REPORTS FOR WORK CENTER EFICIENCY

Hi All,
I´m trying to find reports that shows work center eficiency. Anyone knows any standard report like this?
Regards,
Felipe Tavares

Dear
If you are looking for Work Centre Effiency report , then you should check the Utilisation of Work Centre in production in every months or you can compare the production actual and planned by work centre to know the effiency .
Some of the standrd txn :
1.MCPQ
2.MCP7
Customised report : http://www.onestopsap.com/sap-PM/compare.asp or with the following SAP Table :
WERKS         LIKE  AUFK-WERKS,                     "Plant
      AUFNR    LIKE  AFKO-AUFNR,              "Prod. Order No.
      PLNBEZ   LIKE  AFKO-PLNBEZ,             "Header Material No.
      GSTRI      LIKE  AFKO-GSTRI,              "Actual Start Date
      GLTRI      LIKE  AFKO-GLTRI,              "Actual Finish Date
      GAMNG    LIKE  AFKO-GAMNG,             "Prod. Order Qty.
      AUFPL      LIKE  AFKO-AUFPL,              "Planned No. Of Operation
      AUART    LIKE  AUFK-AUART,              "Order Type
      BUKRS    LIKE  AUFK-BUKRS,              "Company Code
      OBJNR    LIKE  AUFK-OBJNR,              "Object No. For Order Status
      KDAUF    LIKE  AUFK-KDAUF,              "Sales Order No.
      KDPOS    LIKE  AUFK-KDPOS,              "Sales Order Status
      IDAT2      LIKE  AUFK-IDAT2,              "Order Completion Date
       ISM01   LIKE  AFRU-ISM01,              "Required Qty.
      VGW01    LIKE  AFVV-VGW01,              "Quantity Withdrawn
      VGE01    LIKE  AFVV-VGE01,              "Unit Of Measure
      EFFPERC  LIKE  AFVV-VGW01,              "Eficiency %age
      MAKTX    LIKE  MAKT-MAKTX,              "Material Descriptio
Try and come back
Regards
JH

Similar Messages

  • Report for work center hours , maintenance order wise for SAP 3.1i version.

    Hi Team,
    We are using older version of SAP, that is SAP 3.1i. Here we don't have any transaction code such as IW47. Is there any other way to get report of work center and work center hours-order wise.
    Please respond.
    Regards,
    Kiran

    Have a look at table AFRU
    PeteA

  • How to find the reporting for work center machine wise

    hi gurus
    My question is . In one work center machine capacity category 2 machines are used. Client is asking the report machine wise. i.e as 2 machines are available .What is the capacity utilisation for each machine.Provide me the information for this. Thanks in advance
    kalyan

    Hi Kalyan
    you have to make some settings in production order & work center first.
    In work center capacity header ,you have to make indiovidual capacities as 2.
    In the same capacity header screen by going through the menu Goto--->individual capacitities  define these different individual machines.
    In the production order operation detail screen goto " capacity reqmt assignment " assign the quantities for different work centers.
    Adfter this in the confirmation CO11N you have to fill the split field accordingly& confirm different wortk centers seoperatley.
    Then you can the report in the CO14 for diferent work centers.
    you try this.
    Regards
    YMREDDY

  • Shift report for work center

    hello
    is it possible to hav shift report workcentewise? if yes how config is done?

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • Tables for routing (for work center)

    hi friends,
    I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
    i try to get result by using link with PLPO and PLKO.
    in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
    kindly can anybody tell me how to work center.
    thanks & regards
    Bhupinder Singh Kaler

    Hi Bhupi kaler,
    try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
    Best regards,
    raam

  • Report Painter Report for Profit Center

    Hi All,
    I am creating a report for profit center in GRR1.I was using library 8A3,& ledger 8A.which uses for PCA line i tems and table used is GLPCT.which shows profit center totals by period.I ran GLPCT in SE16 and found  out No data selected.I see that profit center accounting is not active  in my system ECC6.0
    and I didn't see any line records for profit center in any of the profit center tables.GLPCA.Now if someone  knidly suggets me how to achieve this report, can I still do it profit center wise or  not? which library should i use in GRR1.The layout of my report is as under.Thanks
    CURRENT MONTH*                                                                               
    Current Yr      Current Yr    Prior Yr
    Actual            Budget        Actual          Variance          
    YEAR TO DATE 
    Current Yr      Current          Prior Yr        Annual
    Actual            Budget        Actual           Budget    Variance
    Regards
    Shaun

    Thanks Abhijit , I can now see my report group at the bottom of the list .I assigned you full points.I posted another question regarding report painter .If you could also give me some guidance on that.When I was creating rows and updating cost elements with account numbers.I set up 3 revenue accounts and then ran the report to see if I get any data for profit centers.I did get data but when I double clicked on one of the account,it displays this messsage.I read the msg. but could not make any sense with it.for example in definning row I put account number from/to  400000- 400000    Explode. and thats a characteristic.
    No valid master data for characteristic 'Account Number'
    Report MEG1 does not contain any data pages.
    No valid master data for characteristic 'Account Number'
    Message no. GR633
    Diagnosis
    No valid master data within the specified interval was found for the characteristic 'Account Number'.
    Explanation:
    For each characteristic that is processed in a report, the Report Writer optimizes the interval limits which are relevant for selecting data from the database.
    Example:
    A report contains the characteristic 'account', for which an account interval from 100000 to 200000 has been entered.  However, if the master data validation shows that the lowest/highest account in this interval is 110000/190000, the selection will be limited to accounts 110000 to 190000 only.
    The system returns this error message if no master data exists for the interval.
    This error is typically caused by an invalid version.  In FI-SL Special Purpose Ledger, for example, versions are assigned to the ledger and are defined in configuration.  The report definition can then contain a non-defined version.  A similar situation applies to controlling (cost center accounting): here, versions are assigned to the controlling area and fiscal year and can be defined in planning.
    Another cause of this error is a ledger that is not assigned to the table for which the report was created.
    Technical information:
    The field name for 'Account Number' is 'RACCT'.
    System Response
    The system cancels processing.
    Procedure
    Check the report definition, or the specified master data, or the intervals.
    Regards
    Shaun

  • Line item actuals report for Profit center group

    I am looking for a Line Item Actuals report for a Profit Center Group  on the lines of KSB 1 report for Cost center /groups.
    I tried report "KE5Z but only profit centers can be selected, not profit center groups.
    Any help on this

    Try out the following report
    S_ALR_87013326 - Profit Center Group: Plan/Actual/Variance
    Call up Actual line items, here we go you would get the profit center group reports in similar lines as KSB1.
    Award points so as to say thanks.
    Regards,
    Suraj

  • ALE/iDoc for Work Center data transfer

    Hello, community.
    I am working on several interfaces for the PP and PM modules using iDocs/ALE.
    One of the requirements is that only created and modified data must be distributed from R/3.
    For Work Centers, we are using basic type LOIWCS02 and message type LOIWCS. We are generating iDocs through transaction POIM, which has two transfer modes: Complete (data for all Work Centers etc.) and Change (only new and updated data).
    The Change Transfer Mode assumes you have set both Change Pointers and Change Documents for the objects to be transfered. Otherwise, it'll work just like the Complete Transfer Mode.
    Our PP consultant told me there is no configuration to generate Change Documents for Work Center data modifications.
    Can anybody give me other opinions? I'll resort to Z-table solutions only if I have no other options.

    Hi Danilo,
    Do you know what the process codes are for
    LOIWCS and LOIROU ?
    Appreciate your help.
    Thanks,
    Gopi.

  • User Exit or DB-Table for Work Center (CR01)

    Hi!
    I have an external software which must be triggered when the user changes a work center in SAP (transaction CR01,CR02). I was looking for an user exit to do what ever is necessary but I couldn't find one.
    So, does anybody know an user exit or BADI for work center?
    Also possible:
    The database table where work center are stored. So I could poll against this table and check if a work center was changed. I found the table SGOSHIST which log all modified objects in SAP. So this could maybe used to check for modified work center, I think.
    Thanks,
    Konrad

    > You can check the BADI definition from transaction SE18,
    > 'LTRM_WORK_CNTR_DTRM', this might be helpful,
    How can I check this BADI. If I use SE18, it doas not exist, buit if I try to create it, the system tells me that it already exists in the SAP Original System... and asks me if I want to create a copy of it! I don't know what to do at this point!
    > Work center details are avilable in CRHD table, you can
    > look for CR* from SE11 transaction,
    I know, but if you change the description of the work center, it is stored in CRTX. there are a lot of CR* tables. It would be helpful to have a table which is updated every time a work center is modified!
    Thanks,
    Konrad

  • Change log for work center data

    Hi,
    I was looking for the table where the change header document for the work center is stored.I was able to find a transation CR10 which shows the changes and also the database table CDHRD.
    When I am trying to view the changes that were made to the work center I find that the data does not exist in the tables.
      I was curious to know this as for some transaction the data is being logged in their respective change table but not for Work Center changes.
      Can anyone tell me as to why this is happening.
    What I think is that some changes to the configuration are required in order to log the changes in the database.
    Kindly help.
    Regards
    Varun

    Hi Wolfgang,
    Thanks for the information.
    However i have another question.
    The change table will have data only when it is activated in the configuration menu.
    However is there any other way by which we can capture the previous data for the work center e.g. the changed by field. I want that the names of the users who has changed the wrok center currently and the name of the person who previously made changes to it.
    See if you can help me on that.
    Regards
    Varun

  • Standard IDOC for WORK CENTER Master

    Hi,
    Please suggest the standard IDOC for work center master.
    I have tried PWKC.Got  DUMP when executed.
    Tried on SAP-Market place for help.Suggested not to use PWLC.
    Please suggest alternative.

    Will you please explain in a bit detail if LOIWCS01 or LOIWCS02 are transaction (as i tried to execute) or programs or please explain how to use these.(I executed from command prompt and SE38 but didnt helped)

  • Table for work center..........

    Hi
    Is there any table for work center which shows available capacity v/s utilized capacity......Please revert with your valuable comments
    Rgds

    Hi,
    Check Table RC65L.
    Regards
    Kannan

  • Number Range for Work Center

    Hello All
          Am having a little concern regarding the number range for Work Center, kindly let me know where the number range for Work Center is maintained or from where it is picked up when we are using external no range assignment for Work Centers.
    Regards,
    J K Tharwani

    Thanks Sir for your reply,
            Actually the requirement is the client want that Equipment number must be the same as the Work Center Code, and Work Center code which i have decided is something like 0101001 & if i give the external no to the Equipment then the system doesnt take the same number instead it takes 101001 i.e. it ignores the initial "0" in the work center code. Actually I wanted to see the no range from where the work center numbering is being picked up, but later on i came to know that there is no such no range setting for work center instead it has contol from no range for object type. Shall look forward to your valuable inputs & guidance.
    Regards,
    J K Tharwani

  • Customization Setting for Work center creation

    Dear all,
    What is the Customization Setting for Work center creation? How to do it?

    Hi,
    Here are the few things you can check
    OP40 : WC category
    OP17 : Formula for WC
    Person responsible : Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers >>Define Employees Responsible for Work Centers
    apart from above You can explore more in
    Plant Maintenance and Customer Service >> Maintenance Plans, Work Centers, Task Lists and PRTs >>Work Centers
    Riyaj

  • Production performance report against work center.

    Hi PP Gurus,
    There is a requirement to develop a production line (work center) performance report in BI which is comprising of Planned setup time, Actual setup time and their variance against a production plant and work center. Input parameters will be Material, Plant, Work center, Date/Week/Month. The scenario is PP Discrete Manufacturing.
    Could anyone please tell me how to fetch data from different tables and how to interlink them?
    Thanks & Regards,
    Abu Arbab

    Hi Brijesh,
    Thanks for reply
    As I told in my first post that I need tables,fields/infostructure that should contain Planned setup time, Actual setup time. I got some infostructure like S022, S024, S281, S282, but I'm not getting exact link between one of them related to input criteria.
    If anybody worked on such requirement please reply
    Thanks & Regards,
    Abu Arbab

Maybe you are looking for

  • How do I download a copy of Photoshop elements 9 for which i have a legitimate license key?

    A couple of years ago I bought a WACOM tablet (Intuos 4) and Photoshop Elements 9 came with the package.  I have changed my computer to a Mac Book Pro and need to download the Photoshop Elements 9 to the laptop.  I have my serial number but cannot fi

  • Page break for a category group of a chart - SSRS 2008 R2

    Hi, I need to add a page break for one of two category groups of a my chart. Is it possible, please? I need to create a chart for this category group to mantain readable the report. Thanks

  • Import Key Mapping of many Remote Systems in one step

    Hi, I have to update the key mapping of a flat table. My problem is that I have more than 30 remote systems. Is it possible to import the key mapping of more than one system in one step? If there is now way to do it with Import Manager can I use APAP

  • Crash during cmd-scrub of playhead.

    Has anyone else had problems with After Effects crashing during a cmd-scrub of the playhead in the timeline? Always happens when I switch back to the app from another running program (Spotify in the last instance), and the first action is to hold cmd

  • SAPCAR error on UNIX AIX

    Hi experts Am trying to apply SPS to our EP 7.0 portal. So I downloaded the files from SMP and dumped them into /usr/sap/trans/EPS/in directory including the SAPCAR file. I renamed the SAPCAR_XXX(some file name ) to SAPCAR. I am getting errors while