Responsible team in srm configuration
In best practices who does the configuration for rfc connection, definiton and assignment of logical systems? Is it the basis team or the functional team?
Hi Jackie,
This is done by the Basis Team, obviously with directions from the Functional Team. Functional Team needs to tell the Basis team about which log system to create, which RFC connection to create etc..
Regards,
Nikhil
Similar Messages
-
There is no access key when I change the SRM configuration
Dear ,Expert :
I want to change the SRM Configuration .I do that as follows :
1,se80 --edit object --web object --component configration
2,I enter :/SAPSRM/WDCC_DODC_RFQ_H_BD_PUR and click the "start configurator "button
3,change the object in IE
then get the error message :There is no developer license and/or modification license registered for object R3TR WDCC/SAPSRM/WDCC_DODC_RFQ_H_BD_PUR 00 in this system for user*****
you can get the screenshot in my attachment
I get the access key from SAP market But there is no place for entering the key .
Bestregards
AlexHi Alex,
Can you please share the solution?
I am facing the same issue...
Thanks,
Anubhav -
New documentation SRM configuration
Hi,
I have found a PDF called SRM40_CG_SSP.pdf but this is an old document, we are on ITS 7.00. Is there new documentation about the configuration of SRM?
We need to upload attachments from SRM portal and we want to view/edit them in ECC but we cannot transfer them at all, we see the order but are not able to see the attachments. We've set all the settings found on SDN:
SRM Side:
Created implementation ZECA_DMS_CLASSIC for BADI BBP_CREATE_BE_RQ_NEW and implementation ZECA_DMS_EXT_CLASSIC for BADI BBP_CREATE_BE_PO_NEW with following code for method FILL_RQ_INTERFACE and method FILL_RQ_INTERFACE and method FILL_RQ_INTERFACE1:
cs_ctrl_att-BE_DOC_TYPE = 'SRM'.
cs_ctrl_att-BE_storage_cat = 'DMS_C1_ST'.
cs_ctrl_att-TRANSFER_ACTIVE = 'X'.
ECC Side:
- Create new document type for SRM with T.code DC10. Following parameters need to be set for that
a. Check Use KPro
b. Enter 1 in the number assignment field
c. Assign Internal number range as u201C02u201D
d. Select Number Exit u201CMCDOKZNRu201D
e. Version number increment u201C1u201D
- Assign following Object links to the new created document type u201CSRMu201D.
a. Type as u201CSRMu201D
b. Object as u201CEBANu201D and u201CEKPOu201D respectively
c. Object description as u201CPurchase req. itemu201D and u201CPurchase order itemu201D respectively
d. Screen number u201C247u201D for EBAN and u201C248u201D for EKPO.
And I've defined the workstation applications in transaction DC30:
ACD Autocad A2 X
BVO Objektpflege * X X
BVV Vertragspflege * X X
GIF GIF Anzeige A2 X
LIM Großbild X *.jpg, *.gif
MPP MS Project mpp X .mpp,.
OHD Dokument der Arbeitsmed. X X
PDF Acrobat Reader pdf X *.pdf
PLT HPGL Anzeige X
SIM Kleinbild X *.jpg, *.gif
SND Ton X *.wav
TIF TIFF Anzeige X
TXT Textdateien txt * X *.txt
WRD Word A2 X
WWI Winword 6.0s doc * X *.doc
XLS Microsoft EXCEL xls * X *.xls, .
XML XML xml X *.xml
I've not set any other customizing.
What can I check or do next?
regards,
WimPlease learn from SAP Library (Link attached below)
http://help.sap.com/erp2005_ehp_01/helpdata/en/2d/830e405c538f5ce10000000a155106/frameset.htm
Regards,
Rajesh Banka -
In my environment in some scenerios one NIC address is hardcoded and other NIC is set to default, that is connected but no IP set up and no DHCP server around. When I team these NICs I end up having to manually re-do IP configuration on the team interface
which is very annoying. Is there a way to force the Teaming wizard to pick up on configuration from the already set up NIC? My team settings are: Swich Independent, Address Hash where the non-configured adapter is selected as Standby.
yaroHi Sir,
Sorry for the inconvenience .
But teaming doen't have this option to apply member's IP configuration .
Best Regards,
Elton Ji
Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact [email protected] . -
LBFO team and VMQ configuration
Hi gang,
So I am running Server 2012 R2 in a two node cluster with some teamed network cards (2 - dual 10 gig cards)
The teaming is switch independent and dynamic.
In the event viewer I am seeing the following error:
Event ID: 106
Available processor sets of the underlying physical NICs belonging to the LBFO team NIC /DEVICE/{2C85A178-B9EA-436B-8E53-FAE34A578E95} (Friendly Name: Microsoft Network Adapter Multiplexor
Driver) on switch 9740F036-858E-49C8-8A29-DAE5BDA94871 (Friendly Name: VLANs) are not configured correctly. Reason: The processor sets overlap when LBFO is configured with sum-queue mode.
So I read a bunch on the VMQ stuff and just want to make sure this is the proper configuration:
Set-netadaptervmq –name “NIC A” –baseprocessornumber 2 –maxprocessors 8
Set-netadaptervmq –name “NIC B” –baseprocessornumber 10 –maxprocessors 8
Set-netadaptervmq –name “NIC C” –baseprocessornumber 18 –maxprocessors 8
Set-netadaptervmq –name “NIC D” –baseprocessornumber 24 –maxprocessors 6
Hyper threading is enabled:
numberofcores numberoflogicalprocessors
8
16
8
16
The last line of the vmq configuration is my greatest confusion.
Thanks.Hi Alexey,
So something like this should work:
Set-netadaptervmq –name “NIC A” –baseprocessornumber 4 –maxprocessors 4 --4,6,8,10
Set-netadaptervmq –name “NIC B” –baseprocessornumber 12 –maxprocessors 4 --12,14,16,18
Set-netadaptervmq –name “NIC C” –baseprocessornumber 20 –maxprocessors 3 --20,22,24
Set-netadaptervmq –name “NIC D” –baseprocessornumber 26 –maxprocessors 3 --26,28,30
Correct? -
Team Explorer iView Configuration
I am trying to configure the Team Explorer. I downloaded and installed the team explorer from OSS note 836380 (version 60.1), and downloaded the documentation from OSS note 828767 and configured accordingly. My question is this: it appears that the only supported NAVID entry(view v_twpc_nav) is key ORGEH (and eval path ORGEH); regardless of what is entered into the NavGroup or Navid iView properties. Is there any way to have multiple entries in v_twpc_nav and v_twpc_v for the Team Explorer? OSS note 828767 appears to indicate that only one NAVID (and therefore, one view) is supported.
Hi Mark:
AT one point when I configured the NAVID, I set-up three of them:
ORGEH with the view O_PROF ( org. units)
Z_1 with view o_SALL (all employees for the org. unit selected)
Z_2 with view O_SDIR. (directly reporting employees for org. unit selected fine.)
It worked fine. (This was in our sandbox). Now in our dev. environment, it just brings back empty tables with no employee or org. unit info..
Thanks
Now I am trying to do the same -
Work flow & SRM configuration step by step guide
Hello All....
Please send me the Work flow DOcumnetation related to SRM/EBP
Thanks in Advance and points rewarded.
ArshadHi Pravin,
Can you please send me the config. Documents to me on my mail id.
[email protected]
Thank you in advance.
Best Regards,
Mahesh. -
DMS configuration for attachement transfer from SRM to R/3
Hi,
SRM 5.0
R/3 ECC6.0
Scenario : SRM SC attachment transfer to PR in R/3
I have done the DC10 and DC 30 configuration in R3
BADI BBP_CREATE_REQ_BACK is implemented
The attachement transfer is not happening to R/3
can someone let me know the necessary DMS configuration to be done in backend system and some steps to validate the SRM configuration i have already done
Thanks
JayeshHi
<b>Please refer to the links below -></b>
Re: Attachments in PR and PO
Re: Sending attachments from SRM to SAP Purchase Requisition
Re: Transfer SC attachment from srm 5.0 to backend R/3
Re: Attachments to backend
Re: Attachments in PR and PO
Re: URL vs. document attached in back end EBP 4.0 Classic/4.7 E
http://help.sap.com/saphelp_47x200/helpdata/en/41/648838ab4e8a11e10000009b38f8cf/frameset.htm
http://help.sap.com/saphelp_srm50/helpdata/en/49/b32640632cea01e10000000a155106/frameset.htm
http://help.sap.com/saphelp_47x200/helpdata/en/d6/806c39917d423ee10000000a11402f/frameset.htm
http://help.sap.com/saphelp_47x200/helpdata/en/9b/c2b9375e62545ce10000009b38f889/frameset.htm
Do let me know incase you still have any queries.
Regards
- Atul -
Grey out of MDM managed fields in R/3 4.7 (Interface between R/3 & SRM)
Hi All,
We have requirement for Creation/extension/changing of MMR (MM01/MM02/MM12).
Current Process:
Creation of MMR for certain material types carried out by MDM team from SRM side.In this case these materials replicated from SRM-MDM to R/3 4.7.
In such case core users from R/3 side can able to change MM fields relevent to MDM managed to fields.So that we want to restrict these fields (Replicated from MDM).to further change
The changes to MMR is only from the MDM side.Not from R/3 side
we dicided to make these fields grey out(Not Editble).through ABAP Development
case1:
If we go through standard configuration of field stutus as a grey out from Field selection/Field Reference.based on materials types/Transaction.then we will face problem while replicating master data from MDM to R/3 .this means that
If we r creating/changing materials from MDM side.and replicated to R/3 side.
Because in R/3 side if i make these fields as grey out .It won't take input values while replicating data from MDM to R/3.so i could end up with idoc error.
Finally the above process is excluded
case2:
If want to go through ABAP development,plz guide on this
If any one face this kind of requirement.Plz guide meclosed
-
ROS issue in SRM 7.0 with SAP EP
Hi Gurus,
I am on SRM 7.0 and have referred to several posts in this forum, in particular, these -
Re: Not able to transfer suppliers from ROS to EBP
Re: External Web Service setting for Supplier Registration ROS to EBP
I have been able to bring the potential supplier to ACCEPTED status, thereafter, I am trying to make the potential supplier available in the SRM system as a Bidder/ Vendor. I know this needs to be done from the "Business Partner from List" - however, I am not able to see "Business Partner from List" in SAP EP Strategic Purchaser or SRM Administrator tabs.
Here is all of what I have done in SRM Configuration - I dont have a separate ROS Client, which means, the SRM and ROS Clients are both 100 in my case. There is no SUS either.
- configured Sup. Reg. (select prod cat for regn, language, assign questionnaire to prod cat.)in SRM Client.
- activated ROS services in SRM Client.
- created a service user in SRM. This user has roles: SAP_EC_BBP_CREATEUSER & SAP_EC_BBP_CREATEVENDOR. This user is maintainted in SRM client BSP service ROS_SELF_REG in Log on Data with SRM client, user ID and password.
- created an external web service 'ROS' in SRM with type "Supplier Diretory" and defined standard call structure as follows:
10 http://sapsrmabap.jiverry.com/sap/bc/bsp/sap/ros_prescreen/main.do 0 URL
20 SAP-CLIENT 100 2 Fixed Value
30 LOCALE ENGLISH 2 Fixed Value
40 User SNR 2 Fixed Value
50 PASSWORD password 2 Fixed Value
60 HOOK_URL <BLANK> 4 Return URL
70 ~OKCode ADDI 2 Fixed Value
80 ~target _top 2 Fixed Value
90 ~caller CTLG 2 Fixed Value
- maintained the table BBP_MARKETP_INFO with Vendor root, Std. Purchasing Org and Currency
Please let me know what I am missing in the configuration or what I have incorrectly done thus far.
SNR
Edited by: SNR on Mar 26, 2010 7:35 PM
Edited by: SNR on Mar 26, 2010 7:52 PMSNR,
Are you implementing ROS without SUS in one client?
I did face similar problem and Summer recommended me to change the SRM system from LOCAL to EBP_SUS (table BBP_BACKEND_DEST). Currently I am unable to try this on my system. Can you please try and let me know whether it works or not?
Did you manage to successfully complete this scenario?
I know XI is mandatory to change the potential supplieru2019s business partner status in ROS when they are accepted and transferred to EBP. Any idea what settings are required to perform.
Sandeep -
Need help to Configure FTPS connection for File Sender Adapter
Hi,
I want to Configure, FTPS connection (Secured Connection) for File Sender Adapter. Could anyone please guide me, what Information I require to configure. I just want to know what Information should I request the team inorder the configure FTPS so that it can be deployed properly.
I have checked with [SAP Help Link|http://help.sap.com/saphelp_nw04/helpdata/EN/e3/94007075cae04f930cc4c034e411e1/content.htm] and while configuring the communication channel found that I need Keystore and the X.509 Certificate and Private Key. which needs to be deployed on the J2EE server by using the Visual Administrator.
Is there anything else, I need to configure.
Any help would be appreciated in this regard.
Thanks & Regards,
Varun.KThe basic things are Certificate/Keys which you already know. Usually it is enough for running a sceanrio.
However, if you have additional requirements, like FTPS for "Connection Security" for encryption, then you may need additional details like commands. Rest all settings are same as FTP.
Regards,
Prateek -
Hi Team,
We have Configuration manager 2012 SP1 and we have requirement to migrate winXP\Win7\Win8\Win8 systems to Windows 8.1 update 1. We are looking for supporting replace, refresh and baremetal OS deployments. Can anyone give some pointers for things we need
to take care while planning approach for migrations. OS image for windows 8.1 update 1 are created through MDT 2013 and we are planning to use Config manager 2012 SP1 for deploying these images with above scenarios.
Regards,More info:
Operating System Deployment in Configuration Manager
http://technet.microsoft.com/en-us/library/gg682018.aspx
OSD in System Center 2012 Configuration Manager
http://www.microsoft.com/en-us/download/details.aspx?id=42959
We
are trying to better understand customer views on social support experience, so your participation in this
interview project would be greatly appreciated if you have time.
Thanks for helping make community forums a great place. -
Team,
Greetings for the day..
could any one please provide some lights on "how to configuring PME in CRM 7".
currently we have installed CRM7 IDES (ABAP / JAVA stacks in 2 different instances under single Host).and need to configure PME.
CRM functional team trying to configure PRODUCT and its giving "PME installation with Errors".
Please help in this regard.
Regards,
Nagarjuna GorantlaHi Naga,
Please check the following links...
http://help.sap.com/saphelp_crm60/helpdata/en/46/4a4296a9dc6a82e10000000a155369/content.htm
http://help.sap.com/saphelp_crm60/helpdata/en/46/540b2405a05e40e10000000a11466f/content.htm
As mentioned in the link PME was replaced with ebClient user interface... -
Hi All
Apologies if this is a long one but I thought the more information I can provide the better.
We have recently designed and built a new Hyper-V environment for a client, utilising Windows Server R2 / System Centre 2012 R2 however since putting it into production, we are now seeing problems with Virtual Machine Queues. These manifest themselves as
either very high latency inside virtual machines (we’re talking 200 – 400 mSec round trip times), packet loss or complete connectivity loss for VMs. Not all VMs are affected however the problem does manifest itself on all hosts. I am aware of these issues
having cropped up in the past with Broadcom NICs.
I'll give you a little bit of background into the problem...
Frist, the environment is based entirely on Dell hardware (Equallogic Storage, PowerConnect Switching and PE R720 VM Hosts). this environment was based on Server 2012 and a decision was taken to bring this up to speed to R2. This was due to a number
of quite compelling reasons, mainly surrounding reliability. The core virtualisation infrastructure consists of four VM hosts in a Hyper-V Cluster.
Prior to the redesign, each VM host had 12 NICs installed:
Quad port on-board Broadcom 5720 daughter card: Two NICs assigned to a host management team whilst the other two NICs in the same adapter formed a Live Migration / Cluster heartbeat team, to which a VM switch was connected with two vNICs exposed to the
management OS. Latest drivers and firmware installed. The Converged Fabric team here was configured in LACP Address Hash (Min Queues mode), each NIC having the same two processor cores assigned. The management team is identically configured.
Two additional Intel i350 quad port NICs: 4 NICs teamed for the production VM Switch uplink and 4 for iSCSI MPIO. Latest drivers and firmware. The VM Switch team spans both physical NICs to provide some level of NIC level fault tolerance, whilst the remaining
4 NICs for ISCSI MPIO are also balanced across the two NICs for the same reasons.
The initial driver for upgrading was that we were once again seeing issues with VMQ in the old design with the converged fabric design. The two vNics in the management OS for each of these networks were tagged to specific VLANs (that were obviously accessible
to the same designated NICs in each of the VM hosts).
In this setup, a similar issue was being experienced to our present issue. Once again, the Converged Fabric vNICs in the Host OS would on occasion, either lose connectivity or exhibit very high round trip times and packet loss. This seemed to correlate with
a significant increase in bandwidth through the converged fabric, such as when initiating a Live Migration and would then affect both vNICS connectivity. This would cause packet loss / connectivity loss for both the Live Migration and Cluster Heartbeat vNICs
which in turn would trigger all sorts of horrid goings on in the cluster. If we disabled VMQ on the physical adapters and the team multiplex adapter, the problem went away. Obviously disabling VMQ is something that we really don’t want to resort to.
So…. The decision to refresh the environment with 2012 R2 across the board (which was also driven by other factors and not just this issue alone) was accelerated.
In the new environment, we replaced the Quad Port Broadcom 5720 Daughter Cards in the hosts with new Intel i350 QP Daughter cards to keep the NICs identical across the board. The Cluster heartbeat / Live Migration networks now use an SMB Multichannel configuration,
utilising the same two NICs as in the old design in two isolated untagged port VLANs. This part of the re-design is now working very well (Live Migrations now complete much faster I hasten to add!!)
However…. The same VMQ issues that we witnessed previously have now arisen on the production VM Switch which is used to uplink the virtual machines on each host to the outside world.
The Production VM Switch is configured as follows:
Same configuration as the original infrastructure: 4 Intel 1GbE i350 NICs, two of which are in one physical quad port NIC, whilst the other two are in an identical NIC, directly below it. The remaining 2 ports from each card function as iSCSI MPIO
interfaces to the SAN. We did this to try and achieve NIC level fault tolerance. The latest Firmware and Drivers have been installed for all hardware (including the NICs) fresh from the latest Dell Server Updates DVD (V14.10).
In each host, the above 4 VM Switch NICs are formed into a Switch independent, Dynamic team (Sum of Queues mode), each physical NIC has
RSS disabled and VMQ enabled and the Team Multiplex adapter also has RSS disabled an VMQ enabled. Secondly, each NIC is configured to use a single processor core for VMQ. As this is a Sum of Queues team, cores do not overlap
and as the host processors have Hyper Threading enabled, only cores (not logical execution units) are assigned to RSS or VMQ. The configuration of the VM Switch NICs looks as follows when running Get-NetAdapterVMQ on the hosts:
Name InterfaceDescription
Enabled BaseVmqProcessor MaxProcessors NumberOfReceive
Queues
VM_SWITCH_ETH01 Intel(R) Gigabit 4P I350-t A...#8 True 0:10 1
7
VM_SWITCH_ETH03 Intel(R) Gigabit 4P I350-t A...#7 True 0:14 1
7
VM_SWITCH_ETH02 Intel(R) Gigabit 4P I350-t Ada... True 0:12 1
7
VM_SWITCH_ETH04 Intel(R) Gigabit 4P I350-t A...#2 True 0:16 1
7
Production VM Switch Microsoft Network Adapter Mult... True 0:0
28
Load is hardly an issue on these NICs and a single core seems to have sufficed in the old design, so this was carried forward into the new.
The loss of connectivity / high latency (200 – 400 mSec as before) only seems to arise when a VM is moved via Live Migration from host to host. If I setup a constant ping to a test candidate VM and move it to another host, I get about 5 dropped pings
at the point where the remaining memory pages / CPU state are transferred, followed by an dramatic increase in latency once the VM is up and running on the destination host. It seems as though the destination host is struggling to allocate the VM NIC to a
queue. I can then move the VM back and forth between hosts and the problem may or may not occur again. It is very intermittent. There is always a lengthy pause in VM network connectivity during the live migration process however, longer than I have seen in
the past (usually only a ping or two are lost, however we are now seeing 5 or more before VM Nework connectivity is restored on the destination host, this being enough to cause a disruption to the workload).
If we disable VMQ entirely on the VM NICs and VM Switch Team Multiplex adapter on one of the hosts as a test, things behave as expected. A migration completes within the time of a standard TCP timeout.
VMQ looks to be working, as if I run Get-NetAdapterVMQQueue on one of the hosts, I can see that Queues are being allocated to VM NICs accordingly. I can also see that VM NICs are appearing in Hyper-V manager with “VMQ Active”.
It goes without saying that we really don’t want to disable VMQ, however given the nature of our clients business, we really cannot afford for these issues to crop up. If I can’t find a resolution here, I will be left with no choice as ironically, we see
less issues with VMQ disabled compared to it being enabled.
I hope this is enough information to go on and if you need any more, please do let me know. Any help here would be most appreciated.
I have gone over the configuration again and again and everything appears to have been configured correctly, however I am struggling with this one.
Many thanks
MattHi Gleb
I can't seem to attach any images / links until my account has been verified.
There are a couple of entries in the ndisplatform/Operational log.
Event ID 7- Querying for OID 4194369794 on TeamNic {C67CA7BE-0B53-4C93-86C4-1716808B2C96} failed. OidBuffer is failed. Status = -1073676266
And
Event ID 6 - Forwarding of OID 66083 from TeamNic {C67CA7BE-0B53-4C93-86C4-1716808B2C96} due to Member NDISIMPLATFORM\Parameters\Adapters\{A5FDE445-483E-45BB-A3F9-D46DDB0D1749} failed. Status = -1073741670
And
Forwarding of OID 66083 from TeamNic {C67CA7BE-0B53-4C93-86C4-1716808B2C96} due to Member NDISIMPLATFORM\Parameters\Adapters\{207AA8D0-77B3-4129-9301-08D7DBF8540E} failed. Status = -1073741670
It would appear as though the two GUIDS in the second and third events correlate with two of the NICs in the VM Switch team (the affected team).
Under MSLBFO Provider/Operational, there are also quite a few of the following errors:
Event ID 8 - Failing NBL send on TeamNic 0xffffe00129b79010
How can I find out what tNIC correlates with "0xffffe00129b79010"
Without the use of the nice little table that I put together (that I can't upload), the NICs and Teams are configured as follows:
Production VM Switch Team (x4 Interfaces) - Intel i350 Quad Port NICs. As above, the team itself is balanced across physical cards (two ports from each card). External SCVMM Logical Switch is uplinked to this team. Serves
as the main VM Switch for all Production Virtual machines. Team Mode is Switch Independent / Dynamic (Sum of Queues). RSS is disabled on all of the physical NICs in this team as well as the Multiplex adapter itself. VMQ configuration is as follows:
Interface Name - BaseVMQProc - MaxProcs
- VMQ / RSS
VM_SWITCH_ETH01 10
1 VMQ
VM_SWITCH_ETH02 12
1 VMQ
VM_SWITCH_ETH03 14
1 VMQ
VM_SWITCH_ETH04 16
1 VMQ
SMB Fabric (x2 Interfaces) - Intel i350 Quad Port on-board daughter card. As above, these two NICs are in separate, VLAN isolated subnets that provide SMB Multichannel transport for Live Migration traffic and CSV Redirect / Cluster
Heartbeat data. These NICs are not teamed. VMQ is disabled on both of these NICs. Here is the RSS configuration for these interfaces that we have implemented:
Interface Name - BaseVMQProc - MaxProcs
- VMQ / RSS
SMB_FABRIC_ETH01 18 2
RSS
SMB_FABRIC_ETH02 18 2
RSS
ISCSI SAN (x4 Interfaces) - Intel i350 Quad Port NICs. Once again, no teaming is required here as these serve as our ISCSI SAN interfaces (MPIO enabled) to the hosts. These four interfaces are balanced across two physical cards as per
the VM Switch team above. No VMQ on these NICS, however RSS is enabled as follows:
Interface Name - BaseVMQProc - MaxProcs
- VMQ / RSS
ISCSI_SAN_ETH01 2 2
RSS
ISCSI_SAN_ETH02 6 2
RSS
ISCSI_SAN_ETH03 2
2 RSS
ISCSI_SAN_ETH04 6
2 RSS
Management Team (x2 Interfaces) - The second two interfaces of the Intel i350 Quad Port on-board daughter card. Serves as the Management uplink to the host. As there are some management workloads hosted in this
cluster, a VM Switch is connected to this team, hence a vNIC is exposed to the Host OS in order to manage the Parent Partition. Teaming mode is Switch Independent / Address Hash (Min Queues). As there is a VM Switch connected to this team, the NICs
are configured for VMQ, thus RSS has been disabled:
Interface Name - BaseVMQProc - MaxProcs
- VMQ / RSS
MAN_SWITCH_ETH01 22 1
VMQ
MAN_SWITCH_ETH02 22 1 VMQ
We are limited as to the number of physical cores that we can allocate to VMQ and RSS so where possible, we have tried balance NICs over all available cores where practical.
Hope this helps.
Any more info required, please ask.
Kind Regards
Matt -
Hi experts,
I want to create a catalog in SRM without using mdm. I am new user and I have not able to find out how can i create a catalog.
Please can you guide me which t-code i have to use or where it is placed in IMG?
Best RegardsPlease refer the Catalog Content Management link in the SRM wiki
https://wiki.sdn.sap.com/wiki/display/SRM/Business+Scenarios
In addition you can download the config guides in the below link:
https://wiki.sdn.sap.com/wiki/display/SRM/Configuration+Guides
Note: You will require valid SMP login.
Regards
Kathirvel
Maybe you are looking for
-
Does iTunes have a mind of its own?
I would like to preface this by saying that I do not want to see, hear, touch, taste, or smell iTunes unless I choose to open iTunes from the start menu. The one and only reason in the entire world that I even have it installed on any computer that I
-
How do I remove the "Go to a website" redirection?
Hi. I'd like to know how to remove the redirection to the navigation bar when I open up a new tab. Everytime I open up a new tab I've set it so I come to my homepage, google. But instead of directing me to the search bar in the center of the site, as
-
Flash for Photo Booth not working. Can it be fixed?
My flash in Photo Booth stopped working--can it be fixed? And if so, can a local computer store do it?
-
How to get max(date) with BI Answers?
Hi, I have a fact table with costs of projects and several dimension tables. The data in the fact table is stored day-based and is related to a time dimension. Additionally there is a relation between the fact table and the project dimension. A proje
-
I am using a brand new computer running Windows 7 64-bit. I am also using Adobe CC for the first time. Downloaded InDesign, Photoshop, Illustrator, and Acrobat last week, and I'm using mostly InDesign so far. My issue: When I switch from InDesign to,