Reservation against planned order

Hi...
I have one issue with reservation against planned order.
We have REM & after MRP run generates planned order with order type PE.When i check planned order in table PLAF.
I found reservation no. & same has been passed to RESB , I got the reservation details but it is not allowed for goods movement XWAOK field in RESB. So no question of goods movement through MB1B with movement type 311.
My question is that is there any customization related to above scenario so that reservation is allowed for goods movement?
Regards
Tushar

Dear ,
In REM , you will recieve reservation against planned order .But GI always happens during GR or after GR along with back flashing .I do not think so you can issue material against reservation as like normal PP Order reseravation  in the production order .
1.Goto -SPRO->production-> Rep Manufacturing->Define Rem MAnufaturing profile(OSP2) --->Control data, in the Control data 1 tab select the "GI back flush at GR posting".
2.Check in  the REM profile assigned in MRP view of material Master (MM03)
Based on this above set up , you can make Goods Issue for Planned order in REM .If you deselect that option execute material staging transaction code is MF60 and then go for REM backflush. In materil staging the components issue is carried out for the planned order.After that you can execute the REM backflush in MFBF
In rem scenarion components placed on the production lines anonomously (without ref to planned order)...you cannot issue materials like in production orders scenario. if you want to have track on the good issues before the GR then use the pull list concept...there will be no movement type but you will have track on quantities issued to header parts/production lines not to planned orders.
Hope this clarifies your doubt .
Regards
JH

Similar Messages

  • Creation of Reservation for planned order

    Hi Team,
    Is it possible to create reservation for planned orders after MRP run?
    My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
    How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
    Kindly need ur guidance.
    Thanks
    psk

    Dear PSK,
    In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
    soon a production order is created.But only if the order is released goods movements can be posted against the reservation
    details through MIGO/MB1A for 261 movement.
    It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
    But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
    are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
    for a production quantity.
    Check and revert back.
    Regards
    Mangalraj.S

  • Material Staging against planned order

    Hi Gurus,
    We are using mf60 material staging issue material to production storage location against planned order.
    If we select particular planned order to issue the material through MF60 material staging which is issuing correctly. But when if we select other planned order to issue material and for common material system considering the stock laying at production location and netting off further not showing for staging which is incorrect the material which is already issued is reserved for some other planned order.
    please advice..
    Regards
    cs

    Hi,
    In planned order bom, materials are under dependent requirement, and not in reservation.
    Unless you convert it to production order, the dependent requirement will not be converted to reservation.
    I think its okay,
    If you have any special stock indicator for this then it will not consider the stock,
    Regards
    Raghu

  • STOCK RESERVATION AGAINST SALES ORDER IN MAKE TO STOCK SCEANRIO

    Presently in our system stock is get blocked or reserved against Sales order in MAKE TO STOCK sceanrio.
    Now we required to remove the stock resrvation against sales order,where we have to make the changes in SPRO?
    Please specify.
    regards,
    NITIN

    Hi Nitin
    Try with MB1B movement type 411 E
    This will pull back from the sales order reserved stocks back to unrestricted
    I dont understand your comments of how the MAKE to STOCK process is getting reserved for sales orders automatically
    somebody has to make atleast a sales order to reserve ?is it so?
    Or somebody is saving a sales order and saving delivery too without PGI?
    In OVZ9 for your combination (checking rule A and checking group pf your material as maintained in MMR) you can remove the tick from the check box of  include sales requirements
    Regards
    Raja

  • Correlation of reservation with Planned order in APO.

    Hi,
    In R/3 in COGI we see reservations. my issue is I want to know for which planned orders in APO these reservations are.
    In the product view in APO we can see some reservations (PRDRES(W) - correct me if I am wrong). How to correlate these reservations with planned orders. I am looking in PP/DS module of APO.
    Thanks a lot in advance,
    Prabhat

    Hi Prashant,
                      You are correct and if product is showing the reservation then it is mean for all order in product view.
    You can check the Production Planning Table inside PPDS for wider view of reservation and orders.
    /n/sapapo/ppt1
    Check the SAP Note: SAP note 439596
    SAP Link is also useful:
    http://help.sap.com/saphelp_scm50/helpdata/en/64/dca63be2bc331be10000000a114084/content.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/c1/147a375f0dbc7fe10000009b38f8cf/frameset.htm
    Let me know if it is sufficient.
    Regards,
    Vishal

  • Manual Reservation against Maintenance Order

    Dear All SAP - MM Gurus,
    Is it possible to do manual reservation against the Maitenance order
    through
    T. code                             : MB21
    movement type                  : 261
    Maintenance Order Number: XXXXXXXX
    If yes, what all steps to be done in SPRO.
    I am trying to do it, but the system is throwing an error. and says
    that "manual reservation for order category 30 is not possible"
    Please help me. Its urgent.
    Thanking you.
    With Regards,
    Mihir

    Hello Mihir,
    Unfortunately, this is not possible. The long text of the error message that you are getting already offers some information about this:
    "Manual reservation for order category & not allowed.
    Cause:
    You entered an order whose category only permits automatic reservations.
    The following order categories do not allow manual reservations:
    .- 10 PP production order
    .- 20 network
    .- 30 maintenance order <<<<<<<<<<<<<<<<<<<< This applies to your case.
    .- 40 batch order (process manufacturing)
    .- 50 inspection lot
    System response:
    The system does not accept your specification.
    What to do:
    Enter a different account assignment, or cancel the processing.
    If required, check whether any reservations for the specified account assignment   already exist."
    An explanation to this fact is the following one:
    "The manual creation of material reservations in this scenario is not supported by the system. Every material allocation has to be assigned to the order operation. We have to keep a tight integration between the reservation and the order because of rescheduling, costing, material requirement planning etc. You cannot split some of the functions. Planning of material consumption has to be carried out via the order.
    There are no plans to change it in the future."
    Sorry, but there is no option!
    Best regards,
    Esther.

  • Stock reservation against Sales order and deivery against reserved stock

    Hi SAP Gurus,
    e We are trying to provide a solution for thscenario where user wants to reserve stock immediatey after SO creation...and deliver same reserved stock.
    i am recommanding Reservation where reservation will be created with 231 immediately after SO creation but the rea problem is that how to create SO delivery against that reservation/Reserved stock so that document flow remains intact for the SO.
    Thank you very much in advance,
    Regards,
    Dharmesh.

    Hi Lakshmipathi,
    I had the same question and search landed to this thread but I ask again with the different perspective
    The reservation concept is really an MM functionality but you really dont reserve stock against any order or delivery (other than using special stock movement types like 412E) but unless you create a delivery immediately (and include deliveries as requirements in case of ATP check) you have no real way of establishing the hard reservation. If you do a non-order reservation i.e. you reserve something in anticipation then reservation needs to be used as a receipt in ATP check for both sales order and delivery.
    Alternatively what you can do at most is to conserve the pegging relationship (fixed pegging) that has been established once the order is confirmed (with or without ATP check) but this can get really tricky when you have batch determination to be done is delivery in which case you find that there aren't enough batch stocks conforming to customer specifc SLED to pick. So both ATP check and pegging looses its purpose of hard reservation. So that leaves us with having to determine batches too at sales order creation and let pegging not change.
    Is this is a good idea in general.. 1) in Make to stock segment, 2) In make to order segment..
    Does the concept of resevation stocks at sales order creation does more harm than good ? in general.. Implication in planning. inventory build up .MRP. Another issue is how long should you reserve stocks against order or against specific customer or country and such.
    Regards
    Loknath

  • How to create the reservation against purchase order

    hi to all,
    as we r using alternate bom scenario in company.
    so if i create the bom of item X base qty-1 pcs
    there r 2 alternate items in bom of X are as follows
    COMPONENTS A-1 PC  priority-1 probability -100%
                         B-1 PC    priority-2 probability -0%
    now as i am creating SUBCONTRATING P.O of X for 1 pc
    than system is automatically picking the quantiy of 1 & 0 pc respectivley of A &B.
    but when i am going to create reservation against this PO .
    it is not oicking data as per PO.
    reservation ispicking data 1 & 1 of A & B. as we have added 1 pc each of A & B in bom OF X.
    Pls help how i can create the reservation against PO.
    answers will be appreciated,
    thanks
    ravi khurana

    hi,
    i f u will go to MB21 than there is option to create reservation with refrence to.
    i can create the resrevation aganst bom, there is also one option for purchase order.
    how can i use it pls suggest .
    thanks
    ravi khurana

  • Sales order against planned order

    Friends,
    We are using currently Make-to -order scenario.
    So here one project has contains "n" number of semi finished products.
    and sales order is for only one project.
    Is it possible to create "n" of planned order against one sales order?
    If it is possible then how?
    pl. guide

    Sandy,
    Is it possible to create "n" of planned order against one sales order?
    Yes its possible by giving Indiv/Coll req as "1" in MRP 4 in Material Master.
    If it is possible then how?
    You need to maintain the BOM for the finished Product. And run MRP - MD02 the demand will generate for all the components.
    Hope this helps.
    Regards,
    Sundhu

  • Stock reservation against Sales Order

    Dear Experts,
    Please help in advising.
    Scenario:
    Created Sales Order, stock is not confirmed, user has created PR/PO for procurement. Once the stock is arrived (GR) in the wearhouse... this stock should be reserved against the Sales Order.
    Please advice.
    Regards,
    KVK

    hi,
    during creation of sales order put order qty in material line item and also go to Edit=> Check Availablility => make confirm qty = 0
    when stock is available the pur required confirm qty and save then stock will reservation for Sales order.
    thanks
    Md. Enayet Hossain

  • Reservation of Planned Order

    Hi,
    In R/3 in COGI we see reservations. my issue is I want to know for which planned orders in APO these reservations are.
    In the product view in APO we can see some reservations. How to relate with planned orders. I am looking in PP/DS module of APO.
    Thanks,
    Prabhat

    Hi Gaurav,
    Thanks for your reply but sorry to say that I couldn't understand the matter.
    I saw in the product view but how to corrrelate the reservation with particular planned order.
    I am not seeing any column for orders in the "Context"
    Please let me know what I am missing ?
    Regards,
    Prabhat Sahay
    Edited by: Prabhat Sahay on Jan 28, 2011 7:24 AM

  • Extra Mtrl reservation against Prod order

    Hi,
    Our client wants to do extra mtrl reservation agnst prod order for for issue mtrls (261 mov type) while doing so from MB21 it is not allowing as order category is std 10 and manual reservation is not possible for this.
    Is there any way to do so? how do i can create reservation manually for the same?
    kindly assist

    Please ask you ABAPer to develop query (SQVI) with table join  (RESB and AUFK tables)
    The field which identifies BOM item id will be RESB-STLKN.
    If this field is "blank" for a component then you can be sure that the material is NOT copied from the standard BOM but added externally and directly in to the production order.
    You can select initial selection criteria as per your req. viz. production order, plant, material, etc.
    Make sure order category selected is 10 (from AUFK table) and RESB-STLKN selected as blank in your initial screen.
    Please try and give your feedback
    Pavan
    Edited by: Pavanakumar on May 16, 2011 3:53 PM

  • Stock reserve against sales order

    Hi all,
       Any idea on how can we reserve the stock against a sales order received.? So that we cannot invoice it to other orders except the order for which the qty is reserved.
    Thanks & Regards,
    Aditya

    Functionality you asked for is not available,You can check
    whether it is availabe in SAP 2007 versions.
    But you can link sales order in production order by
    which production(stock) is meant for particular customer.
    Jeyakanthan

  • Reservation against maintenance order and MMBE

    Dear Experts,
    As per my knowledge the reservation which are created through maintenance order will be reflected in MMBE as we save the order, without specific to status of maintenance order.But here in my client it is not happening, instead of this it is getting reflected only after releasing the maintenance order. Reserved quantity of material is getting updated only after releasing the maintenance order.However if I select plant and check for reservation details there it shows all the reservations. But the quantity in Reseved column is getting updated only after releasing the maintenance order.
    Please tell me where is the setting for this type of system. Please correct me if I am wrong anywhere.
    I wanted the reservation quantity should get updated in MMBE at the moment I save the order. please do the needful.
    Thanks & Best regards,
    Praveen
    Edited by: Praveen kumar on Nov 28, 2008 4:23 PM

    hi praveen ,
    in MO itself in operation tab the last field you will find... Reservation/PR  with immediate,from release ,never ... u can control from here itself while creating MO .... or you can set this thru config --- Function and settings for order types --- Define collective Requsitions.. here you can find the same setting and ... better to grey out that field for MOs through field selections in operation detail screen in config.
    regrds
    pushpa

  • Reservation against maintenance order

    hi PM guru,
    my scenario is i want to transfer the requirements from maintenance order to MRP, to trigger purchasing, but i don't want to reserve the stock. I set 'never' in the configuration so that system doesn't create a reservation, but this does not trigger a requirements to MRP also. Please help and let me know if you need further clarification. Thanks

    Dear
    This case not required the PM orders to trigger the PR. In materail master in MRP 1 Tab you have to activate the MRP type (taken from configuration)
    Reorder point (if stock falls the below PR will generate automatically)
    Then maximum stock level to control the materails stock in plant
    MRP 2 tab needs to maintain the Safety stock to keep in minimum for unexpected
    Also needs to do the availablity check at master in MRP 3 tab for auto checking
    Finally these all in every periods which will be run by the stores dept at MD01
    If the stock fall below reorder then PR will created.
    Please have the discuss with your MM guys
    thenna

Maybe you are looking for

  • In PDF file click on Tools, try to click on Sign In option nothing happens. why can't I sign in to convert my file.

    In PDF file click on Tools, try to click on Sign In option nothing happens. why can't I sign in to convert my file.

  • Embedding Flash in Swing

    Hi Flash community I am researching on having the Flash application embedded in the Java Swing GUI. An approach seems to have the Http client view to load the flash url. But are there any additional technologies from Adobe? How extensive is the integ

  • What is better XP drivers or manufacturer?

    When installing new hardware such as a video card, is it better to use the drivers that Windows XP intalls upon detection, or the drivers that come with the product on cd or from the manufacture's website? Hmmmm???

  • Search process hangs system

    Hi Team, One of our users has noticed a problem with the help search engine and slow network links. The user is accessing the help from a remote machine, which means that OHJ receives its help files slowly via http. The user brings up the help naviga

  • Retail customer - Site (Store) level authorization

    Dear All, We are implementing IS Retail for retail store chain customer. As I understand, in retail, Plant is replaced by Site and each store is considered a site, which obviously will be an org level. Now our customer want that, for example, a store