Reservation issue

Dear all,
When I create reservation using T. code MB21 & Mov. Type: 202  we use to enter input parameter  Material, Quantity in , UnE, plant , SLoc & Batch number.
But here I have have been facing one problem which is created due to acceptance of any Batch Number (not available in system) entered at Batch field. Due to this new Batch number gets generated. Neither system  restricts entry of new Batch.
So can i restrict the Batch number creation by T.Code: MB21 and Mvt type 202.
Edited by: Maulik on Oct 2, 2009 4:26 PM

Dear ,
I already made the below settings but the batch num still accepted.
1) SPRO-LO General-batch managemnt-creation of new batch-Define bacth creation for goods movement  for movement type 202 - No Batch Creation.
2) SPRO-LO General-batch managemnt-creation of new batch-Define bacth creation for Material Types.
We have resttict the Manual Batch Creation.
But both above settings doesn't works and new Batch gets created if user inputs the any new Batch no in Batch Field.System doesn't prompt any msg during this Batch Creation.
Regards,
Maulik

Similar Messages

  • MRP and Reservation issue

    Dear Gurus,
    Our scenario for chemical industry is  MTS with strategy 10.
    After MRP run for material 15 Planned orders are generated. After converting planned orders to Process orders are generated on same day 05/01/2012.
    But actual production starts earlier on 25/12/2011 when process order date changed to 25/12/2011 and try to do batch determination error occurs as Material not available on 25/12/2011,though enough stock exists.
    After TECO (all other 14 process orders) this allow process order to do Batch determination.
    Why this error occurs ?
    Please guide.
    JHPert

    Hi Pert,
    The issue is in ATP logic. Please check of you have comsidered the reservation in ATP and also the pal orders and production orders as welll.

  • Cycle Count Reservation Issue in Item Supply/Demand Form

    Hi
    Few of the inventory items are stuck with Cycle Count Reservation in Item Supply/Demand Form. The Identifier field is empty. It is not tied to any sales order or PO . I checked the On hand quantity(on-hand quantity form) and the current on hand (Item Supply/Demand form) both are same. Could not able to figureout what went wrong and how the cycle count reservations are created. Even after performing the Cycle counting on these items, it did not consumed these reservations and releaved those reservations.
    Could anyone suggest me please in what scenrios we get this issue and how to eliminate these records from the Item Supply/Demand Form. we are on 11.5.10.2 INV and WMS RUP4.
    Thank You!
    Krishna

    CC reservations can be triggered by Curtail (Short) picks on mobile gun. When this happens the ATR qty gets decremented by this Qty by putting a CC reservation.
    This can also be deleted from front end by changing the demand source to acc/acc alias, save and then delete.
    Karthik

  • WRT350N access using telnet, fixing DHCP reservation issue

    Hi,
    Got my WRT350N recently and ran into a small bug.
    Somehow I could not set a DHCP reservation for a specific machine/address. For other machines it worked perfectly.
    I found out that I can telnet to the device:
    $ telnet 192.168.1.1 33
    # uname -a
    Linux 2.6.12-arm1 #1 Thu Dec 13 14:07:15 CET 2007 armv5tejl unknown
    That's handy, you know what you are running on the WRT350N!
    Then I found with
    # nvram show
    that the machine failing in DHCP reservation was already listed as first item in variable:
    static_dhcp_clients=eljo:280:000874AB0846:1:joel:192.168.1.12:0015F23B916E:1
    Using 'nvram set' I removed the 'eljo' entry and I could fill it in again correctly using the web interface!
    So I'm a happy user ;-)

    I have the same issue on Solaris 8 with a Linksys WRT54G firmware 3.01.3. I can access the internet using the Netscape 4.7 browser but, only by using http://ip.addr. nslookup works in forward lookups e.g. www.google.com. and sometimes by ip.addr.
    snoop -d le0 shows
    hostname DNS R Error: 3(Name Error)
    I removed dhcp configurations and set a static route on the linksys router under advanced routing and plumbed the interface. I still have the same problem.
    I am using a Sparc20.
    I checked resolv.conf and it is correct. I checked /etc/nsswitch.conf, it uses hosts: files dns.
    defaultrouter is the same as yours.

  • MB21- Hard Reservation Issue.

    Hi Experts,
    I have a scenario at my client...
    We have a stock for the matl A2552A - 200 Qty.
    Engineering dept creates HARD reservations for material A2552A for 15th Oct'08 using MB21 with mvt type 201 for a cost center for 100 Qty.
    Now a STO for the material A2552A comes in for 150 Qty. When the ATP happens for the order based on the lead time give proposal for delivery some time end of Aug'08.
    But what our clients want to do is make the reservation as SOFT reservation where the STO will consume the 150 Qty and the reservation will reduce for 50 and the next MRP will full file the remaining 50 qty for the reservation. They want this to happen outsie or within the time fence.
    Right now the planned is manually making the reservation de-active and once the STO is completed again make the reservation active.
    How to make the above process through configuration set or user exist or with some enhancement suggestions.
    Any help will be appreciated.
    Thanks

    Hi Lakshman
    So how does Engineering create HARD reservation?
    Using MB21 mvt type 201 for a cost center.
    Thanks

  • Name reservation issue

    Hi all,
    I want to enforce name reservation in my NWDI (SLD on same system).
    I configured a NWDI landscape with the SLD system on it.
    I can see from SLD -> name reservation that the name reservation is on (the button label is: disable name reservation).
    However from NWDS, in my pre-existing track and dev conf, I can still see that no naming convention is enforced.
    What should I do?
    Thanks
    regards
    Vincenzo

    Hi,
    Please check for configuraiton steps of activating of name service.
    http://help.sap.com/saphelp_nw70/helpdata/en/2f/a72f41b239a831e10000000a1550b0/content.htm
    Regards,
    Thulasi

  • Settlement issue for Pooled asset

    Hi all,
    I created a notification (type MF) for pooled asset in IW21. I was able to view the notification in the planning board (PAM03). I was also able to do the planning of the demand and was able to reserve, issue and return the pool asset.
    Now, I am facing an issue during settlement. Which I try to do the settlement, system is giving an error 'Unable to determine the pool category for requirement'. Message No. PAMS145
    Below is the detailed message:
    Diagnosis
    In Customizing for PAM, you define activity types for each pool category for
    each controlling area.
    When settling a PAM requirement, the system calculates the service performed
    for the activity types defined for 'Rental price' and 'Price/unit.'
    The pool category is determined using the equipment or message (in this
    order) for the requirement
    The controlling area is determined from the equipment.
    Unable to determine a pool category for the requirement.
    System Response
    The settlement of the requirement is terminated.
    Procedure
    Depending on the business process, store a pool category in the equipment or
    the message.
    I think I am not able to tie up the pool category which is there in the configuration of PAM with the equipment I created. Has someone faced similar issue before? What could be the possible way to resolve this error?
    Thanks,
    Tajinder

    hello Gandalf ,
    Create an IO Through KO01 with extra Create AUC........
    Then post the exp to AUC........
    Then assign the settlement rule as Fixed assed and enter the Asset number and give % or amount....
    Settle the IO through K088
    Hope this will resolve your issue............
    Regards
    Kumar

  • Namespace Reservation in SLD ??

    I have the JDI sp13 and I'm trying to configure it.
    I'm arrived at point that the Installation Guide speas about "Registering the Reserved Prefix for the Name Reservation Service"
    and I'm dubious about the meaning of this stuff.
    It's really necessary ?
    I'm not going to use the prefix "sap.com" or my developents so why they should be overvritten ?
    Regards

    Hi,
    thank you for this thread!
    Coming from
    [Name Reservation Issue|Name reservation issue]
    [Technical Implications|Name Prefix Reservation - Technical Implications]
    I am missing some detailed technical examples according to the interrelationship between
    the procedure given by the SAP Marketplace Link
    [Request Namespaces for Development|http://service.sap.com/namespaces] and the SLD
    name space procedure.
    Namespace / Description are fields related to ABAP Workbench, I think so.
    But what is typically given to the field Name Server? The Namespace Prefix? Something like
    rig.com/mydc as stated in the document
    How to ... Get started with the SAP Netweaver Development Infrastructure v1.00 - July 2006 ??
    What is effected by activating the option: Object Generators?
    Is that all  a one step procedure, or have I to give as many requests as I want to use the different
    possibilities in the namespace reservation of the SLD?
    I am in need of an explanation of that matter. Thank you.
    Regards
    Christian

  • Material Serial Number Issue.

    Dear Friends,
    Material Serial Number Issue.
    Its better to explain with the example.
    Material Number : ABCD with serial number as 123456
    There is a reservation for the Material ABCD from work order, now the warehouse person Goods Issues for the reservation ABCD with serial number 06-123456.(he issued wrong serial number)
    Correction action - Reverse Goods Issue for serial number 06-123456, now Goods issue for correct number as 123456. But the systems doesnot allows the serial number, error Material ABCD 123456 is already installed. Thenin  IQ09 the material ABCD with SNO 123456 is INSTL Status.
    Now question.
    1. In 1st place how system allows the Goods issue for particular reservation with different serial number?
    2. Without issuing the serial number 123456, how the status changed to INSTL???
    3. How to solve this problem, need to change the stauts of Material 123456 as ESTO, then i can do goods issue,. how to change the status??
    Regards,
    Saravanan.S

    Hi,
    Ask the workcentre to give that materail with 202 or 262 mvt to you. Now with the new reservation issue the required serial number material to site.
    System does not have the serial number in reservation slip.Manually u are assigning it diuring the MIGO.
    Ramesh

  • Does Leopard support Font Reserve?

    I wasn't sure where to post this question, so hopefully someone reading this can help me out. I'm having a problem with Font Reserve now that I've installed Leopard. When I try to open the browser I get a message that says:
    "Font Reserve is off. THe browser cannot be opened until it is turned on by the Font Reserve control panel. Do you want to open the Font Reserve control panel now?"
    I click on "Yes" and the control panel appears but I'm unable to click the "On" button. I'm assuming this is yet another outdated program that Leopard doesn't support (sorry if I sound bitter but I just found out Leopard doesn't support iPhoto 2.0, so I just had to purchase iLife 08, in addition to having to buy more memory for my computer just to install Leopard. Ugh!) Anyway, is anyone familiar with the Font Reserve issue?

    i'm having the exact same problem. i'll let you know if i find anything out. last v. of font reserve i have is 3.13, and extensis doesn't seem to have any advice. i tried trashing prefs and reinstalling the software. somewhat frustrating as i'm a designer and need access to my typefaces! ugh is right. good luck.

  • Adobe Acrobat 10.1.3 Mac OS does not inherit the Duplex setting from PPD for HP printers

    Adobe Acrobat for the Mac OS does not inherit the setting from the PPD for the printer. Our current settings for the PPD has Duplex enabled as the default for the HP LJ 9050 and it works in all the application with the exception of Acrobat 10.1.3, Acrobat does not inherit this setting from the driver.  Our previous installation with Acrobat 10.1.0 duplex worked well with our PPD configuration where Acrobat inherits the setting from the PPD and duplex is default for all our black and white printers.
    We found reference to the reserve issue with 10.1.2 in the forum but that solution is global for all printers and it only works with version 10.1.2 
    Does anyone know how to set the default printing settings in Acrobat version 10.1.3 to allow us to have duplex printing by default on the Mac.

    >It looks like a typical case of finger pointing, Adobe blames Epson, Epson blames Apple. Apple blames the user...
    No, you still don't get it...Lightroom is a Cocoa app...it uses Cocoa printing APIs...therefore, print drivers will have to be rev'ed to support those Cocoa APIs...the 3800 (6.10) DOES...the earlier 3.5x drivers won't under Leopard.
    What's the driver version of your R800? Something like 3.09? The odds are REAL GOOD (since Epson hasn't released an updated driver for that printer yet) that it's not been updated.
    So, you are just gonna have to wait for Epson to rev the drivers, use Tiger instead of Leopard or print out of Photoshop CS3 (which is a Carbon app and uses the Carbon APIs) or not print.
    You may not _LIKE IT_ but those are your options...

  • %SW_DAI-4-DHCP_SNOOPING_DENY after dhcp server migration

    Hello,
    Some weeks ago, we migrated our DHCP server (from windows 2003 to windows 2012 with the new failover features in active/passive mode).
    On our switches ; we have both arp inspection & dhcp snooping enabled. Since the migration, arp inspection is not working correctly : as soon as i activate the arp inspection on our client vlan (96) ; we get errors like : "Sep  1 11:50:39: %SW_DAI-4-DHCP_SNOOPING_DENY: 1 Invalid ARPs (Req) on Fa0/29, vlan 96.([d4c9.efdf.710e/10.0.96.89/0000.0c07.ac60/10.0.127.254/11:50:39 GMT+1 Mon Sep 1 2014])
    Sep  1 11:50:40: %SW_DAI-4-DHCP_SNOOPING_DENY: 2 Invalid ARPs (Req) on Fa0/7, vlan 96.([d485.64b4.0068/10.0.97.214/0000.0000.0000/10.0.127.254/11:50:40 GMT+1 Mon Sep 1 2014])
    If i have a look on the dhcp snooping binding table on the same switch :
    NUKUH052#sh ip dhcp snooping binding
    MacAddress          IpAddress        Lease(sec)  Type           VLAN  Interface
    18:A9:05:F5:28:2B   10.0.97.101      418236      dhcp-snooping   96    FastEthernet0/40
    6C:3B:E5:0D:B3:B2   10.0.96.184      2936        dhcp-snooping   96    FastEthernet0/36
    10:60:4B:7C:A3:14   10.0.97.17       678739      dhcp-snooping   96    FastEthernet0/42
    00:1F:29:02:AA:6B   10.0.98.53       678938      dhcp-snooping   96    FastEthernet0/37
    88:51:FB:80:1B:E1   10.0.97.252      680212      dhcp-snooping   96    FastEthernet0/3
    64:31:50:A3:F8:52   10.0.96.96       341484      dhcp-snooping   96    FastEthernet0/20
    64:31:50:A3:D7:5A   10.0.97.209      677205      dhcp-snooping   96    FastEthernet0/6
    6C:3B:E5:1A:8D:05   10.0.96.255      677165      dhcp-snooping   96    FastEthernet0/8
    00:1F:29:02:AA:EF   10.0.96.207      678365      dhcp-snooping   96    FastEthernet0/1
    00:23:7D:2F:72:E7   10.0.98.152      680376      dhcp-snooping   96    FastEthernet0/16
    Total number of bindings: 10
    Strange, interface FastEthernet0/7 is not in the table !!! and that s the same case for a lot of computers. (of course it s dhcp and not static ip address). 
    Extract of the switch configuration :
    Standard port configuration 
    interface FastEthernet0/7
     switchport access vlan 96
     switchport mode access
     switchport nonegotiate
     switchport voice vlan 192
     switchport port-security maximum 3
     switchport port-security
     switchport port-security aging time 1
     switchport port-security violation restrict
     ip arp inspection limit rate 256 burst interval 10
     no logging event link-status
     mls qos trust dscp
     no snmp trap link-status
     storm-control broadcast level bps 1m
     storm-control multicast level bps 1m
     storm-control action shutdown
     spanning-tree portfast
     spanning-tree bpduguard enable
    General switch settings
    ip dhcp snooping vlan 96
    ip dhcp snooping information option allow-untrusted
    no ip dhcp snooping information option
    ip dhcp snooping
    >> ip arp inspection vlan 96 : as soon as i had this command i have the error messages.
    I already :
    * tested several software version
    * only enabled  a single dhcp server in the helper address
    But i don't find the issue... the problem came when we started up the 2 new dhcp server (with the new 2012 dhcp failover feature). We have the same issue on all the switches of this LAN (the same config is running fine on the other factory we own).
    Can you help me to solve that issue ?

    Hi,
    I just attached the file containing the filtered caps ; taken simultaneously on both dhcp servers. As we are using HSRP ; it looks like the dhcp messages are not doubled, but quadruplet.
    Below the HSRP configuration on one of our both core switches :
    interface Vlan96
     ip address 10.0.127.252 255.255.224.0
     ip helper-address 10.0.9.33
     ip helper-address 10.0.9.32
     no ip redirects
     standby 96 ip 10.0.127.254
     standby 96 timers 1 4
     standby 96 priority 80
     standby 96 preempt
     arp timeout 720
    And i also discovered that there are some microsoft bugs related to dhcp failover. Links here :
    http://blogs.technet.com/b/teamdhcp/archive/2014/02/26/dhcp-failover-patch-to-address-a-reservation-issue-and-another-issue-related-to-failover-partner-not-accepting-state-transition-from-bad-address-gt-active-has-been-released.aspx
    and
    http://support.microsoft.com/kb/2831920
    And the active dhcp windows server has not been updated since january 2013.... (so the update are not applied). I ll discuss with my colleague in charge of server to update it asap...

  • DHCP Failover, one DHCP Server Partners Supnet is deactivated, Clients losing network connectivity for 3 sec. after renewing they IP Adress

    Hello,
    currently we are using two W2K12R2 DHCP server configured in "load balance Mode". On DHCP1 the IP-scope with failover partnership to DHCP2 is deactivated. DHCP2 is working fine. Now we register that 50 percent of our clients (W2K8R2 application
    server) losing the network connectivity for 3 sec. after rereleasing they IP-Address. On DHCP2 servers eventlog we receive a lot of
    BINDING ACK reject events 20291 and 20292 for these IP addresses entries.
    These 3 sec. of loosing they Network connectivity is our big Problem because the Client application (W2K8R2 application server) cannot handle these timeout. It looks like a
    DISCOVER-OFFER-REQUEST-NAK cycle that are described here:
    http://blogs.technet.com/b/teamdhcp/archive/2014/02/26/dhcp-failover-patch-to-address-a-reservation-issue-and-another-issue-related-to-failover-partner-not-accepting-state-transition-from-bad-address-gt-active-has-been-released.aspx#pi47623=2
    there is a solution to prevent the 3 sec network failure?
    Rgds

    Hi Steffen,
    Have you applied KB2919355 in the server?
    If issue persists, please check the detailed information about the event. It will tell us why does the server send the NAK.
    Best Regards.
    Steven Lee Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Support, contact [email protected]

  • Command to get information on disks

    Hello
    What is the command that gives the rpm (speed), seek time, transfer time of each disk?
    thanks

    Hi,
    Could you provide more information about your environment. For example, the exact text of any error messages that you received that are associated with this problem? 
    Screenshots is the best information.
    Base on my experience, these warnings are about disk reservation issue. When the cluster nodes try to access the disk, it finds that the disk is already reserved. We need
    to check whether these disks are presented to this cluster or not. If they are not present, we can ignore this error. Else, we will have to involve the storage vendor to check why these errors are present.
    The similar third party information:
    Question about CSV (Clustered Shared Volumes)
    Cluster Disk with Identifier has a Persistent Reservation on it
    http://blog.patricknielsen.net/2010/06/cluster-disk-with-identifier-has.html
    Hope this helps.
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Reg FLOW in programming

    Hi ABAP GURUS,
    I am new to ABAP programming ,previously i was in java,I want to know about
    the flow of SD & MM in programming.
    Plz help me.
    Regards,
    Viveksivam

    Welcome to SDN.
    SD:
    Inquiry -> Quotation ->Sales Order ->Delivery ->Invoice ->Return -> Credit memo
    VA01 Create Sales/Returns Order
    VA02 Change Order
    VA03 Display Sales Order
    VA11 Create Inquiry
    VA12 Change Inquiry
    VA13 Display Inquiry
    VA21 Create Quotation
    VA22 Change Quotation
    VA23 Display Quotation
    VA41 Create Contract
    VA41 Change Contract
    VA43 Display Contract
    VF01 Create Billing Document
    VF02 Change Billing Document
    VF03 Display Billing Document
    VF11 Cancel Billing Document
    VF21 Create Invoice List
    VF22 Change Invoice List
    VF22 Display Invoice List
    VK11 Maintain Pricing
    VK15 Create Condition Records, Transaction used to enter multiple sales conditions (most will be entered here)
    VL01N Create Delivery
    VL02N Change Delivery
    VL03N Display Delivery
    MM:
    MRP Requirements (demand)-> Purchase Requisition (PR)-> Requisition for Quotation (RFQ) -> Vendor selection (Supplier) ->Purchase Order (PO)-> Goods Receipt
    Inspections (Quality Inspection) -> Inventory management -> Invoice Processing /
    Invoice Verification
    Intra Function Process Flow:
    Purchase demand for material -> Evaluate, select
    potential source -> Create RFQ -> Selection of vendor -> Create purchase document -> Arrange delivery schedule
    Processing of consumable material :
    The cost of the materials received are posted directly to a cost center (job order).
    The Raw material sent to Production for further process.
    Those material can be finished or semi finished products.
    Stock transfer processing:
    Transfer between internal plants (multi-site inventory management).
    Stock transfers can be of Raw Material for further processing.
    Transfer of stock can be Finished product for Sales.
    Stock transfer is integration between Material Management and Sales & Distribution.
    Consignment stocks :
    Usually the transfer of ownership of inventory occurs synchronously with the physical flow of the inventory
    A vendor may stock parts at the buyer site (enhance maintenance)
    Customers try to push the financial burden to vendors
    MM has to track vendor-owned stock.
    Vendor will deliver the stock as per requirements.
    Company will be owner of vendor consignment stock.
    Subcontract order processing:
    Integrate the subcontractor in the logistics flow
    Reserve, issue, receive material
    Supply plan (from MRP / forecasting –PP)
    The company may maintain parts on subcontractor premises
    The company will transfer semi finished material to subcontractor.
    Approve the planned requirement.
    Issue a requisition
    Associate the requisition with a «source of supply»
    Create RFQ, obtain bids
    Create a subcontract purchase order
    Send the purchase order to supplier
    Generate purchase order
    Issue component material to the subcontractor
    Receive shipping notification
    Receive items in stock through GR / Send item to Customer.
    External services management :
    Services are posted to a cost center (material are recorded in an inventory)Process
    Requisition (from maintenance, production orders)
    Approval cycle
    Select, RFQ, accept
    Service purchase order
    Integrate with FI (cash management, funds control)
    http://www.sap-img.com/sap-mm.htm
    Also have a look at SAP online help.
    http://help.sap.com/saphelp_40b/helpdata/en/e1/8e51341a06084de10000009b38f83b/frameset.htm
    I hope it helps.
    Best Regards,
    Vibha Deshmukh
    *Please mark all the helpful answers

Maybe you are looking for

  • Please Help: Error message with files.

    I'd REALLY appreciate some assistance with this, something has gone wrong with a large project and I'm prepared to beg!! The root of my problem is trying to open the media files in an iMovie project (well about half of them anyway, for some reason th

  • User exit in Z program

    Hello all, I have copied a standard program to a Z program. The standard program as a user-exit, but in the Z program this user-exit won't work. Does anyone know what i have to do so it will work? Thanks in advance, Nuno Silva

  • XI messages and ERecruiting application

    PUBLICATION_VIA_XI via a custom class- ZCL_HRRCF_PUBLISH_XI_PUB is setup as a periodic service to run through batch job - RCF_PERIODICAL_SERVICES in the background every 10 minutes. I understand that this batch job that runs every 10 minutes will tak

  • PSE 8 and high res compatibility with W7

    I have just upgraded from PSE 5 to 8.  I am running on a laptop with W7 and 1920 x 1200 res screen.  In order to make menus and text legible, the system is set at 150% in Control Panel.  This seems to work fine with Office applications and other prog

  • How can I increase the parameter db_files

    Hi, When I am trying to add a new data file to Tablespace it is giving error. 1. How can I increase the parameter db_files? Sap Version is: 4.7E and Database is: 0racle 9.2.0 Thanks&Regards, Nani