Report unavailable 4 multiProvider with 2 Plan allowed real-time icube?

Dear all,
  It seems that the multiprovide with 2 plan allowed real-time infocube can not generates report correctly. Is that right? Or I'm missing defining some configurations? Any sugguestions are appreciated.
best regards,
Gerald

Hi,
It will generate report properly. U might missed something.
Thanks
Debasish

Similar Messages

  • 2 AIR applications directly communicating with each other in real time

    Building a installation that requires 2 different kiosks to communicate with each other. I'd like to use Adobe AIR to create the individual applications.
    My question is
    Is it possible for 2 separate AIR applications to DIRECTLY communicate with each other in real time, without any server to act as mediator?
    Ideally the only data that would be transferred would be json based.

    Not sure whether this helps; http://www.adobe.com/devnet/air/flex/articles/creating_socket_server.html

  • Can oracle database interact with sysbase database in real-time?

    There are two database,one is oracle,one is sysbase,sysbase is produce database.My program only can visit oracle database,and can't directly visit sysbase database.My question is whether there is a directly link from oracle database to sysbase database,when I visit oracle,oracle database can interact with sysbase database through this link real time? How to realize above function? Please give plan for it.
    Thanks in advance!
    Best regards,
    Edward

    Yes there is. You have to create heterogeneous connection between these two databases
    Take a look at below links:
    http://www.dba-oracle.com/t_heterogeneous_database_connections_sql_server.htm
    http://asktom.oracle.com/pls/asktom/f?p=100:11:0::::P11_QUESTION_ID:13401716754850
    http://download-west.oracle.com/docs/cd/B10501_01/server.920/a96571/repmultdemo.htm

  • Edit Xcel doc with multiple users in Real time on a home wireless network

    I was wondering if anyone knows how to edit an Xcel Document by multiple users at the same time from Homw wireless system.
    1) We both have mac's
    2) We both have our Computers shared with eachother
    3) I Set the Excel file to allow multiple users/editers
    4) Placed the file in my shared files folder.
    5) He can open it but it is still read-only and if he tries to save it he would have to under a diffrent name i.e. a Seprate File.

    Just an FYI Allan
    Excel 2011 for Mac does facilitate simultaneous multiple use without a server: it requires that all users be on the same network but it does not require a server for storage (although the file must be on a shared drive)

  • Extract single colour plane in real-time video

    I have used Extract Single Colour Plane VI to process a running video as shown below:
    However the video freezes whenever I activate this case structure. Is there any way I can perform the single colour plane processing while the video is running?
    Attachments:
    Extract Single Colour Plane.png ‏9 KB

    The function "Extract Single Colour Pane" is not the reason why your video freezes. Even with an large image it just takes about 20ms (of course this is system dependent too) which would still enable you to play your video with rates of about 50 frames per second.
    However, when "activating" this case structure your VI jumps into a untimed while loop and does the colour pane extraction for the same image as long as you "deactivate" the loop.
    You should reconsider your architecture!
    Christian

  • Recording Audio For Timeline With Logic Pro In Real Time

    I do commentaries on videos and was wondering if there is an easier way than what im doing now..
    Right now I export my video from premiere to a bad quality version and import it into logic pro and record the commentary there.
    Then I have to bounce the audio and import it back to premiere.
    Is there a way to get the same plugins that are in logic pro to be used in premieres audio mixer??
    A dream come true would be that I could just record directly into premiere with all of the effects coming from logic pro.
    Anyone know of any kind of solution or trick or anything so I dont have to keep going back and forth and to make this easier???
    Thanks for any info I really appreciate it!!

    I just hate going back and forth from premiere and logic and all the extra time wasted exporting the files so they will work with eachother.  
    I just thought of something else.... Is there a way that I can get the video in premiere to play the same time I push record in logic pro and maybe sync with it?
    Like if I push record in logic the video in premiere will start playing then when I push stop in logic pro it will stop in premiere or at least stay in sync with it so the timing will be right?
    if anyone has any ideas throw some out there I would love to hear them.
    Thanks!

  • How can link the accosaries requirements with production planning

    "I am in cable manufacturing here i have a problem in  accessories requirements ( dies,Nozzles,Rollers,Embossing wheels etc )link with production planning,at the time of production than these material required for production   Can any body tell me how to link this ,accessories is not consubles "
    Thanks,
    Anurudh singh

    Yes you can use PRT for these requirments,
    Logistics - Production Process - Master Data - Production Resources/Tools - Production Resources/Tools - Equipment - Create.
    spro->production planning for process industries->master data->production resources/tools (PRT)
    you will see 5 transactions to configure your settings:
    -define PRT auth.grps
    -define PRT status
    -define Task List Usages
    -define PRT Group Keys
    -Define Overview Variant for Where-Used List/Mass Replacement

  • I recently got an iPhone 4 out of nowhere it has decided to go to connect to iTunes screen/emergency calls only when I plug into iTunes it states we are unable to continue with your activation at this time please try again later, or contact customer care

    I have recently got an iPhone 4 out of no where it has decided to think that my headphones are in and they are not but does work with headphones in.
    Then later on within the same day it after turning my phone on and putting it on charge it comes to the screen stating to connect to iTunes/emergency calls only/no service so I connect it iTunes and it says we are unavailable to continue with your activation at this time. Please try again later, or contact customer care.
    HELP!

    the same problem but i used it already for 3 years my iphone 4, when i update to ios 6.1.3 version, now is failure like said.
    we are unable to continue with your activation at this time please try again later, or contact customer care
    any help please. i am here in saudi arabia city of jeddah.
    thank you very much in advance
    pabs

  • UCCX 7 (SR4) - real time reporting based on option choosed

    hello,
    i would like to extract real time information on wich option the client choosed on my uccx7 script. I know where to get in the database some info from the queues (Summary Tables), and i would like to make some custom real time reporting based on wich option was choosed to know how many callers choosed the voicemail option (so the call won't show up as abandoned).
    Is there any way to get real time info from a custom variable in real time? in wich table?
    thank,
    met.

    IVR selections are not recorded within the CCX databases. You would need to save this to an external database and report from there. Your only method of capturing this within db_cra would be to store a value into an enterprise data variable which can be seen on historical reports.
    Also, the only tables that are "real time" are those identified as such: RtCSQsSummary and RtICDStatistics for use by wallboard applications.

  • Third-part​y boards with the real-time OS

    I have some third-party PXI board and would like to work with it with the NI's real-time OS, provided with
    the NI's RT computers (like PXI-8170).
    - How do I tell to the OS that there is some board connected to it ? How do I map it I/O ports in the I/O address space of that embedded computer ?
    - May I write directly to the I/O ports in this OS ? (E.g., in NT I cannot, I need a driver that runs in kernel mode.)

    To program a third party board you can use VISA Register Level Programming. The first thing you'll need to do is to generate an .inf file - this file is used for NI-VISA to properly locate your PXI instrument. To create this file, use the PXI Driver Development Wizard that ships with NI-VISA. This drivers will collect basic information about your board - manufacturer ID, model ID, and interrupt handling (if applicable.) Once the .inf file is created, you can ftp it to the RT controller. You will then be able to use VISA register level code (peeks and pokes, etc) to program the board.
    Regards,
    Dafna

  • Generate a report with date range and year as POV with Hyp Planning ?

    Hi everybody,
    I am starting with hyp planning and i need your help please.
    I have to create some forms. In those forms, the final user is supposed to be able to display data in the forms between 2 dates and for a specific year.
    My first problem : I don't know how you can display data in a form between 2 dates and for one specific year. I just have one dimension YEAR and one PERIOD, so if i selected them as a PAGE, the final user will just be able to choose the month and the year for his form ... and not displaying data between 2 dates.
    My second problem is with the dimensions YEAR, SCENARIO and VERSION. I don't want to put the dimensions VERSION and SCENARIO as PAGE (it easier for the final user to just choose a year than to choose a year, scenario, and version) but as POV with a relationship with the dimension YEAR (because if the user chooses YEAR = actual_year (2012) the VERSION and the SCENARIO won't be the same than if the user chooses YEAR= last_year). IF YEAR = next_year, VERSION=Propuesta, SCENARIO=Forecast
    IF YEAR = actual_year, VERSION=Propuesta, SCENARIO=Forecast AC
    IF YEAR = last_year, VERSION=Actual, SCENARIA=Real
    How can i do that?
    Thank you for your help
    Edited by: 932573 on May 7, 2012 3:44 PM
    Edited by: 932573 on May 7, 2012 4:27 PM

    I am not sure if you are using RAS or Enterprise SDK, but here are some code snippets to set range report parameters:
    For scheduling:
    // oReport is IReport object holding the crystal report.
    oReportParameter = oReport.getReportParameters().get(i);
    currentRangeValue = oReportParameter.getCurrentValues().addRangeValue();
    currentRangeValue.getFromValue().setValue(dateParameter);
    currentRangeValue.getToValue().setValue(dateParameter);
    For viewing:
    ParameterFieldRangeValue pfrv = new ParameterFieldRangeValue();
    pfrv.setBeginValue(dateTimeValue);
    pfrv.setEndValue(dateTimeValue1);
    pfrv.setLowerBoundType(RangeValueBoundType.inclusive);
    pfrv.setUpperBoundType(RangeValueBoundType.inclusive);
    pf.getCurrentValues().add(pfrv);
    f.add(pf);
    f is Fields object and pass that to viewer.

  • How to do a report on one multiprovider along with other Infocube

    Hi ALL,
      I am new to this field. Can any of you u tell me how to report on two infoproviders one being the multiprovider and the other being the info cube.
    Thanks,
    Vinay

    Hi
    You can't do reporting on multiple Info providers . What you can do in u'r case is have your cube inculded in the Multiprovider you are refering to , or else create a new Multiprovide with all the Cubes and DSOs from which you need data for reporting . The latter method better case it would not effect any of your existing queries on the Old Multiprovider .
    Rajesh

  • Rogers is saying that IOS4 won't allow use of the personal hotspot with a plan of less than 1GB data.  I say it's a policy of theirs, not an iOS restriction.  Anyone know the truth?

    Rogers is saying that IOS4 won't allow use of the personal hotspot with a plan of less than 1GB data.  I say it's a policy of theirs, not an iOS restriction. Anyone know the truth?
    I call BS but the tech guy was insistent that the iPhone can detect what plan I have and won't enable the feature and there's nothing they can do about it, short of selling me a larger data plan...

    robfromkelowna wrote:
    Actually it does.  It's wrong to lie to a customer.  By blaming Apple, they shift the blame and make it seem like there is nothing they can do about it.  If they admitted it was their policy, I could complain and try to get it changed or I could move to another carrier.
    If a person killed someone and blamed it on a heart attack, the person is stil dead, does it matter? Either way they're dead, right...  (extreme, I know, but illustrating a point)
    Wow.
    It is certainly Rogers policy and is not unusual at all among carriers.
    Seems like a non-issue to me, but apparently being "lied to" ( perhaps the employee was simply mistaken, it happens) is a major deal to you.

  • Databases that Crystal Reports 9 can function with

    Hi,
    We are going to purchase Crystal Reports for the use with a new financial program that we will be purchasing.  The financial program that we will purchase allows report customization within the program if using the Crystal Reports 9 engine.  For that reason we are going to purchase Crystal Reports 9.  Otherwise we would have to create custom reports outside of this program if using a more recent version of Crystal like 2008.
    However we need to make sure Crystal Reports will work with our SQL Server 2005 database.  I tried to research a bit on Crystal Reports 9 (of which currently I know nothing about) and came across this document when doing a search https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/202ff507-281f-2b10-78b6-b6bce2668d6b.
    We also need Crystal 9.0 to work with Paradox and BDE databases.  It looks like BDE 5.1 and Paradox 8 & 9 are listed as supported platforms.  I also see SQL Server 2000 but do not see SQL Server 2005.  Will Crystal Reports 9.0 work with a SQL Server 2005 database and also what are the plans for Crystal Reports 9.0 working with future versions of SQL like 2008?
    thanks,
    JW

    According to the supported platforms document for CR9:
    (You should be able to search and fine this document via https://www.sdn.sap.com/ - you may have to create an account and login)
    Database Connectivity
    Clients:
    u2022 DB2 6.1
    u2022 DB2 7.1
    u2022 Holos 8.0
    u2022 Holos 8.5
    u2022 Informix 2000
    u2022 Lotus Notes 4.6
    u2022 Lotus Domino R5
    u2022 Microsoft SQL Server 7.0 SP3
    u2022 Microsoft SQL Server 7.0 OLAP Services (SP1)
    u2022 Microsoft SQL Server 2000 Analysis Services (SP2)
    u2022 Microsoft SQL Server 2000
    u2022 Oracle 8i
    u2022 Oracle 8.06
    u2022 Oracle 9i
    u2022 Sybase 12.5
    u2022 Sybase 12.0
    Servers:
    u2022 DB2 UDB 7.1 (Intel)
    u2022 DB2 (OLAP) 1.1, 7.1 (Fixpac 0)
    u2022 Essbase 5.02 (Patch 13a)
    u2022 Essbase 6.0, 6.1 (Patch 2)
    u2022 Essbase 6.5 (Only available with the updated
    u2022 driver, Essbhapi_650.dll.)
    u2022 Holos 8.0
    u2022 Holos 8.5
    u2022 Informix 9.14 (Intel)
    u2022 Informix 2000 (Intel)
    u2022 Lotus Domino R5 (Intel)
    u2022 Microsoft SQL Server 7.0.699 (Intel)
    u2022 Microsoft SQL Server 2000
    u2022 Oracle Server 8.0.6
    u2022 Oracle Server 9i
    u2022 Sybase Adaptive Server 12.0 7/20/2004 4:59 PM Copyright © 2004 Business Objects. All rights reserved.
    u2022 Sybase Adaptive Server 12.5
    u2022 SAP BW 2.0/Oracle Server 8.0.5 back end
    u2022 SAP BW 3.0/Microsoft SQL Server 2000 back end
    Other:
    u2022 ACT! 4.02 and ACT! 2000
    u2022 BDE 5.1
    u2022 Btrieve Pervasive SQL 7
    u2022 Btrieve Pervasive SQL 2000
    u2022 Microsoft Access 97
    u2022 Microsoft Access 2000
    u2022 Paradox 8
    u2022 Paradox 9
    u2022 Microsoft Outlook 98
    u2022 Microsoft Outlook 2000
    u2022 Microsoft Exchange 5.5

  • Around the end of the month I get an alert saying I am nearing the maximum minutes the plan allows.  I check my account and that simply is not the case.  Sure would like to talk to a live human being.

    Around the end of the month I get an alert saying I am nearing the maximum minutes the plan allows.  I check my account and that simply is not the case.  Sure would like to talk to a live human being.

    It's Verizon rounding up and a reminder to refill or pay.  They do this with data too.  It isn't just lag in reporting, it's just the way Vzw does this.  A lot of customers don't watch their usage and just go with the alerts as a measuring tool, and Verizon knows it.

Maybe you are looking for

  • Transformationsde-activating after changing write optimized to standard dso

    Hi experts, i changed write optimized dso to standard dso because of some changes, but after changes done i activated the changed transformations  standard dso(previously write optimized), but it is not activating , after gone through the issue its h

  • Adobe 11 will not open at all-error messge

    I have uninstalled, rebooted computer, and reinstalled adobe 11. It will not open. an error message says it cannot open. acrord32.exe, AppVer:11.0.4.63. Using microsoft windows xp

  • Windows 7 Intermittant LAN Disconnect

    I have about 20 Windows 7 laptops in a section of our office building.  About half of these laptops experience random disconnects about once a week that last for about 5 minutes.  During this time: The laptop can ping its loopback address The laptop

  • CTI Genesys Integration Siebel 8.0.2

    Hi all, We are trying to establish connection between Siebel and Genesys with GPlus Adapter. But after to do everything is documented in GPlus Adapter 7.5 Deployment Guide.pdf, LogIn button toolbar is inactive and log generated is: ObjMgrLog     Erro

  • How to convert a .alsx file into pdf

    How to convert a .alsx file into pdf Iam facing this problem since many days please resolve it http://www.roothow.com Thankls in adavance