Report to pull next call date for all equipment

Hello,
Is there a report in SAP to get all the next call date for all of our equipment within our company?
Thanks

hi
in IP24 use the multiple selection to select all the equipment and in the selection screen under maintenance dates select maintenance status as W/ and execute system will display the next planned date for the equipment selected -But with all the call object which are on hold
regards
thyagarajan

Similar Messages

  • Billing call data for previous months

    I have always been on paperless billing to save money. As Kerry said in a previous post to encourage paperless billing:
    "Get organised
    Signing up to paper-free billing with My BT can save you time – and it makes finding your latest bill much easier than searching through endless cabinets and drawers for that elusive bit of paper.  Copies of your bills are stored online for 15 months, so they're always there to view, download and print when you need them. One secure online log-in gets you instant access to your bill.:"
    I now find that you can only look at call data for the latest months bill. It is no good having paperless billing if you have to use loads of your own paper to print out all the data.

    Patty-L wrote:
    @    john46  You could of course store the data on your computer in pdf format each month I do  and can go back years.
    Thank you John for the information it has worked (I can now save on paper usage)    
    Regards Pat
    And Ink, and wear and tear on the printer
    toekneem
    http://www.no2nuisancecalls.net
    (EASBF)

  • Maintenance Plan which has two call dates for year

    Hi all,
    I need to create a Maintenance Plan which has two call dates for year. The dates have to be the last Sunday of March and the last Sunday of October for the same Maintenance Plan. Does anyone know the solution? Please do throw some light on it.
    Thanks
    S
    Edited by: Sara Silva on May 14, 2008 11:39 AM

    Sara,
    You could do this without user-exits...
    Create a factory calendar with two working days. Then create a maintenance plan with a package of 1 day.
    Once scheduled it should produce the required maintenance cycles.
    There are two things you need to be very careful about:
    1. Keep the factory calendars updated, say, 3 years into the future
    2. Ensure you comprehensively test the IP30 transaction
    PeteA
    [www,pjas.com]

  • Can we load data for all levels in ASO?

    Hi All,
    Im creating cube in ASO
    can i load data for all levels in ASO
    we can load data for all Levels In BSO but in ASO i need confirmation????
    and one more
    wat is the consider all levels option in ASO is used for ? wat is the purpose?
    Can any one help ,it would be appriciate.
    Thanks

    In an ASO cube you can only load to level zero
    The consider all levels if used for aggregation hints. It allows you to tell the aggregation optimizer to look at all levels when deciding if aggregation needs to be done on the dimension

  • Can we load data for all levels in ASO cube

    Hi All,
    Can we load data for all levels of members in ASO cube in 9.3.1.
    Regards

    Yes you can load data for all levels in an ASO cube in any version HOWEVER, none of the upper level data in any cube will be there when you look for it. You will get a warning message in the load because ASO cubes don't store data at upper levels. It is the same as loading data into dynamic calc members in BSO cube. It will do the load without compalints, but there will be no data there (At least you get the warning in ASO)

  • Why files in Lightroom mobile and files in the creative cloud not the same? idea-  one place(stored date) for all application ??????

    Why files in Lightroom mobile and files in the creative cloud not the same? idea- one place(stored date) for all application ??????

    Lightroom Mobile is not a cloud storage service. You shouldn't treat it as a way of backing up your files. You are merely storing Smart Previews of your files in the cloud space, high-quality JPEGs of your files regardless of their original format on your desktop. The point is that they are there so you can continue editing them in a Lightroom-like environment even while away from your desktop/laptop computer. The files in Lightroom Mobile can only be used in Lightroom Mobile.
    This is very different from what is offered by the Creative Cloud storage, which can be used to synchronize your files between any device (that can support the individual files).
    The vast difference in how each service works and its intended use is why they are separate.

  • Is there a way to allow setting of "Due Date for All Tasks" to current date in OOB Workflow

    Is there a way to allow setting of "Due Date for All Tasks" to current date in OOB Workflow
    I need to set it today because there are tasks that is needed to be completed on the same day.
    Is there a way without modifying the page/form. like a configuration or something?
    ----------------------- Sharepoint Newbie

    Hi ,
    As Ajeet said,  for implement your requirement, you can change the data validation on the Due data field.
    You can do as the following :
    Open the site with SharePoint Designer 2010
    Click on Workflows on the left launch, then find ‘Approval-SharePoint 2010’, click on it
    On the Forms section, click ‘ReviewApproval_***.xsn’
    Then you can find Due Data for All Tasks, and change the validation
    In addition, if you create an approval workflow with SharePoint Designer, you can use a specific date, it contains hour and minute.
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • Difference between Due Date for All Tasks and Duration per task in an approval workflow

    Hello,
    I'm starting to read up and learn about approval workflows in Designer 2010.  I am confused by the fields "Due Date for all Tasks" and the "Duration per task".  I understand that the Due date for all Tasks is the date that all
    of the tasks in the workflow must be completed by.  And I understand that the duration means each task has x number of days to complete.
    But I dont know whey we need them both.  If I have the task duration set to two days and there are 3 tasks involved, then wouldn't the due date be 6 days from the start?  Why would I have a due date for all tasks that is completely different than
    the sum of the duration of days for each task? 
    Please help shed some light!

    Hi Michelle,
    Due date for all tasks, this setting specifies the date by which all tasks are due. It’s used for serial and parallel
    task.
    Duration per tasks, this setting specifies the date by which an individual
     task is due, it’s used for serial workflow participants.
    Note, when you create an approval workflow, select task process participants(approvers oob approval workflow), we can also
    select once at a time(serial) or all at once(parallel).
    For more information, see
    http://office.microsoft.com/en-us/sharepoint-server-help/use-an-approval-workflow-HA101793831.aspx
    Best Regards.
    Kelly Chen
    TechNet Community Support

  • In mdx how to get max date for all employees is it posible shall we use group by in mdx

    in mdx how to get max date for all employees is it posible shall we use group by in mdx
    example
    empno  ename date
    1         hari        12-01-1982
    1         hari        13-06-2000
    by using above data i want to get max data

    Hi Hari3109,
    According to your description, you want to get the max date for the employees, right?
    In your scenario, do you want to get the max date for all the employees or for each employee? In MDX, we have the Max function to achieve your requirement. You can refer to Naveen's link or the link below to see the details.
    http://www.sqldbpros.com/2013/08/get-the-max-date-from-a-cube-using-mdx/
    If this is not what you want, please provide us more information about the structure of you cube, so that we can make further analysis.
    Regards,
    Charlie Liao
    TechNet Community Support

  • Save persistents data for all users

    Hi
    The persistent datas are save for one specified user, the user logged in into the system (e.g. Windows).
    Is it possible to save persistent data for ALL users?
    If yes how?
    Thanks
    Hans

    Hi Hans
    IMO it might be a bit tricky. As you know - Persistence objects are stored in databases. I presume you're not asking about document database. Second database is stored in SavedData file which is located in per user data directory. I.E. on mac in ~/Library/Caches/Adobe Indesign/Version 6.0/en_US/Indesign SavedData
    Probably you need to create your own implementation of persistence or take a look on relations between file system and IDataBase interface.
    Regards
    Bartek

  • Next release date for C++ Parser- URGENT-

    What is the next release date for the C++ Parser??
    The bug in 2.0.3.0.0 regarding broken DOS filenames is preventing us from shipping a build to Apps that is required next week.
    Otherwise what is the most recent C++ build that offers:
    a) A fix for entity reference parsing(&apos,&quot)correctly.
    b) DOS filename compatibility(i.e c:\cleo.xml).
    This is very urgent so your response is much appreciated.
    null

    It is scheduled to be released by the end of this week.
    Oracle XML Team
    null

  • How to generate a list of  pick dates for all scheduled deliveries?

    Hi!
      How to generate a list of  pick dates for all scheduled deliveries?
      What all the tables involved?
    Thanks
    Imran.

    Thanks for the suggestion concerning the file path.  And certainly it would have been nice to have done this before beginning.  However this is a project that has been around for quite a while, and the files have been moved into different bins.  And now the project sequence is being revised.
    So the problem is, worded slightly differently, how can I search all of the bins for the files that are used just by this sequence, ignoring the files which are used by other sequences?  Or, how can I get a list of the file paths of the files that are used in the sequence?

  • HOW TO MIGRATE DUNNING LEVEL & LAST DUNNED DATE FOR ALL OPEN LINE ITEMS

    Hi,
    We need to upload dunning level & last dunned date for all open items (to be done separately i.e. after all open items migrated) which is different for each and every line item so if we use mass upload (fbl5n) we have to do for each and every open line item which is not feasible as open line items in thousands..I tried LSMW also,problem is that for Batch input recording we need to run one complete cycle in sm30 but there is no maintenance dialog for BSEG & BSID table.. Please share your valuable Inputs how we can go ahead..
    Thanks in advance

    Hi Mark,
    Thanks for your reply.
    It is complete a Zcopy of a standard one, but we are facing one or two records are not updating correctly out of hundreds of customers in the worklist.

  • Can start date be set before valid for date for an equipment?

    Can start date be set before valid for date for an equipment?

    Hello,
    Generally when a asset/equipment  is purchased that is the valid from date and when commissioning done and it becomes operational then that date is start up date. So logically start up date should not before valid from date, it could be same.
    Can you elaborate why you want start up date before valid from date ?
    Thanks
    Naveen

  • Vendor ageing report data for all doc type needed(urgent)

    hello everyone
    once again i need ur help guys.
    in the vendor ageing report i am getting data for only one document type and not of other.
    ex- see i have two documents type-
    1.KD 2. EJ
    so i am getting data for document type KD only.
    so how to get the data of document type EJ along with KD.
    below is my code .
    so tell what modifications i have to made .
    *& Report  Z_VENDOR AGEING                                                    *
    *&  in this repoet I am calculating the vendor ageing
        which is depending on formula
        AGEING = Current Date(or any date entered by user) – Bline Date(BSIK-ZFBDT)                                                                 *
    REPORT  z_vendor  NO STANDARD PAGE HEADING
                      LINE-SIZE 200
                      LINE-COUNT 65(3).
    TABLES : bsik.
    DATA : BEGIN OF t_out OCCURS 0,
           bukrs LIKE bsik-bukrs,
           saknr LIKE bsik-saknr,
           bldat LIKE bsik-bldat,
           wrbtr LIKE bsik-wrbtr,
           lifnr LIKE bsik-lifnr,
           zfbdt like bsik-zfbdt,
           zbd1t like bsik-zbd1t,
           ageing type i,
           END OF t_out.
    parameters : p_date1 type d.
    SELECT-OPTIONS : s_bukrs FOR bsik-bukrs,
                     s_saknr FOR bsik-saknr,
                     s_lifnr FOR bsik-lifnr.
    SELECT bukrs saknr bldat wrbtr lifnr zfbdt zbd1t
           FROM bsik
           INTO  TABLE t_out
           WHERE saknr IN s_saknr
           AND bukrs IN s_bukrs
           AND lifnr IN s_lifnr.
    Loop at t_out.
    CALL FUNCTION 'DAYS_BETWEEN_TWO_DATES'
      EXPORTING
        i_datum_bis                   = p_date1
        i_datum_von                   = t_out-zfbdt
      I_KZ_EXCL_VON                 = '0'
      I_KZ_INCL_BIS                 = '0'
      I_KZ_ULT_BIS                  = ' '
      I_KZ_ULT_VON                  = ' '
      I_STGMETH                     = '0'
      I_SZBMETH                     = '1'
    IMPORTING
       E_TAGE                        = t_out-ageing
    EXCEPTIONS
      DAYS_METHOD_NOT_DEFINED       = 1
      OTHERS                        = 2
    IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    Modify t_out.
    Clear t_out.
    Endloop.
    LOOP AT T_OUT.
    IF T_OUT-SHKZG = ‘H’.
    T_OUT-WRBTR = T_OUT-WRBTR * -1.
    T_OUT-WRBTR = T_OUT-DMBTR * -1.
    ENDIF.
    DATA: TOTAL(16) TYPE P DECIMALS 2.
    TOTAL = TOTAL + T_OUT-DMBTR.
    Endloop.
    LOOP AT t_out.
      WRITE : / t_out-saknr,
                t_out-lifnr,
                t_out-wrbtr,
                t_out-zfbdt,
                T_OUT-DMBTR,
                t_out-ageing.
    AT LAST.
    WRITE:/ TOTAL.
    CLEAR TOTAL.
    ENDAT.
    ENDLOOP.
    Message was edited by: sanjeev singh

    Sanjeev,
    Can you tell what is document type EJ representing...Secondly, if you check couple of documents of EJ type and check if data is available as per you WHERE clause filters.
    Regards
    Anurag

Maybe you are looking for

  • Problem in formatting a Numeric Field(Urgent)

    Dear All, I hava a variable of type p decimals 2 in my driver program. a value of 12.50 is assigned after calculation in Me23n. when displying the same in sap script it's displying like 12,50 instead of 12.50 I saw in my default settings(SU01)       

  • Screen resolution switches while using Powerpoint & hyperlinks

    Hi. I'm using Office 2011 on a Macbook Air. I use PPT to teach and my classrooms have integrated projectors (VGA connection). My PPT runs and displays well. However, I often put hyperlinks in my slides so I can quickly access webpages. When I click o

  • Can I run Imacros on an Ipad mini?

    Plain and simple, I need to know if I can run imacros for firefox on an ipad mini. If I can't then I'm not going to buy it. Thank you! Josh

  • Adobe Reader 11freezes with Windows 8 64 bit

    Adobe 10 worked fine with Windows 8. After I upgraded Reader to 11 it started to freeze. It will download a PDF about a tenth of the way and then just freeze. Have to go to Taxk Manager to get out of the program. I have uninstalled and reinstalled se

  • Did file size get bigger w/iTunes 8.0.2?

    I just downloaded the latest version of iTunes, but I'm finding that every song I download requires me to delete at least two (sometimes three) songs on my iPod to make space for it. Anyone else having this issue? Is there a way to choose to download