Hi Team,
We are using older version of SAP, that is SAP 3.1i. Here we don't have any transaction code such as IW47. Is there any other way to get report of work center and work center hours-order wise.
Please respond.
Regards,
Kiran

Have a look at table AFRU
PeteA

Similar Messages

  • Work Center in Maintenance Order.

    Hi ,
    Due to Process Change some maintenance work centers become obsolete.
    Can it possible to hide or work center do not see in F4  help in Maintenance order.

    Dear Ashu
    Jogeswara Rao Kavala input is the most suitable in your case however another work around would be :
    If you are using the "Person Responsible" for your work center, then remove the entry from the person responsible for such obselete work center as they will not be used any more and no person will be responsible for their maintenance and co-ordination. This will help in all other reports selection and analysis also.
    While searching for work center(F4 Screen), default the tab "Person Responsible".Now when you select any work center based on person responsible, automatically that work center will be excluded from your selection screen.
    Pre-requisite: You use Person responsible assignment in ALL work centers....
    Other way would be to set deletion flag to this work center so that even if they are included by user without looking into F4 help, system will prevent those work center from including in the work order for further processing.
    Hope this helps
    Regards
    Murad..

  • Block production work center during maintenance order

    Dear Experts,
    iam trying to do the integration between PM and PP, I want to block the production work center from any production order  when there is any maintenance order opened for a certain equipment which is inside this  work center ,
    till now i did the following:
    1) the production work center is now inside the equipment location tab
    2) when i open any maintenance order i put system condition as zero
    now what i only achieved ,
    - in transaction CM25 the capacity is black for the period of the maintenance order
    BUT the work center is not blocked and any production order can be created without any error
    please help and much thanks in advance
    Best Regards

    Hi,
    Till time you have performed right things to integrate PP-PM & system is also responding according to setting.
    Showing block capicity in CM25 against the Maintenance Order.
    If you want to block production order as well, you need to do one more setting.
    go to t- code OIOI, selection Production order types (those you want to block) & in capacity Availabilty choose Collect conversion as 3 : No creation if there is insufficiant caacity.
    i hope this will definately solve your problem.
    - Yatharth

  • Change history of work center in Prodn Order

    Hi All,
    We currently are changing the work center in prodn order via an ABAP program number of times based on various conditions. We would like to know the change history for the work center in prodn order. Is there any <b>transaction or report or function module </b> that we can run for a given prodn order to know these changes. This change info is not captured in AUFK or AFPO or AFKO or logs for Prodn Order.
    We have not activated audit trail for this. Please can anyone suggest a soln for this.
    Thanks

    Hi Bala,
    AFRV table contains  Confirmation pool information. But I am looking for change history for the work center in prodn order. Like after creating the prodn order u changed the work center and then again after release of prodn order u changed it to some other work center (for some particular business reason). I would like to see all this change history.
    Swapnil

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • Change log for work center data

    Hi,
    I was looking for the table where the change header document for the work center is stored.I was able to find a transation CR10 which shows the changes and also the database table CDHRD.
    When I am trying to view the changes that were made to the work center I find that the data does not exist in the tables.
      I was curious to know this as for some transaction the data is being logged in their respective change table but not for Work Center changes.
      Can anyone tell me as to why this is happening.
    What I think is that some changes to the configuration are required in order to log the changes in the database.
    Kindly help.
    Regards
    Varun

    Hi Wolfgang,
    Thanks for the information.
    However i have another question.
    The change table will have data only when it is activated in the configuration menu.
    However is there any other way by which we can capture the previous data for the work center e.g. the changed by field. I want that the names of the users who has changed the wrok center currently and the name of the person who previously made changes to it.
    See if you can help me on that.
    Regards
    Varun

  • Profit Center to be picked from Equipment Cost center in Maintenance Order

    Hi All
    We are not maintianing any costcenter in work center and only maintaning the cost center in equipment master.
    So when i create the maintenance order, profit center is not picked up in Additional Data Tab from Cost center maintained in equipment master.
    Please  provide your valuable sugesstions.
    Regards
    Praveen

    Hi,
    The profit center is derived from the cost center of the responsible work center when the order is first created. If a cost center is not available then I expect the profit center cannot be automatically filled on the order. The user can manually enter a value.
    The exit IWO10005 is frequently used to determine the profit center. You may want to look at implementing some custom logic there.
    -Paul

  • Customization Setting for Work center creation

    Dear all,
    What is the Customization Setting for Work center creation? How to do it?

    Hi,
    Here are the few things you can check
    OP40 : WC category
    OP17 : Formula for WC
    Person responsible : Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers >>Define Employees Responsible for Work Centers
    apart from above You can explore more in
    Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers
    Riyaj

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • User Exit or DB-Table for Work Center (CR01)

    Hi!
    I have an external software which must be triggered when the user changes a work center in SAP (transaction CR01,CR02). I was looking for an user exit to do what ever is necessary but I couldn't find one.
    So, does anybody know an user exit or BADI for work center?
    Also possible:
    The database table where work center are stored. So I could poll against this table and check if a work center was changed. I found the table SGOSHIST which log all modified objects in SAP. So this could maybe used to check for modified work center, I think.
    Thanks,
    Konrad

    > You can check the BADI definition from transaction SE18,
    > 'LTRM_WORK_CNTR_DTRM', this might be helpful,
    How can I check this BADI. If I use SE18, it doas not exist, buit if I try to create it, the system tells me that it already exists in the SAP Original System... and asks me if I want to create a copy of it! I don't know what to do at this point!
    > Work center details are avilable in CRHD table, you can
    > look for CR* from SE11 transaction,
    I know, but if you change the description of the work center, it is stored in CRTX. there are a lot of CR* tables. It would be helpful to have a table which is updated every time a work center is modified!
    Thanks,
    Konrad

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • Standard IDOC for WORK CENTER Master

    Hi,
    Please suggest the standard IDOC for work center master.
    I have tried PWKC.Got  DUMP when executed.
    Tried on SAP-Market place for help.Suggested not to use PWLC.
    Please suggest alternative.

    Will you please explain in a bit detail if LOIWCS01 or LOIWCS02 are transaction (as i tried to execute) or programs or please explain how to use these.(I executed from command prompt and SE38 but didnt helped)

  • Table for work center..........

    Hi
    Is there any table for work center which shows available capacity v/s utilized capacity......Please revert with your valuable comments
    Rgds

    Hi,
    Check Table RC65L.
    Regards
    Kannan

Maybe you are looking for

  • CS6 for iMAC keep asking for serial number nearly everyday

    Hello, There is an iMAC (OSX 10.10) in my company which was purchased 2 years ago with CS6 Design Standard installed. There was no problem at all after the purchase. However recently, CS6 keep asking the user to type the serial number nearly everyday

  • Filter or Smart Collection for Exported Images?

    I want to keep track of the images I export. (in most cases to skydrive).  Can I set up a filter or criteria for a smart collection to do this? Thanks

  • Audigy Switches from 5.1 back to 2 speaker mode everytime I reb

    Anyone know how to fix this? Thanks, Robert.Message Edited by rbarclay on -07-2004 09:09 PM

  • Report - EPM Member selector - using filter

    Hi ALL, I would like to ask a general question : everytime I try to use <CONTEXT> value (within the "Member Selector" in the "Report Editor"), the selection doesn't work, my filter doesn't work ! Why ? And then I obtain this error message : How does

  • Upgradation problem pls help

    I imported my oracle 8.1.5 database dump in oracle 8.1.7 but when I want to connect to my instance thru a client machine one error message comes as " problem in connecting to the database, check whether it is started or contact sys admin" whereas the