Reservation & Availablity check

Hi ,
To produce a material A , component B is needed . Material A is required for export customer and Domestic customer as well
but the export order is very high importance due to that if the material A stock is available in stores then it should reserve for export order only and the same way the dependent requirement component B also should get reserved
Ex: Export order qty - 10 Nos , Domestic order Qty - 10 Nos , material A is available at stores is 5 Nos , so the 5 numbers should get reserved for export order ( this can be done by ATP check assigned with item category in sale order ) , for the remaining 5 requirement system create a planned order for A and dependent requirement for B
Component B stock is 5 Numbers & this 5 numbers will get reserved for material A based on availablity check rule 
but my query is suppose the reserved qty -5 is issued to domestic order requirement then the shoratge for export may occurs.
what are the setting need to be done  to avoid the reserved material issuing to other order ( it should get blocked )

R,
The answer is yes, as I stated in my earlier post.  The quantities are irrelevant.  If 'B' stock is built as 'make to order', it cannot be issued to any other requirement, except for the specific sales order/item for which it was built.  In effect, all B stock is reserved to individual orders.  There can be no 'stealing' without manual intervention.
You can construct your Bills of materials and Material masters to be MTO all the way down to the Raw Materials, if you wish.  In each case, the stock at any MTO level of the BOM only exists to serve one and only one sales order requirement.
I suggest you try this in your sandbox to see how it behaves.  Managing B as MTO meets all the requirements you have stated so far.
Rgds,
DB49

Similar Messages

  • Material Availablity check of the Process Order......

    Hi there,
                  If the reservations of material  are made against the process order & the material is not available and the stock is expected in near future........ then during the material availablity check of the process order........will it show that the material is available............
    Please elucidate me.......
    Thanks
    Kaushik

    Hi Kaushik,
    Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date.
    Therefore the system checks the current available quantity of stocks.........
    but, for example imagine if the available stocks are not sufficient to meet the order............then the system checks replenishment lead time of the material i.e. time taken for the material to become available either internally (in house production) or externally (from a vendor) and then issues a material availability date.........i.e. date on which material would be available for delivery.
    Depending on the above checks, the systems issues the delivery date.
    <b>Reward if helps</b>
    Regards
    Sai

  • Availablity  check with ATP logic

    Hi everybody
    Can any one tell me where where we assign Checking rule (A - sales order) in availablity check.

    dear srikanth
    please gothough this
    TOR AND AVAILANBILITY CHECK
    To confirm the quantities for a particular line item in the sales order on particular day system carried out transfer of requirements (TOR) & AVAILABILITY check, so has to confirm the quantity on particular day as system should know what are there requirement of the sale order and delivery with MRP then system carries out availability check function, to confirm the quantity on particular day. Depending upon the IMG setting system carries out availability check function based on 3 methods:
    A) Availability Check with ATP logic or against planning:
    In ATP logic systems ATP Qty while carrying out availability check function for
    Particular line item (ATP qty=warehouse stock +planned receipts planned issues)
    Planned Receipts: EX: - purchase requisitions, purchase orders, stock in transfer stock at inspection etc.
    Planned Issues: - EX: - open sales order & open delivers
    B) Availability check against product allocation:
    Availability check can be carried out against product allocations in which system automatically restrict the user to confirm the quantity beyond reserved quantities per particular customer. EX:- Availability qty =100, existing orders=10,then system automatically distributes to items evenly to the sales order.
    C) Rule based Availability check:
    Rule based availability check can be carried out based on the business transaction.
    EX: - For normal sales order system has to carry out availability check for special sales order ex: - cash sales and rush order systems need not to be carry out availability check,
    In rule based availability check system in which system carried out Global availability to promise in all plants. In this check system transfers the requirements to APO system where GATP takes place and the result of the availability check transferred to R/3 system. This process takes place with the transaction code CIF(central inter face) inR/3.After carrying out availability check function system proposes(by using ATP logic) default values of ATP check  result to the user in a dialog box, in which system gives the  choice to the user to take the decision in contest of insufficient stock.
    a) One time delivery:
    If the user chooses one time delivery and the order Quantity is 100 units system confirms 50 units then systems automatically confirms as a zero. If the user saves the document with the zero confirm qty then system   trace the sales order as aback order (V_RA), which can be confirmed later by RESCHEDULLING (V_V2).
    b) Complete Delivery:
    If order Qty=100, Availability stock = 50, system says that remaining can be given after one week. Then if the user selects this option then system push up existing confirmed qty to after one week and the total qty can be confirmed after one week only.
    c) Delivery Proposal:
    If order qty=100, system confirms 50, and remaining 50 can be confirmed after one week. If the user chooses this option then system confirms 50 Qty today allows the user to delivery 50 quantities today remaining 50 can be delivered after one week.
    CONFIGURATION SETTINGS FOR TOR:
    Define Requirement Class:
    Path: Img &#61664; S&D &#61664;  Basic functions &#61664;  Availability Check & Transfer of requirements &#61664;  Transfer of requirements &#61664;   Define Requirement classes
    Requirement classes control MRP, Requirement consumption, strategy, relevance for planned. It specifics whether the availability check & TOR to be Called out for transactions.  Ex: Sales Order
    It determines whether requirements relevant for MRP or not, the allocation indicator from the sales view which controls the settlement of customers requirements with planned independent requirements. It determines the item b to be settled as an availability heck. Assignment, the settlement profiles the results analysis key. The TOR and Availability check functions are globally controlled using the requirement class for all the Sales documents. The values from the Requirements class are transferred to scheduled the of the sales documents class are transferred to scheduled the of the sales document default values and can be over written there.
    Define Requirements Classes:
    Requirement class defines whether the system has to carry out availability check based on the STP Qty. Ex:
    Define Requirement Types:
    Here we define requirement type, Ex:  and Assign to Requirement class that we defined in the promote step.
    Determination of Requirement types using Transaction:
    Requirement type is going to be determined for sales document by following a search strategy. .
    First System checks strategy group in MRP3 view if it trend requirement type then system takes from it, otherwise.
    It will go to MRP group in MRP1 view, otherwise
    It will check to Material type, otherwise
    It will go to item Category + MRP type, otherwise
    It will go to Item category only, otherwise
    Finally system determines the transaction b not relevant for TOR & Availability check.
    Choose Item category TAN+MRP type PD=Requirement type =0
    Define Procedure for each schedule the category:
    Here we define respective schedule the category of the sales documents, whether an availability check and TOR should be carried out. This setting is relevant for sales documents only. It is fine tuning of availability check for sales documents TOR & Availability check function    can be activated at sales order level those are proposed in to schedule line category level. If u wants to deactivate TOR availability check function at schedule the category level and want to deactivate at requirement class level it b impossible.
    Ex: If u wants to check availability w/o transferring the requirement we can use it.
    Choose schedule line category CP & Activate Availability check, requirement & Product Allocation
    Block Quantity confirmation in delivery Blocks:-
    When we transfer requirements to MRP then confirmed quantities is also reserved for confirmed sales documents, if transaction is blocked for delivery the reserved quantities are also blocked so that the conformed quantities cannot be used by any other purpose. So has to avoid this situation we can block the transfer  of requirements(TOR) for delivery blocks, in this case requirements transferred to MRP but will not be reserved, that will be cleared once we save the documents then system shows confirmed qty as zero.
    When we remove the delivery block then system automatically carries out availability check & confirms the qty.
    A) Deliveries: Blocking region for sales Area:
         Here we define blocking regions for TOR ex:-credit limits
    B) Reasons for scope of delivery blocks: TOR. Block:
    Ex: - 01 credit limits-check confirmation block.
    Maintain Requirements for TOR:-
    Here we can define our own requirement with the help of ABAPer for TOR
    Ex: - a) 102- prevent reservation in the event of credit block
           b) 102-purchase requisitions.
    System doesn’t create purchase requisitions for sales order line items if it has a credit limit.
    Availability check:
    Configuration setting:-
    Availability check with ATP logic or against planning:-
    A) Define checking group:
    Checking group defines what kind of requirement record system use to create when sales order & deliveries are processed for this material. We can create 2 kinds of requirements records
    Individual requirement records: that means system creates requirement record for each S&D document.
    Summarized requirement Records: That means system creates requirement records under certain condition in the material master record. There are 2 type of summarized requirement record:
    Summarized requirement records for each day.
    Summarized requirement records for each week
    Define checking Action;
    Here we define     01- daily requirement      -B                                        02- Individual requirements -A
    Where      B-total record per day
         A-single record per day
    B) Define material Block for other users:
    When 2 users tries to confirm the quantities for the sales order for same material at a time system will be confused to confirm the quantities both sales orders. So has to avoid this kind of situation we can block the materials from confirming the quantities for 2 users at a check, check block
    C) Define checking group default values:
    Checking group is going to be determined depending upon the material type & plant.
    -Go to new entries, specify material type, ex;-FERT
    & plant = checking group of availability check: 02
    D) Carry out for Availability check:
    Here we define checking rule for the Availability check & allocate them to the checking group. The checking rules specify the scope of the availability check. For a respective transaction, means which planned receipts & planned issues systems has to taken into consideration and also it determines whether system has to take RLT into consideration.
    *Select checking group of availability check-02, checking rule=01
    *Go to details icon, & check which planned receipts & planned issues system has taken into consideration for availability check
    *save it, exit.
    E) Define procedure by Requirement class:
    Here we define requirement class whether on availability check & TOR should be carried out the setting that we carries out at requirement class level they are at global level. There settings automatically copied into define from of requirement class and vice versa.
    *Choose requirement class: 041 & check availability check & TOR (requirement)
    F) Define procedure for each schedule line category:
    Here we carry out fine tuning setting for availability check at schedule line category level. Here we define whether system has to carry out Availability check for particular transaction.
    Ex: - if we want to implement availability check w/o TOR for a particular transaction. According to settings at requirement class level TOR & availability check function activate & those setting will be copied into the schedule time category by default, so that at schedule line category level we deactivated TOR
    G) Determine procedure for each Delivery Item category:
    Here we switch on or switch off availability check functions of a delivery item category
    *choose item category ‘TAN’. & specify the appropriate value.
    H) Checking group for updating back orders:
    Here we assign checking group to a plant that rule specifies for individual application, according to which the availability check is carried out;
    I) Define Default settings:
    Here we define the result of the availability check.
    *Choose your sales Area, & check fixed dates& Qty options & specify ‘D’ or ‘E’
    Where: D- Dialog box in the case of shortages (one time delivery)
    E- Dialog box in the shortages (delivery proposal).
    rewards if it helps
    siva

  • Availablity Check - With Account Assignment Category Q in the PR/PO

    Hi
    When I create PR/PO using the acct. assgnt. cat. "Q" availablity check is not working.  But, while using "P" it is working fine.
    The case is, while I create PR/PO  using "P" the G/L account field is open and material used is valuated material.
    While I create PR/PO using "Q" the G/L account field is greyed out and the G/L account number is defaulted, the material used is the same valuated material. I doubt this would be the cause for not checking the budget availablity in the case of assigning "Q".
    Could some one throw light on this.
    Thanks
    Arun.An

    Availability Check or Availability Control???
    Please clarify!
    Regards
    Sreenivas

  • Availablity Check and Planned order

    Hi,
    In Material Master Record in MRP3 view , we have a field for "Availablity Check".
    Whether it is required for MRP run ?
    As we are not doing any stock transfer orders , as SD module is not implemented.
    So my Question is :
    1) Whether "Availablity Check"field is required for MRP run?
    2) While running MD03 Transaction we see Planned order getting generated....What is the use of it and Can we avoid this Planned orders to get generated?
    Utsav

    Hi,
    Availabilty check will check the available stock of the material as per its defiunition .
    When the material is MRP material if there exists a requirement for the material either in the form of a sale order or planned independant require ments, SAP checks these requirements anb compares with the available qty and generates the requirements like planned orders , which in turn will get converted into either PRs or Orders depending upon the procurement type of the material in MRP view.
    If your material is not related to MRP this data need not be maintained
    For more details please refer to the link
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d327a44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d326d44af11d182b40000e829fbfe/content.htm
    and
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d315744af11d182b40000e829fbfe/content.htm
    ansewe to your first question yes
    second question:Planned order is a requirement generated for the short fall of the material when checked with the avauilability check.It can be converted into either PR or Order depending upon the procurement type.
    If do not want the planned order to get generated means material need not be maintained with MRP.Means you does not want the shortfall requirement to get generated(if this is your criteria)
    Please reply back if you are not satisfied with the answer.
    Regards,

  • Availablity check

    Dear Friends,
    1.In  availablity check configuration,i cant able to understand ,
    define material block for other users
    2. what is the importance  between checking checking group maintained in sales general plant view and checking group in mrp-3.
    kindly explain on this.
    3. what is back order
    points will be rewarded

    AVAILABILITY CHECK:
    1. Define Checking Groups
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups
    You define checking groups with which you specify the type of requirements records the system is to create when processing sales orders or deliveries
    2. Define Material Block for Other Users
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Material Block for Other Users.
    3 .Define Checking Groups Default Value
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups Default Value.
    4. Carry out Control for Availability Check
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Carry Out Control for Availability Check.
    5. Define Procedure by Requirements Class
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure by Requirements Class.
    6. Define Procedure for Each Schedule Line Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure for Each Schedule Line Category.
    7. Determine Procedure for Each Delivery Item Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Determine Procedure for Each Delivery Item Category.
    8. Checking Rule for Updating Backorders
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Checking Rule for Updating Backorders.
    9. Define Default Settings
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Default Settings.
    Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.

  • Demo Flight Availablity Check - status code 500

    Hi Friends,
    When I executing Demo Filight Availablity check, I am getting following error.
    Error Type:  XI system error 
    Error Details:  HTTP response contains status code 500 with the description Internal Server Error 
    Please give me the solution.
    Advanced Thanks,
    Chandrasekhar

    Hi,
    Take a look at this thread:
    Re: XI 3.0 Demo: Unable to check flight availability: XI System Error
    which deals with "Unable to check flight availability" error -
    you can find a solution over there - using a correct RFC destination in SXMB_ADM --> Integration engine config
    (for all clients except 100)
    also this one:
    SAP XI 3.0 demo examples errors
    Regards,
    michal
    Message was edited by: Michal Krawczyk

  • Availablity Check in Sales Order with Total Replenishment Lead Time

    Dear PP Consultants,
    This is regarding the TRLT field functionality during availablity check of Sales Order.
    I understand the TRLT field is defined manually in Material Master MRP-3 view as the sum of the longest lead time of raw material, in-house-production time and floats.
    If during the availablity check of Sales Order, the raw material which is having the longest lead time is already available in stock, can the system calculate the TRLT dynamically and propose the delivery date in sales order only based on in-house production time??
    Is there any setting that can be made so that during availability check of Sales Order, the system considers the stock of raw materials and then propose the confirmed dates?
    Your early respose is much appreciated. Thanks a lot in advance for your valauble suggestions.
    Thanks,
    Kishore

    Hi,
    The RLT is not dynamic, and is not related to the stock situation of the components.
    It's only purpose is to give an estimated availability date for the finished material (sold) when no better information is present (like a procurement element).
    The only way I know to get an availability date taking into account the availability of components, is the assemble-to-order scenario. In this scenario (MTO!), a production order is created automatically during the creation of the sales order. The system can then use the production order features like scheduling and availability check of components to propose the availability date for the finished product.
    Besides that, you can get much more complex solutions for ATP using APO's ATP engine.
    Regards,
    Mario

  • Assignment of Equipment as PRT - Availablity Check.

    Dear All,
    Could any of you all please let me know whether the availablity check would work if the Equipment as PRT as been assigned to the activity in CN22.  If there is any setting that has to be made other than the availiblity check which is in Material node and explained as below, then request your valuable input. 
    Material --> Availability Check --> Define Checking Control
    With respect to  Plant and Order Type
    Under PRT availabilty
    No Check is not enabled (Not ticked)
    Checking Rule is assigned as 2 (Status Check and Inventory Audit)
    Collect. conversion  assigned as 3 (No creation if PRT is missing)
    Or if any would be able to give the actual steps to be followed up in the easy access also it would be helpful.
    Regards
    Arun.An

    Hi Charles,
                      Even if we maintain the Test equipment  Material or Equipment we can do the same .
    What are other factors that will lead us to maintain the same as PRT , Material or Equipment ?
    Thanks & Regards
    Kaushik

  • EBP - Backend Reservation - Availability Check

    Hello
    We have a requirement for doing classic scenario with reservation if for inventory items. The system (SRM 4.0) is configured to determine whether to create a reservation (if stock available) or external procurement in the backend R/3. The standard function checks for sotck availability at the time of shopping cart creation. The question is if the system can check the stock availability right after the final approval. Is there a BADi I can utilize?
    Another question is regarding to services procurement. The standard EBP supports buying services by quantity (based on UOM) and with value. Can the standard EBP procure services by value($) only? For example, if the buyer has a fixed amount budget to procure services, he/she does not want to specify days/months for the services but the budget amount. How would the system support this?
    Also, the same question on the receiving/confirming end (receiving by value).
    Your comment is much appreciated.

    Hi Christophe,
    This sounds exactly as what we want. The only catch is we don't have a sandbox in Classic scenario to play with it yet. As soon as we have our box up, we will do this.
    Another 2 follow-on questions on the same token.
    1. During the SC creation, requester can check the availability in the "Availability" tab. Assume there are multiple plants have sufficient stock for this item. Does the requester have to select a plant before submitting the SC?
    2. Assuming Plant 1001 is selected at SC creation, however stock is not available/sufficient after the final approval while other plants (say Plant 1002) in the same company code have sufficient stock). Would the system switch to Plant 102 for reservation or create an external procurement document (PR/PO) with standard SRM(4.0)?
    Thanks,
    Joseph

  • Reservation budget check

    Dear Gurus,
    We have a criteria here where we are creating a reservation for material for consumption for PM Order, we need to check the budget for each reservation. As I am seeing in our system the cost elements are not being copied to our automatically created reservations however we are entering the Cost Center in the PM Order and Funds Management derivations are already setup in the system.
    We need to assign the cost center and check the budget at the time of creation of reservation through maintenance order.
    Your help in this regard will be highly appreciated.
    Thank you,
    Farooq

    seems like no one has any clue about it....

  • System ignores automatic reservations when checks availability

    Dear colleages
    I have 1000 units of a material in unrestricted stock of storage location. I configured the system so that it does not allow to reserve a quantity greater than available in unrestricted stock. However, the system is allowing to reserve a quantity greater than available in unrestricted stock since there are also automatic reservations made for that material on that storage location. How can I configure the system so that both automatic and manual reservations are taken into account when system checks availability? What fields in tcode OMB1 should I consider to do this?
    Regards,
    Carlos Piana
    Functional Leader MM
    La Universal
    Guayaquil, Ecuador, South America

    Hello Charlie
    The available unrestricted stock of material 500009, in plant 1100, storage location 1109, is 4,589.4 Kg. Reserved quantity is 1,104.904 Kg. These figures are shown in tcode MMBE. The 1,104.904 correspond to two open automatic reservations made in plant 1100, storage location 1109. I think I could manually reserve 3,484.496 Kg (4,589.4 - 1,104.904); however, the system shows an error message saying that for that date there is only "0" Kg available in unrestricted stock. Why doesn´t the system allow me to manually reserve this quantity??
    Regards,
    Carlos Piana

  • Availablity check at storage location level in STO

    Hi,
      There is an unique requirement from my client with respect to the Availability check at storage location level in STO
    Process:
      Based  on the inputs from APO we are creating STR for moving the material from one plant to another plant. These STR’s will be converted into STO through ME59N batch job. During STO creation process system will do the availability check and only if stock is available in the issuing plant then only STO will be generated.
    During this availability check the stock will be considered at plant level and not at storage location level.
    Requirement/Scenario:
    Issuing plant contains two storage location ( location A & B).FG stock exists in both the locations.
    Our requirement is system should create separate line items in the STO based on the availability of the stock in the respective storage locations.
    Example
    Total required qty: 1000  of material X
    material X - Stock in Storage location A  : 600
    material X - Stock in Storage location B : 400
    Two separate line item needs to be created in the STO
    Sl no
    Material
    qty
    Issuing storage location
    1
    X
    600
    A
    2
    X
    400
    B
    Is there any function module available for doing Availability check at storage location level so that it can be called in ME59N with the enhancement.
    Please suggest how to achieve this. If any enhancements needs to be done we will do it.
    Thanks & regards,
    Prashanth

    Hi Nilesh,
    in SAP standard the system is always checking on plant level first and then on the storage location level, there is no possibility to change this behaviour.
    I'm also not sure if the process is correct, because if you have also requirements on plant level only then you would create negative ATP if you confirm on storage location level even though there is no ATP on plant level.
    I'm also not aware of a user-exit that would suite your requirement, additionally according to the IMG documentation the user-exits in the availability check area should only be carried out in agreement with SAP.
    Regards,
    Markus

  • Availablity Check with Third Party Orders

    We have inventory on hand (from returns- customers refused order or canceled order at the last minute) and would like to do a check on inventory before the purchase req is created. Is there any automated way of doing this? I know that I could change the item cat on the material master, but this is difficult because there are many third party products that we sell. Any insight will be greatly appreciated.

    Hi,
            first u maintain item category determination for both TAN,TAS.during sales order creation if system does not confirm the required quantity after carrying out availability check then u change the item category to TAS system automatically creates purchase requisition, any how we have to change the item category in the sales order when ur treateing a material as both normal item and some times third party item.
    withregads,
    kirankumar vemula

  • Availablity Check which includes Block Stock

    Hi All,
    I do have a problem with Availability Check.
    For a material the Goods Reciept is made directly into Blocked Stock. Due to this the MRP is not considering the availability of the stock and creating the new PO for the old reqirement.
    I want to know how we can configure the Availability Check so that it can consider the block stock into consideration during MRP run.
    Thanks for the help in advance

    hi,
    To avoid the situation, you need to move the stock to unrestricted use...
    Its correct, if we think logically then if there is req. for the material...then you can never use the block stock for the production etc...so, when the MRP runs, it doesnot consider the block stock...
    Pls trasfer it to the unrestricted use stock..and then run MRP...
    Hope it helps...
    Regards
    Priyanka.P

Maybe you are looking for

  • Drive won't read any dvd .. ejects it automatically after spinin some time

    My MBP is just some 2 months old and suddenly it has stopped recongnizing/reading the dvds, they dont even show up on the desktop, dont even read a blank dvd. it spins for some time with a noise and then ejects it out by itself. it is doing this for

  • BT Infinity modem problem with Kelly Communication...

    Hi all, I am using Unlimited BT Infinity 1 (just for one month). I just received a call from a mobile phone regarding my broadband modem. He said he is from Kelly and there is something wrong with my broadband equipment. He is going to send an engine

  • You Tube goes all warbley after about 4 mins since Windows 8.1 was installed, why?

    I bought a new Windows 8 two years ago & then they updated to Windows 8.1. After around 4 mins playing something usually on You Tube, it gets warbley static & just messes up the rest of the time. Please fix this since it never did that on Windows 8.

  • Passing Information to a Method or a constructor

    Hi henry, yawmark, Darry Buke, all My last posting was a question. This i forgot to put question mark. Please look into it. I am ready to repeat it if you have any confusion. Hi henry I am satisfied with your answer which has been illustrated in your

  • How can I Changing SID

    I have dedicated server. The hosting company installed the oracle Xe and set the sid=XE whereas my java servlet connection string nows the sid=orcl on port: 1521 this is very difficuilt to change the hudereds of java files. please let me know how can