Reservation of components against production order
Dear all
how to delete the reservation of components against production order
guide me
Hi
When you execute TECO for a production order, all the reservation will be cleared.
are no other screen using the order or material.
Next option is to delete the reservation directly via MB22. sometimes this option is not possible, normally when Reservations are created automatically by the system, in this case only deleting the source of the reservation.
Final option is to clean only the reservation for a given material, just go to the ordern in change mode, and then to the material details, and set the flag "on" for the field "Final Issue".
Hope this helps.
Thanks
Saravana
Reward if useful
Similar Messages
-
Avoiding creation of reservation during creation of production order
Dear gurus,
when we create a production order for a semifinshed material there are reservations created for the raw material used to produce the semifinished material ,what if I what to avoid the creation of material reservation .
I have tried out with setting in opl8 wherein we specify the creation of reservation on release of production order or on creation or never but it is not working otu please if u can help me out.
I what to create manual reservation for production orders......Is it possible?
Thanks in advance.Dear ,
.As long as , you have BOM components are in stock , system will generate reservation for them when you create Production order where as if any of the component is not available in the stock then it will generate PR based on the material master set up because when you are creating production order or creating planned order through MRP , system performs material availablity check in the back ground and generate either reservation or PR automatically .
Secondly, you can not create Manual Reservation , See the Std SAP message .Message no. M7 126
You entered an order whose category only permits automatic reservations. The following order categories do not allow manual reservations:
10 PP production order
20 network
30 maintenance order
40 batch order (process manufacturing)
50 inspection lot.
So conclusion is you can't stop creation of reseravtion .Curious to know why you do not want reservation for PO ?
Hope this is clear
Regards
JH -
Tolerance limit for GI against production order
HI
Is there any standard functionality of having tolerance limits at Goods issue level - against the production order?
Just like GR.
or can we make this functionality using any Exits?
-ashokDear,
Rstriction of excess goods issue against production order is not possible in standard setting.
For achiving this you have to go for User exit.
The logic should be
In MIGO check mvt. type 261
Pass the order through table RESB and select all the components with quantity.
Capture the header material of order and use this as input along with the order creation date, plant and BOM application to explode function module CS_BOM_EXPLOSION.
This will give you the BOM components which were valid at the time of order creation.
Now compare these BOM components with the components from RESB with quantity.
Here conditions will come in picture
If quantity is exactly matching then GI will be possible
or if you want to keep tolerance limit say for 10% then accordingly you can map the condition.
Regards,
R.Brahmankar -
Excess goods issue against Production order
HI PP Gurus,
My requirement is to block excess goods issue of raw material against a production order.
Ex. Production order qty = 10 , For producing 10 Finish goods i require 10 raw material. When i do confirmation via CO11N the system automatically shows GR & GI Values in Goods Movement tab. there i change GI value of RM from 10 to 20 the system takes the value and does the GR & GI.
My requirement is that the system should not do GR & GI if the GI value is more than that is calculated at the time of creation of Prod. Order.
Thanks in Advance,
DevenHi,
Rstriction of excess goods issue against production order is not possible in standard setting.
For achiving this you have to go for User exit.
The logic should be
In MIGO check mvt. type 261
Pass the order through table RESB and select all the components with quantity.
Capture the header material of order and use this as input along with the order creation date, plant and BOM application to explode function module CS_BOM_EXPLOSION.
THis will give you the BOM components which were valid at the time of order creation.
Now compare these BOM components with the components from RESB with quantity.
Here conditions will come in picture
If quantity is exactly matching then GI will be possible
or if you want to keep tolerance limit say for 10% then accordingly you can map the condition.
Regards
Amit Parkhi -
How to restrict reversal of Goods issue against production order.
Dear All,
How to restrict reversal of Goods issue against production order if production order status is CNF or DLV.
i want that user can not reverse the goods issued against production order, if they want to do so, then user has to reverse the GRN and reverse the GI then only.
Please suggest the solution.
Regards,
Sandeep DhruveHy Sandeep,
You have to use User Exit for this.
The following enhancement is available for production orders:
o CCOWB001 User exit for modifying menu entries
You can use this function module to deactivate menu entries or
functions. The locked functions can then no longer be executed by the
user.
The enhancement CCOWB001 contains the following components:
Function exit
o EXIT_SAPLCOWB_001 Good movement: Deaktivate functions
Display documentation
Regards,
Dhaval
Edited by: Dhaval Choksi on Aug 22, 2008 3:01 PM -
Good issue by MB1A against Production Order
Hi Dear PP profesionals,
Could you advise me about the follow scenario.
I am using MB1A to do re-stcok (262) and consume (261) against Production Order only for one o two component(ROH Materials).
Just I created Production order by 100 EA, after I confirmed it but I need to do some ajusment in some components.
For one them I need to do re-stock from production order to storage location in this case I am using MB1A against production order with movement type 262 the quantity to back storage location is by 5 EA.
For the other component I need to consume 5 EA more then I am using MB1A against production order with movement type 261.
After excute MB1A for both cases I go to the production Order but I can not see reflected this changes
For first one I expect to see 5 less if when I confirmed production order were issue 100 EA after ajusment with MB1A I expect see 95 with movement type 262.
For second one I expect see 5 EA more if initialy I consumed 100 EA after ajusment with MB1A I am expectin see 105 EA.
Could you advise me about iit, f I am expecting is correct or MB1A only make ajusment without any reflected in Production Order?
Best Regards,
Julio PPHi PP_HKV,
I did as you told me about use MB1A/261 against production order and you rigth, This not up date any quantity in production order for component only I can see this movoment in option GOTO --> Documented goods movements, but not in component overview in field Qty withdrawn, It is the same case when I use MB1A/262 transation allow me to do the movment but the quantity in production order for component is not up date only it is show in GOTO --> Documented goods movements
I see in standard process it is not work as I expect. Is there some way for to do that any bapi o customization?
Thanks in advance,
Julio Werekeitzen -
Fetching open component qty against production order
Hi
The requirement is to fetch component 'open quantity' for a production order. [ Open quantity = requirement - withdrawn qty of the component ]
Can we get it through /SAPAPO/OM_ORDER_GET_DATA ? I could see the requirement quantity but not the quantity required.
Thanks in advance...
YogeshHi PP_HKV,
I did as you told me about use MB1A/261 against production order and you rigth, This not up date any quantity in production order for component only I can see this movoment in option GOTO --> Documented goods movements, but not in component overview in field Qty withdrawn, It is the same case when I use MB1A/262 transation allow me to do the movment but the quantity in production order for component is not up date only it is show in GOTO --> Documented goods movements
I see in standard process it is not work as I expect. Is there some way for to do that any bapi o customization?
Thanks in advance,
Julio Werekeitzen -
Auto goods receipt against production order
is it possible to do auto goods receipt against production order of (material with serial number)
if not please suggest me solution
please also tell me possibility of enchancement
for goods receipt against production order
sunilHi
If you check mark the auto goods receipt in the control key used in the work center used in the routing then you can have auto goods receipts posted for the production order against a confirmation.
Rathnakar -
Excess Issue of Material against Production Order
Hi
For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order. How can it be controlled.
Regards
Madhesh KumarHi Madhesh,
there are many loop holes to issue excess stock against production order
so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
Thanks
Bala -
Partial GR against Production Order
while doing partial GR against Production Order system is not considering the overdelivery tolerance. It is allowing for GR quantity when we do in one stroke including overdelivery tolerance. When we want to do GR partially in two, first time the order header quantity and second time the overdelivery tolerance quantity, system is giving message that Document does not contain any selectable items. I have tried by removing the tick in delivery complete in CO02 transaction, but still same message is coming.
Please suggest sol.
Thanks
KrishnamurthyDSSKrishnamurthy,
Please let us know how you are performing GR, is it through Confirmation? or MB31 or MIGO?
If it is in MIGO it should be possible, once you remove the Delivery Completed Indicator in the Goods Recipet Tab of the Order header.
If your GR is through confirmation, first system checks the defination of overdelivery for confirmation of yield based on the confirmation parameters set for the plant / order type combination.(OPK4). Here you define the "Warning message for Overdelivery".
Hope this helps...
Regards,
Prasobh -
Error while issue material against production order
Hi,
In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant, now for this new plant I have created new profit center with KE51 and after that I have create done cost ceneter in that this new profit center is assign now while goods movment with MB1A with movmen type 201, 202 it works OK system is not giving any error but while issue the material against production order in MB1A with movement type 261 system is giving error message
No postings can be made to profit center DUMMYBAOPC in company code MT50
Message no. KM183
Diagnosis
Profit center DUMMYBAOPC cannot receive postings in company code MT50.
this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated for new we have new profit center then it is linking to that what can be the solution.
regards,
zafarHi,
After asigning new profit center in the Production order problem solve.
regards,
zafar -
How Can We Trace Out Delivery Against Production Order
Dear All
How can I check the delivered Qty(invoicing) Against Production Order .
For Egg :-order qty Is 50000
Like 1 P.O-10000
2. P.O-5000
3. P.O-2500
And Despatch Or invoicing of 12500 qty.
Then Through which report i can Find out That 12500 qty Is despatch From 1& 3 PRODUCTION ORDER.
Rgds
Pankaj AgarwalHi
yes we can do it
please go to CO02
change prod order
see in header >> goto>> goods movement document
please tell me if any more question or reward
Sunil -
GR against production order accounting entry
Looking for help regarding offset account hit at the time of GR of Finished production
Let see the entries
When GI Against production order for material code x000000091 by 261
6110010 CONSUMPTION - XXX 10,000.00 Dr.
3430020 Stock account 10,000.00- cr.
When GR of Finished good Concrete by 101
3450010 FINISHED GOODS 19,990.00 Dr.
6000010 Production offset 19,990.00- Cr.
just we want to know how does production offset be cleared, even it is showing in our trail Balance as Cr.
please help how does production offset works.Hi,
Please consult your FI-Co consultant.
The setup in OBYC needs to be checked & corrected. The G/L account specified seems to be incorrect. The output from production should be credited to the Production Output account & not Production Offset account.
The entries should be:
Cr. Production Output A/c
Dr. Finished Goods
Hope it clarifies.
Regards,
Vivek -
GR quantity check against Production Order in MB31
Hi Experts,
How to check GR quantity against Production Order (101) can not be greater than Confirmation quantity for the Production Order in MB31.
Regards,
Praful MankarHi Praful,
Use user exit MBCF0002, here put condation that check AFEU table (confirmation table) and allow
that quantity only to do GR
and it will triger at the time of MB31
Regards
Girish -
Scrap against production order
Hi,
My scenario is : I have a production order of 100 pieces out of which 80 are ok and 20 are scrap. I do a Goods Receipt of 100 and then scrap 20 pieces from stock.
What steps should I follow after I scarp 20 pieces from stock from Materials Management perspective like : Do I need to pay excise duty, entry in RG1 and Rg2 registers...
Regards
AshishHi,
My scenario is : I have a production order of 100 pieces out of which 80 are ok and 20 are scrap. I do a Goods Receipt of 100 and then scrap 20 pieces from stock.
What steps should I follow after I scarp 20 pieces from stock from Materials Management perspective like: Do I need to pay excise duty, entry in RG1 and Rg2 registers?
You can do goods receipt against production order using MIGO /MB31 for 80
And then scrap the 20 in production area using MB1A and use Movt type 551 place it in to scrap location from there you can do scarp sale.
And for 20 Pieces you can reverse the in put excise duty go to J1IH select Mat write u2013off tab or select (F5) enter the input parameter as material document generated out of scrapping the material (551) and select the Register which is relevant for the material. Then enter the duty values like BED, Ecess & She cess manually.
Rgs
Maybe you are looking for
-
HT1766 How do I move a backed up app from my Mac to my iPad?
How do I move a backed up app from my Mac to my iPad?
-
IPod stops syncing on my MAC G5.... continued
If anyone else is having a problem syncing their iPod with their MAC could you post here so I can make sure I'm not alone. Originally I posted a work around to get my music on my iPod and I thought that it fixed my problem completely. But after purch
-
Lotus notes as a front end and oracle as backend
Dear All, Can i use lotus notes as a front end and oracle as backend atleast for few forms in my application. If Yes how to go about it. I have not tried it even once Kindly also advice if this is appropriate forum to ask this question Best Regards,
-
Noticed a pretty obvious bug in 5.0 ctrl+shift+d will bookmark all sites open but there is NO reference in any of the file menus, where is it located if you didn't know the shortcut from a previous version?
-
Problem with master page text frame
I am using ID 4 on a Mac with Snow Leopard 10.6.6. I have created a master with facing pages and master text frame. But the pages based on that master do not have any text frames showing. When I go to Document Setup the Master Text Frame checkbox is