Requirement plan number is to be populated in production order

Hi all,
Can anyone suggest how Requirement Plan Number given in MD61 can be populated in production order.
This is urgent.
Thanks
KumaraGuru

Hi Kumra,
When we create the Requirement Plan number in MD61 it is updated at PBIM table. And after running the MRP, Requirement plan number (PBDNR) is updated in the PLAF  ( Planned Order Header ) Table.
I am not sure about, it can be populated in production order.
Le tus know your requirement so that we can help u further.
Regards,
R.Brahmankar

Similar Messages

  • Requirements plan number

    Hi,
    At what point is the requirements plan number (field PBDNR) populated in SAP. I need to understand when this field first gets populated.
    Thank you

    Hi,
       If you want to give requirement to more than one material ( or a group of materials), through "Requirements Plan number" in the initial screen of MD61, you enter the list of materials.
      In MD62 and MD63, you can view the list of materials collectively by this plan number (PBDNR).
      In real time scenario, the client will use this field as unique to identify the monthly schedule of the respctive month.
       Check this...
    -Thaila Shree

  • Table/Field for the requirements plan number.

    Hi,
    I need the Table for requirement plan number (that I display in MD61)
    Tablename and Fieldname.
    Thanks

    Pass the material and plant in PBIM and fetch the BDZEI- By using BDZEI and   date (PDATU-PBED), fetch the (PLMNG- PBED )as planned qty, UOM as ( MEINS-PBED) and date (PDATU-PBED) system.

  • Customize the requirements plan number

    Hi,
    where can I customize the requirements plan number.
    Thanks
    Dede

    In MD61 you can enter a reqmt. plan number as per your need, anything preventing you from entering the same?
    or if the business need is something else, then can you let us know the same

  • How to Run MRP with requirement Plan Number

    Dear all,
    I am working for the process of MRP Run .But customer requirement is that "To Run the MRP with requirement Plan Number"
    If you are aware of this scenario ,please provide the solution.
    Thanksin Advance

    Go to MD61
    Select the Radio Button Rqt Plan Number
    Write the plan number eg. "test1"
    now you get the next screen
    Here you can enter the materials like
    first line Testmat1 -qty 100   150 ....
    2nd line Testmat2 -qty 150    100
    like that
    So the difference between MD61 with Material and Rqt Plan number is
    Material means we give requirement for only one material
    But for Requirment plan number , w.r.t one Rqt Plan number we can maintain requirement for multiple material
    same material with same period we can maintain requitement for Different Requirement Plan number
    This is reducing effort of client of data entry and for different sales Regions for the same material through "Rqt Plan No" they can differentiate the rqt
    MRP run run it for PLANT or multiple plant with Scope of Planning
    thanks
    Pl award points if useful
    K.Prabakaran

  • Issue : PIR Internal Requirement Plan number generation

    Hi,
    I am facing Problem on demand release as a PIR with requirement plan number .
    Requirement Plan number internally generating for each line items one plan number.
    Requirement type : VSF
    Version                : 05
    Example: I want 10 line items in planning table should create internally only one requirement plan number .
    If you know solution help me out.
    Regards,
    Sadasivam R K

    Hi,
    Requirement Plan number internally generating I think it is not possible, as it is to  create and to identify one or more planned independent requirements.
    Only active version of PIR will be considered
    Regards,
    R.Brahmankar

  • Requirements Plan Number - PLAF Table

    Hai PP Gurus,
    Requirement plan number not updating in the PLAF table.
    What would be the reason?
    Pls throw some light on this.
    Thanks & Regards,
    S.Ganeshraja

    Hi ganesh,
    Before using the fuction module use following table.
    PBHI.
    list out the all the data on particular date (PDATU).
    PBIM:
    Pass the all records with refernce to
    PBHI- BDZEI -> PBIM-BDZEI.
    Now u will get list of records for  material number and plant
    Now use fuction module  for planned order Number,
    i think MRP run  create one planned order for all req Plans for  a day.
    Plz tery and comer back & reward and clsoe teh thread.
    regards
    pardeep

  • Issue :PIR Demand release with internal requirement Plan number.

    Hi,
    I am facing Problem on demand release as a PIR with requirement plan number  from SCM to SAP R/3.
    when generating the requirement plan
    Requirement Plan number internally generating for each line items one plan number.
    Whenever releasing the demand from APO to R/3 , It should give only one requirement plan number for that batch , Not each line item seperate requirement plan number.
    Requirement type : VSF
    Version                : 05
    Example: I want 10 line items in planning table should create internally only one requirement plan number .
    If anyone know solution help me
    Regards,
    Sadasivam R K

    I hope you must have resolved your query at your end.

  • No Planning file entry when materials received against production order

    Hi,
    Planning file entry is not getting created when I receive material from a Purchase order where account assignment category is 'F' - Order. In other words, the material is received against a Production Order.
    We run MRP automatically through MD01 and it will not run for the material as there are no planning file entries.
    MRP List MD06 shows the purchase requisition and the production order even though the production order requirement has been met.
    Please help me out with this issue. I really appreciate the help the community members have given me earlier regarding my questions related with the planning file.
    Sincerely,
    Ketan

    Hi Dhaval,
    1st Scenario
    When I receive material through a Purchase order and receive it into stock, then MRP is able to run because planning file entries are created when I receive the material and clear out the MRP list as the requirements have been met.
    2nd Scenario
    When I receive material through a Purchase order and directly against a Production order (Direct Procurement) , then MRP is not able to run as planning file entries have not been created even if the requirements have been met.
    How can I prevent the 2nd scenario in future where production order and purchase requisition exist in the MRP List but since the material has been received against a production order therefore MRP will not run and clear out the MRP List?
    Sincerely,
    Ketan

  • Use of Planning Table (MF50) in Capacity Levelling with Production Order

    Hello Experts
    I wish to know that is it possible to perform Capacity Levelling in planning table (tcode MF50) with respect to a Production Order ? It is known that MF50 is used in Repetitive manufacuring to do the capacity levelling with respect to Planned orders. But in our discrete manufacturing scenario we want to use planning table to the capacity levelling with respect toa Production order.
    Any clue or help pertaining to this will be highly appreciated.
    Thanks in advance
    Regards
    Jayanta

    Dear ,
    MF50 is does the cacapcity leveling based on mateail -run schedule order (planned order ) where as in discrete manufacturing , when you run the MRP ,  MRP system assume Infinite Capacity  and schedule the order as per your selection in MD02(2,1,3,3,2)  and then you convert those planned order to Production order .Here you checkied the Capacity in Production Order level .
    In stanadrd SAP  , it is not possible to use MF50 for discrete production order.
    In discrete order or process order ,  do the caapcity leveling , there are seperate planning table available based on Over all Capacity Profile and Schedule type .This can be done  in following way :
    1.CM31-Production Order Wise -Tabular
    2.CM23-PO wise -Graphical
    3.MC88: Ruf Cut Planning
    Work Centre Wise : CM21 -Graphical , CM22-Tabular Planning Table .
    Make sure the below set up before  you carry on the Capacity leveling :
    .Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In OPJK  maintained check capacity with SAPSFCG013 profile for your production order type
    In OPU3 , scheduleing parametre s: Generate Capacity , Scheduling Type , Automatic Log ,Start date in Past as per your req.
    In OPJU , chekc the contol tab of the scheduleing as per OPU3
    In OPKP- Production scheduling paranmeters assing the overall capacity profile -SAPSFCG013  with finte scheduling tick.
    Master Data :
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    Hope this will help you .
    Regards
    JH

  • Serial number creation at the completion of production order

    I am trying to create a production order and the finished goods is serialized. However, when I complete the production order it never asks me for a serial number for the finished goods. I have to go to registered products screen and manually create the serial number. I am assuming there is a way to minimize the number of step I have to use during the production process to create a serial number.
    Any Ideas?
    Thank you
    Chintan

    Hi Chintan,
    i believe that serial numbers are not supported in production orders.
    Serial numbers are available on delivering and receiving goods
    Regards
    Andreas Czech

  • Profit center to be populated in Production order without material.

    Hi,
         I am creating Process order without material for my requirement and the settlement receiver of these order will be a cost center. Now my requirement is the Profit center assigned to the cost center is to be populated in the Profit center field (CAUFVD-PRCTR) in Assignment tab of the Process order when saving the order. Kindly tell me how to achieve the same.
    Thanks & Regards,
    Ravi Kumar C.

    Dear R.Brahmankar,
       The exit referred in the note will trigger while opening CORO itself. But my requirement is to trigger after entering the cost center in the settlement rule (Settlement receiver is manually entered before saving the order). After entering the cost center in the settlement rule system should populate the profit center. Is there anyway to achive the requirement.
    Regards,
    Ravi Kumar C.

  • How to output serial number in wwi template from the production order

    Dear Experts ,
    Has Sap defined report symbol to output serial number in sap glm

    Dear S P
    there are "lots" of threads discussing this.
    GLM - Serial Number Hide
    EHS GLM how to define serial numbers out of a list
    Bar Code in SAP GLM
    New changes for GLM in EHP7.0 and ERP 6.0
    GLM - Serial Number Hide
    Sap GLM Serial NUmber printing
    Please check them
    C.B.

  • VC reference char not auto-populating on Production Order

    Experts,
    I've created a reference char CAUFV_AUTYP & included it on my class 300. Intent is to influence certain behavior on the stand alone Production Order (CO01) configuration using VC (Header >> Configuration section).
    Expectation is that when a Production Order is created, the CAUFV_AUTYP will get defaulted to a value "10" (for Production Orders) & when that happens, I want the VC to enable certain things for me on the configuration screen. I'm trying to write a selection condition & a pre-condition using the value of CAUFV_AUTYP = 10.
    Problem - When I create a stand alone production order, I'm not seeing the CAUFV_AUTYP value auto populate to "10".
    Any ideas on this? I was hoping that even before the Production Order commit to the CAUFV table happens, it shud have been able to read the AUTYP=10 & populate on the production order.
    Thanks

    I don't know whether you can do so.  According to SAP help, you can only change BOM component (STPO table), task list operation (PLPOD), Sequence (PLFLD),  and PRT value (PLFHD).  You can put the object dependencies in BOM or routing. 
    You cannot just change any field in production orders (why would you want to change the field order category in the first place?).
    You can also change the sales order via VCSD_UPDATE table.  The object dependencies should reside in your configuration profile in this case.
    Rgrds,
    See the link for more detail.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm]
    Edited by: ayethebing on Apr 17, 2011 3:37 PM

  • Delivery schedule line number in sales order is not populated in production

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Will reward points.
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

Maybe you are looking for

  • ITunes and Quicktime do not open anymore.

    Hello, I have used iTunes and Quicktime for a long time and recently I updated my Quicktime software to the latest one. Now neither iTunes nor Quicktime open and no message come up after attempting to open either. I double-click, the hour glass comes

  • Creating Sample XML data to view Reports

    Hi All, I have the following: RTF Report Templates XML definition files - i.e. format <parameters> parameter names = .... </parameters> <dataQuery> Sql statement in here </dataQuery> <dataStructure> element names... </dataStructure> and translated xl

  • Anyone know how to show table format in email using php?

    I created a form using tables in dreamweaver.. and my email works and I used php. My issue is I want my submitted form to look like the form I built in dreamweaverwith the tables and spaces etc. Is there a way to do this?

  • Html Email Authentication

    I use below Oracle DB version. I have procedure that sends email from oracle db. I want to change my code TLS encryption support. You may find my procedure below. NLSRTL 11.2.0.1.0 Production Oracle Database 11g 11.2.0.1.0 64bit Production PL/SQL 11.

  • Why HCM Extracts is better than HCM BI Report?

    Hi All, I have simple question that why we use HCM extracts at time extracting data from HCM? any suggestion will be helpful to me. Thanks & Regards, Shramistha