Report Painter Drilldown on Cost Element for Project Systems
I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.
Hi Avinash,
See my replies below.
1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
When you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
coming to equipment cost - are you capturing using PO through GR?.
2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials have their own valuation class and have default CEs accordingly. that would not be big issue.
Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
3. I have answered the relevance of Cost relevance check box in above.
Hope above makes sense.
Thanks,
Sudhakar
Similar Messages
-
How to get Cost element for a component in co03 cost analysis report
Hi,
I'm using table COSP to find the quantity for a production order component. However, I need to identify the cost element first to get the unique data. In CO03 cost analysis report, there is cost element for the component. Does anyone know how to get it ?
Thanks.CSKA stores the basic info about the cost element
There is no data in CSKB.
I'm trying to use different tables to get the cost element.
AUFK, AFKO, AFPO, RESB, ...but no luck... -
Hi Experts,
would anyone know of any reports that allows me to view the cost element by the rows, base on the WBS that i enter. For standard report, S_ALR_87013543, they list the cost element by each row, i am trying to find a report that shows the cost element by the column with the WBS in the row. Is there such a report? Please assist <removed_by_moderator>
*Read the "Rules of Engagement"
Edited by: Juan Reyes on Apr 6, 2011 4:07 PMHi,
If I have understood your query correctly...
You can use CJI3,CJI5,CJI4 reports instead of S_ALR_87013543.
or run S_ALR_87013543 & use call up report(F7) feature to get CE & WBS.
Regards,
Sl -
Define a settlement cost element for receiver type CTR
Hi, i work for real estate company and we just implemented SAP. were on our process of closing our books and we are tied by error during PS settlement. House repair, which is an income statement account and cost element as well, are monitored in Project Systems with settlement rule set to GL. Postings will initially be posted as Project Cost WBS and will be settled to house repair GL. however, someone advised us that only balance sheet accounts should be settled to GL. Cost and expenses should be settled to Cost Center and so we changed the configuration and business process to posting costs directly to GL house repair and settlemet rule is to be settled to CTR. After the change in configurations and settlement rule, we still cannot process settlement due to this error "Define a settlement cost element for receiver type CTR". Please help, i may have missed a step in system configurations. Thanks thanks
Define a settlement cost element for receiver type CTR
Check in OKO6 whether you have defined the required Settlement Cost Element to the allocation structure.
thanks
G. Lakshmipathi -
Cost elements for WIP (TCODE : OKGA)
Hi All,
I am working with Production Order wip calculation, varaince and settlement.
In the RA key configuraion,(for WIP calculation)In OKGA, tcode we define, the cost elements for a perticular line id, for WIP calculation.
I wanted to know, what is the purpose of these two cost elements.
If I execute line item report, I dont see any value on these cost elements, after wip calc and settlement.
However, I see the work in process on it, in the layout. I want to know, the exact purpose of these cost elements assignment.
Is there any internal controlling document that is getting posted?
Regards
SRHi Swastik,
Those cost elements (category 31) are used to calculate and store WIP values at the detailed level of so called line IDs.
Line IDs are groups of cost elements that were posted to production order.
For example you can calculate and store WIP separately for Raw Materials, Semis, Activities and overhead.
You can also settle them to different GL Accounts via mapping in txn.OKG8.
Hope it helps,
Szymon -
Can we create a cost element for a Balance Sheet account?
Hi folks,
Is it possible to create a cost element for a balance sheet account? If yes, what are the scenerios we would need it and how is it done?
thanks in advanceHello
Please review the below information regarding cost elements category 90 : Financial Accounting Balance Sheet Accounts
Category 90 is automatically assigned when you create cost elements in CO whose general ledger accounts in FI are asset reconciliation accounts
(special balance sheet accounts), not income statement accounts. You
cannot change this category in CO master data maintenance.
FI does not require CO account assignments to cost elements of
category 90. However, if you enter an account assignment, it is only
recorded statistically for real objects.
Category 90 allows you to check order or project budgets for fixed
asset procurement. To do so, enter the investment order or WBS element
in the corresponding field in the asset master. The Asset Management
component ensures that the order or element automatically appears in
the document when you access the asset procurement.
The R/3 System debits the order/WBS element statistically in the
Controlling component, which you can then monitor with availability
control.
You can treat cost elements of category 90 as activity-independent as
part of cost center planning.
Also see note 75980 for further information. From the note:
The use of cost element category 90 is only provided in the standard
system in the following two cases:
1. As of Release 3.0G, asset acquisitions and down payments which are
assigned directly to a fixed asset or asset under construction can
be assigned to an account on internal orders or WBS elements
statistically. In this manner, for example, an availability check
can be triggered on the order or the WBS element for asset posting.
2. As of Release 4.0, cost elements of category 90 can also be created
for material stock accounts to display material make-to-order stocks
on sales orders or customer projects.
Regards
Javier Reviriego -
Is there a way to bypass activity type/ cost element for CJ20n Activity?
Hi Experts,
Is there a way to bypass the activity type set in the Internal tab of a particular activity in CJ20n?
Here's a background of the scenario:.
- In CJ20n, under WBS element 100->Network 10->Activity 1, under the internal tab, the activity type set up is ACT1
- Under person assignment, I have 2 resources assigned Person 1 and Person 2, with the following values:
Person 1 Work: 1.0h Dur. 10D
Person 2 Work: 2.0h Dur. 15D
- In infotype 135, person 1 has a cost element set as ACT2 and person 2 has a cost element ACT3.
- The problem is that when you bring up the Plan/ Actual comparision report (ctrl+F11 in CJ20n), the costs are consolidated for ACT1 and negates the cost elements for Person 1 and Person 2
Is there a way to bypass this and use the individual cost elements set up for person 1 and person 2?I dont think this is possible for the scenario that you explained. I mean, you have a single activity which has 2 resources assigned and each of these resources has a different activity type. Standard SAP allows only 1 activity type for an activity.
Just a query, why dont you create 2 different activities for these resources since the activity types are diff for both? -
Two Cost Element for the same GL
Hi,
We have 2 Company Codes - 1000 & 2000. We are using same CoA in both the Company Codes. We have a GL, say 12345678 for posting short/excess amount. So during MIRO, the accounting entry would be:
GR/IR a/c dr. 10,000
GL 12345678 2
Vendor 10,002
GL 12345678 would be dr or Cr would depend on short/excess amount.
We have created Cost Element for this GL 12345678. If I post the MIRO without attaching a Cost Center to this Cost Element system thows an error to attach the Cost Center. I have separate Cost Center for Company Codes 1000 & 2000 however I can only put one Cost Center in this Cost Element.
Can anyone advice how can I post the above mentioned entry with different Cost Center. This line item (GL 12345678) is generated automatically and the Cost Center field is greyed out hence I don't have option to enter the Cost Center during MIRO. I checked the FSG of this GL, Cost Center field is 'Optional' over there.
Thanks,
SandySolution Option* -You can assign Differant Cost Centers to Company Code 1000 and Company Code 2000 in OKB9 Transaction Code.Follow the below process....
--- Go to OKB9
--- Select New Entries button
--- Give the Company Code 1000 in first row and 2000 in 2nd row
--- Enter the Cost element 12345678 for company code 1000 and 2000
--- Enter the relevent cost centers for company code 1000 and 2000
--- Select Save
Thanks
Fit 4 Nothing -
COPA: how to identify which cost element for sender and receiver in IMG
Hi Guru,
I know my cost element for sender and receiver from the settlement document, but where in IMG, i can identify how it settup to use which cost element for my sender - order , which cost element should be used for my reciever profit segment.
Thanks,
KickHi,
Go to KEI1
Select your transfer structure
double click on assignment lines
check the source and value fields to get the mapping.
Regards,
Sridevi
<i><b>Pls. assign points, if useful</b></i> -
Define a settlement cost element for receiver type FXA
Hi,
While settling the AUC internal order,i am gettingg the below error.Kindly advice me
Define a settlement cost element for receiver type FXA
Message no. KD506
Diagnosis
In allocation structure A1 (controlling area AFCO), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type FXA.
Procedure
Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
Thanks
SupriyaHi Supriya,
Go to SPRO-> Controlling > Internal orders>Actual postings>Settlement> Maintain Allocation structures & choose A1 and go to assignment, select the relevant category like raw material / consumption and then go to source, check the range of cost elements first then click the settlement cos t element and under that choose FXA and define the settlement cost element which must be created under 22 category.
After maintainig the above, you will not get the error anymore.
Thanks & Regards
Anuj Agarwal -
Cost elements for TAX expenses
Dear all,
Is it necessory to create cost elements for following GL's ??
We are not going to implement PCA here.We are going to implement Product Costing.
50000031 EXCISE DUTY - PURHASE
50000032 SALES TAX C.S.T-PUR
50000033 SALES TAX M.S.T-PUR
50000034 EXCISE REBATE CENVAT
50000035 SALES TAX (PUR)
50000044 EXCISE REBATE CONSUM
50100000 CLOSING STOCK OF SEM
50100001 CLOSING STOCK OF FIN
50100002 OPENING STOCK - SEMI
50100003 OPENING STOCK - FINI
50100058 ROUNDING OFF
50100138 Cost of Goods Sold
50200011 PREVIOUS YEAR EXPENS
50200012 PREVIOUS YEAR TAXES
50200013 Doubtful Advances Provisions
50200014 Doubtful Debts Provisions
50200015 Realized Loss on Foregn exchange
50200016 Unrealized Loss on Foregn exchange
Thanks & regards,
RanjeetRanjeet
Check your Previous threads answer
Anup -
Want to change the cost element for a activity type (KP26)
Hi,
I want to change the Allocation cost element for an activity type in KP26. I have already changed the cost element in the activity master data in KL02. Now i want to change it in KP26. I am trying to delete the existing line item in KP26 to create the new line item with the new cost element, but system not allowing to delete the existing one. It throws the error message ""Allocations with XXXXXXX/XXXX (Cost center/Activity type) exist ; deletion not possible". Can someone please help me to change the cost element?
Regards
DevHi Rao and Lalit,
Thanx for you people for helping me. i havin gone doubt here. If i am deleting the existing line in KP26 and create new line with appropriage cost element will it be cause the existing datas? I don't want to go for another activity type, because our process is a complex process exist all over the world in more than 300 company codes. So i want to use the existing activity type but want to change the allocation cost element alone. Is there any possibility to change the cost element alone?
Regards,
Dev -
COST ELEMENT FOR G/L ACCOUNT [KA01]
HI,
KA01 GIVES ERROR
COST ELEMENT: SILT
VALID TO XXXX VALID FROM: XXX
eRROR: CREATE G/L ACCOUNT SILT FIRST.....Hello,
You need to create a G/L account first. Create a G/L account with transaction code FS00 and give this account as the cost element in cost element creation (KA01).
If you have any doubt then check the existing cost elements in the system and check the G/L account and try to replicate in FS00.
Prase -
Planning Profile for Project System
Dear All,
In planning Profile (T Code OPSB) for Project System we can find RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
Thanks and regardsMr. Sridhar,
Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
Regards
Ramesh -
Crystal Report does not show the webelement for SAP System
Hi all,
I have added web element in Crystal report for SAP system (BI or R/3) . But it does not show the control. It shows only scipt.It does not render the HTML.
But if I add the webelement for Excel sheet ,It shows the control.
How can I add web element for SAP System? Can't we use web controls in SAP system ?
Help me in this regard.
Regards
Hemalatha JHi,
We have the same problem, did you find the final solution?
Thanks in advance
Regards.
Maybe you are looking for
-
Mac mini (late 2014) display Flicking/goes Off and On
Hi everyone! Well.. i can say that, this is my first Mac computer and i already have problems. I have read a lots of comments and i have seen that many people experienced this problem with Mac mini, like display corruption, not property colors, flick
-
How to get a dynamically created symbol to delete itself on click?
Here's the setup... I want to have a dynamically created symbol appear upon click of a hotspot. In this case, you click on a pulsating hotspot and a popup box appears. Here's the code I'm using for that. //Create an instance element of a symbol as a
-
Readind Data From ID/IF Clusters (PU12)
Hi, I want to read data from Clusters ID and IF of table PCL2, they store historical data of PU12 Interface Toolbox. The macro that I will be using is rp-imp-c2-id, I am not sure how to interpret the data stored in clustd field? Does anybody know FMs
-
PO in backend classic scenario
Hi experts I am triing to create Po in backend from a catalog shopping cart but an error occur ERROR CREATING SUBSEQUENT DOCUMENT` But no log that help me to solve the problem are displayed. Im PPOMA_BBP the users have BSA atribute ECPO. IN Define Nu
-
My iweb web site is not showing in some MSIE or firefox browsers???
...I really don't know why, is anyone able to help? My site is www.wildfiresolutions.co.nz