Request for detailed acts to upload Work center, BOM, Routing data in LSMW
Hello PP ANgels,
Request for detailed actions to upload Work center/Resource, BOM, Routing/Recipe data in LSMW.
Thanks in advance
Sanjay,
In the forum I found that you had used some "drops", that require a password to view.
In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support). SAP Support is mostly available only to customers and partners of SAP. If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person). If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp). Alternatively you can contact your local SAP Sales office and speak to your account administrator.
Maybe it would be a better idea to group all standard solutions in one place.
I expect it will be so...in Nirvana. Here, life still entails suffering.
With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input. I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
This is the SCM PP forum. You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
Sorry I couldn't be of more assistance.
Best Regards,
DB49
Similar Messages
-
Fields for Super BOM, Work Center & Super Routing for Variant Config
hi! gurus,
Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
thank youHi,
In the Super BOM you need to maintain the object dependencies.
Workcenter fields are as usual for other production processes.
Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
Regards,
Senthilkumar -
Message no. IW056 Work center change -- default data redefined
Hi,
After EHP5 Upgrade. I am getting Message no. IW056 Work center change --> default data redefined during Maintenance Order Change (IW32). Please suggest me Is their any SAP Note or any Configuration setting to fix it.
Regards
Maheboob
Please use [Enterprise Asset Management (EAM)|Enterprise Asset Management (SAP EAM); forum for PM/CS specific topics
Edited by: Paul Meehan on Oct 25, 2011 11:56 AMHi Maheboob
Im glad the note worked -
To find the note , you could do a note search on the message IW056 you received and the support pack level you are on ..
For EHP5 the note is valid up to SAPKH60504.
The IW056 is listed as a keyword so if you search on it the note should be returned.
Thanks-
Enda. -
FM for checking Available Capacity of Work Center
Dear All,
I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it). It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process. Any inputs would be appreciated.
Thanks in advance.Dear
Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
If you are stick to FM : Help about available capacity
Hope this will address you issue
Regards
JH
Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM -
BAPI for deletion of employee from work center T Code IR02
Any one can give me a BAPI to delete position/person from work center ?
T Code IR02
IR02 -> HRMS - > Expand - > select person - > delete.
Thank you
MrudangThanks for your fast reply!
I have looked to both functions before. Beside that they are both not remote enabled (which is not such a big problem as I could copy them or build a custom BAPI around them) I'm not quite sure how they could solve my problem.
If I got it right, I would first use CR_CAPACITIES_OF_WORKCENTER to get the KAPID and using it as input for CLOI_WC_CAPACITY_READ. But I have problems to understand the output of CLOI_WC_CAPACITY_READ. The data type of the capacity is a float ( FLTP ) and the number seems to be to big, eg. 9.800000000000000E+01= 98h for one day.
Could you try to explain your solution once again?
Thanks,
Simon -
Work Center Changes need data for previous and new work center
Hi All,
I have a requirement as the organisation is going through RESTRUCTURING. In ECC in Plant Maintainance they are changing Work Center. E.G.
Work Center OLD : ABC
Work Center NEW : XYZ
Now the requirement is I have data for ABC already coming in BI Prod. Env. Now when they will change ABC to XYZ the new data will come for XYZ.
Reporting Reqmt:
Data In Cube
Work Center No. of Maintainence Orders
ABC 10
XYZ 20
When user run the report it should and gives input in Work Center variable as " XYZ" then
XYZ -- 30
Presently it is showing
ABC --10
XYZ --20
They have list of OLD Work Center mapping to NEW Work Center.
Now, Can anyone tell me is it possible to achive this scenario.
Thanks,
MayankHi,
find the below link it has similar issue ,
Re: mapping between old/new material codes in BW
Regards,
Satya -
Same order start date for 4 FG in same work center
Hi All,
I have four different Finished goods all have same lead time and same requirement date in same work center, I didn't have capacity planning so all FG have same start date in same work center after MRP run, how it is practically possible on the shopfloor.
Is there any solution available.
SekharThe fact of running MRP (with or without Lead time scheduling) has nothing to do with the leveling of capacity. Lets consider both cases :
Indicator "1" :
- No capacity load is determined
- Basic Dates from material master calculated to cover the requirements.
Indicator "2" :
- Capacity Loads are calculated.
- Dates coming from recipes or routings calculated to fulfill the material requirements.
- Overload displayed in CM01
What you need is to run Capacity Leveling (CM25, CM29 ), dispatching the orders to the work center in a feasible date. But this step is never included in MRP run.
Regards -
Control Key in Work Center and Routing
Hi Gurus,
Can anybody tell me what is the difference between Control Key we are providing in second tab of work center and the control key we input in routing.
can i use same control keys at both the places.
Regards,
Anand.Hello,
Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
Almost in all the PP we define same Control key to the work center as well in the routing.
For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
Regards,
Piyush -
Updating Work Center Capacity Header Data (UoM : KAPEH)
Hi All,
Using an LSMW all the Work Center were created, but it was having a wrong value for the Capacity header data unit of measure KAPEH. Due to that it's giving an error of " In table T006, entry ****** is missing".
I tried to maintain the Time Dimension using SPRO but I can't create the value which has been passed as HR (Hours), because it's already used by some other UoM.
What would be the way one should update the value of KAPEH.
Thanks & Regards
Harryin the t. code CUNI or OPCF
Select the time intead of AAAADL , - Next to unit of measurement
and click Unit of measurement
and Create a new time unit as HR
It will solve your problem
or create a LSMW for CR02 to change the field KAPEH HR to H
this will solve your problem -
"Request for Reporting available " is not displayed after loading the data.
Hi
A DSO feeds the data to a cube and DSO. In dso reporting sysmbol is present. However in the cube "Request for Reporting available " is not present in the manage tab of the cube.
Please advise on this.
Regards
loyeeHi,
What is the status in Monitor. If it is ok, go to manage of the infocube,
in that screen on the menu, Environment --> Automatic Request processing. Then you will get three check boxes.
Click the first check box, (Set Quality status to OK). If you aggregates, choose second box.
Hope this helps.
Regards,
Rama Murthy. -
Entering Registration Code for Quicktime acts like it works but doesn't actually
I've read a lot of these quicktime troubleshooting steps and support Q&A but can't seem to get Pro to unlock. I have verified that I am typing correctly in both the Registered To and Registration Code fields on the register.
When I hit Apply it produces a line of text that says QuickTime 7 Pro, but that's it.
When I hit okay and try to use some of the QT Pro functionality, say file>New Player it still acts like I don't have Pro. if I click About QuickTime it doesn't says 7.7.1 not pro
So heres what I have tried so far. Restarting Quicktime. Restarting the Computer. Uninstalling Quicktime Restarting the computer and Reinstalling Quicktime and trying to register again.
The problem still pursists. I have purchased the Windows Version, am running Windows 7, and have the latest version of quicktime. I don't mind re-doing any of these steps if it will help troubleshoot this problem. What would you suggest to ensure that I can upgrade to QT Pro successfully?When I hit Apply it produces a line of text that says QuickTime 7 Pro, but that's it.
That's all you get. There is no other confirmation.
When I hit okay and try to use some of the QT Pro functionality, say file>New Player it still acts like I don't have Pro. if I click About QuickTime it doesn't says 7.7.1 not pro
It won't say "pro" anywhere other than a small "Pro" tag on the QuickTime "Q" logo. If the Pro labels disappeared from the commands and they're no longer greyed out, the key was correctly registered.
If "New Player" doesn't work, something else is amiss. First, confirm that the new player isn't just hiding behind an existing one or other window. If that's definitely not the case, do any of the other Pro functions such as Export work? Or are all of the functions not working?
Regards. -
Module Business Processes (request for detailed website links)
Hi,
I'd like to learn more about the different Business processes inside all of the SAP modules. For instance, I'd like to know what Business Processes are included in each SAP Module, what they do, how they are used, what their specific objectives/outlines/uses are and etc.
Please provide online links and documentation that can help me learn more about what each module is and does (in terms of the module specific business processes.)
Any and all help will be greatly appreciated.Hello John,
Take a look at this.
https://websmp202.sap-ag.de/bestpractices
Detailed information on all SAP Best Practices scenarios (Scenario Overview, Business Process Procedures, Installation Guides etc.) can be found in the SAP Help Portal (http://help.sap.com/)
Cheers ! -
Upload/ download Work Center Hierarchy
Hello All,
I need your help with this one. Therefore thanks in Advace:
Is there a way to download and upload work center hierarchies?
The idea ist to download a complex hierarchy to a file and then upload it to another system/ client.
Thanx
RafHi Daniele,
I just tried the way you suggested:
- RCRAPDX1 downloaded a txt to presentation server with data.
- changed only the plant in file.
- run RCRAPDX2
unfortunately result is that ths system try to maintain the work centers within the file,
(which are already maintained).
The hierarchy structure won't be maintained.
So what I look for is a manner to transport the complete hierarchy structure...
regards
raf -
Designing Work Center & Assigning in Routing For Textile Industry
Dear All
There are around 20 Looms in weaving.As per clients requirement to map indvidual Loom efficiency each loom is considered as indvidual work center.In routing its possible to assign only one work center.
Kindly suggest me how to map this scenerio.The client requires machine wise output.Should i raise 20 Production orders for indvidual Work centers.
Regards
Jayhi,
i am sending the information about
Maintaining Individual Capacities in the workcenter,
Prerequisites
Individual capacities are used in capacity planning for more detailed resource planning. For instance, you can divide a machine capacity into several individual machines and maintain an available capacity for each machine. Capacity requirements can then be distributed among the individual capacities. If you do not maintain an available capacity for an individual capacity, it is calculated from the operating time of the capacity to which the individual capacity has been assigned.
Individual capacities have the same capacity categories as the capacities to which they are assigned.
In order to be able to create individual capacities the CapCatPers indicator for the capacity category must not be set in Customizing.
Procedure
Assigning Individual Capacities
On the header screen choose Goto ® Individual capacities.
The Assignments to Individual Capacities screen appears.
Define the individual capacities.
Maintaining Available Capacities for Individual Capacities
In the Assignments to Individual Capacities screen place the cursor on the individual capacity whose available capacity you want to maintain.
If the Maintnd indicator has been set, then an available capacity has been maintained for this individual capacity.
thanks
sbabu -
How to manage work center in Production order
Hi,
I am producing a material having one operation (suppose cutting), which I have mentioned in the routing. I have also mentioned the work center in routing on which cutting operation will be performed. When I make the Production order of 1000 pcs there comes only one work center. But practically, they are producing these 1000 pcs on two different work centers ( 500 on one and 500 on second). How to manage this in SAP.
Kindly help me.
Thanks and Regards,
Yogesh SinglaDear ,
What is the individual capacacity of the Work Centre -CR02-Header -No of Individual Capacity ?
I think you must be using similar kind of work centre of 2 no 1000 pc .Now , when you are creating routing for this , you should hit Required Spilliting in Routing Operation -Select Operation line item and then Double click -Select Spilitting and enter splitting No 2.
At the same time in CR02-Work Center -Capacity Tab -Hit the Header -In the Bottom of the Detail Capacity Header -Avaialabile Capacity -Include 2 as Number of Inidvidaul Capacity and SAVE.
Now based on thr required spilittinga and invidual caapcity , it will consider the Work Centre Load .
Other wise , you can enter one more operation line in routing with similar Labor hrs , work center and control key in routung for production of 1000 pc .
Hope it clarifies
Regards
JH
Maybe you are looking for
-
CRM_RESOURCE_THREAD abend with SP8
Last night I was patching an occasional clients cluster and ran into some trouble. I installed this cluster in early 2005 when NW65SP3 was roaming the earth... I havent been back since, and they havent done any maintenance. Last week, as they were wr
-
The limitations mentioned below come from the BIP Administrator and Developers Guide 10.1.3.4, I thought these were removed in 11g but I see the same limitations in the 11g doc. Can anyone confirm if these limitations still apply for 11g and when wil
-
Getting the Drive To Abort a Stuck Read Cycle
Are there any better methods for advancing or stopping a drive stuck in a failed read cycle besides force quitting? Perhaps a 3rd party software? I have not had this cycle stop on its own and assume they don't? DETAIL: Every so often while in the mid
-
File server migration with Offline files involved
Hi, We are planning a file server migration in following weeks. This morning, our customer came with the good old "Ow, and I just thought about something else" Here's the scenario : -They are using 1 network drive -That network drive is made offline
-
The photos are RGB. Shutterfly can't figure out why and says there must be some error in the file when it is saved. Does anyone have a reason and/or solution? The portion of the photo on the left is edited, the one on the right is how the image looks