Reserved quant. exceeded by qty

Hi,
While corfirming the order backflush for components I am getting the below error
RE Reserved quant. exceeded by 5.000 MT : Material number plant storage location
The stock is available in the storage location.
thanks and regards
muru

Dear Murugesan,
Are you facing this issue in a Discrete scenario,when confirming the order using CO15?
In my understanidng,please check whether using some enhancements is there any check made by the system if reserved
quantity = the quantity to be issued.
check and revert back.
Regards
Mangalraj.S

Similar Messages

  • COGI Error - RE Reserved quant. exceeded

    Hi All,
    First of All "Wish You A Happy New Year"
    I got a issue with high priority in COGI transaction with Error Text " RE Reserved quant. exceeded by 4,071.456 KG : CPXXXBRT 1000 R100"
    Application Area M7 & Message Number 362.
    The material is a raw material. I have verified the production order and found, the Requirement Qty for this raw material is 144,275.00, Committed quantity is 29,941.876 & the Withdrawl Qty is 147,667.284
    I am new to this error issue in COGI. Can any one guide me what to do now and how to solve this issue quickly?
    Thanks & Regards,
    Phani Kumar

    " RE Reserved quant. exceeded by 4,071.456 KG : CPXXXBRT 1000 R100"
    since the material is activated as a Backflush,  when the try to post extra  qty compare to requirement qty for that reason, Goods movement is failed  and log is created in COGi.
    IF they client  want the above qty issue against Planned consumption.
    then they need to increase the requirement qty in CO02 by 4071.456, so that the reservation qty will equal as posting
    IF they client  want the above qty issue against unplanned consumption.
    Then They can delete the COGI error and post the Goods issue in MB1A, with out entering order in initial screen and the add the order in MB1A and post the raw material

  • Withdrawal Qty exceed requirement Qty in production order

    Hi: guys
    In our system, withdrawal Qty can exceed requirement Qty for a production order, even we use planned GI. That means when we use MIGO/MB1A to process GI to reference production order, we can manually change withdrawal Qty. Even this Qty has exceed requirement Qty of production order, system also not give me any message.
    Anybody can tell me how to customize settings to limit this function, such as give me a message (error or warning), and ensure withdrawal Qty can not exceed requirement Qty.
    thank you.
    Henry

    Henry,
    I got what excatly the problem is in your case, the guy who executed has done it very cleverly.
    What must have happenned, is that in the change mode of the order, the component quantity was increased and then Issued. Latter on in the change mode of the order again the quantity was reduced.
    I think this is the excat case what you are having now in the system, the only clue left out for us is to check whether the manual change was perfomed or not. In the components overview scroll to the right side of the screen till you reach column with heading "ChngeProc.", here if the field value is "1" - then it is obvious that there was a manual change in qty for the component.
    The possible resolution to prevent in future is to Make the dynamic message "CN" - 752 as Error in the prodcution order change program. You need to work with your ABAP person for this.
    Hope I was able to get to the right problem and possible resolution.
    Regards,
    Prasobh

  • Released qty exceeds available qty pick list error

    Hello experts,
    I have the following scneario:
    1) In stock 570
    2) COmmitted 10,100
    3) Available -9530
    I want to create a pick list for 100 and the system doesn't let me saying " Release qty exceeds available qty".
    Can someone please explain why?????????????????????
    Thanks

    Hi,
    As an enhanced functionality in SAP Business One version 8.8, the Pick and Pack Manager now allows the user to release items to a pick list even when there is no available quantity to release, such as when merchandize exists but has not yet been entered into SAP Business One.
    In spite of this enhancement the user cannot release an item from a Sales Order to a Pick list when the item does not have sufficient available quantity in stock to cover the quantity of the Sales Order.
    The system shows the following error message:
    "Released quantity exceeds available quantity"
    Solution
    This enhanced functionality only works if the "Block Negative Inventory by" checkbox is not selected under Administration -> System Initialisation ->Document Settings -> General tab
    Check Note No. : 1485867 as well.
    Kind Regards,
    Jitin
    SAP Business One Forum Team

  • Material reservation and unrestricted Available qty report

    Hi
    SAP Buddies
    Please can anyone tell me how to get the lCollective list of Material Reservation with Available unrestricted stock??
    i.e.
    MAterial No.         Reserve Qty         Unrestricted Available Qty  
    These three parameters are must ?
    Thanks  in Advanve
    BV

    Hi,
    Please try MB25 MB25 or MF65.
    Regards,
    Mohd Ali.

  • Return Order Qty should not exceed Reference Qty

    Hi
    The Qty of Ref Billing document is say 10, Return order is done for eg 8 for first time and for same ref document user enters 5 qty, now the total return order qty is 13, but billing doc qty is 10, where in 3qty is exceeded and system just gives a warning message and allows further. In this case how can we Restrict Return order if Qty it exceeded the reference document qty.
    I have checked the copy control settings, no use. Please through some Light.
    Regards
    Praveen Kumar......

    Hi
    But the problem is, now we have done return sales referring and billing doc qty eg. 10.
    Now again if we do return order referring the same billing document,
    system will allow to do another Return sales for same 10qty
    Is there any where we can control this feature.
    Maintain the copy control settings as suggested by the other friends
    Mainly Pos/Neg field
    While creating the second return order (sales order) referring the already referred billing document system should give some warning message
    Check that message in OVAH
    I feel some warning msg should come which you have to change to error
    Unfortunately i am not in a position to test this
    Still if the problem is not solved you need to go for suitable userexit
    Normally when you create Returns sales order with reference billing doc in that sales order if you add a new line item which was originally not there in billing doc system will very cooly accept it (not even warning message)
    This also has to controlled thro userexit ( this part is not related to your issue but i said this as an information)
    Regards
    Raja

  • GR qty should not exceed GI qty for an order.

    Dear All,
    GR for an Prodn order should be restrictected if the Qty exceeds the GI qty done against the order.
    Eg.The target qty for a production order is 100 MT.The GI is done for 80 MT(261),the system should allow MB31(101)only upto 80 MT not more than that against the order.
    Please suggest how can I map this?
    Thanks in advance.
    Regards
    Ankush

    Dear Ankush,
    in Std SAP allows Confirmation without GI
    Also Allows GR without GI & confirmation
    so best option is user exit
    Regards
    Madhu

  • GR Qty in a Service PO Exceeds PO Qty

    Hi Gurus
    My client has cerated a service po of qty=1 value=99270 (service master not been used, account assignment K, No limit is unchecked, overdel tolerance o%) client has created service entry sheet for qty=2 value=99270 & 25000 respectively.
    I want to know how the system allows client to make service entry sheet twice for the same po exceeding the total po qty and amount?
    Any idea? plz help.

    Hi,
    Just double check maybe your SES is not yet accepted and its just saved.
    Thanks
    Silas

  • Invoice qty and value should not exceed po qty/value

    Is there a way where we can make tolerance zero in case of invoicing i.e i want to restrict the variance between PO qty/value and Invoicing qty/value.
    Gurus help me...
    Regards,
    Satyendra

    the problem still persists.
    When i make message 087 as error and try to post invoice for greater qty (than po), after GR, it allows me giving warning message (081) that Invoice qty is greater than GR qty. Because 087-error message will be effective for POs with out GR.
    So can we have a check for POs whose GR is done for PO qty, but doesnt allow me to post invoice greater than PO qty
    Regards,
    Satyendra

  • Can LT12 of Pick TO reserve the delv itm Qty for PGI?

    Hello All,
            I've come across a feature wherein upon LT12 the Delv Item stocks get reserved for PGI so that no other txn(ex. 311/MB1B StLoc to StLoc etc ) can use those stocks. Is that really possible ,I'm still trying to figure out.. please shed lights if anybody knows?
    Regards
    MM

    Reservation (stored in RESB) is related to IM and has nothing to do with WM.
    Whether you can execute MB1B+311 is related to IM and has nothing to do with WM (from availability point of view).
    You cannot 'reserve' stock in WM in standard SAP. That's all.

  • Tolerence limit for Goods issue while CO11N Confirmation

    Hi,
    We are creating the production order which continues for 1 to 5 days, and partial confirmation is done for the order e,g production order 100, partial confirmation 5,10,20 etc.
    Now while order confirmation, we do the goods movement by which raw material issue against order, but some material issue in different units, like cement issue in BAG, KG etc, due to this at final partial confirmation some times system is issuing the message goods movement failed and in transaction 'COGI' it is showing the error as 'RE Reserved quant. exceeded by 0.010 TO : 40007510 XXXX XXXX XXXX004002'  is there any option for this to allow some excess quanity by providng the tolerence limit, or is there any badi or user exit for this to rounding  the values at the time of final issue.
    Regards,
    Zafar 

    Hi Zafar,
    You can define underdelivery/overdelivery tolerance in Work scheduling view for the material master.
    Added to that, you can define if the tolerance is checked in order confirmation parameter (OPK4 ).
    Thanks and regards,
    Suraj Kamble

  • Report for Qty Contract and Value Contract with PO release exceeding limits

    Hi All,
    Is there a std report in SAP that the users can use to view Qty and Val Contracts that has exceed in Qty (in case of Qty Contracts) or Val (in case of Val Contracts) ?
    Thanks in advance!

    hi Duke,
    If thinking logically, then there is no report for the same..this may be because you enter the qty or value limits in the contract doc itself....So, when you make the PO for the same, and if the qty or value exceeds the system automatically provides the message..stating that the qty or value has exceeded....
    So, there is no report for the same...
    Hope it helps...
    Regards
    Priyanka.P

  • Reserved sales order qty based on sales order

    Dear All,
    is there any way to reserve the sales order qty in stock based on the sales order?. Actually i want to block the some qty for paticular sales order.  For example I created one sales order with 100 qty of x article and now i want to delivery of sales order with the  same qty after one month . In this case i want to reserve this qty for this sales order that should be not deliverd by another sales order.
    Thanks
    Abhi

    Hi,
    Block this qty against sales order
    MB1B >>> Use movement 413 & enter
    Speciefy sales order number & item number
    Then this qty will be permanently reserved or blocked for the perticular order.
    Kapil

  • Issue qty is more tahn reservation qty

    Reservation has been created for 100 Nos.
    While doing Goods issue with ref to reservation. system is allowing to Post more than 100 Nos (That is more than reserved quanties)
    How to keep a check in this

    Hi,
    Go to OMCQ and convert message 'M7 362' to 'E' to error. I think this will solve your problem
    Regards,
    Vikas Mayekar

  • Goods issue based on reservation !

    While performing a goods issue based on a reservation, i can exceed the qty in the reservation, how can i control this so that to prevent the user from posting a goods issue qty more that what in the reservation?
    Thanks
    Ahmed Karam

    hi,
    check the system messages
    go to SE91 check the relavent message, and control the same in system message setting*
    Edited by: Suresh Shenoy on Jan 24, 2008 10:28 AM

Maybe you are looking for