Request a "fisheye" correction target in ACR

Fisheye lenses are very useful for panoramic photography because they capture a lot of the world in each shot.  They also need a lot of correction for chromatic aberration and vignetting.  And for geometry: there is no standard 'fisheye' projection, each 'fisheye' lens projects the world in its own special way.  To stitch a panorama, the projection has to be known, and be corrected to a standard form so that the s/w can construct a true image of the world.
Correction with ACR would be an ideal first step in the stitching flow, except for one small problem:  at present it only offers one target for geometry correction,  the rectilinear perspective projection.  That is fine for "de-fishing" moderately wide fisheye images, but far from ideal for preparing stitcher input.  The rectilinear projection may be appropriate for fields of view up to 120 degrees or so, but it stretches the edges of wider fields to an unacceptable degree, and cannot represent a 180 degree field of view at all.
Most panorama stitching software uses the equal-angle spherical projection (image radius proportional to angle) to represent  the 'ideal' fisheye lens, and corrects the projections of real lenses to match.  That works well in practice even though few fisheye lenses nowadays are designed to the equal angle projection (as many old 'glass footballs' were). 
Adobe Lens Profile Creator also calibrates fisheye lenses in terms of the equal-angle spherical projection.  So, using Adobe Lens Profiles, it would be easy for Camera Raw to generate corrected fisheye images in that projection.  That would be a great help to panoramic photographers.  Our alignment and stitching flows would be simpler and work better if all input images had a known standard geometry.
-- Tom

Thanks for the detailed request, Tom. I will pass it to our Adobe Lens Profile Creator team.

Similar Messages

  • Request is red in target after correcting PSA

    Hi All,
    I am facing this issue when incorrect data comes from the source system in 0BP_DEF_ADDRESS_ATTR extractor.
    The steps I follow to correct the data is:
    Delete incorrect request from data target (0BPARTNER)
    Filter out incorrect records in PSA
    The field PSA status will mention what is incorrect in each record.
    See if user has entered special characters by mistake. If yes, remove the special character. If incorrect data does not show any special characters then remove data for that field and save the PSA.
    Update to data target manually from the corrected PSA.
    The load again has status RED in target. If I delete the request and check the PSA for erroneous records nothing is displayed.
    The record check in infopackage shows the following details:
    When I check in the target all the records from PSA are present. Also infopack does not update to any other data target.
    Please let me know why the request still shows as RED in the target even though error is corrected and data has been updated.
    Thanks,
    Amrita

    Hi,
    Have you tried to move data from psa to target by using reconstruction?
    normally in 3.x that option would be useful in your case.
    From red request how many records you moved to target.
    if your all request were are correct at tarrget level then you can change status red to green.
    other wise can you with that red request and visit monitor icon there and see in details.
    thanks

  • Error "cannot load request real time data targets" for new cube in BI 7.

    Hi All,
    WE have recently upgarded our SCM system from 4.1 to SCM 7.0 which incorporated BI 7.0.
    I am using BI 7.0 for first time and ahve the following issue:
    I ceated a new infocube and data source of flat file and succesfully created transformation, and Data Transfer Process. Everything looked fine. I added flat file and checked preview and could see data. Now when I start job to load data in infocube the follwing error is shown "cannot load request real time data targets". 
    I checked cube type in setting in infcune is shows as Standard.  When I doube clicked on error the following message showed up
    You are trying to load data into a real-time InfoCube using a DTP.
    This is only possible if the correct load settings have been defined for the InfoCube.
    Procedure
    In the object tree of the Data Warehousing Workbench, call Load Behavior of Real-Time InfoCube from the context menu of the InfoCube. Switch load behavior to Transactional InfoCube can be loaded; planning not allowed.
    I did not understand what it is meant and how to set changes. Can someone advice and follow me through.
    Thanks
    KV

    Hi Kverma,
    Real-time InfoCubes can be filled with data using two different methods: using the transaction for entering planning data, and using BI staging, whereby planning data cannot be loaded simultaneously. With Real time cube you can select the method you want to use for update as
    Real Time data Target can be loaded With Data; Planning not allowed &
    Real Time data Target can be Planned; Data loading not allowed
    You can change this behaviour by right clicking on cube and selecting Change real time load behaviour and select first option. You will be able to load the data then
    Regards,
    Kams

  • Call RFC for Lookup from BPM. how to determin the correct target system

    Hi
    I have a scenario where i am sending a sync call to SAP R/3 to fetch some sata using the BPM.
    The issue is I can have multiple SAP systems so to determin the SAP system for the correct lookup is necessary.
    in the rec determination step of Config I can configure multiple receivers but this isthrowing an error saying the multiple receivers cannot be determined for sync step.
    Any idea why is such an error occuring
    Regards
    Nikhil

    Nikhil,
    Multiple Receivers cannot be configured for a Synchronous Interfaces. reason is that when you are sending the request message to the target systems, XI will recieve multiple responses for one request and this is aginst the concept of Synch Message Processing.
    You will have to have an option of determining the receivers inside your BPM and using separate Send Steps for each of these.
    Regards
    Bhavesh

  • No of requests in a Data Target

    Hi
      How/Where i can see the count of Requests loaded in a Data Provider in BI 7.0
    Thanks

    Hi,
    RSICCONT is table used to check the requests in the Data Target level ( Cube and DSO) and also if you are not able to delete the request from the data targets in PRODUCTION (Sometimes you will not have authorization for deleting Request) by going to the mentioned you can delete the request.
    Regards
    Ram.

  • Need correct Target Id for report logical links

    Dear Experts,
    I have the following requirement where I need to have 5 Trade Funds related reports to be displayed when I click on the 'xyz' workcenter of my business role.
    The standard Group Id (Work Center Link Groups) for the reports is FM-ALL-RE.
    The logical links for the 5 reports included in the above Group Id are:
    FM-MC13-1
    FM-MC13-2
    FM-MC13-3
    FM-MC13-4
    FM-MC14-1
    So I did the following:
    1. Created a custom workcenter e.g. xyz.
    2. In workcenter definition, the Logical Link ID is abc (custom).
    3. In logical link definition, abc is assigned to Target ID TSLSDASHWC.
    4. Group Id FM-ALL-RE is assigned to workcenter xyz.
    5. Workcenter assignment to Navigation Bar Profile and Business Role is done as usual.
    But I am not getting the links for the 5 reports when I login using the business role and click on Workcenter xyz.
    I have analyzed and found that the issue is happening because of step 3, where it seems the wrong Target Id is assigned.
    Can anyone please guide as to which should be the correct Target Id which can solve this issue.
    I tried to go through various standard SAP business roles but none of them had any link to my above 5 reports.
    regards
    Animesh

    Hi Animesh,
    I have got the feeling that you are correct concerning the SWITCH_ID field.
    You have multiple possibilities to check if it is the reason. One would be to:
    Set a breakpoint in method CL_CRM_UI_NAVBAR_SRV->TRAVERSE_WC_DEFINITION() for the following code
    * remove entries with inactive switch id
      IF iv_ignore_switches EQ abap_false.
        LOOP AT lt_wc_infos ASSIGNING <wc_infos> WHERE switch_id_wc_a   IS NOT INITIAL OR
                                                       switch_id_wclg_a IS NOT INITIAL.
          lv_tabix = sy-tabix.
          IF cl_webcuif_switch=>is_switch_active( iv_switch_id = <wc_infos>-switch_id_wc_a ) EQ abap_false OR
             cl_webcuif_switch=>is_switch_active( iv_switch_id = <wc_infos>-switch_id_wclg_a ) EQ abap_false.
            DELETE lt_wc_infos INDEX lv_tabix.
            CONTINUE.
          ENDIF.
        ENDLOOP.
      ENDIF.
    Then either just jump over the LOOP whenever it is hit or check the contents of LT_WC_INFOS
    Now check in WebClient if your links show up
    The solution to your problem is afterwards to activate the switch to ensure correct display and (more important) data content.
    cheers Carsten

  • PSA request updated to data targets but not showing

    Hi All,
    It must be a basic question for BW support activities. However appreciate if someone can help me out as I am unable to find similar post.
    In PSA the request shows it successfully updated to a data target but I can't see the delta request in the data target (Cube)- Manage.
    This is a delta request. Can someone tell me how do I load the data back in to the cube? Do I need to delete the request from cube and run it again but I guess the deltas will be lost.
    Help. pls give me all the steps in detail how do I fix this.
    Thanks,
    B

    Hi,
    There are two options.
    1. at PSA find how many records are exist for your request.
    Note/down load the records into excel if you have countable. As my guess delta records might be less.
    Later thru repair full request you can load to PSA and then to target.
    AT repair full request we need to use proper selections to load required records only.
    2. PSA Request must be stored at back end table.
    in that table if we can change update further status then we can do the psa request to target thru delta dtp.
    Thanks

  • Credit Memo Request Vs. Invoice Correction Request

    Hi,
    I have done tests and searched the forums but I don't understand the difference between a credit memo request and invoice correction request.
    What are the business scenarios for each? They both create a credit memo in the end (just one has 2 line items and the other has 1).
    Thanks,

    Hello,
    When customer has a complaint about the products or when return delivery happens, usually you give the customer credit memo with reference to the credit memo request. It can either be created with referent to sales order or billing documents.
    Whereas in Invoice correction request, any changes occurs in either  quantity or value of the order, you create invoice correction request which is followed by credit memo. It always be created with reference to billing documents. Morever its not necessary that credit memo always be created, it may be debit memo as well.
    Hope it clears your doubt
    Regards,
    Jaydeep

  • Credit memo request and invoice correction request

    Hi,
    Can anybody please explain the difference between Credit memo request and invoice correction request?
    Regards
    Deepak

    Hi Deepak
    Credit memo request --  A credit memo is used when a customer has to get receive some credit amount to customer
    Example : If billing happens for 100pcs but any damage happened in transit and he received only 75pcs and the customer has paid for 100pcs then we can raise the credit memo only for that 25pcs qty
    Invoice Correction request -- It is a also a  document type where a customer can receive anyone debit memo or credit memo  based on the request raised by the customer
    Credit memo Example : If the billing happens for 100pcs and the billing  price is Rs.25000/- but do to some mistake Rs.27500/- happened then a Credit memo has to be issued to customer
    Debit memo Example : If the billing happens for 100pcs and the billing  price is Rs.25000/- but do to some mistake Rs.23500/- happened then a debit memo has to be issued to customer
    Regards
    Srinath

  • Specify multiple correct targets in a drag and drop?

    Is it possible to specify more than one correct target in a drag and drop interaction (i am creating a quiz where the learner has to label a diagram of the urinary system and there are 2 kidney labels they have to correctly drop onto the diagram, however i would like either label to be correct if dragged onto the 2 kidneys - if i've explained this clearly?)

    Sorry, overlooked this question. Lot can be solved from that window, glad you found out yourself.

  • More than one correct target in Drag and Drop

    Can an object have more than one correct target in a drag and drop? I have a question: Balance cost with _________ and ___________. The correct answers are interchangable. It doesn't matter which goes in which blank. Is it possible to tell Captivate that either would be a correct answer?

    Unfortunately, no. I need to be able to drag sources to both targets. I
    have two sources and two targets. It doesn't matter which source goes
    into which target for this statement. So I need it to be correct no
    matter which order the learner puts the answers.
    Shekhar_Dhiman <mailto:[email protected]>
    Tuesday, May 07, 2013 4:49 PM
    >
          Re: More than one correct target in Drag and Drop
    created by Shekhar_Dhiman
    <http://forums.adobe.com/people/Shekhar_Dhiman> in /Adobe Captivate/ -
    View the full discussion
    <http://forums.adobe.com/message/5298955#5298955

  • ABAP report to read request details in data-target and delete

    Hi,
    Is there any abap report which I can run in background to read all request details (Request ID, Date) in a data target?
    And any ABAP report which can delete a particular request?
    Regards
    Vikrant

    Hi Vikrant,
    You can check Table RSREQDONE and RSREQICODS for all details about requests.
    About deletion you can try with standard function in InfoPackage when uploading.
    Ciao.
    Riccardo.

  • Filtering request in Manage Data Targets

    Hi,
    is it possible to filter all Requests loaded in the data target (InfoCube) by some criteria (InfoSource or DataSource, Source_System...).
    I would need filtering to locate all requests for delete (delete requests form one Source System / delete all request form particular InfoSource / etc.)
    Thanks and regards, Tomaz

    Hi,
    At an infopackage level, under the tab 'data targets' there is a column titled "automatic loading of similar / identical requests from infocube". If you click on this, you will be presented with a window that will allow you to delete existing requests based on various criteria like if infosources are the same, if datasources are the same, source systems are the same etc. etc.
    Check and see if this functionality meets your requirement.
    Assign points if useful.
    regards,
    Pinaki

  • Is Lens Correction Currently in ACR 6.0 ?

    I'm sure this is a really dumb question, but I can't find if the ACR Lens Distortion Correction is only available in the New ACR 6.1 Release candidate or if it's supposed to also be in ACR 6.0
    I have ACR 6.0 installed and have the Lens Correction Tab, but it doesn't contain any Lens Distortion corrections.  I have to currently go into PSCS5 to use the Lens Distortion Filter.
    Is the Distortion Tab only available in the 6.1 release candidate?
    Thanks
    Dave

    Is the Distortion Tab only available in the 6.1 release candidate?
    Yes.

  • Request a Nikon lense profile for ACR 6.1?

    I apologize if this should be posted somewhere else. I did not think the feature request qualified.
    I am using a Nikon D80 with a 'AF-S DX Zoom-NIKKOR 18-135mm f/3.5-5.6G IF-ED' lense and it is not in the current list of profiled lenses in ACR 6.1 RC-1.
    Is it possible to request inclusion of this lense in the database, or is it just too old or not professional enough?
    If not possible to include, can I assume that I need to build my own profile?
    I do own a copy of PT Lens which has the profile, so not a huge deal - but; I would love to stay in ACR and then go direct to PS.
    Running current PS CS5 on Mac Pro (Early 2008) and OS X (10.6.3).
    Vanilla installs of all software other than the ACR 6.1 RC (only third-party PS plug-ins are current versions of PT Lens and Photomatix Pro).
    Thanks for any info, or a shove in the right direction for posting.

    Thank you for responding and I certainly understand.
    I really want to thank all the Adobe employees and other experienced individuals who are helping us. It is very much appreciated and a breath of fresh air compared to some other big company forums where responses from employees are either extremely rare or non-existent.
    I am enjoying PS CS5 and know all the small bugs will be worked out in time and the features we depend on will receive the polish they deserve (or at least that has been my experience since PS 6).
    Thanks again and I will either use PT Lens in the interim or perhaps see what I can do with the profile creator.
    Love the new additions to ACR!

Maybe you are looking for