Report of result recording for multiple batches in a given time span .

Dear team ,
I am looking for a standard SAP report that gives the details of result recording with all the characteristics for mulitple batches in a given span of time . The MICs will show the actual values recorded for each of the batches.
The colums may be like this
material/batche/lot/quanity/mic1 value/mic2 value/mic 3 value...........
A standard report is prefered and we would also like to have a trend analysis done for the batches .
Looking forward to hearing from you .
Ram

Thanks for the answer Firefighter.... cheked the t code and seems to be useful . But I would like to have the report in the folowing format . Kindly guide.
SN     MATERIAL     BATCH     INSPECTION LOT      QUANTITY     CHARACTERISTIC 1     CHARACTERISTIC 2     3     4
Ram

Similar Messages

  • Multiple results recording for Delivery inspection lot

    Hi Gurus,
    My requirement is to configure for quality results recording for sales delivery document. Where client wants to record Customer, supplier, Umpire, etc results record for inspection characteristics.
    I got response from few Sapiens that I should use Inspection point concept for multiple results recording. Could anyone cna tell me how can I do this.
    Your help will be highly appreciated.
    Thanks,
    Kumar

    Hi Kumar,
    Okay!
    First of all letu2019s try to understand whether inspection points are really suitable for your requirement or not. Accordingly further errors can be eliminated. I just try to understand.
    A- Using Inspection Points
    1.     Inspection points are used when you inspect the same parameters again and again.
    2.     When you click on results tab in QA32, system asks you put some identification number. Letu2019s say you put A1 and then press enter. Thereafter you record the actual results (LENGTH, WIDTH etc.) You save this without giving UD.
    3.     For the next time when you again click on results for the same inspection lot, system again asks you to put identification number. This time suppose you put A2. Then again you record the results (LENGTH, WIDTH) for A2.
    4.     Likewise you can retrieve the inspection results from system with respect to inspection point (identification point).
    5.     Typically this can be used for chemical industries where you record the temperature of the same chemical after every ½ an hour. Here 10:00 am, 10:30 am can be used as identifications numbers. As a result of which you can get the information that at 10:00 am temperature was 40 Deg and at 10:30 am it was 75 degree Celsius.
    If your requirement resembles this situation, then only the use of inspection points would be fruitful.
    B- Without Inspection Points
    But if you want to record the readings by various agencies like customer, umpire (refer following pattern)and want to compare them there are other ways.
    1.     Reading by your inspector
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    2.     Reading by customer
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    3.     Reading by umpire
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    You can achieve this without using inspection points also. For this in QP02 you need to create 3 operation; Inspector, Customer and umpire respectively. Feed the MICs in each of these operations. When you click on result tab system will throw pop up for these 3 operations. Double click on Umpire if you want to record results noted by umpire. Likewise for rest of the operations. You can do this even after UD also (after 1-2 months also). You need to use MIC with control indicator as long term characteristics for this in QS23.
    Regarding averaging of results u2013 This can be achieved using single result recording MIC with or without inspection points. Use appropriate sampling procedure. When you feed results in QA32 system automaticaaly averages out the reading. This can be viewable against phi symbol.
    Finally you did mention that u201Chere I am not getting the newly created inspection lotsu201D. Does that mean inspection lot (10 origin) has not created?
    Regards,
    Anand Rao

  • Issue material for Subcontracting with reference to PO for multiple batches

    Hi All,
    Issue: I want to issue 5-6 materials with reference to PO which have multiple batches. How can that be done?
    Thus, if my raw material in stock are:
    mat X   Batch 1    50 nos
    mat X   Batch 2    40 nos
    mat X   Batch 3     30 nos
    mat Y Batch 6    10 nos
    mat Y Batch 7    10 nos
    mat Y Batch 8    10 nos
    mat Y Batch 9    10 nos
    i f for semi finished material A, sub contractor order 45000009 is created, where raw material required are:
    Mat X      100 nos
    Mat Y      30 nos
    then how can I issue the raw materials wrt PO, and select multiple batches at the same time, without user entering the material again and again.
    I have gone through the SDN multiple times to see the probable solution exists, but I have not received any solution.
    Regards,
    Ankush

    DO MB1B transaction, with Movement type 541,
    Enter the material with different Batches for required qty. as different line items.
    e.g
    line item 1 : mat X Batch 1 50 nos
    line item 2 :  mat X Batch 2 40 nos
    line item 3 :  mat X Batch 3 10 nos
    line item 4: mat Y Batch 6 10 nos
    line item 5 :  mat Y Batch 7 10 nos
    line item 6 :  mat Y Batch 8 10 nos
    Edited by: sudhansu satapathy on Oct 21, 2011 7:29 PM

  • Result recording for quantitative inspection characteristic

    Team
    Greetings!
    Please find the following requirement.
    We are using quantitative characteristics inspection.
    Inspection lots are created automatically and the sample size for each characteristics are determined based on the sampling proceedure.
    when we do result recording for a characteristic, say the sample size is 5, even if any one of the sample does not fall under the limit, we need the characteristic to be rejected.
    How can this be addressed.
    Gobinathan G

    .

  • Subcontracting - outbound delivery by ME2O for Multiple batch of 1MTR

    **Dear Expert**
    **Subcontracting -we want to send One material to Vendor for processing but this material having Multiple batches,In T-code ME2O  we can enter only one Batch while creating delivery.**
    **If we want to create Delivery  for multiple batches of one material how we can send By ME2O ? is there any option to add multiple batches in ME2O**
    **please reply as early as possible**
    **Thanks & regards**
    **Pash@SD**

    Moved from sales forum.   Please try to post the question in right forum so that you will get right solution.
    thanks
    G. Lakshmipathi

  • Result Recording for inprocess lot

    Hello SAP gurus.
    For in process inspection lot i have 3 operation for testing my requirment is if i goning for result recording for second operation without result recording for first operation system should restrict me. we are using 100 inspection point for inprocess inspection please suggest how can we do this?
    Regards.

    Dear,
    Goto OPK4 -Select order type /Plant - Select 'Generally valid setting' for 'Operation sequence-Select 'Error when operation sequnce is not adhered  and also QM Error message if no inspection result exists.
    Or you can use the exit CONFPP05 PP order conf.: Customer specific enhancements when saving .
    Regards,
    R.Brahmankar

  • Three Physical Samples withdraw from inspection lot 04  and then result record for all three

    Dear Gurus,
    We have 3 quality labs and each lab is sent a separate samples to inspect certain characteristics once we receive material from production. I have created an inspection plan and mapped these three labs as  work center in operation and then assigned MICs under each operation to inspect.
    Now my issue is how to map separate 3 samples to inspection lot generated from production  ( type-4) and also how to configure that to inspection plan.
    I have to result record for all these three physical sample as withdrawn from Lot based upon inspection plan as mentioned above.
    I can mention sample drawing procedure in inspection plan but how to map actual sample there.
    Any help will be greatly appreciated.
    Regards,
    Satish

    Hi Satish
    You are creating three operation for depicting three testing Labs.
    Against each lab (operation) you had assigned MICs as per your requirement.
    Now you have to assign a SDP along with inspection point type 200 for physical sample in task list.
    After prod confirmation system will create inspection lot along with a sample by default for 1st operation.
    For other operations you have to create samples manually referring the same inspection lot (QPR6).Remember to click ' Create Insp points' and mention operation.
    Release the samples in QPR4.
    Now when you go for result recording system would ask first for operation, so select the operation , then system will ask for insp point (sample no).There click on assign insp point , so system will provide the Sample no which were created in QPR6 for that particular operation.
    Please follow the steps and revert.
    Regards
    D Mohanty

  • Batch derivation for multiple batches

    hello,
    anybody pls help me i am doing batch deivation. i have made all configuration. but i am not getting how it will work for multiple batches. i my scenario when i am doing sheet clitting against sales order if my rm have two batches and my fg have four batches in one production order. how can i assign which rm batch characteristics goes to fg batch.pls pull out me for this situation.
    bhakta

    Hi Bhakta,
    Bigger problem in your case is not multiple Batches of RM but more then one Batch No. of Header Material in single production Order.I guess in your case Batch No. are triggered at the time of GR and not in Production Order at the time of Release.Correct?
    But up to my knowledge Batch Derivation is triggered at the time of Batch Creation in Production order.For which you have to first carried out Batch Derivation of sender Material.But in your cases the scenario is totally different due to Batch is created at the time of GR.So Difficult one and can be possible if you go with 1 Batch for 1 prod. order.
    Regards,
    Dhaval

  • Can I run the currency translation for multiple years at the same time?

    Dear Friends,
    I set up currency translation on our BPC NW 7.0 system and it is working fine ONLY if I run it for any one year at a time. But if I select multiple years in the data package (FX Restatment) selection it only calculates for the first year in that selection.
    say if I run the data package for years: 2009, 2010, 2011, 2012, it only performs currency translation for the year 2009.
    Can I run the currency translation for multiple years at the same time ?
    Note: The year is determined from the YEAR property of the "Time" dimension
    appreciate any inputs,
    thanks

    You can run currency translation for multiple years.
    I think the problem it is actually related to how you are sending the parameter to currency translation script.
    Just review the script logic log and you will see with what parameters was called currency translation FXTrans.
    My expectation is that actually the script is called just with first year and that's the problem.
    Log of script logic you can find it into:
    C:\BPC|DATA\Webfolder\YourAppset\YourApplication\Private Publications\Users used to run logic\Temp
    Regards
    Sorin Radulescu

  • Use of MS Project Management 2010 to Manage Multiple projects over a given time period

    Is there some information (article/s) I can research about using MS Project Management 2010 for managing multiple projects over a given time period? I'm being asked by a potential client to take a job as a Program Manager to manage five projects all
    at once. Each of the projects has it's own MS Project Management software, project leader, and project team. An overall project plan has to be put together to manage this large project. There are some dependencies with these projects inorder to complete
    on a specific date.
    Thanks

    SSCDML --
    In order to manage this program of five projects using Microsoft Project 2010, I would recommend you do the following:
    Create a shared resource pool file containing the resources in all five projects.
    Connect each of the five projects as sharing files with the shared resource pool file to share the resources.
    Create a master project for the program containing each of the five projects as subprojects.
    In the master project, set cross-project links as needed to show dependencies between projects.
    Hope this helps.
    Dale A. Howard [MVP]

  • To retrieve the Multiple Count of Records for Multiple types

    Hi Can some one help me in this:
    I have a talbe (MyTable) in which a column(Column 1) will have values as (Value1, Value2 , Value3, Value4 and Value5) for Multiple Records .
    I need to write a query which can give me the count of All the existing Records with the values(Value1, Value2 , Value3, Value4 and Value5) by a Single Query.The Resulting Table should have the Columns as :(Value1, Value2 , Value3, Value4 and Value5) with the Corresponding Counts in the Table.
    Thanks in Advance,
    vijay kumar k.
    Plz help me asap as it is very much linked with my Work..

    Hello
    Well, it always helps if you can post a create table statement, some test data, and the result you are expecting....it doesn't take long and you'll be much more likely to get a quick response from someone who has some time in between things that very much related to their work...
    create table dt_test_values(col1 varchar2(10))
    insert into dt_test_values values('value1')
    insert into dt_test_values values('value1')
    insert into dt_test_values values('value2')
    insert into dt_test_values values('value2')
    insert into dt_test_values values('value2')
    insert into dt_test_values values('value3')
    insert into dt_test_values values('value3')
    insert into dt_test_values values('value4')
    insert into dt_test_values values('value4')
    insert into dt_test_values values('value4')
    insert into dt_test_values values('value4')
    insert into dt_test_values values('value5')
    insert into dt_test_values values('value5')
    insert into dt_test_values values('value6')
    insert into dt_test_values values('value7')
    insert into dt_test_values values('value7')
    SQL> SELECT
      2     SUM(DECODE(col1,'value1', 1, 0)) value1,
      3     SUM(DECODE(col1,'value2', 1, 0)) value2,
      4     SUM(DECODE(col1,'value3', 1, 0)) value3,
      5     SUM(DECODE(col1,'value4', 1, 0)) value4,
      6     SUM(DECODE(col1,'value5', 1, 0)) value5,
      7     SUM(DECODE(col1,'value6', 1, 0)) value6,
      8     SUM(DECODE(col1,'value7', 1, 0)) value7,
      9     SUM(DECODE(col1,'value8', 1, 0)) value8
    10  FROM
    11     dt_test_values
    12  /
       VALUE1    VALUE2    VALUE3    VALUE4    VALUE5    VALUE6    VALUE7    VALUE8
            2         3         2         4         2         1         2         0HTH
    David

  • Condition records- setting printer for multiple vendors at the same time

    Hi all,
    I have maintained condition record for POs for Key combination of Doc type,Purch Org and vendors.Now for a particular doc type and P.Org , I have around 50 vendors. I need to change the printer for all these 50 vendors to 'printerx'.Is it possible? I tried selecting multiple vendors at a time and changed the printer but its not working.

    Hi Saurav ,
    You can achieve this through SCAT transaction.
    For running SCAT take the help of ABAP team.
    I hope u might be having the list in the form of text file.
    If not , download the same from NACH table.
    Regards
    Ramesh Ch

  • Customer Quality notification for multiple batches

    Hi All,
    Is there any way I can reference multiple Batches to single quality notification?
    Present solution Proposed -  Using user exit insert New Zfields to notification to enter Batch nos manually.
    is there any other standard enhasment where multiple batch entry can be done!
    Thanks in advance!
    Jay

    Dear Sadan,
    There is a chance of happening this due to that field is marked as mandatory.
    I hope this would happen, when Pm guy was making settings for the notification fields.
    He might have made this filed mandatory w/o any reference of Notification type (Influencing in spro filed selection), If he doesnt select Influencing and Notification type, that field Mandatory will effect all the Notification types.
    So please check with ur PM guy and change the field setting for Notifications and ask him to use Influencing - Notification type and desired notification type.
    Regards,
    Praveen

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • Result Recording for In Process Inspection

    At the time of taking Usage Decision for In Process Inspection, system gives warning message if Results have not been recorded. Can this Warning message be changed to Error message so that user could not able to take UD without recording the results.
    Thanks in advance
    Srini

    Dear Srini
    1)Use status profile for restricting the user to do UD without doing RR. use this link for doing it
    Link: [https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/20fbc091-ea3a-2b10-f0a3-877ffbf36436]
    2) you can use this auth object for doing the same restriction - Q_INSP_FIN
    Link: [Re: Preventing UD without results recording]
    Regards
    Gajesh

Maybe you are looking for

  • Error While Opening Reports IN OBIEE11g

    Hi Experts, I am getting the below error  while opening the Reports in OBIEE. OBIEE 11g has been installed on the linux box . Odbc driver returned an error (SQLExecDirectW).   Error Details Error Codes: OPR4ONWY:U9IM8TAC:OI2DL65P:OI2DL65P State: HY00

  • How to Compare date with Current system date in XSLT mapping.

    Hello Experts In a XSLT mapping program, I hava a filed, ZZOB which is giving some date. which I need to compare with the current date. Condition- ZZOB is greater than current date or ZZOBLIG = NULL Then go further statements. how can i campare with

  • How to get rid of 8800GT Video Laggin and Stutters

    Hi there I know you must be sick of my complaints of the same issue all the time but ive still not managed to fixed this this is my 4th 8800GT that ive owned since last december when the y got released Ive even tried XP and still the same with the la

  • Pages 09 not printing graphics since updating to snow leopard

    I've updated to 10.6.2 but I am unable to print templates with graphics to my Xerox 6520 DP printer. Reloaded the drivers but still not working. Will go ck with Xerox to see if they are issuing a new release driver or not. I tried opening a template

  • IPhone doesnt show in iTunes after update to newest version from 8.0

    Yesterday evening i update iTunes and then go to bed. Today when I want to sync my iP witch iTunes iPhone doesnt show! But tomorow it worked. I tried to repair, then uninstall and then install again iTunes, but it doesnt help. I dont know what to do,