HI,
Is there any possibility to maintain Purchase Requisitioner Field in the Task LIst?
here this field is Mandatory in PR, i want to run Service Maint.Order Scheduling in Back Ground. and system is showing error.
Pls suggest the best possible solution
Thanks in advance

Dear Keerthik,
I have one suggestion, i know there is no mandatory in requisitioner field in PR, if you want remove mandatory field in PR in OMF2.
This requisitioner field is not mandatary in MM, only this field is used for reports or name ference purpose, so you can change mndatory to optional
Hope this may helps you
Prem.

Similar Messages

  • How to make read only field in Task list?

    Hi All,
    How to make read only field in Task list?

    This can be done one of two ways:
    1. Customize the form in Infopath, right click your field and disable the control.
    2. Use JavaScript/jQuery on the page to disable the element.
    Andy Wessendorf SharePoint Developer II | Rackspace [email protected]

  • User defined fields in task list

    What is the significance of adding user defined fields in task list operation?

    Dear Maniaba
    We have used user fields in task list to capture quantity in terms of nos & its weight for each operation. This we used as a work around to capture the repair jobs quantity & tonnage. While mapping repair of a particular machine with out any reference to material(that is we have not created them as serialised material as in the case of refurbishment) we have created task list for its repair and user wanted to capture the quantity of repair (say how many & also its weight) so we have maintained the tonnage per 1 no in these fields. later when order is being created user selects the task list & changes the quantity field then we have developed report where we calculate the total tonnage of that job & also no of items repaired.
    Regards
    S P Behera

  • Use of user define field in Task list

    Hi,
    Please give the solution for the strange requirement of the client as:
    My client wants to define the operation for preventive maintenace in two parts like
    check temperature  :  45 deg celcius.
    check temperature should be like operation and rest what he has to check to be defined in other field  i.e. both should not be together.
    so i find the solution as user defined fields in the task list where i can define this second parameter.
    But the problem is that system is not proposing this second field in the preventive order, only operation field is proposed.
    Please suggest some solution, how can this requirement can be mapped.

    Both operations of the inspection lot will need to be completed at some point.  They are in the same lot so they belong together.  Both operations should be available to the user.  (Unless you used workcenters and security to limit users to specific workcenters).
    Once set up, it will only be available to new inspection lots.  Few things in SAP are retroactive.
    Craig

  • Show a custom list field in task list

    Hi
    i created a custom list and started approval workflow process
    i want to provide a field called employename in task list bcz
    when apporver user  opens tasklist and before approve  he will enter employeename in this filed
    adil

    Hello,
    Above link to add field in task form but if you want to create lookup column so modify your form in infopath. Then add field to get emp name from emp list
    One more link to customize task form and add column
    http://office.microsoft.com/en-us/office365-sharepoint-online-enterprise-help/customize-a-task-details-page-HA103858063.aspx
    http://www.jasperoosterveld.com/2012/05/how-to-change-workflow-task-form-with.html
    This link will give you an idea to modify the form.
    Hemendra:Yesterday is just a memory,Tomorrow we may never see
    Please remember to mark the replies as answers if they help and unmark them if they provide no help

  • External Identification field in Task List

    Hi Guru's
    I need to activate the External Identification ( TL EXTID ) field in the Task list..
    Could anyone assist me how to activate this 40 character field ? Is there any enhancement which requires activation of this field..
    Pls help us out...
    Regards
    Bhanu

    Dear Mahee,
    While they create the Task list for equipments,  they need to enter SOP No's relevant to equipment in this field..
    Regards
    Bhanu

  • How to fin the Workcenter after getting Task list type

    Hi all ,
           I got the fields PLNTY(Task List Type ) , PLNNR(Key for Task List Group) , ZAEHL(Internal counter ) and VORNR (Operation/Activity Number)   from PLPO table .
    I need to get the work centers names . I saw the work centers are in CRHD table .
    May i know how to get the name of the work centers after getting the task list type details .
    I  found the routing details of a give finished/semi finished material .
    my next step is to find the work centers.
    Any suggetions from you are appreciated .
    Regards
    Raj

    Hi Jan,
    Yes, sa38 makes it possible indeed to execute in background into immediate mode a job but
    the user have to know the name of the program to be carried out ...
    The user knows only the name of these transactions trade. For example, IW38.
    In the menu of this transaction, SAP gives the possibility to execute in background :
    Program --> Execute in Background --> display of Start Time screen for the type of start condition :
    Immediate, Date/Time, After job, After event, or At operation mode).
    It is at this time there that we want that the user can only choose the "immediate" mode.
    We must thus prohibit the other choices (Date/Time, After job, After event, or At operation mode) ... and
    and we don't know how to restrict these other options in this screen "Start Time screen for the type of start condition".
    Thank you.
    By.

  • Validation setting in task list

    Hi
    I have Project Manager and Project Approver fields in task list. I want to add validation so that Project Approver = Project Manager. Other wise user should not able to save the record.
    When I go to Validation settings, I don't see Project Manager and Project Approvers in the column list. Can anyone give suggestions on this?
    Thanks

    It looks like the fields Project Manager and Approver Manager are Person type fields. These fields are not listed in List validation column settings. An alternative for you is to override SharePoint JavaScript function "PreSaveAction". You can
    use JavaScript code to comapre the values in these two fields and perform validation.
    Blog | SharePoint Learnings CodePlex Tools |
    Export Version History To Excel |
    Autocomplete Lookup Field

  • Fields in the Task List -- Operation Overview

    Dear Expert,
    There are few fields in the operation Overview of the Task List -
    >> if we move ahead in each n evry operation -- fields like Material Grp, Cost element and Assembly....n lot more. plz tell me the appropriate use of the same.(If any)
    plz guide
    thanks
    DM

    hi deepak
    As you know task list is ued for easy uplaoding of operation and materials ,in tak list you can maintain internal and external operation ,hence for both the operation you will give the appropiate necessary fields.like for PM02 you will assingn the purchasing grp,cost element,material grp
    regards
    thyagarajan

  • Making task list field mandatory in creation of maintenance plan?

    Dear All,
    I need your help in configuration of Making task list field mandatory in creation of maintenance plan. I checked with sceen variant config but that also not giving me any option to make the field mandatory.
    Is there any note or user exit for it?
    Regards,
    Kaushal Rai

    Dear,
    Pls check the exit IPRM0004:Maintenance plan / item: Customer check for time "SAVE".
    Regards
    Sunil

  • Need 2 metadata fields from item I am running a approval workflow on to show up on the task list

    I have document library "A" that contains many documents with 6 columns of metadata. I have a simple approval workflow for the library that works as it should in functionality. My users would like it if 2 fields of metadata from the items in library
    "A" would show up in the Task list so they could track the tasks by the 2 fields. Can anyone point me in the right direction here to make this happen? Working in SP2010 with Designer 2010 and IP 2010.
    Thanks 

    Hi Ross,
    According to your description, my understanding is that you want to display two managed metadata fields in the associated tasks created in the approval workflow.
    I recommend to edit the approval workflow in SharePoint Designer and new two task fields to display the two managed metadata fields.
    Here are the detailed steps:
    Open the approval workflow in SharePoint Designer and click Approval in Start Approval Process step.
    Click New to create two task form fields in single line of text type.
    Click Change the behavior of a single task under Customization.
    In Before a Task is Assigned step, select Set Task Field under Task Behavior Actions and then set the newly created task form fields to get the values in the managed metadata fields of current item.
    Please refer to the picture below(create a task form field called Managed Metadata for example and mm is the managed metadata column in the list):
    Best regards.
    Thanks
    Victoria Xia
    TechNet Community Support

  • How to add a popup list in the requisitioner field in PR

    Have to add a popup list containing the list of employee vendors in the requisitioner field of Purchase Requisitioner. As client is in need of adding the employee vendor list so that it will be easier for them to locate the correct employee for whom the material to be ordered.

    Hi ramesh
    Yeah .....we want F4 help for that field..
    ABAPer has to do it in User exit or BAPI ????????
    Regards
    Siva

  • Setting Profile Value as default in Task List Initial Screen Profile Field

    I have created a profile for enabling Network Graphic view for operation relationship in PM task list. Whenever i want to create task list i have to enter profile in initial screen to activate Network Graphic view. Can this profile be set as default, i mean whenever i create task list, profile field be filled automatically with predefined value instead of entering profile every time ?

    Yes, you can default this Profile name by use of PIDs
    Not at a system right now - can anyone help with the PID name??
    PeteA

  • Additional User Defined field in Maintenance Task List

    I wan to add an additional field user field in Maintenance Task List.
    I know It is possible in User Fields.
    But I an not able added user field to Operations that are already there in the maintenance plan.
    The system is allowing me to Add field in New Operations that I am adding the the Task List.
    Thanks
    Sabyasachi

    Hi,
    If I am correct, It is not possible to add user fileds to the operations in the maintenance plan which was copied from the tasklist which is there in the maintenance plan.
    if you required these user fileds goto to change mode in maintenance plan and remove the task list in plan and do necessary changes in the task list and add to plan again. After that you can get userfileds in the opeations as u required with was generated now onwards. It is not possible for the past ones.
    Regards
    Srinivas

  • Make a field Unchangeble in Task List

    Hi Friends,
                    Can anybody help in making the field RIHSTPX-MEINS (which is basiccaly the component Unit of Measure field ) in the Component page of a Task List.The Issue here is that the users are able to change the UOM value and can be modified.My clinet wants to make these unchangeble once created.
    Please help with your suggestions
    regards
    leo

    hi
    your requirement is when use enters  say 8 it will be hours  only H
    suppose the work is 4 days
    currently if he puts 4 days system will conver into H as 96 H & entry will be made without any error
    your Agenda is he should not select days at all if he want to enter work for 4 days
    he will conver as 96 H
    is the requirment is like this or something other please let us know
    Regards
    chandrashekhar

Maybe you are looking for

  • Suggestion - Peoplesoft documentation in HTML format

    Hi, Currently, we can find all the Peoplesoft documentation on the following link : http://www.oracle.com/technology/documentation/psftent.html That really nice, but the purpose format is only pdf style, is it possible to add the HTML format which is

  • Iphoto 11 in OS 10.7.4

    Twice it happened to me that I downloaded my photos from canon 7D and all the portrait mode pictures are black in color. I have rebuild my library but to no avail I can't get the photos back. I have already deleted it from my memory card so I am resi

  • Lock in the results recording in QE51

    Hi,I use a BAPI to do results recording in QE51,but when someone inside the characteristic,results recording does not happen, and there is no error message appears.What should I do to deal with the problem? Should I use 'lock object' method? I know n

  • Dreamweaver Installation Failing

    I have downloaded without issue Photoshop and Indeisgn however when I go to install dreamweaver, installation makes it to 95% and then fails with the message I have pasted below, please advise... Thanks Exit Code: 7 Please see specific errors and war

  • Using .js scripts to launch Photoshop

    Hi I'm kind of new to this Photoshops scripts field and would like to  write an external application (.NET based) that would be able to invoke  the Photoshop application and run Photoshop .js scripts on it and then return the reply to some other exte