Report on Material received through Transfer posting for Receiving Plant

Hi,
I have one bussiness requirement, I want a reoprt on Inventory ie
If the material is transfered from One plant to another plant via 301 movement. Can a report be generated with the receiving Plant and Sloc

Please use T code MB5B,  enter movement type 301, receiving plant & selection date.
Regards
Bhavesh
Edited by: Bhavesh Mistry on Jul 10, 2009 11:19 AM

Similar Messages

  • Reset transfer posting for doubful receivables and its provisions

    Dear Expert,
    I have run f103 (transfer posting for doubful receivables) and f104 (provisions for doubful receivable) but the value is wrong.
    is it possible if i want to reset/cancel f103 and f104 and the rerun it? how can it be?
    Thx n regards,
    Marilyn

    SE93 add variant

  • Transfer posting for sale order

    I have Material A Received from customer A 100 mtrs, in Storage location 0001
    Customer is telling me to use only 20 mtrs. so i will raise sale order (for the rest of the 80 mtrs he will tell when to issue to prod)
    By this time i have to do transfer posting only for 20 mtrs and also i have to create a batch and keep it in 0002 storage location
    what is the correct movement type i have to use??

    Hi murugan,
    I am receiving material by raising PO, then i am doing GR
    For eg suppose customer is giving 10000 mtrs, i will raise PO for 10000 mtrs and take the printout of it and i give to him as Receipt that PO number is for eg 1000
    i will do GR for 10000 qty against that PO number 1000 and keep it in 0001 str location
    in stock i will have 10000 mtrs of customer material
    Later after 1 month he will tell me what design has to be printed on the Material
    that too he wont give for total 10000 mtrs he will be giving only for 2000 mtrs
    for this 2000 mtrs i have to create a batch and i keep it in 0002 str loc
    while receiving material the code will be CM01
    After receiving the design from the customer we have to do transfer posting for 2000 mtrs and the code will be BC01 batch - 1000b01(shows 1000 is the Tracking number(PO number) B01 Batch 01)
    so that we come to know how much material have been received from the customer and for how much metres we have received design
    How much is still lying in storage location, tracking will be easy
    My question is CM01(customer material at initial stage dont have batch number)
    After receiving design for partial quantity  to do TP matereial to material  for 2000 mtrs fromt received 10000 mtrs.
    Material to material TP at that time system should create Batch? sale order also will be created as soon as we receive the Design for 2000 mtrs

  • Error in Transfer posting for movement type 303

    Hi Sir,
    I am getting following error while doing Transfer posting for movement type 303 thru BAPI_GOODSMVT_CREATE
    Error in Function:
    Order    not found or not permitted for Goods Movement.
    I am passiing all mandatory parameter for it as per BAPI Documentaion in tcode BAPI
    Transfer posting
    Transfer posting without reference to a reservation
    The following fields must be populated:
    Material number
    Plant
    Storage location
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    If I am doing manually by MB1B tcode, it is successfully done.......here its not asking any ORDER No...
    Please help me .........
    Regards,
    Krishan

    I'm not sure what you're system set up is...   So I'd suggest looking at everything you enter on the screen and then checking to make sure you are passing all the information in the BAPI.
    With that said our system does require posting date, and batch.  You might check that.   Also check that you've included all the required information in the header.
    Did you use the same data when you tried to process the BAPI that you used when you tried to do MB1B manually?

  • Transfer posting for intercompany

    Folks,
    I have the following scenario:
    Company code 1, plant 1, SLOC 1 and WHS 1
    Company code 2, plant 2, SLOC 2 and WHS 2.
    Is it possible to do a transfer posting (for example 301) between plants that have a different company code?
    Regards,
    MdZ

    Hi,
    check this link
    Its not possible with 301 mvmt type
    [http://help.sap.com/saphelp_470/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/content.htm]
    Thanks
    Suresh

  • You can only make a complete transfer posting for the quant?

    Dear All,
    The error message "You can only make a complete transfer posting for the quant"  displayed when I Create a TO in LT03 for a Delivery.  While the total available qty = 200, I am only creating TO for qty = 5.
    What settings need to be done to allow partial quatity?
    regards,
    Shetty

    Hi,
    Please check the below config in your system:
    LE>WM->Interfaces>Shipping>Define Shipping Control-->Shipping Control per Warehouse Number
    Here Put check for partial picking .
    Hope it will help you.
    Rgds,
    Kris.

  • Transaction to see the Open stock transfer order for the plant

    HI ,
    i need to develop one report in that client to make the report for the all open stock transfer order & the cost of the open stock transfer order for the plant .
    I need how to cretae the stock transfer order for the material , whci material master is required for this process.
    please give me step by step details for this .
    regards
    satish
    Edited by: satish kapartiwar on Jul 16, 2009 9:33 AM

    Hi Satish,
    You can see open stock transfer quantity in MB5T and stock value in MB5L. If you want to make stock transfer, there is two types intra company transfer(with in same company code) and inter company transfer (different company codes).
    Steps for Intra company stock transfer:
    This is only within the comp.code(w/o SD)
    (w/o SD) 351101 MvT. and (with SD) 641101
    1. Mat.(1434)should be maintained in both the plants.(@1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.
    Create customer (xd01) & and define the shipping data for plants in both the plants.
    Path: spro u2013 img u2013 material mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data
    (1 by1 )
    In Receiving plant (1100)
    Customer num. 123345 (for ex.)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    In Supplying plant (1000)
    Customer num. -
    (don't fill)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign doc. Type is "NLCC".
    Position doc type is "UB"
    Enter supplying plant(1000) & doc type (NL)&checking rule (ex:01)
    6.Assign doc. Type is "UB" to u'r plants.(PO)
    Go for new entries
    Enter supplying plant(1000) & Receiving plant (1100)&doc type (UB).
    7. Create a PO, choose the doc type is 'UB' & item cat.'U', Enter supplying plant as a vendor in PO of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 outbound delivery instead of PO mov.type 101.
    11. See the stock overview in the receiving & supplying plants.
    Steps for Inter company Transfer:
    1) Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure, In Customer Master, sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group, Shipping Condition and Supplying plant combination, Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receiving Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Regards,
    Prasath

  • Transfer Posting for Line Items between Reconciliation Account

    HI,
    My customer want to transfer costing the line items between a old Reconciliation Account and a New Reconciliaton Account.
    For example, i have a Account Group Vendor with a old Reconciliation Account " Vendor CEE".
    This reconciliation account has the line items concern differents Vendors.
    Edit a new Account Group calling ( CEE) to replace a Old Account Group.
    After changing in Vendor Master data the Reconciliation account, we need to transfer posting the line items in the new account reconciliation
    In Sap system is there a report can do it? Can you help me?
    Regards

    Hi,
    Thank you for the answer.
    I did that, and exactly:
    - In Trx Obbw insert the reconciliation account and Adjustement account.
    - and execute the trx FAGLF101 in test but the sap system give me the following error:
      " Account determination for transaction A00 is missing for account 0205016001 ZM P001 "
       Message no. FR005
    Can you help me?
    Regards
    Edited by: Marika De Cesare on Oct 18, 2011 1:06 PM

  • Transfer posting for RT packaging to unrestricted stock transfer.

    Guys,
    I am having some stock in RT Packaging (501 M) and now I wish to transfer this stock to normal unrestricted. Pl suggest.
    Thanks in advance,
    Parag Mahajan

    Hi,
    I'm afraid you cannot post the RTP stock (special stock "M") to "common" unrestricted-use stoc.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b921143ad11d189410000e829fbbd/frameset.htm
    Which Goods Movements are Supported?
    The following goods movements (and the respective reversal or return movements) are defined:
    - Posting Other Goods Receipts to Returnable Transport Packaging (RTP) Stock
    - Posting Returnable Transport Packaging (RTP) Quantities at Goods Receipt for Purchase Order
    - Transfer Posting Between Storage Locations
    The transfer of RTP stock to your own stock is not supported.
    So, you can achieve your goal in two steps:
    1. Eliminate the RTP stock (502M)
    2. Receive it (e.g. 101; 501)
    Regards,
    Csaba

  • Transfer Posting for Plant to Plant: Account Determination

    Dear all,
    I'm performing a standard transfer posting from Co. X Plant A (issuing plant) to Co. Y Plant B (receiving plant). Upon successful of the transaction, there are 2 accounting documents generated for both issuing plant and receiving plant, respectively.
    Alright, when I view the accounting document for the receiving plant, it's debit stock account and credit another account. I know that the configuration for stock account is under BSX. However, I'd like to know how the SAP system determine which account to be credited at the same?
    Thanks.
    Steven

    Dear all,
    Thank you for the answers so far. However, I apologize if I've caused some misinterpretation.
    Let me explain further. I'm not using STO. I"m doing a transfer posting of stock using movement type 301 between 2 interco. plants as explained earlier. My question is more on accounting document generated for the receiving plant. The following is what I get:
    Accounting Document for Receiving Co. Y Plant B:
    Debit - Account GLxxxx -> Spare parts (This is my stock account configured in OBYC - BSX) => OK, no problem here.
    Credit - Account Nxxx -> Co. X => My question: Where or how did the SAP system acquire this account information at the first
    place? I don't remember configuring this in SPRO.
    Thanks.

  • Transfer posting from one plant to another plant

    Friends i want to transfer goods from one plant to another plant of same company code and iam trying this one in transaction migo if post for this it gives an error
          "posting only possible in periods 2006/05 and 2006/04 in company code" what error it is

    Hi,
    Use the MMPV to open the new posting period date.
    here you have to use your company code & Current date , then execute to open the new posting period.
    while running this transaction you ensure that GR open screen should be closed.
    hope it helps....
    manoj Singh

  • Receiver Determination - Configuration Overview for Receiver Determination

    Hi All,
    I was trying on some tutorial for Calling RFC(sender) and creating a File at Receiver site.
    I've configured all the required setting at the Design: Integration Builder.
    As for Configuration: Integration Builder. Until the Step where I required to setup the Receiver Determination, there is this part "Configuration Overview for Receiver Determination". where i have to maintain the "Receiver Service", else i will hit this error "Enter the receiver service".
    The steps which i followed was :
    1. Create 2 Communication Channel for Sender/Receiver in the Business System.
    2. Create a Sender agreement.
    3. Create a Receiver agreement.
    4. Create a Interface determination.
    5. Lastly "Configure the Overview for Receiver Determination"  for   Receiver Determination
    The problem which I'm facing now is I have nothing in the "Configure the Overview for Receiver Determination" at all even i have created the sender/receiver agreement and interface determination.
    While some troubleshooting, under the If No Receiver Is Found, Proceed as Follows: I tried choosing the "Continue Message Processing with the Following Receiver" radio button and choose the Receiver for the Service then hit the save button.
    The error "Enter the receiver service". pop up but now, the Receiver service was shown under the "Configure the Overview for Receiver Determination". When i try choosing back the "Terminate Message Processing with Error (Restart Possible) and hit the Save button. The Receiver service goes missing again.
    Any Idea what happen ? or anything i missed out ? thanks in advance.

    Hello
    Check if you have the issue in the kba #1538009 Error When Executing Open - Object not found.
    Also see note #1466011 Usability Improvements in Directory:
    o Don't show deleted objects in navigation tree
    When you delete an object in Directory the link to this object is not
    automatically deleted from Configuration Scenario. You need to manually
    open every scenario and remove such 'broken' link. In scenario editor
    broken links are displayed in grey font and therefore can be easily
    identified. Unfortunately the navigation tree in 7.1 (in contrast to
    XI3.0) doesn't make difference between existing and broken links and
    shows them as they all leads to existing objects.
    Regards
    Mark

  • Material loss tracking in two step transfer posting with in plant

    Dear Friends ,
    Here the case is  material will going loss when shifting one storage location to another , here i am using two step procedure . so how can i track rhe loss here . our client want to post loss value to production account only and also they want to know total loss in report . How it can be maintainable?.....which is right method for this .
    RB

    Hi,
    You can scrap the material that underwent losses either at issiuing location (reverse GI for that much qty) or at the receiving location (do GR then scrapping).

  • Restricting Transfer Posting for Reserved Stock

    Dear Gurus,
    I have a scenario that the user should not be allowed to transfer material (SLoc to SLoc) that has been reserved. At the moment the system is allowing without any warning or error. Is it possible and do I have to configure any settings for it?
    Regards,

    Hi,
    Contact your Basis team and lock the movement type 311.
    Reards,
    Mahesh Wagh

  • Error when making transfer posting for order type UB

    Hi Experts
    I have created a stock transfer order with order type UB, it's two differents plants within same company, but I got error message " purchase order contains no items for stock transfer" I have checked relevant configuration in OMGN, and also the purchase order, it didn't have problems, so what could be the problems?
    points will be rewarded if helps.
    thanks
    elly

    Hi Elly
    pls check
    1)Goods issue wrt to the STO in the supplying plant ( 351 mvt type).T code MB1B
    2)Good Receipt in the receiving plant ( 101 mvt type ).
    Check item category of item is 'U'
    Check settings in OMGN
    check in OMGN Assign delivery type and checking rule and see if UB is entered there for your supllying plant.
    Also check PO is not subject to release
    Vishal...

Maybe you are looking for

  • Tempo problems with imported wav files

    Hey everyone, sorry if there's a quick fix for this in the forums that I couldn't find, but I've been having some tempo problems with imported .wav files. Long story short, my system couldn't handle playing all the tracks for a song while recording d

  • Help with nav buttons please

    Hey there, i've recently been following a tutorial and I have come across a problem with the AS for the nav buttons,  http://www.flash-game-design.com/flash-tutorials/basic-flash-website-tutorial-6.html, the tutorial says to write: btnabout.onRelease

  • [SOLVED] gtk3 living with gtk2

    I am using Xfce, and after updating today I noticed that the Gnome applications I have installed that are now running under gtk3 look like crap. I followed the instructions in this thread (https://bbs.archlinux.org/viewtopic.php?id=116451), but there

  • Regarding datasource creation

    hi   i wanna connect to back end oracle database ,can any one send me steps for creating datasource in visual admin tool and the code  to be inserted in webdynpro and further things to be done regards Ramakrishna

  • Change entry in ADR6 table

    Hi, I need to replace the existing email address domain with the new one [example: xxx(at the rate of)yyy.com to xxx(at the rate of)zzz.com] in ADR6 in two fields: SMTP_ADDR and SMTP_SRCH. There are huge number of entries in the table which apparentl