Rescheduling at material level or MRP controller level

Hi,
I have come across one scenario:MRP need date and PO delivery date are within one week no exception message will be generated.
We can acheive this by maintaining tolerance values in OPPQ/OMDW. But problem is user wants this functionlity for purchased parts only and not for Inhouse mfg. parts.
As per my knowledge if we maintain tolerance values in OPPQ and select all recipts elements these values are applicable for those one also.
To overcome this issue is there any standard config exist in SAP? or else please let me know any enhancement to resolve this issue
Thanks in advance for your valuable input
Regards,
Alex

Hi
Thanks a lot for your quick reply
Let me clear you this issue
User wants rescheduling tolerance values in OMDW. But there requirement is it should affect only for purchased parts and not inhouse parts. For inhouse parts they don't want to consider these tolerance values. Creation of MRP group is out of question in this business.
As I know if we maintian tolerance values in OMDW it will affects for all receipt elements. So my question is: Is there any enhancement available in SAP where we can apply this tolerance values for procurement type 'F' materials only. (Externally)
Regards,
Alex

Similar Messages

  • Material Master For MRP Controller

    Hi All,
    Any report available to see the material w.r.t MRP controller
    Thanks
    P.Srinivasan.

    Hi,
    In SE11, table MARC,
    Plant- WERKS and MRP controller DISPO, it will display all the materials with MRP controller.
    Thanks,
    JK

  • Authorization for MRP contoller level for PR creation...

    HI ..,
             Can anybody suggest me How to control the PR creation through authorization level for MRP controller.
    Regards
    sam

    Hi,
    Maintain the activity "Purchasing Group in Purchase Requisition", this is M_BANF_EKG. Set activity to:
    01     Create or generate
    02     Change
    03     Display
    06     Delete
    08     Display change documents
    Then maintain the purchasing group EKGRP and entered desired purchasing group.
    If you add this to a role, or create a new one say "Purchase Requisitioner", then assign the users. If each user should have different access rights to purchasing group, you would need to maintain this seperately per role. Perhaps create a unique per purchasing group.
    Use SUIM>Roles>By Auth Object and enter one above. This will show all roles which this current object and you can check which users have the role. Again through SUIM or AGR_USERS table.
    Thanks.

  • Can MRP be run MRP Controller wise ?

    We have only one plant. I want to run MRP for BOM items as well as ROL items. MRP can be run plant wise thru tcode MD01. I want to run mrp for only ROL items.
    Please suggest
    Regards,
    ( Rajneesh Gulati )

    Hi,
    Please find the required User exit details
    This enhancement controls MRP run at MRP controller level.
    System selects Materials under MRP Controller specified in user parameters (Par. ID = DGR)
    Enhancement : M61X0001 (User exits PP-MRP materials planning)
    Function Module:          EXIT_SAPLM61C_001
                   EXIT_SAPMM61X_001
    The user exit must be activated and the corresponding logic must be implemented. Here, the coding for both function modules (EXIT_SAPMM61X_001, EXIT_SAPLM61C_001) must be identical, that is, the Includes ZXM61U01 and ZXM61U02 should be identical.
    For further information see documentation (transaction SMOD, extension M61X0001).
    &----&  Include           ZXM61U01&----
    CLEAR: no_planning, stop_planning.
    CASE user_key.
    -* select materials for one MRP controller (specified in user_par)---- 
    WHEN '001'.    uxpar = user_par.   
    CONDENSE uxpar.   
    WRITE uxpar+0(3) TO dispo.   
    IF dispo IS INITIAL.     
    EXIT.   
    ENDIF.   
    IF mt61d-dispo <> dispo.     
    no_planning = 'X'.   
    ENDIF.
    ENDCASE.
    Hope this helps
    Regards
    Dheeraj

  • MC.9 report is showing -ve value when MRP controller selected

    Hi Expert,
    I'm confuse about the -ve value in MC.9. If i run by using Plant as the selection parameter for month 02.2010, then sorted by valuatted stock value(ascending), it will not show me the -ve value for all materials. But if i run the report by using Plant and MRP controller as the selection parameters,then sorted by valuated stock value(ascending), it shows me the -ve value. why?
    Please explain.
    Thanks

    hi jurgen,
    i still not clear. I try to run the report for material A and mrp controller  001. I got the -ve value. But when i run the material without mrp controller, it shows 0. no -ve value. i check in MM03,changes history for the material. MRP controller has been changed few times but the latest is 160. What am i confusing is, what is the relation between MRP controller with the report? What is the function of the report actually? Isn't it suppose to give the same data either i put the MRP controller or not when running the report?
    Thanks

  • MD07 using MRP controller

    Hi
    Can any help the advantage or usage of MD07 using MRP controller
    Thanks
    JJ

    Hi,
         In MD07 using MRP controller you can take a list of material under the MRP controller. There you can check the Stock/Requirement list by selecting the induvidual material.
    Hope it will be useful.

  • Is it possible that we generate material requirement in MRP at company code level?

    We want to generate material requirement in MRP at company code level, what is the possibility or any work around.
    Thanx in Advance.

    Hi Mirza
    This is not possible on the standard system. The highest planning level on MRP is the plant.
    It has been discussed on the following thread, where BAdI MD_CHANGE_MRP_DATA was proposed as a solution, however, the logic to be implemented on this BAdI is very complex:
    MRP Run considering Stocks for Multiple Plants and Requirement maintained for Plant Cluster
    If you want to know more about the BAdIs available on MRP check the following document:
    BAdIs for MRP
    Another alternative is to use flexible planning to plant at company code level, then disaggregate the planning to the plants and transfer the result to demand management and MRP.
    See the following thread for details:
    Flexible planning | SCN
    BR
    Caetano

  • Reoder level planning (MRP)

    Hi,
    As result of <b>Reoder level planning (MRP)</b>, system is giving me one PR for one material. So if i take 1000 material under MRP then it will give me 1000 PR, which is very difficult to process.
    Is there any way, so that system gives only one PR with multiple line item for 1000 material instead of seperate PR for each material.
    Please help
    Regards,
    Sachin

    HI Sachin,
    WHile you run MRP it will consider each material Info record and price and dependecy , every material will have different requirement so it is not possible if you need collective PR from MRP
    but it is possible with manual PR, You can create number of line item in one single PR
    Hope it is clear
    Thanks
    Bala

  • MRP  : Planning levels , time lines , qunatities

    Hi all ,
    can somebody answer me this
    What level can we plan the material using MRP ?
    can material planned at storage location level ?
    What are the time ( lines ) say Purch processing time , planned  delivery time , GR processing time are considered during MRP run. what stock types are considered ?
    what are those qunatities taken into consideration ?
    thanks all
    sri

    What level can we plan the material using MRP ?
    can material planned at storage location level ?
    1. Generally, you can run MRP at plant level and this MRP run will consider all of oyur SLocs.
    2. If you use MRP areas, there will be one MRP area for your plant, and there may be MRP are for SLocs as well for your subcontractor. In this case you can run MRP at MRP area level.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/41/32b8371a2c9912e10000009b38f889/frameset.htm
    3. You can use SLoc MRP concept. In this case you can exclude SLoc from planning (via setting in MRP4 view of material master > SLoc exlusion will be valid only for materials you set the proper indicator). You can also carry out settings for SLoc to be planned separately (MRP won't consider those SLoc during planning, but it will plan for them separately > CBP). Please notice that SLoc MRP is not the same as MRP aea.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2d2644af11d182b40000e829fbfe/frameset.htm
    What are the time ( lines ) say Purch processing time , planned delivery time , GR processing time are considered during MRP run. what stock types are considered ?
    1. What kind of stock types are considered you can set for MRP type.
    SPRO > Production > MRP > Master Data > Check MRP types
    2. Purchasing processing time, PDT, GR processing time
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2a1a44af11d182b40000e829fbfe/frameset.htm
    Regards,
    Csaba

  • Low-level code MRP

    Dear gurus,
    i find in the material master (MM02 and in the table MARA) the parameter "Low-level code" = 000 , how  use this parameter ?
    When this value is write?  At saving of Bom? Is a setup of customizing for value possible?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Hi
          Pl go thru the following may be useful
    The lowest level that a material appears in any product structure of the
    company. The low-level code controls the sequence in which the material
    is planned in an MRP run: First the materials with low-level code 0 are
    planned, then the materials with low-level code 1, and so on. The lower
    the low-level code, the higher the number that is assigned to the
    material.
    The level that is set in the material master record represents the level
    at which the material will be planned. This means that the material will
    only be planned once all assemblies in which it occurs have been planned
    and exploded.
    The low-level code is set internally in the material master record when
    the BOM is maintained.
    When you create a bom item for a assemblyparts ,the item's low-level code will equal (assemblyparts's low-level code + 1),but if (assemblyparts's low-level code + 1) < bom item then the bom item's low-level code not changed
    Ram

  • Mass change of Reorder point at MRP area level

    Hi,
    I have another constraint.
    MM17 will mass change the reorder point at plant level.
    Is there any process to do mass change of reorder point for a particular MRP area level.
    Please suggest.
    Thanks in advance.

    Hi,
    When I am doing mass change of reorder point through MM17 tcode selecting MARC table,it will chnage at plant level and getting reflected in material master once I save changes.
    But I need it at storage location level.I tried to do this through MM17 tcode selecting MARD table,which will ask for storage location data(i.e storage location level).But after I save the changes,changes are not getting reflected in Display material-MRP1 view.
    Can anyone pls suggest why this is happening.
    Thanks in advance.

  • Material stagging at storage location level

    Hi Guys,
    When i do material stagging at storage location level (MF60) material moved from one storage location to another storage location 311 and material document is created in system .
    I want to do it through two steps that is material issue from one location and receipt in other location
    how to do it , what configuration need to be done .
    I do not have in WM in scope of implementation.
    Thanks and regards
    Thamizhchelvan G

    Dear,
    The movement type 313 removes the stock from the first storage location and in conjunction with this movement type yuo use Movemnt type 315 which in turn places the material in the receiving storage location.
    In OMBA you will see Goods Issue Doc Type..
    If you click that in the next screen , you will find Tcodes & Doc Type...
    Now Go to that T code & Press F4 in the Movement types filed...
    So the Above Doc type is applicable to those Mvt types..
    These transactions are attached to the Movment types in OMJJ transaction, select the movment type click on Allowed transactions page.
    So based on the transaction attched to the Movement type the document type is determined for the Movement types.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • If a material reports to two higher level assemblies in the BOM /Is there a

    Hi, 
    If a material reports to two higher level assemblies in the BOM would creates two planned orders for it. Each of the orders has a different date?
    For example
    Z is final assembly
    In that Y is one assembly in that says X1material in level 2
    And the again same material X1 is reporting to Y in levels 5 so here my question is it would create two planned order with different dates?
    And
    Is there any report to see confirmed time to say machine time / labor time or shall we go for report.
    Thx....Srini

    Srini,
    CS15 can be usefull to check the usage of component in assemblies.
    if its used then more then once it can be easily located through this report.
    another concern what you expressed is not clear.
    But what i understand is same component is used at level 2 and level 4 of a BOM.
    assumption from the word levels is , X is used in  level 2 its used directly in BOM of Y and Y have some differnt component G which inturn again have X in it .
    so at both this levels if the dependent requirement is different, you can get 2 differnet orders use individual /collective indicvator for this material as individual .
    If your concern is for BOM position (Item Number) field in BOM then system will create a single plan order even if you set it for individual requirement in material master.here some work around can be possible by maintaining lead time offset IN BOM in item detail screen.
    check and come back
    Hope it helps you
    Regards
    Ritesh

  • Material Plant Level or Planning Plant Level

    Hi Experts,
    May i know what ever the material lying in the warehouse whether it is showing the stock at Maitnenance Plant level or Planning Plant level.
    Also is it possible to keep the inventry at Maintnenace Plant level.
    Please provide your valuable information.
    AR

    Hi Experts,
    You mean to say if there is no planning Plant we cant make the inventory ? Please correct me if i am wrong.
    Also i want to know is it possible to maintain the stock at Maintenance Plant level.Because we have four  Maintenace Plant 8000,4000,1000 & 6000 and all four are assigned under one Planning Plant 2000. Here i want to know is it posssible to maintain the stock under all four Maintenance Plant if yes then what i have to do for the same.
    AR

  • Blocking material for sale at plant level

    Hi,
    Can you please help me whether we can block the material for sale at plant level.
    We can block the material in sales organization view --> DChain-spec. status as BLOCKED FOR SALE , but it wil block sales of the material for all the plants in the sales organization.
    Please help whether we can go ahead at plant level.

    the posting block for goods issues can already be reached with a material status, so no phyiscal inventory document necessary.
    What you could try is to control the usage by a userexit.
    E.g.  you define a sales status AND a material status, just as table entry without any customizing in detail.
    and in the userexit you check for the combination of sales status and material status, and if your material has this combination then send a error message to the user.

Maybe you are looking for

  • Attach Documents to Custom Program Using Generic Object Services

    Hi There,          I created Object type ZGOS and used in the custom program, when i try to attach documents it allows and then shows in attachment list.         But When I use that program next time that document attached is not available. Is there

  • "jco.server.unicode" is gone in JCO 3.0.5??!!

    Recently  we have migrated from   JCO 2.1.8  to  3.0.5.   Currently we are witnessing some problems with communications from non-Unicode Sap systems. In the previous version  (JCO 2.1.8)  JCoIDoc.Server had a property "jco.server.unicode"  in the lat

  • Error in RFC Function module

    Hi Expert, I am facign very strenge problem in the RFC function module. I have passed the paramters to the RFC function module and getting the result back into the table paramters. HWen i am trying to execute the RFC function module in the destinatio

  • Help with the Architecture

    Hi, We have developed an application using Java and XML. Now we are planning to change the architecture thats I want to use RMI. We have Services and Clients, the Client routines are returning XML Elements.The WebSever we are using is TOMCAT.now how

  • How to play IFO files in MSI Media Center III?

    Read the topic. We all can play avi, mpg, mpeg and other file types, but is there a way to play DVD files from a HD? MSI Media Center III recognizes the VOB's as separate files, not as w whole movie. I see no IFO support in MSI Media Center III, or m