RESB - Reservation/dependent requirements

Hello
I am SAP BI consultant who needs to build an delta enable extractor out of table RESB - Reservation/dependent requirements
This table doesnt containt any doc creation or change date.
Where can I find material reservation creation or change dates? Any log for material resevation?
Thanks

Hi,
look in the logical database MMIMRKPFRESB.
The relevant tables are RKPF (Header), RESB (Position) and the regarding movement type (RKPF-BWART).
Does it help if you use the requirement date RESB-BDTER, or what additional information do you need?
Regards
Carola

Similar Messages

  • Reservation/dependent requirements Table

    Hello,
    Does 2LIS_04_P_COMP data source uses RESB table in the back ground for extracting Work Order and related components?.
    Please let me know whether this extractor uses RESB or other tables.
    - Ganga

    Hi Ravi,
    I have used the transaction code RSA2 to look at the tables. it looks like it is not pulling the data from RESB table for this extractor 2LIS_04_P_COMP.
    Any idea, what extractor should be used to pull the data from RESB table?.
    Your help will be really appreciated. Pls let me know.
    - Ganga

  • Technical data for planned order dependent requirements .

    Dear All,
                  I have to call the dependent requirements created by MRP run in my report. Can anyone please tell me that where these dependent requirements are stored in the database or is there any function module to get these values?
    Thanks.

    Dear,
    RESB Reservation/Dependent Requirements Link with PBED for FG and SFG releation. Function module MD_STOCK_REQUIREMENTS_LIST_API
    Also refer this link,
    Dependent Requirements report required
    Regards,
    R.Brahmankar

  • MRP Planned order generation for Order reservation excluding Dependent Requirements

    In our Project we have a requirement like for FG stage & SFG1 stage are M.T.O So after sales order are punched through  MD50 we have created Planned orders against sales orders,But dependent stages like SFG2 & SFG3 which are pure M.T.S so only Dependent requirements will get generated.Suppose for SFG1 i have partially converted planned order to Production order then for component SFG2 we get Partial Quantity as order reservation.Now requirement is if i run MRP for SFG2 system need to generate demand only for order reservation excluding Dependent requirements.Is there any possibility where we can generate demand only for order reservation.As system will create Planned order for SFG2=Dependent requirement + Order reservation

    Hi Uli,
    Suppose i have Sales order--100 kgs for FG
    B.O.M levels
    1.FG-----M.T.O
    2.SFG1---M.T.O
    3.SFG2---M.T.S
    4.SFG3---M.T.S
    5.ROH
    So if i run MRP via MD50 system would generate planned orders for FG & SFG1 level as they are M.T.O specific
    Now my requirement list would be
    FG-100kg planned order
    SFG1-100kg planned order
    SFG2-100kg dependent requirement.
    Now suppose i have partially converted SFG1 planned order to production order
    SFG1--100kg planned order to 30 kg production order
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-70kg dependent requirement & 30kg order reservation.
    Here my requirement is if i run MRP for SFG2 in MD02 as these stage is M.T.S system should provide 30 kg planned order & if we see down the line it would be like
    Now my requirement list would be
    FG-100kg planned order
    SFG1-70kg planned order & 30 kg production order
    SFG2-30kg planned order & 70kg dependent requirement.
    SFG3-30kg planned order
    ROH-30kg Purchase req
    Client requirement is like these..

  • Dependent requirement v/s order reservations

    Dear Guru's,
    Could you please explain me the difference between dependent rquirement & order reservations? As we check MD04 for any material we could see both for same material & both requirements are coming from upper or header material.
    Reservations are done against production order & dependent requirement is generated due to the requirement at header material. Please explain in detail.
    Regards,
    SAP CONS

    Hi,
    Dependent req. are generated by o planned order (for its components), whereas order reservation are ceated by production orders (for its components).
    One sets the other off, as planned orders are converted into production orders.
    You see both in MD04, since you may have both planned and production order for the upper level material at the same time.
    Regards,
    Mario

  • RESB_BDAT="AR"  - dependent requirements

    I'm analysing materials in table RESB and found one with BDART= "AR". I need to understand why this material has this type of requirement. What defines if a material will have the requirement type "reserve" (MR) or "dependent requirements" (AR)?
    Thank you in advenced.

    Dear,
    Dependant requirements 'AR' (Automatic Reseration for order) material reservation created from planned order. You can see the details in MD04 transaction for the material.
    Regards,
    Syed Hussain.

  • Dependent requirements

    Dear friends,
    For example I am having a Sales order for 20 items. Due to some constrains, at a time I can not produce more than 1 item. So I am creating a production order for 1 item with reference to a sales order (using CO08).
    My problem is while running MRP, system is creating the dependent requirements for all the 20items. So I want to run MRP for the production order (like MD50 for sales order). Otherwise my MRP run should not consider the Sales orders for the dependent requirements calculation.
    Dependent requirements for all the 20 items is creating a big confusion. My scenario is pure MTO. Down the line all the production is for the respective sales order only.
    Please suggest me...
    Regards.

    Hi Kodand Nag,
    Please explain your scenario once again, I get confused little bit, 
    What I understood from your last reply, u have created sale order  with order qty is 20 nos for one material. (I assume).
    Then u have created prod order for one Nos (Partially – since is capacity constraint) with reference to sale order.(CO08).
    In MTO, system consider the sale order to create dependent requirements for dependent  material.
      Here u want system to consider production order not sale order requirements  – This is not possible.
    My solution is since u have converted partially qty as Production order, order reservations should have created for dependent material, if u run the MRP for dependent material (Next one below the header material) , sale order requirements is not taken into the account only production order req. I hope i am not mistaken, else please comeback.
    Regards
    Pradeep

  • Dependent Requirements report required

    Hi All
    I'm searching for transaction which will generate a report with total of dependent requirements for a given FG material list:
    Do you know if there are such type of transactions in SAP?
    Kind Regards
    Andrey

    Hello!
    We had the same problem, and our solution was making this report in ABAB. In ABAB you can call structure MDEZ and filter it by "MRP element"= DepReq.
    Other solution, rather temporary, is report based on table RESB (using e.g. transaction se16/se16n, SQVI, or ABAB). In that table field BDART='SB' means requirements coming from DepReq. The problem is, that RESB table can be huge, and searching in that way can take a lot of time.
    Best Regards,
    Marcin

  • Dependant requirements are to be considered in reorder point planning

    Hi,
    We are currently using safety stock planning with PD.but the problem is that MRP triggers a procuement proposal when ever the availabile quantity(not the stock) falls below safety stock(as it considers MRP elements like DEP REQ etc in the net requirements calculation).
    Now if i propose VB,it does not consider the dependent requirements at all(they are not even displayed)
    Requierment is that the procurement proposals should only be triggered when the safety stock falls below the physical stock and DEPREQ's and all other requirements should still be displayed.
    I appreciate your help in getting me through with this.Thanks.
    Ram

    Dear Ram,
    go to the customizing of MRP type ,
    ther you will find the field 'Reorder point planning with external requirements'
    Indicates whether an external requirement (sales order or manual reservation) is included in the net requirements calculation for reorder point planning.
    If yes, you can decide whether it is to be included:
    -in the complete planning horizon, or
    -only within the replenishment lead time
    I hope the above information will be useful,
    best regards

  • Function module to find out dependent requirements

    Hello Experts,
    Any function module to determine the dependent requirements for process order...
    Pls let me know.
    Regards.

    use the following FM
    MD_STOCK_REQUIREMENTS_LIST_API
    give material no and  plant and following\
    DISPLAY_LIST_MDPSX = X
    DISPLAY_LIST_MDEZX =  X
    DISPLAY_LIST_MDSUX =  x
    o/p
    MDPSX filter for the values of here DELKZ(MRP element indicator) = AR
    you will get all depnedent reservation from process order.

  • How to Find dependent requirements generated for a period

    Pegged Requirements for the PR's Generated after MRP Run

    Hi Archie,
    We can find out the list of dependent requirements from RESB table.
    We can pass the pegged requirements in RESB and fetch the dependent requirements and purchase requistions created for the same.
    The Planned orders within a particular period can be fetched through table PLAF and the same can be given in RESB and fetch dependent and purchase requisitions.
    If you feel my answer is clear and useful, kindly award me with points.
    Regards,
    Prashanth.

  • MRP Dependent requirements - How to define

    Hello.
    If I set "1" in MRP Dependent requirements field the Depended Requirements are excluded, but also the Order reservations.
    Can i somewhere set so that only depended requirements are excluded and not the rest?
    Thanks in advance.
    /Gherry Svantesson

    Dear,
    In the MRP dep.requirements field, you set the indicator to 1 so that dependent requirements (reservations) are not planned.
    You do not set an indicator in the Cross-project field for the availability check. This means that only the individual segment (segment of the production lot) is checked during the availability check.
    Thanks,

  • Dependent requirements not displayed for ROP

    In reorder point planning, an entry is only created in the planning file and the net requirements calculation is only carried out if stock levels fall below the reorder point. To avoid overplanning, sales orders, dependent requirements, reservations and so on are not usually included in the net requirements calculation as these future requirements are already planned with the reorder level. However, to guarantee that the MRP controller is informed of current issues, the system displays sales orders, dependent and manual reservations and so on.
    --- The question is in my case system is not displaying dependent requirements though they are only for information sake.
    Can somebody throw a light on this?

    Hello,
    In reorder point planning, dependent requirements are neither displayed nor considered in the net requirements calculation.  There are several helpful notes and a modification note available for this. Please take a look at the following SAP notes:
    - 549752 question 3
    - 550954 question 3
    If you want to display the dependent requirements, please refer to note 37697 which contains a modification for that purpose.
    I hope this helps!
    Siobhan

  • Dependent Requirement Reduction

    Hello All,
    While posting the backflushing, I mant the system to automatically reduce the dependent requirement for the materials ( for MRP) .
    Plz help me with any settings which will clear the reservations automatically while backflushing

    Hello All,
    Thanks for your replies.
    The scenario is, My PIR is 100 KG for a Finished Good ( FG). A planned order has been generated for this PIR, also it generated a planned for 100 Kg of the FG's component.
    Now I have converted the planned order to process order and confirming it for 10 Kg, by backflushing 10 Kg of  the component.through COR6
    Also I'm doing GR for 10 Kg through MB31.
    Now in the MD04 list, the PIR has been reduced to 90 Kg. ( as per strategy 11).
    But even after the next MRP Run the Raw material dependent requirement is showing as 100 Kg.
    But I expect the system, aslo to reduce the dependent requirement. Please suggest any solution for this.
    Regards
    Mahesh

  • Dependent requirements deletion

    Hello everybody,
    Do you know if there is a way to delete (old) dependent requirements (table RESB)?
    Because, as the number range has recently reached its top limit, we encounter now some problem of "duplicate entry" with the MRP Run...
    Thanks in advance for your help.
    Regards,
    Rudy

    Hi Rudy,
    As you properly wrote dependent requirements come from planned order, from higher level; the planned order is the source of them.
    If you want to get rid of the dependent requirement, you have to eliminate the source (you cannot modify the DepReq directly). If the DepReq is old, the PldOrd should be also old...
    (This is very similar to PrdOrd and OrdRes: OrdRes comes from PrdOrd and you cannot modify OrdRes manually; if you close the PrdOrd, OrdRes "disappears" automatically)
    Maybe your problem is that the planned order does not exist and still SAP displays the DepReq and calculates with it. In this case you should search for suitable OSS note and if no result you can contact the softwer producer...
    Regards,