Reshedule to another Production Line

Hi All,
I have a material which can be manufactured in 2 work center. Now I have a capacity constarint at first work center.
In CM21 , capacity levelling screen , how can i reschedule the prod order to another work center automatically?
Amit

Access CM21 with common work center and dispatch your operation to the work center you desire to switch due to overloading. When you save the capacity leveling scren, system will also update your process order with the new dispatched work center
Zubair Mir

Similar Messages

  • Why don't you have any other size monitor than the 27"? You are forcing me to buy another product line and I like Apple?

    I'd like to know why Apple no longer offers any other size display besides the 27"?  I can't use that size, nor do I have that kind of money. You are forcing me to buy another brand and the other brands don't have the compatibility to the new MacBook I just purchased. I would never have bought the new MacBook last month had I known about the display discrimination!  This ***** !

    Well, there are a lot of good screens out there that support mini display port. Just because you bought apple, doesn't mean you have to stick with it. Also you can get adaptors such as mini displayport to hdmi or mini displayport to dvi. Both of those adaptors will allow you to connect your MacBook to a regular monitor.

  • Change over time on production line.

    Hi Experts,
    We have a scenario where we need to schedule the orders also considering the changeover times on a production line from one product to another. Suppose I am producing product A on the line and my next product is B, say the change over time is 10 mins. But suppose if I am changing from product C to product B, then the changeover time is 15 mins. Similarly it is different from one product to other based on what will be produced on the line next.
    Like,
    A---->B is 10mins
    C----->B is 15 mins
    D----->C is 30 mins and so on.
    A big matrix exists for the same.
    Is there any way that I will be able to handle this in standard SAP? Ideas will be much appreciated.
    Regards,
    Sachin

    Hi,
    You need to maintain the Setup Group Key in the routing, and then in capacity levelling table you group orders by this key, and then there's a function to reduce/change setup time for each order and for the group.
    Definition of Setup Group Key - transaction OP43
    Definition of Setup Matrix - transaction OPDA. In here you define the "new" setup times that substitute the "old" setup times, and are setup group dependent.
    In the routing opration detail in CA02 or CA01 choose the setup group key on the "general Data" part.
    For the capacity levelling part, it is too complex to guide you here.
    Regards,
    Mario

  • Performance issue: Adding a new product line to existing Quote calls pricing engine for existing line a well

    Hi All,
    I need some assistance for my below query...
    If there are already existing some product/quote lines on the quote and then we try to add another new product/quote line to this quote , then  it is taking more time to add the product. As per my understanding it is calling the Pricing engine for the existing line as well. How can we avoid the pricing engine call for the existing lines.
    There are some parameters which we are setting as mentioned below :
    l_control_rec.header_pricing_event := 'BATCH' -- What does this mean when we set to batch
    l_control_rec.price_mode := 'ENTIRE_QUOTE'; -- (possible values could be CHANGE_LINES , QUOTE_LINE)
    l_header_rec.pricing_status_indicator := 'C';
    l_control_rec.calculate_freight_charge_flag := 'Y';
    l_control_rec.calculate_tax_flag := 'Y';
    l_header_rec.tax_status_indicator := 'C';
    Question :Could someone please help us with this whether is there any way with these parameters could be altered or changed to some other value ( like for PRICE_MODE we see this parameter could have some other values like : CHANGE_LINES , QUOTE_LINE etc other than ENTIRE_QUOTE).
    means lets say we do the Pricing Engine call only for the Newly Added quote line but not do it for the Entire Quote again and again..
    Now the other question here could be how do we finally synch the line level price values for all the quote lines upto the Quote header level in form of Totals (TOTAL_LIST_PRICE,TOTAL_TAX, TOTAL_SHIPPING_CHARGE, SURCHARGE, TOTAL_QUOTE_PRICE in aso_quote_headers_all table) ??
    Also is there a way that we don't do the Freight Charge calculation and Tax calculation (means we skip this completely) while adding products to the quote but do it at a later point when doing the Submit to Order functionality.
    Could someone please help with these pricing related parameters and modes to be used in order to get around this performance issue
    Thanks
    Mithun

    Dear Expert,
    Activate your Controlling area as usual and Cost Centers and Profit Center , You can assign an internal order for the particular product line for what you are seeing and can collect the costs of that particular product line exclusively.
    Regards,
    Shankar K B

  • Performance issue adding a new product line to existing Quote pricing issue

    Hi All,
    Morning , need some assistance with this as we are currently stuck with this...
    Using the Seeded API call mentioned here : aso_quote_pub.update_quote we are trying to add a new product/item lines to an existing quote in Sales Online Module but it is taking lot of time ( means performance issue is there ).
    Also if there are already existing some product/quote lines on the quote and then we try to add another new product/quote line to this quote , then also it more and more of the time..
    There are some parameters which we are setting as mentioned below :
    l_control_rec.header_pricing_event := 'BATCH' -- What does this mean when we set to batch
    l_control_rec.price_mode := 'ENTIRE_QUOTE'; -- (possible values could be CHANGE_LINES , QUOTE_LINE)
    l_header_rec.pricing_status_indicator := 'C';
    l_control_rec.calculate_freight_charge_flag := 'Y';
    l_control_rec.calculate_tax_flag := 'Y';
    l_header_rec.tax_status_indicator := 'C';
    Question :Could someone please help us with this whether it there any way these parameters could be altered or changed to some other value ( like for PRICE_MODE we see this parameter could have some other values like : CHANGE_LINES , QUOTE_LINE etc other than ENTIRE_QUOTE).
    means lets say we do the Pricing Engine call only for the Newly Added quote line but not do it for the Entire Quote again and again..
    Question : Now the other question here could be how do we finally synch the line level price values for all the quote lines upto the Quote header level in form of Totals (TOTAL_LIST_PRICE,TOTAL_TAX, TOTAL_SHIPPING_CHARGE, SURCHARGE, TOTAL_QUOTE_PRICE in aso_quote_headers_all table) ??
    2.Also is there a way that we don't do the Freight Charge calculation and Tax calculation (means we skip this completely) while adding products to the quote but do it at a later point when doing the Submit to Order functionality.
    Could someone please help with these pricing related parameters and modes to be used in order to get around this performance issue
    Thanks

    Dear Expert,
    Activate your Controlling area as usual and Cost Centers and Profit Center , You can assign an internal order for the particular product line for what you are seeing and can collect the costs of that particular product line exclusively.
    Regards,
    Shankar K B

  • Change in confirmed quantity resulting in another production order

    HI Gurus
    I have an issue where the user changes the confirmed quantity in sales order schedule lines it is resulting in creation of
    another production order.
    PRocess flow:
    In depot
    1) creation  of sales order which has scedule line category CP MRP requirements are passed to Plant to create a production order
    In PLANT
    1) Run MD03
    2) create planned order and then production order
    3)create stock transfer order STO
    Suppose A sales order is created today and the system gave a confirmed qty date as 10-02-2010. Here requirements are passed resulting in a Production order.
    now when the user goes and changes the confirmed qty or date the system is creating another production order
    My requirement is not to have another production order when the user changes the date or quantity
    regards

    Dear Farrukh,
    There is not tcode to run sales order for all line items, but if you run MD02 it will plan all sales order & line items also. You can run MD02.
    Regards
    Abhijit Gautam

  • SCXI product line life cycle?

    I don't know that this is really the right place to ask this, but does anyone know where the SCXI product line currently is in terms of lifecycle?  Is it likely that I will still be able to buy SCXI cards in, say, 10 years?
    If not, is PXIe the crate of choice for long term supportability?

    I was told fairly recently that NI will support SCXI through 2020.  That gives you another 5 years.  And I think that is just driver support, not necessarily being able to freely buy it.  But check with your local NI sales rep to make them look into it.
    But if you are making a new system, PXIe is definately the way to go.

  • How about some more samsung products in the auctions ? I really don't want to bid on those crappy ipads. How about a better mix of product lines or at least some of your "new" digital coupons geared towards Samsung products????

    How about some more Samsung products in the auctions ? I really don't want to bid on those crappy ipads.
    How about a better mix of product lines or at least some of your "new" digital coupons geared towards Samsung products????

    How about some more Samsung products in the auctions ? I really don't want to bid on those crappy ipads.
    How about a better mix of product lines or at least some of your "new" digital coupons geared towards Samsung products????

  • Error  while giving the production line in repetitive mfg

    Hello friends,
       When i am maintaining the production version in material master for repetitive mfg, and in production line when i am giving the workcenter which is in operation of rate routing, system giving me the error message that "REP01(which is my workcenter) is not maintained in plan (planning type = plant = smp1)".Message no. is CFVO90.
          Though i have got the solution of this message, but i am not able to understand the solution.
          Actually while creating the production version in material master, for task list data i was only maintaining the task list type, Group Number and Group counter for  Rate Based only as Rate Routing.And when i would give the workcenter which is in operation of rate routing then  system would give me the error.
           Later on when i maintained the Task list type, Group Number and Group counter for Detailed scheduling, Rate Routing, and Rough cut scheduling and than maintained the workcenter in production line,system didn't give the error.
          My question is as we are doing the repetitive mfg, and as we have maintained the rate routing, so why it so that in Detailed scheduling and rough cut scheduling also we have to maintain the Task list type, Group Number and Group counter.
         Plz guide.

    Hello pravin,
    Thanks for the reply.
      Actually if i give the details of Task list type, Group, Group counter for Rate based scheduling only in production version and if i maintain the workcenter which i have given in the operation of Rate Rounting in production line then system is throwing the error mentioned above.
        Unless and until i mention the details of Rate Routing for all i.e. Detailed scheduling, Rough cut scheduling and Rate based scheduling, system is not allowing me to save the production version.
           As per your answer, even i am confused that as i have ticked the repetitive mfg in mrp 4 view and as i have given REM profile, so system should not give me the error when i only maintain the rate routing data in Rate based scheduling in production version.
          Is there any other way to solve this error.If not than whats the logic behind it.
               I hope u have understood my query.

  • FRM-41211: Integration Error: SSL failure running another product Error

    Hai,
    I am developing POS Application in Oracle(Forms6i/Reports6i). I design the Invoice Print Format in Reports6i and call from the Invoice Form. When the
    user save the Invoice I Commit the Invoice and call the Invoice Report for Printing Immediately. I use Epson TM U210B Label Printer for Billing. Sometimes the Invoice Print is not coming in the Printer and it gives the
    following error(especially the First print after restart the computer).
    FRM-41211: Integration Error: SSL failure running
    another product
    After that if you print further for transaction no plm. only it gives the error first time of print
    So Please give the solutions immediately. I am waiting for Ur favourable Reply.
    Ur's Shahul

    As Petr said make sure you're reports25_tmp is set in your registry and that the directory exists AND you have the rights to write to that directory.
    You can also get this error if you try to issue a 2nd asynchronous run_product call to run a report and there is another one running. For this, Oracle has two 'solutions'.
    1) Do not run more then one asynchronous report per session
    or
    2) Use a delay loop before calling the next report.
    It's been my experience that #2 is worthless as, if it works, is doing pretty much the same thing as #1. I really hope this gets fixed (for good) at some point...somehow. <G>
    Chad

  • Integration error SSL failure running another product. - Urgent

    Anybody knows what could be the possible problem and how to solve it. This error is coming when I am running RUN_PRODUCT built-in forms 6i, that application was running for 2 years in Forms 5, without any problem.
    I have included the message what Forms doucmentaion had.
    FRM-41211: Integration error: SSL failure running another product.
    Cause: There is a problem detected when launching another product.
    Action: Check the RUN_PRODUCT built-in.
    Level: 99
    Type: Error
    null

    I got this error when I was using 4.5, it may be caused by the
    correctness of report_path in registry.
    Regards,
    George
    Anybody knows what could be the possible problem and how to solve it. This error is coming when I am running RUN_PRODUCT
    built-in forms 6i, that application was running for 2 years in
    Forms 5, without any problem.>I have included the message what
    Forms doucmentaion had.>FRM-41211: Integration error: SSL
    failure running another product.>Cause: There is a problem
    detected when launching another product. >Action: Check the
    RUN_PRODUCT built-in. >Level: 99 >Type: Error >null

  • Integration Error:SSL failure running another product.In DeveloperSuite 10g

    I'm using DeveloperSuite 10g. I'm trying run the report from Forms but when I'm
    clicking on button to run report using RUN_REPORT_OBJECT I'm getting following
    error :
    Integration Error : SSL failure running another product.
    Can any one explain why I'm getting this error.
    Regards
    Alpesh.

    Hi alpesh
    I think you are good at oracleDS 10g and it is running on your machine successfully. But I am not able to run any form on my system.
    My OS is Win XP with service Pack 2
    Installed Oracle Database 10g
    Installed Oracle DS 10g
    Able to run reports on paper layout and web layout, But can not run forms. Error is shown on the IE Ver 7. Only source code is displayed. can you help me out from this.

  • INVENTORY by Product Line

    Hi All,
    do we have any report  for  Review reporting by Profit Center (COGS & Inventory by Product Line)
    I know I asked this question previously, and friends said I can use FAGLB03 or FS10N , using Profit center as the sort criteria, BUT I need to see inventory by Profit center i mean to say QTY, and actula valuated price at the level of Product line, NOT the inventory G/L account .
    as the business users says we have field in Material maser for Profit center why can't we see the inventory by Profit center.
    Thank you ,
    Paarthu

    so you mean to say,
    mixing MBEW and MARC tables with MB5L
    will give the material-qty-valuated stock-Profit center
    Is that what you are trying to say ?
    I tried MBEW and MARC downloaded to excel,is that the right way to do ?
    or do we need to run a query in SQ01 , by giving all 2 tables and fieds?
    let me know,
    Paarthu

  • Sending material back to production line

    Hi all,
    Can I send a material back to production line once the GR is done after production,UD is taken(inspection type 04 active) and the material is now in unrestricted stock.

    Sherya,
    I hope you are working on REM process of SAP -PP, in transaction MFBF you can click the "Neutral Reversal", now the quantity field would be with negative quantity, enter the required reversal quantity and then perform the backflush.
    Once the above is done, you can again perform Backflush using MFBF for the new Serial number.
    If you are'nt working on REM, then you can use transaction MB31 movement type 102 for reversing.
    You cannot reverse the Backflush document or Material document using MBST, since QM is active and UD is over, but certainly you would be allowed on the above process suggested by me.
    Regards,
    Prasobh

  • After installing, when the site pops up to say "here is another product...", nothing shows up?

    After installing flash player, when the website pops up to say "here is another product...", nothing shows up on the site.  Is this a sign that there was a problem with the install?  I did a fresh install of FP12 as I was having crash issues with games/websites.  It would work, but inevitably, the player would crash.  I'm hoping a fresh install will solve it, but I'm not liking that nothing shows up on the Adobe site after this install completed.  Any thoughts on this would be welcomed.  Going to test the install now.
    Win7 Pro 64bit
    Firefox 27.0.1

    download the following:
    Flash Player for ActiveX (Internet Explorer)
    Flash Player Plug-in (All other browsers)
    Flash Player Uninstaller
    Also, download these:
    Shockwave Player Uninstaller
    Shockwave Player 112 FULL installer (ther browsers)
    You'll need to install Shockwave with the FULL installer for IE too, but there isn't a direct download for it. You'll need to go to: http://get.adobe.com/shockwave/otherversions/ using IE AFTER everything else is done.
    Save all the files and close your browser.
    Run the uninstallers first (both of them)
    Go to: C/Windows/System32
    Delete the Macromed folder.
    Go to: C/Windows/SysWOW64
    Delete the Macromed folder.
    Open your Registry Editor (Start>Run or press the Windows key + R and type 'regedit' [minus the quotes] and click OK)
    In the Registry Editor, go to:
    HKEY_LOCAL_MACHINE/SOFTWARE
    Delete the Macromedia folder (Right click and choose "Delete").
    Go to:
    HKEY_CURRENT_USER/Software and delete the Macromedia folder there too.
    Close the Registry Editor and empty your recycle bin.
    Run the Flash Player installers, and then the Shockwave FULL installer you downloaded.
    Lastly, open IE and go to: http://get.adobe.com/shockwave/otherversions/ to download and install the Shockwave FULL installer for ActiveX (IE).
    For Firefox, I recommend FlashBlock (https://addons.mozilla.org/en-US/firefox/addon/flashblock/) It's prevent ANY Flash content from loading until you allow it manually. It can get to be a pain, but you eventually get used to it.

Maybe you are looking for

  • XI Web Service Authentication problem

    Hi, I have a XI Web Service that our third-party PeopleSoft client is trying to consume. I tested the Web Service and that works. I used SOAP client testing tool that I have which posts SOAp message to the web service URL. Before i use this tool usin

  • Using XMLencoder/decoder to save GUI -- why?

    In my last project, I spent a good deal of time writing functions to save and load a project to a local XML file with my own XML format (I was not using Java for this project). I just began looking into XMLEncoder and XMLDecoder and I wrote a simple

  • How to upload photos from 4gs to XP PC?

    How can I upload photos from my iPhone to my XP PC??? The PC does not recognize the iPhone, iTunes does, but does NOT sync or move any photos to my PC. HELP!

  • Version field width increase

    Hi sap gurus, Kindly tell me how to increase version width from two digits to five digits. This is my client requirement Regards, Prasad

  • Photoshop unable to identify D drive

    Hello, I've got photoshop CC and when I check Edit>preferences>performance, the C drive is visible (SDD disk) and also the external HD is visible, but not the D Drive. I already checked the discussions about assigning rights to the disk, but the righ