Restrict use of tab Components in Maintenance Order

Hello guys.
   I'd like to know if is there a configuration to restrict the use of modification Maintenance Order (IW32) to only the "Components" Tab? Otherwise, how can I implement this?
   Thanks in advance.
Gabriel

Gabriel,
If I'm correctly understand your requirements and your system meets some prerequisites
http://help.sap.com/erp2005_ehp_07/helpdata/en/46/4ad530501c0db6e10000000a1553f6/content.htm?frameset=/en/61/de307316e74958ad1b90cbbcabbcfb/frameset.htm&current_toc=/en/46/4afb86d8d551ede10000000a114a6b/plain.htm&node_id=169
then you can use Basic order view functionality

Similar Messages

  • Restriction to Costing Tab in the Maintenance Order Change (IW32) and IW33?

    Hi Gurus -
              I want to restrict the access to costing TAB for a specific Planner Group and Plant.
              Can I restcit the access to costing tab using Authorisation Role?
              Which Authorisation Objects and values I should use.
             Kindly advice.
    Thanking and with best regards,
    Narendra Dere

    Hi Narendra,
    This can be done with help of your ABAP team. There is no standard authorization object to do so.
    Take help of your ABAP team. create one customized authorization object Z_COSTTAB having field as planner group and plant.
    user BADI IF_EX_IWO1_ORDER_BADI - Authorization Check for PM/CS Order.
    With this badi check add check for auth object which you have created. Assign this auth object to ur required user role.
    This will solve your problem.

  • Use of item number in maintenance order

    Hi Experts,
    Plz tell me what is the use of item number in maintenance order?

    Which item no you are indicating in the order?
    Maint item in planning tab ?
    or
    Item no in Components ?
    Maint item indicates the order is generated by Maint plan
    Regards,
    M.Alagesan

  • Work field in operation tab pages of maintenance order.

    Hi,experts,
    i need to enter work time in operation tab pages of maintenance order followed by two decimal digit like 2.55 mint or 2.65 H.System is not allowing to enter two or more than this decimal digits,it is allowing upto only one decimal digit like 1.5 H,2.3 min etc.How can I enter value like 2.56 min.Client is not accepting to enter after converting the unit.this is required for one of my specific scen.please suggest how I will enter 2.55 min or 2.55 H etc.thanks in advance.
    rgd
    rajib

    As standard the field is set to 1 decimal place.
    You cannot change this value without modifying your system (not recommended)
    I think you can enter more decimal places in the confirmation documents e.g. IW41
    PeteA

  • How to use Standard Text Key in maintenance order header long text?

    Dear All,
    I have created a standard text key using transaction CA10 and I want to use this in maintenance order header long text. Is there any way to select any standard text key in maintenance order header long text?
    Regards & Thanks,
    Saif

    Hi
    To use standard texts, perform the following six steps:
    Select the maintenance order and access the operation overview screen using Goto -->Operation overview.
    You can enter standard text keys in this screen or in a detail screen for the relevant operation.
    Enter a standard text key in the appropriate field and press ENTER .
    If the text is longer that the short text line available, the field Text is selected for that operation.
    Check the long text and edit it if necessary. To do this, select the operation and choose Operation--> Long text.
    The system branches to the text editor screen. If you also entered a short text for the operation and specified that this should not be overwritten by the standard text, you will see the short text displayed in the first line of the editor. The following lines contain the standard text.
    Check the standard text and change it if necessary.
    Save the final version of the text and return to the previous screen with Goto--> Back.
    Save the maintenance order.
    Standard texts are created for your system by your system administrator using the Customizing function.
    Regards
    Makarand Gurjar

  • How to restrict changes of material quantity in Maintenance Order

    Hi Expert,
    How can i restrict the user to change the material and quantity in the Order's components tab.(IW32) Eg, not allow changes after RELEASE.
    Can the system keep track on all the changes for material number and quantity in the Orders?
    Please Advise
    Thank You
    Best Regards

    Hi,
        Better way is grey that tab after releasing the MO .. try BADI ;-IWO1_SCREEN_MODIFY Field Content and Display Modification
    You can also explore User exit ;-PPCO0023 : Check Changes to Order Components
    FM ;- STATUS_READ
    regards
    pushpa

  • Table control View in Maintenance order Services tab

    Hi Experts,
    I am trying to change the table control fields of the services tab of the maintenance order , when we use PM03 control key to generate services PR.
    I try to remove some check box which are earlier defined as invisible to make it visible. However after saving the system variant system doesnt take the changes. It is coming back to the original .
    Here are couple of fields I would like to change the setting. As of now I am trying to change the below mentioned field to visible . Presently it is in invisible mode.
    Fields
    Formula::ESLL-FORMELNR,
    Form values: ESLL-FRMVAL1 to ESLL-FRMVAL5 and
    User field3:  ESLL-USERF1_TXT
    program name SAPLMLSP
    Control TC_VIEW
    I am following the below. Kindly let me know whether I am following the right step.
    1) Click on tbale setting
    2) CLick on administrator
    3) Select the field and do the necessary change to make visible or invisible.
    4)Activate
    5)Close
    6) save.
    RG
    Vinod
    Edited by: vnodpm on Feb 6, 2012 7:07 PM

    Hi,
    The IMG customizing will have greater priority than the screen table controls (also specific program logic can supersede the table controls). Check the customizing for service screen at following path:
    SPRO - Materials Management - External Services Management - Define Screen Layout
    -Paul

  • Option 'Maintenance Order' missing in 'Allowed Object Types' tab in IMG of User status Profiles

    Dear All
    I have created a User Profile using T-Code OIBS.
    Now I want to assign that User Profile to Maintenance Order. But in the 'Allowed Object Types' tab, the option "Maintenance Order" is missing due to which I am unable to assign it to Maintenance Order.
    Could anyone tell how to add the option "Maintenance Order" in 'Object Types'.
    Thanks in advance.
    BK

    Hi Peter
    Thanks for your help.
    I just found that in t-code BS13, the object categories ORI and ORH exist but 'No Status Profile' check is marked against them. That is the reason why the system is not showing the 'Maintenance Order' as an option in Allowed Object Types.
    Thanks a lot !
    Best Regards,
    BK

  • How to Create New Maintenance Order using IP30 against the deleted one

    Dear Sir,
    We have an equipment having Monthly Maintenance Schedule . Using IP30 , we had generated Maintenance Order for next 3 months (i.e Jan / Feb / March ) .  Due to some change in the Task List , We decided to Delete these earlier generated Maintenance Orders and then generate the fresh Orders usiing IP30 . To set Delete Indicator , we used Tcode IP02 and these Orders were marked with Delete Indicator .
    Subsequently using IP30 , we tried  to generate fresh Maintenance Orders ( for month Jan / Feb / March ) for this Maintenace Plan.  But no fresh Orders are getting generated .  On Analysing it further , we find that for this Maintenance Plan ( Tcode IP02) under the tab <Maintenance plan Schedule Call > , against the Jan / feb / March months  Sceduling Type/Status is appearing as "Schedule Completed" .
    Kindly guide us as how can we generate the fresh Orders .
    With Thanks and Rgds
    Sonia

    Hi
    I would suggest two option for this query:
    Option1: You can use the existing (deletion flaged) orders, by deleting all the operation  in the created PM order and in order, goto Extras - select the Task list which you have done changes. In this option your exsisting plan is not distrubed.
    Option2: If any way you want new PM orders, then Goto schedule of the plan & restart, system will ask wheather to delet/ skip the existing schedule.
    Hope this options will help you to take decision.
    Regards
    S Ramanujam
    Edited by: Ramanujam Srinivasan on Dec 29, 2009 8:13 AM
    Edited by: Ramanujam Srinivasan on Dec 29, 2009 8:15 AM

  • Costs tab on Maintenance order

    Dear users,
    We have a requirement in one of our projects relating to the Costs tab on Maintenance order (IW33). Since we have multiple external vendors working in our landscape, very often the partners need to access an Order created by another partner. However, we don't want the partners to view 'costs' tab on the maintenance order if it is created by another partner.
    Is there a standard configuration by which this can be achieved? Or is there a BADI/User exit/ Enhancement point where one can put some code in and achieve the functionality?
    Warm Regards,
    Vijay

    Hi Srithar,
    Thanks for providing another option. The problem is we haven't turned that functionality on in our system, through which the Personnel numbers are looked up from Work center.
    Cheers,
    Vijay.

  • Line item deletion in Maintenance order

    Hi Guru's
    Please let me know how to find the deleted line item in the component tab of maintenance order before saving.
    for eg. The user creates the following line item in the component tab of the maintenance order.
    Before saving he deletes the line item 20.
    Item   component   qty
    10       100001        10
    20       100003        20
    Please let me know  where exactly the deleted status is stored, before saving for the line item
    Regards
    Vidhyadharan

    Hi Pete
    We are trying to prevent the user from creating product line items in Maintenance order with respect to equipment BOM. Let me explain you the scenario
    Equipment 1000201 - contains the following components as BOM
    1002775 - qty 2
    1003326  - qty 1
    When the user creates the order , he tries to withdraw more qty than the qty specified iin BOM. We have controlled it using enhancement IWO10009.  Initially we didn't anticipate that the  control can  be skipped by duplicating the material (i.e material line) eg line no 10 :1002775 - qty 2 and line no 20: 1002775 - qty 2 and the transaction is saved. In order to control, we have modified the program accordingly and never allow the user to save, if there is a duplication of material.
    The problem started when the user tries to save the line item after deleting the duplicate material
    The check we used doesn't not allow the user to save inspite of the line item been deleted. The msg introduced keep repeating .
    We tried debugging the program, we wouldn't find any  deletion indicator in the structure   CAUFVD_IMP or resb  to overcome this bug.
    Can you pls let us know where exactly the deletion indicator or status is stored for the line item in the component tab before saving
    Regards
    Vidhyadharan

  • Add the budget profile in the order type Maintenance Order

    Dear Experts,
    Scenario for Repair & Maintenance with only MM & FICO module live w.e.f. 2007 (PM not live)
    Process Managed thru Internal Order (Order Type: RPMT)
    Budget managed through Investment Management (IM); Budget is directly entered against the IO using transaction IM52
    Scenario for Repair & Maintenance with only MM, FICO & PM module live (PM went live in 2010)
    It was proposed to assign budget against each Maintenance Order. Since the number of maintenance orders being used is very high, it was decided to link the MO & IO so that budget will be assigned to the IO and when the MO is settled against the IO, the budget in IO can be deducted accordingly. The proposed process to assign budget in Internal Order against each Maintenance Order are given below-:
    1.) In EAM process one can plan/procure material and External Services only when the Maintenance Order is created & released but practically it has to be planned long before any Maintenance Activity (Maintenance Order to be linked with the estimate so that PO can be created against the estimate).
    2.) The no. of Maintenance Order generated in EAM Module is very large as Maintenance order is created for almost each and every maintenance activity. It is cumbersome to allocate the budget to each and every maintenance order. There should be a single estimate for maintenance activity (as in MM module) and that should be linked to maintenance order so that the actual cost of Indent/Service Entry Sheet can be deducted automatically from the estimate (Maintenance Order is to be linked with estimate).
    3.) While doing return Indent the cost of return material is not being added to the maintenance order automatically (Maintenance Order is to be linked with estimate).
    4.) If Material & External Services not planned in the maintenance order (estimate), the user must be able to do that through Internal Order (estimate), hence the Internal Order must be link to the Maintenance Order. They should able to record the planned & actual cost in the maintenance Order.
    Process followed:
    1.) Created Internal Order in KO01 for Repair & Maintenance Order Type
    Assigned budget to Internal Order thru IM52
    2.) Created PM order and assigned Internal order against Settlement Order in tab
    u2018Locationu2019 and in Settlement Rule with 100%. In this Section attach the Internal
    Order with selection type u2018ORDu2019.
    3.) Released both orders and issue the Material for particular Operation and then
    determine the Cost for material .After that performed MIGO for consumption of
    materials.
    4.) Settled the PM order in KO88.
    Settlement process was successfully saved.
    Problem faced:
    After posting the goods movement (against each Maintenance Order) and settlement of the maintenance order against IO, we still find the budget assigned to the IO is not consumed/deducted.
    1. Actual cost of maintenance is not reflected in the internal order
    immediately. We have to run cost settlement (t-code KO88) for the
    maintenance order each time the actual cost is incurred in the maintenance order.
    2. Also in the case of return indent, the value of returned material is not directly
    added to the available budget of internal order.
    3. When the material is issued from store through the reservation generated by
    maintenance order, system does not check for budget in the internal
    order/maintenance order while issuing material from the store.
    4. It must not be allowed to create reservation from the internal order of order type
    RPMT.
    5. In case of external service in the maintenance order, the unit of
    measure in the requisition is set to u201CD (days)u201D by default. System does not allow
    changing the unit of measure in the requisition (it should allow to change the unit
    of measure or set the unit of measure u201CJOBu201D).
    6.) When the material is issued from the store through reservation generated in
    maintenance order, system does not check for budget in Internal Order
    (estimate)/Maintenance Order while issuing material from store.
    7.) My first problem is every time running the cost settlement(KO88) is maindetory.Without running cost settlement, How we can settle the actual amount of MO with IO (Estimate budget).
    2.) As you know that I have assigned the budget in IO.How system will check the budget while issuing the goods for maintenance order.So will please tell me that which user-exit is used over here.
    Thanks & Regards,

    Hi Deepak1103,
    Well, obviously you will have to settle the costs incurred at the maintenance order. The internal order should be mentioned in the settlement order field in the location tab of the maintenance order. What you can do is to ask your ABAP person to activate this enhancement IWO10004: Maintenance order: Customer check for order completion, use the CAUFVD structure to get the internal order number, then use the BAPI BAPI_INTERNALORDER_GETDETAIL and pass the details to the function module BBPG_BUDGET_CHECK and check the actual cost against the required budget. In case of a conflict raise an error other wise run the function module CK_F_IH_ORDER_SETTLE to settle the costs of the maintenance order to the internal order. Budget would also be consumed and you can verify the same in S_ALR_87013019.
    Regards,
    Muhammad Usman Kahoot

  • Technical completion of Maintenance Order Dates or Reference Dates Settting

    Hi,
    My client has two requirements
    1- In standard, system allows us to take technical completion on previous date, how should I restrict / stop this completion in past? Could I set technical completion possible after atleast 1 month?
    2- Can I stop technical completion before goods movement or set error message while technical completion before goods movements?
    Regards,
    Edited by: PROCESSES EXPERT on Aug 31, 2010 11:01 AM

    For both of the above requirement you can use the user exit IWO10004 Maintenance order: Customer check for order completion
    You have develop a logic on what basis you have to reject the TECO of the order, please consult your ABAPer and discuss with him for more clarification on this.
    Praveen

  • Date/time changes in maintenance order

    Hello,
    We are using strategy plans to generate maintenance orders. Is there a way to change the basic start and end date and times of the order? The scheduling type is Forward with time. I want to be able to change the start date to the date of generating the order and the end date as the end of the maintenance cycle. How can this be accomplished?
    I have checked out exit IWO10012 but it does not get called from IP10.
    Thank you,
    Nithya

    Hi,
    I do not want to change the planned date of the maintenance plan, which is what the exit IPRM0002 does. I want to influence the basic start and end date of the order that is generated based on my call horizon.
    Even if I set the initial and subsequent buffer in the maintenance package, both dates still come as the same. How do I change the end date to reflect the end of the maintenance cycle.
    Any pointers anyone?
    Thanks much!
    Nithya

  • OLD COFC errors for maintenance orders

    Hello,
    We are cleaning up some very old maintenance orders in our system (from as far back as 2004).  Many of these have COFC errors so when we try to close and set the delete flag we get the error "unprocessed future change recs exist".
    We did the same clean up on production orders and were able to delete the COFC errors using program ZPPCON_075 (program given to us by SAP via Customer Message).
    When I try to use this program on the maintenance orders it doesn't find the errors (I can see them in COFC) so I can't delete them.
    Any idea how to clear up these errors so I can close and archive these old orders?
    Thanks much,
    Andrea

    Hi Andrea
    Did you solve the issue? I would recommend the report from note 530174.
    BR
    Caetano

Maybe you are looking for

  • Microphone calibration for a sound level meter

    Hi I need an application for measure sound level by using the sound and vibration toolkit and severl microphones as input, but I don´t get the same values as a portable Phonic portable meter. I´m using a 60db gain preamplifier but when i use this val

  • Wish List, Shopping List in iTunes store?

    I want to save items of interest for possible future purchase, but can't find any way to do it in the iTunes store. Amazon has Shopping List and Wish List, as do other sites, but it appears that the iTunes store has nothing like this. I don't think t

  • Memory Leak in Oracle BLOB writing

    Hi, We have strange performance problem. Our profiler shows that Oracle connection object holds the inserted BLOB (byte[]) data. This is not getting released at all. The details are below. BLOB writing method: ============== We are using Hibernate OR

  • Since upgrading Firefox, within Win7, I cannot embed pictures into an email. I can only attach. How can I embed pics...or should I downgrade?

    So...within the body of an email, I click on the icon (I think it is a square with a tree in it??) to browse my photos of product images and select one and click OK. With previous versions of FireFox, a picture shows in the email. Now, after upgradin

  • Direct download of 3.1.2 upgrade

    I have problems when trying to download IPhone upgrades through ITunes. Instead I used Firefox to successfully downloaded iPhone1,23.1.2_7D11Restore from iclarified. The .ipsw file is now on my desktop, however when I open it, ITunes opens but does n