Reports for Repetitive Manufacturing Process

Hi All,
Can any one please let me know the Reports FOr Repetitive Manufacturing (Like COOIS/ COOISPI)
I could not find any such for Repetitive Manufacturing.
I need to get the reports for below data.
1. Goods Receipt in certain Period for certain Material with Certain Production Version
2. Component COnsumed.
3. Activities Consumed
Please let me know the Tr.Code for these.
Thanks and Regards
Khadeer

Hy Khadeer,
MCP6  Goods rcpt analysis: repetitive mfg
MCP8  Goods rcpt analysis: repetitive mfg
MCRJ  Prod. Cost Analysis: Repetitive Mfg
MCRK  Prod. Cost Analysis: Repetitive Mfg
MCRO  Matl consumptn anal.: repetitive mfg
MCRP  Matl consumptn anal.: repetitive mfg
MFBF  Backflushing In Repetitive Mfg
MFHU  Backflushing In Repetitive Mfg
MFPP1 PackDemandMgt Repetitive Mfg: Plan
MFPP2 PackDemandMgt Repetitive Mfg: Pack
OKL4  Report Tree: Repetitive Mfg
OKR2  Report List for Repetitive Mfg
OKRM  Report Layouts for Repetitive Mfg
OKS2  Generate Reports for Repetitive Mfg
OKSB  Import Reports for Repetitive Mfg
OKT5  Cost Comp. Groups for Repetitive Mfg
OLIF  SFIS: Setup-Repetitive Manufacturing
OPP3  Customizing Repetitive Manufacturing
OPR4_ Repetitive Mfg and Process Mfg
OSP2  Repetitive Mfg Profile
OSP4  Repetitive Mfg: Distribution Functn
OSP5  Repetitive Manufacturing: Cost Log
OSPF  Repetitive Manufacturing Line Texts
OSPT  Repetitive Mfg Profile Assistant
OT81  Process Repetitive Codes
Regards
Dhaval

Similar Messages

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

  • WIP FOR REPETITIVE MANUFACTURING WITH VALUATED SALES ORDER

    Dear All,
    We are in the process of implementing Repetitive manufacturing with valuated sales order(MTO). I want to clarify whether in this scenario WIP will be generated.
    Since, at the time of final backflushing, what ever GR done for finished goods, the GI for its components will be done automatically. The components will be issued based on the BOM. I think in this scenario WIP will not be there.
    Please tell me whether i am correct.
    regards
    ranga

    Thanks. I have another scenario. My client wants to transfer all cost of HR,Admin, finance etc and other indirect production cost center cost to production cost center. I mean they want to charge on the product. I have to production cost center. Client will give me the basis for allocating the cost. I have to do assessment and distribution for cost allocation
    But, I want to clarify how do i include the admin, hr or finance and indirect production cost center cost in cost component structure if i do the above process.
    How to do the cost splitting.
    regards
    ranga

  • Report for conformation cancelled process orders.

    Hi frnds,
    I need a report for orders which have got cancelled of confirmation.
    plz suggest...
    Robert.

    Dear,
    There is no standard report in SAP which shows Report for conformation cancelled.
    But you can check in order it self in COR2 good movement details.
    Or  check document in MB03
    Use CORS to reverse the phases.
    After canceling if you want to view it again then use CORT (here there is one check box named 'Reversed' means that phase is reversed).
    Or Please use user exit
    EXIT_SAPLCORF_404 Process order conf.: Customer specific input checks 2
    Regards,
    R.Brahmankar

  • Specific PP report for current running process in plant.

    Hello Experts.
    I have very RAW information to address this problem, which is described below.
    My Client requirement :
    They have various process running in the production plant.
    They want to see on one screen, how many total process running in the plant along with production order number and how much process has been completed (in %) vs Time (Date or Hours).  (something like giant chart ou Production order number with completion status in % vs Time)
    According to my knowledge, SAP doesn't provide this kind of plan board kind of solution.
    Again I understand this information is very raw, so if its possible then Please let me know, how can we see this kind of report on one screen,
    If any kind of report is available, which full fill this information than Please provide me information,
    Inputs are highly appreciated.
    Nixal

    Hi Nixal,
    Yes you are right, you can not achive this in standard SAP. I think you have to develop customise report for that. But first i suggest you just go through COOIS report available in the system. In this report there are too many options available, you can try out any as per your requirement.
    Regards,
    Hiren

  • PRT Rounting prob for counter updation for Repetitive manufacturing

    Hi Experts,
    Is it possible to do update measuring counter thr production specially in case of Repetitive manufacturing scenario .If we try the same counter thr discrete then it will update the counter .
    Pl guide ,is there any customization for these case fr PP or PM side.
    Also another prob is to make factory calendar for all seven days as working days bcoz now all preventive order laps the holiday for order creation . Temporary we solve this prob by setting call horizon parameter . So is there any way to make factory calendar so all order come as earlier predefined date. Now all holiday or weekly off order come on next day.
    Thx in advance .
    With regards.
    AVI DDS.

    Thx to all

  • Need Rework flow for following manufacturing Process

    Hello Experts,
    i am New to PP
    in one Production process, we are having 7stages. at the end of the 7th stage. we are getting finish product.
    and at the end of the Each stage, we are doing Quality Inspection.
    but at the end of the 4th stage, we are having major quality inspection. at that stage (Drying stage), QA Team decide, This Product able to meet all characteristics and Convert in to the powder form. if its rejected from here (Stage 4) than all mixture of liquid added in to Next batch of the production Process from Stage 3 (condensing stage).
    and if possible than can you Explain me Whole work flow for this rework process ? i mean what steps should i follow to complete ths rework?
    Thank you
    NP

    Hi,
    As rightly said by Mr. Alok, you can directly add 1 more operation for Rework. Yo can directly insert operation automatically through Trigger point in production order.
    For more information about Trigger point for Rework, you can check the following link.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/80a43feb-13bf-2d10-fd8e-a06debfd5e0c?quicklink=index&overridelayout=true
    http://www.sap-img.com/production/rework-thru-trigger-point.htm
    Please go through it and revert if you need any further clarifications.
    Regards,
    Hiren Ramani

  • Required report for the invoice processed twice for the same PO & Vendor

    Hi SAP MM experts,
    I want a  report which is to identify the same invoice processed twice against the same vendor and same PO which system cannot detect only  because the invoice numbers are manually entered slightly different, and that is why I also want to include the document date of the invoice so that the possibility of identifying the duplicated invoices is increased.
    Any help will be highly appriciated.
    Thaks in advance
    Sachin Patil

    You might also refer reports ME80RN,ME2N,ME2L for purchase order or refer report MIR5 for vendor.
    Also refer report FBL1N - vendor open items,Check for document type - 'RE'
    Whether check for double invoice is ticked accounting view of  vendor master ? or else
    Check double invoice is configired for which combination in LIV SPRO ?

  • Order type for planned order in repetitive manufacturing

    hi
    In repetitive manufaturing there is no prodcutiion order
    planned order only. so i want know what is order type  for repetitive manufacturing
    In configuration order type for  reptitive is required or not   if  yes  then how will define order type ,where
    In Discrete order type will define to control  prodution order
    like that i want know details about order type in repetive manufature
    ravikumar

    HI
    Planned order in REM is of PE type thar s non convertible in PO and also these planned orders are assigned to PVs thru Planning table and the Confirmation is done agianst these planned orders.
    check these links:
    Re: order type in repetitive manufacturing
    http://www.sapfunctional.com/PP/REM/page1.htm
    Regards
    Anupam Sharma

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Repetitive Manufacturing planned order long text

    In our scenario, we will use the repetitive manufacturing process with planned order.   However, the users would like to attach the long text for each planned order. 
    Is there any use exit or BADI to support this?
    Regards,

    Hi ,
    i think there is no user exit or BADI which can work in your case.
    When we required similar functioanolity we landd up in desigining entirely new Z tocde which would accept the long text ofr the plan orders and save it.
    we created coplue of ztables to store the plaf link.

  • Triggering Repetitive manufacturing inspection lot - insp type 13

    Dear Expert,
    I have activated 13 insp type for my semi-finish material,
    in the routing also for the last operation control key has maintained.
    Finally in the production version also we have selected the the same routing.
    I am not able to create Inspection lot for repetitive manufacturing.
    Please tell me what settings need to be done.
    Thanks
    DON

    Dear DON,
                   Before posting thread please refer to earlier created theards you may find some thing which you were looking for related to your query.
    you will definatly find the solution,If the threads are not there then post the new thread with your query.Our great Gurus will help the needy.
    please refer to
    [In Process Inspection of Repetitive Manufacturing;
    for your repetitive manufacturing
    if this is not enough,follow this as given below.
    MM01/MM02
    Activate inspection type 09 at the time of material creation. AND enter the number of days in the field "Inspection interval" in QM view.
    This field indicates at what frequency in days you need to trigger the recurring inspection lot.
    QA05
    Define a variant for recurring inspection lot generation. Refer the below pasted link for the same.
    Related Thread
    It will trigger the inspection lots according to the date of next inspection date in he Batch.
    QP01
    You need to keep a inspection plan ready to record results for this lot.
    QA32
    Record Results for the inspection lot.
    Perform UD for the lot.
    To create variant through QA05 will not enough. You need to schedule the job, and release them also.
    To check whether you have successfully scheduled the job or not.
    Run QA05, here you will be able to see a line item for the variant you have created. correct?
    1}
    So select that line and click on the button "DISPLAY SCHEDULING", if the scheduling is not carried out, it will through the "Message no. 38001 - No jobs found in the display client" else will show the it will show "Recurring insp: job planning: list of scheduled requests."
    2}
    To schedule the job, select the variant line, and click on the button Schedule, it will lead you to the screen Recurring insp: job planning scheduling; start time.
    here you need to define "Job start date" and "Batch job start time", then click on "Schedule Periodically" and enter the at what frequency you want to replete the job run.
    At the this frequency (e.g. if you select day 1) then it will run the job daily at the time you have entered at "Batch job start time".
    3}
    Then replete the 1} to view your scheduling details. And the job is not released then release them else it will again not run and you will not have the lot.
    Edited by: vijaysap123 on Jan 25, 2010 11:33 AM

  • Pending quantity report for a manufacuting firm

    Hi Guys,
    I need a report to know the daily pending quantity report for a manufacturing company..
    I have tried a query and to some extent its working fine.. i need some more changes in the query.
    The report should be look lie below,
    ITEMCODE,ITEMNAME,ORDERED QUANTITY,ORDERED VALUE,SALES QTY(DELIVERED QTY),SALES VALUE,PENDING QTY,PENDING VALUE ,SHORTFALL(IF THE INSTOCK QTY IS LESS THAN PENDING QTY).
    Here there are using 5 different price lists.
    and the above report has to be classifed seperately for each price list seperately and also in the given period if there is a item which has not been ordered then it also be needs to list in the report with eventhoug it dont have any values .
    Could anybody pls modify the below query.
    SELECT T1.ItemCode, Max(T1.[Dscription]) As 'Item Description' ,t3.price as 'Unit Price/PC',Sum(T1.[OrderedQty]) as 'Ordered Qty' ,(Sum(T1.[OrderedQty]) * t3.price ) as 'Ordered Value' , Sum(T1.[Quantity]) as 'Del Qty',(Sum(T1.[Quantity]) * t3.price) as 'Sales Value',(Sum(T1.[Quantity]) - Sum(T1.[OrderedQty])) as 'Pending Qty',((Sum(T1.[Quantity]) - Sum(T1.[OrderedQty])) * t3.price) as 'Pending Value',T2.OnHand, (T2.OnHand - (Sum(T1.[Quantity]) - Sum(T1.[OrderedQty]))) as 'SHORT'
    FROM ODLN T0 
    INNER JOIN DLN1 T1 ON T0.DocEntry = T1.DocEntry
    INNER JOIN OITM T2 ON T1.ITEMCODE = T2.ITEMCODE
    inner join itm1 t3 on t1.itemcode = t3.itemcode
    inner join opln t4 on t3.pricelist = t4.listnum
    WHERE T0.[DocDate] >=[%0] AND  T0.[DocDate] <=[%1] and t4.listname = '[%2]'
    Group By T1.ItemCode,T2.OnHand,t4.listname,t3.price

    Try this query
    SELECT T1.ItemCode, Max(T1.[Dscription]) As 'Item Description' ,t3.price as 'Unit Price/PC',Sum(T1.[OrderedQty]) as 'Ordered Qty' ,(Sum(T1.[OrderedQty]) * t3.price ) as 'Ordered Value' , Sum(T1.[Quantity]) as 'Del Qty',(Sum(T1.[Quantity]) * t3.price) as 'Sales Value',(Sum(T1.[Quantity]) - Sum(T1.[OrderedQty])) as 'Pending Qty',((Sum(T1.[Quantity]) - Sum(T1.[OrderedQty])) * t3.price) as 'Pending Value',T2.OnHand, (T2.OnHand - (Sum(T1.[Quantity]) - Sum(T1.[OrderedQty]))) as 'SHORT'
    FROM ODLN T0 
    INNER JOIN DLN1 T1 ON T0.DocEntry = T1.DocEntry
    INNER JOIN OITM T2 ON T1.ITEMCODE = T2.ITEMCODE
    left join itm1 t3 on t1.itemcode = t3.itemcode
    left join opln t4 on t3.pricelist = t4.listnum
    WHERE T0.[DocDate] >='[%0]' AND  T0.[DocDate] <='[%1]' and t4.listname = '[%2]'
    Group By T1.ItemCode,T2.OnHand,t4.listname,t3.price
    union all
    select B.ItemCode, B.ItemName,D.Price,SUM(C.OnOrder), 0,0,0,0,0,SUM(C.OnHand),SUM(C.OnHand)-SUM(C.OnOrder)
    from OITM B
    INNER JOIN OITW C ON B.ItemCode = C.ItemCode
    INNER JOIN ITM1 D ON C.ItemCode=D.ItemCode
    WHERE B.ItemCode NOT IN (SELECT T1.ItemCode FROM ODLN T0 
    INNER JOIN DLN1 T1 ON T0.DocEntry = T1.DocEntry
    INNER JOIN OITM T2 ON T1.ITEMCODE = T2.ITEMCODE
    left join itm1 t3 on t1.itemcode = t3.itemcode
    left join opln t4 on t3.pricelist = t4.listnum
    WHERE T0.[DocDate] >='[%0]' AND  T0.[DocDate] <='[%1]' and t4.listname = '[%2]' )
    GROUP BY B.ItemCode, B.ItemName, D.Price
    Regards,
    Bala
    Edited by: Balakumar Viswanathan on Nov 15, 2010 4:23 PM

  • In house prod. time for continuous manufacturing

    Hello friends,
    I want to enter in house production time in matarial master for continuous manufacturing process.I am using Base Unit Of Measure "Quintal".It is not possible to calculate In house production time. So how can I define it?
    Thanks!!

    Hi,
    In-house production time is lot size independent it use to schedule the order with basic date only, but when we do the lead time scheduling or create production order then system take the values from routing as it is lot size dependent.
    It is not possible to calculate In house production time?
    So pls maintain the approx time in material master then schedule the routing ca02extrascheduling--schedule after that click on scheduling result and update material master.
    Then go to CA96 and update the result in to material master and check the time in material master--work scheduling view.
    Hope it will clear your doubt.
    Regards,
    R.Brahmnkar

  • Repetitive manufacturing activity and componenet backflush

    Dear experts,
    We use repetitive manufacturing. We use BAPI_REPMANCONF_CREATE_MTS for repetitive manufacturing. We have a requirement that to change the activity quantities and component in or before confirmation.
    Moderator message: not a proper question, please do more research before posting, show what you have done yourself when posting.
    Edited by: Thomas Zloch on Jun 27, 2011 2:56 PM

    anyone?

Maybe you are looking for

  • T430 brightness control question....

    It seems that no matter what Power Plan I choose.... the screen brightness goes to a very dim level while in battery mode. Even after a "Custom" plan, it forgets the desired brightness level after a re-boot. Any advice would be appriciated....  Thank

  • Content server migration - loadercli and I'm running nuts...

    We have an (old) content server database of 150 GB on 7.3.0.52 and we're trying to migrate that database to Linux x86_64 bit. I tried the following before: - tried to install/run 7.3 on SuSE SLES 11 SP1 - failing (new kernel threading) - tried to res

  • Suspected End of file error in template

    Hello all. I am relatively new to dreamweaver and have an error in my template. http://www.tdws.co.uk/commscaf/Templates/FPMainContLeft.dwt Error at line 159 column 1 absoloute position 7481: unexpected end of file. Everything looks fine and I cannot

  • Cs 5 upgrade, no qualifying product found problem.  solved!

    hey guys.  I posted earlier with the cs5 photoshop upgrade not recognizing my cs 4 serial #.  wanted to give an update.  Turns out the cs5 installer wasn't recognizing my installed copy of cs4 extended as a qualifying product.  so after a nice chat w

  • Webservices complex parameters

    Hi again, I try to use a complex object as a parameter in a webservice. This object is serializable and contains only some Strings and lists. I created a deployable proxy with this parameter Object successfully and the lookup to the proxy via jndi na