04.It is showing 0 stock rather it would show 4 (MMBE un restricted stock..)
What are thesettings required or any thing missing in IMG. Please help me in this.
Regards,
SriniSrini,
You may also want to check if the Unrestricted stock is in a storage location that is excluded from MRP.
On MD04 you will then see a separate line item at storage location & the Qty =4 should appear as shown below.
12/02/2009 Unrest Stock 12 12
12/02/2009 SLocSt QANN StLoc: not plnd 0 8 QANN
12/02/2009 SLocSt VEND StLoc: not plnd 0 0 VEND
Hope this helps. Good lcuk.
thanks,
Ramm -
Lot quantity to order for a material set as reorder point planning
Dear All,
Suppose the requirements of a material are as follows:
Week1 Required quantity - 100
Week2 required quantity - 150
Week3 required quantity - 300
Week4 required quantity - 500
This material is set as "VB" (Reorder point planning in the material master)
My questions is:
Can we use periodic lot sizing procedure for a material planned based on reorder point planning , so that MRP run will consider the requirements of a month (1050) and use that as the lot size to order material.
We want to plan the material if it falls below the reorder level, but we want the system to dynamically calculate the quantity to order based on the actual demand (and not on either fixed lot size or maxmimum stock level).
with regrds
Laxmipathi.G.VHi
Use Anyone of the following
1. Use automatic reorder point with forecast planning requirment.Where ssytem will calculate reorder point automatically based on weekly /monthly Forecast req.In this case Lot size you can use EX itself.
2. Use Planning type PD and lot size EX and Instaed of ROL use safety stock so that system will consider weekly sale req. and also safety stock according to that procerement proposal will be created.
Regards,
Velmurugan S -
Dependant requirements are to be considered in reorder point planning
Hi,
We are currently using safety stock planning with PD.but the problem is that MRP triggers a procuement proposal when ever the availabile quantity(not the stock) falls below safety stock(as it considers MRP elements like DEP REQ etc in the net requirements calculation).
Now if i propose VB,it does not consider the dependent requirements at all(they are not even displayed)
Requierment is that the procurement proposals should only be triggered when the safety stock falls below the physical stock and DEPREQ's and all other requirements should still be displayed.
I appreciate your help in getting me through with this.Thanks.
RamDear Ram,
go to the customizing of MRP type ,
ther you will find the field 'Reorder point planning with external requirements'
Indicates whether an external requirement (sales order or manual reservation) is included in the net requirements calculation for reorder point planning.
If yes, you can decide whether it is to be included:
-in the complete planning horizon, or
-only within the replenishment lead time
I hope the above information will be useful,
best regards
Maybe you are looking for
-
System Hangs when playing games -K8N Neo4 - SLI Plat
Hi, This is my first post..........so bear with me. I've just completed my sons new computer, all was fine until he started to play games!!!. The system is, Floopy = Mitsumi DVDR = LG CDR = LG Memory = 2 sticks of Samsung 512 PC3200 DDR400 Graphic
-
I just downloaded ios7 now i can only use the phone with speaker, how can i fix this?
-
When i attach my ipod it freezes my computer and itunes...any ideas ?
When i attach the ipod with the USB...it freezes my itunes and i can't do anything until i unplug the ipod....any ideas ??
-
Optical drive will not open disc
Optical drive will not open CD or DVD since upgrading to Lion.
-
Tab not changing focus in a JTextArea
Hi I am writing a little program that at a certain point uses a JTextArea. What bugs me a lot is that the JTextArea keeps focus when I press the Tab button I see two solutions to this. Either I extend JTextArea into MyJTextArea and override the proce