Restrict PO creation as material blck for quality reason in other plant

Hi QM Experts,
one material (say MAT-1) in maintained in  two plants (Say- X & Y).
qm in procurement active in material for both the plants.
created two Q-info records with material MAT-1, vendor ( Say- V-1). one info record for plant X & other for plant Y.
while creating PO for material -( MAT-1)  in plant X, system giving error- material blocked for quality reason.
even though in Q-info record for plant X, material is not blocked . it is blocked in Q-info record of plant Y.
why system looking for plant Y, even when we are trying to create PO in plant X for same material and vendor.
please guide on same,
Thanks & Regards,
Roshan
Edited by: roshan s on Dec 16, 2011 6:29 AM

hi,
Please check ur Q-info of Mat-1 V1 and X properly and please also check ur material master in X, whethere some control key is defined in QM in Procurement or Not. If any control key is there than chcek the settings of that control key and as per ur requirement remove it .
regards

Similar Messages

  • System message:Procurement of material&blocked for quality reasons(0006 883

    Hi Greetings!
    I have the following issue.
    I need to make the message "Procurement of material & blocked for quality reasons" as Error message . Message number - 00 06 883.
    This will not allow to create PO , if the "Blocking Function" - 02 "Block Request and Purchase order " is set in the QM info record.
    Even though i ahve set this message as "Error" in the configuration ( Materials Management --> Purchasing --> Define Attributes of System Messages), i am getting only warning message during PO creation.
    Can you please let me know if am missing any setting.
    Gobinathan G

    Dear sir,
    GO to material master of that item go to .. PURCHASING VIEW there is a Plant specific material status chk if that is 01- blocked for production 02- blocked for BOM chk and change it then system will allow you to purchase the parts.
    Kaustubh

  • Creation of material Documents for RMPM adjustments using BAPI

    Hi
    can any one help me Creation of material Documents for RMPM adjustments using BAPI...
    i should be grateful to you...
    advance thank you
    with regards
    venkat

    You can check MB_CREATE_GOODS_MOVEMENT which has mkpf as inporting parameter.

  • How to block invoice posting for quality reasons

    how to block invoice posting for quality reasons.For example while doing  Goods receipt  the material is  posted to quality inspection stock. Then the material is rejected for some reasons. Once the decision is made then the  standard system allows to post invoice. But I want to restrict invoice posting once the material is rejected for quality reasons.

    posting of invoice is always allowed, the only thing you can restrict with customizing of QM in Procurement is the payment.
    if you want to block invoice posting, then you have to control this in a user exit.

  • How can I block Vendor for Quality Reasons at POrg Level ?

    We are currently on ERP 4.7 and are facing the following challenge:
    We want to block the Vendor using MK05 with the function Block for Quality Reasons at the POrg level.
    Example: If we define a Delivery Block in configuration to Block Goods Receipt and then assign this blocking code using MK05 for Vendor X under POrg 1002, it also blocks the Goods Receipt for this Vendor X under POrg 1001.....
    We realize that the Purchasing Block section of MK05 is per POrg but you cannot block the Goods Receipt with this functionality... only the Purchasing Documents can be blocked.
    Would appreciate any feedback, ideas...
    Thank You,
    Johanne

    Thanks very much for the feedback.
    In MK05, under the Purchasing Block section, we can select whether the Purchasing Block is applicable to all POrgs or only Selected POrg.
    This functionality is fine to block Purchasing Documents and can be controlled at the POrg Level.
    Our problem lies in the second portion of MK05 - Block for Quality Reasons - If we select a Delivery Block which is configured to Block the Goods Receipt for Vendor , even if we selected the tick box - Selected POrg only, the Goods Receipt is blocked for this Vendor for ALL POrgs.
    Johanne

  • Adding a comment field in block for quality reasons subscreen of XK05?

    Hi Experts,
    I have requirement to add a comment field in block for quality reasons subscreen.
    I didn't find any BADI for this requirement.
    Kindly any one advise is it possible to add this comment field in XK05.
    Regards,
    Anusha

    Hi Raymond,
    Thank you for the reply. As per the note some one already implemented the Screen Enhancement with 2 custom views. I need to add the field in any one of existing custom view. So for this I have created a Subscreen in copied function group of MGD1(Y_FE_MARA). But in the function group already 10 Subscreens were created. Is this is the problem? or else copy the FG MGD1 into another FG and create the subscreen will be feasible to my scenario?
    Please suggest me.
    Thanks and Regards,
    Muralikrishna Peravali

  • For some reason or other I can't remember my password for my apple id and when I go to reset it I can't find the email they have sent me.

    For some reason or other I can't remember my password for my apple id and when I go to reset it I can't find the email they have sent me.I think they are sending it to my apple email [email protected] which I can't access as they are telling me my password is wrong and send me an email message to this email address which I cannot remember the password for. I am in a vicious circle.Support have emailed me and stated they can't change it?!

    Sign in at http://icloud.com with the new ID and password and confirm that your data is still all there.
    Then sign out in System Preferences>iCloud then sign back in with the new ID and password. Your data will disappear from your Mac when you sign out, but will reappear when you sign back in.

  • 11.0.3 MRP creates WIP for dep demand at other plant - need internal req

    At one manufacturing plant for finished good item, have component sourced from other plant. When MRP runs it creates WIP Job for component sources at other plant, need is to have internal req. Please advise what needs to be changed.
    Ex - Finished Good is Car at chicago plant, one of main subcomponent wheels is from mexico plant.
    Wheels are setup as buy, with inventory source type and source plant from mexico in item attributes at chicago org.
    This wheels item is setup at mexico plant.
    MRP release of planned order is creating WIP job at mexico plant for wheels component.
    we want mrp release of planned order should create internal requisition when demand for finished good car comes at chicago plant.
    Please advise what needs to be changed in 11.0.3 environment.

    Hey there,
    I think you should check your SOURCING RULES for those items wheels.
    Make sure the sourcing rules are of "TRANSFER FROM" type with the right org and not "MAKE AT".
    Hope this helps, if you find it helpful or correct please kindly mark it as such,
    Aaron

  • Creation of Material Master for a material with Material Type NLAG

    Hello Sirs,
         I have to create a material which will be consumed directly. I would use the
    material type NLAG (Non stock material). If I create a material with this material type, will it contain an Accounting view where in I can maintain the price of the
    material? If it contains an Accounting view, which type of Price control should be
    used (Moving average or Standard)? Further, can we maintain an info record for
    a material with material type NLAG?How the price updation happens?
    Regards
    Yoga

    Hi Madhu,
        Thanks for your reply. But, I have one more doubt. For non stock materials, we
    will specify the cost centre and G/L account at the time of creation of Purchase order. Then, do we have to specify the valuation class at the time of creation of
    Material Master since there is no automatic account determination?
    Regards
    Yoga

  • Payment block for Quality reason

    HI,
    How can I block invoice for paymant due to quality reason ?
    Regards,
    Chetan.

    Hi ,
    Check whether any inspection lot is created for that material and go thro the following
    If the Invoice block indicator is set in QM control key , when the invoice is created, the system determines whether an inspection lot exists and if necessary, sets blocking reason I. This occurs in the following instances:
    o There is still no usage decision for the inspection lot
    o The inspection lot is rejected.
    If all settings are OK  and Once GR is done, 
    In MRBR transaction , you can see the Blockage Indicator set for the Quality field.
    Once UD is given for the matl by the Quality , payment can be made after releasing by removing the blockage indicator.
    Regards
    K.M.Arun

  • Good receipt for job work from other plant

    Dear Experts:
    1.Material Received from Other Plant for job work with challan and how to bring the Material into Stock at receiving plant.
    The same material stock number available in this plant also.
    Regards,
    Sridhar.N

    Hi,
    You could use serial number concept or bacth managment here to separate within the material code.
    Regards

  • Suppress "Barcode-Pop-Up" for MM-Movements of other plants

    In order to archive different kind of attachments for MM-Movements, a barcode will be entered in the “Standard Barcode Pop-Up functionality” (T-Code OAC5) provided by SAP every time a movement is beeing created.
    Additional SAP let you configure for which "Object type/Document type/User"
    (also over T-Code <i>OAC5</i>) and for which "Movement types and  transactions" (IMG: <i>Materials Management->Inventory Management and Physical Inventory->Goods Receipt->Activate storage of incoming documents</i>) the Pop-Up for entering a barcode will be shown.
    The problem we have now is that more sites are on the same system and we should configure the system so that only for specific sites (MM-Plants), the Pop-up should be shown. Does somebody know some additional customizing or an easy way to assess a solution to this request?
    Thanks in advance and best regards

    On 4.6C it is not possible (under standard situations).

  • Book(material) number/name  for Quality Management

    Hi experts,
       Can u tell me what is the exact material number for quality management configuration for SAP R/3 as well as for all the material related to quality management provided by SAP.(like for abap objects - BC404)
    Expecting your reply.
    Regards,
    Arun.

    Hi prashant,
        I do have those materials, but it didn't helped me in studying QM.
    For webdynpro, sap as given a material named NET310, likewise for every study material they have given some material number.
    Likewise what is the material number for QM configuration?
    Hope u can help me in this regard.
    Waiting for your reply.
    Regards,
    Arun.

  • Book(material) Number/name for Quality Managment

    Hi experts,
    Can u tell me what is the exact material number for quality management configuration for SAP R/3 as well as for all the material related to quality management provided by SAP.(like for abap objects - BC404)
    Expecting your reply.
    Regards,
    Arun.

    solved

  • Unrestricted stock with Migo for quality-inspect materials

    Dear MM Gurus,
    We have a case, for some vendors(between cross company sales) we want to have the materials posted to the unrestricted stock.
    We have changes the stock type form quality inspect stock to unrestricted stock during purchase order creation with MM badi purchase_custom.Now it's ok and when go to migo, it seems also unrestricted stock.After saving the migo screen, checked the material document, it seems again quality inspect stock.
    What happens seems that, the system before saving checks the material master and sees the quality inspect type there selected.
    What we need here is to deactivate this during migo also.Could you please suggest us a userexit-badi to deactivate the quality data of the material so that the stock type is unrestricted.
    Thanx in advance
    Best regards
    Jack Black

    Hi,
    I suggest as per the scenario as if want to go for particular vendors with material combination for quality inspection and for other vendors with material combination for stock type unrestricted.
    I suggest not to go for any user exits.
    You have two options
    1. While creating purchase you can change the stock type in item detail in delivery tab pag e by selecting the desired stocktype for the vendor material combination. For this you need to uncheck the tick mark for quality inspecion for the material in the materila master record.
    2. You can tick the material subject to quality inspection in materila master as it is which willbe defaulted and appear as read only while craeting purchase order for all your vendors. After doing the goods reciept you can tranfer the stock from quality inspection to unrestricted with movement type 343.
    Regards,
    Tushar Patankar

Maybe you are looking for

  • Belle Nokia Maps GPS Coordinate entry?

    I want to go geo caching and enter in GPS coordiantes but can't figure out how to with Nokia Maps on my N8 Belle. Any tips? White 808 Pureview NAM Black N8 NAM Silver N95-3 NAM Solved! Go to Solution.

  • Quickest way to move albums between libraries..

    I am splitting my itunes libary because it is too big...is there any way to do this easily...I figured I'd create a new libary and copy about 100 albums in..and then go back and delete them from the first library.. does that sound right..

  • HT204154 monitor display problem

    I have an early 2009 24 iMac and a late 2009 27 iMac.  The 27 has that common problem of the monitor going black. And staying black. Computer runs fine, but screen goes black. The monitor of the 27 goes black. Has been black for months. So I use an e

  • What are the parts needed to build an iPhone 4s

    Since iPhone 4s tend to be expensive I have took it upon myself to make the iPhone 4s using parts. My opinion is that it's way cheaper! So can someone guide me by telling the peices needed? Thank you for your time (:

  • Purchasing from second stage dealer

    hi, i am purchasing a  material from a trader(second stage dealer),on that he give mi excise invoice,on which he calculate excise on qty, material     qty     rate per unit      rate of duty %    duty per unit     EXCISE Dty & Ed cess         amount