Result recording valuation

Dear All,
When we are doing results recording there is a valuation happening (Acccept / Reject) based on the results(tolerance).
is it posssible to have more valuation there ie..Accept,Reject,Partial Accept/Reject?
If possible how can we achieve this?
Regards
Senthil

Hi
Goto QS41 select 3 in catalog field and put* in code group filed.Select the code group which you want add extra codes and select the codes folder in that you can add the new code.
Goto QS51 Select the catalog  as 3 and plant which you want assign and selected set as *.Click new entry end enter the codegroup which you changed in QS41.
Please try this and come back
Thanks
S.Murali

Similar Messages

  • Single result recording valuation based on min and max  values

    hi,
      Our client requirement is as follows:
                               While entering the single results recording the system should not calculate the average , we need the system should valuate based on the  Minimum and  Maximum values in result entry. Is it possible?. can anyone explain in details.
    Regards,
    Ramu.

    Hi
    This is a standard SAP functionality available in SAP
    As
    Variable Inspection by S-Method
    If you set this indicator, you define the valuation mode for the variable inspection according to the s-method (ISO 3951).
    For a sampling procedure with this valuation mode, valuation occurs using a sampling plan consisting of sample size and k-factor. A quality score is calculated from the measured values of a sample and compared with the k-factor.
    Now you want  Both limits should come into picture while valuating then Check valuation Rule :31 -Variable insp. s-Method (two limits)
    so select the Valuation  mode  : 310- Variable insp. s-Method (two limits)   in sampling procedure.
    I hope this will add some value.
    Regars
    Sujit

  • VALUATION NOT APPEARING IN RESULT RECORDING

    Hello....
    I have created an inspection plan where i have assigned all the characteristic to be inspected with quantative data.
    Upon goods receipt inspection lot is generated,
    while doing result recording when i enter the result for eg. if the characteristic value is 1-10, and i enter the reult as 1, the valuation has to be set automatically as accepted but its not appearing, could anyone please let me know am i missing any settings.
    Suggestions will be worth appretation

    Hi sarfrazbaig  ,
    If you are using sampling procedure, check the "Valuation Mode". It must be "Manual Valuation" to achieve the valuation Manually.
    The trx code will be QDV1/2/3 for Sampling procedure.
    Regards,
    Shyamal
    =================================================================================
    Okey if you are not using the sampling procedure then,
    Set the value as "Automatic Close" / Close, Navigate and save automatically" in the IMG settings at Quality Management->Basic Settings->Maintain Settings at Plant Level, here for the relevant plant select the "Result Recording" Tab and set the mentioned vales for the field "Recording configuration"
    Revert for for further inputs.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on Aug 12, 2009 12:24 PM

  • What is the setting- Pop up window 'Valuation' appears in Results Recording

    Hi,
    When i am doing Results recording in qa32, after processing all characteristics the status of all characteristics appears '5' but while saving it gives a pop-up window named 'valuation' where under 'valuate inspection point' sub screen field 'valuation' with entry 'Accept' in grey mode appears. Also a tab named 'valuation' appears on the same pop-up window with pencil symbol through with UD can be made in RR only.
    What is the setting because of which this pop up window comes while saving the results recording.
    Thanks in advance.
    Regards,
    Abhijit.

    HI,
    I am using insp. point 200 which have default valuse in valuation tab. In functional module tab no FM are attached.
    What are the setting required tobe changed in i want to use Insp. Point and do not want the Pop up window of Valuation.
    In some other cases i am using point and pop up doesn't come.
    Abhi.

  • Result recording & display of multiple tests/analysis of single sample

    Hello Friends
    Here is my scenario;
    I receive 500 kgs of material in 5 bags. I want to draw sample of 1 kg from each bag. Thus I will be having 5 samples. I will perform the required tests on each sample. For testing I am consuming @250 gms of material. Out of 5 samples, I had to conduct the retest on 2 samples. I want to do the result recording of these tests/samples. In my understanding there will be 7 result recordings which will include 2 of Retest of 2 samples. I would like to display all the values recorded ( atleast for each samples ). Also, I would like to see the individual values and not the averaged out values the recordings.
    How can I take care of constraints due to pooled sample i.e. it allows only the result recording of pooled sample and not the subsequent samples.
    I would appreciate your detailed guidance on this issue.
    Regards
    mahesh

    Hello Lenin
    Normally, we use Sampling procedure with Fixed Sample as Sampling Type withAttributive inspection non confirming units as valuation mode. Determination Rule as 10 ( Fixed Sample ). Sample drawing Procedure followed is "draw from all containers". Irrespective of our present settings, I would appreciate if you let me know the settings to be made in order to map given scenario.
    Regards
    mahesh

  • Rejection  in results recording

    I have created a sampling scheme lot size=100, sample=10, c1=2 and d1=8  for a raw material
    Now when i do results recording for 100 nos(sample=10)
    defects=9
    now in this case, when defects is 9, then as per sampling scheme , the lot should be rejected. But system is allowing to accept the lot. Same is the case with Usage decision.
    Can anyone help with this

    hi,
    QDH1- dictate u the quality level
    so first check ur Valuation type and what  sampling schemes u r using with valuation type .
    Regards

  • Problem in results recording

    Hi,
    While results recording for every quantitative characteristic I am getting the options as Accepted / Rejected / No Valuation / Failed. I want the system to accept the numeric values. I tried to change the valuation mode in sample procedure, but no use.
    What might be the problem?
    Regards
    Ramakanth

    Try to tick on "Record Measured Values' in Control Indicator

  • Result recording configuration with automatic close indicator

    Hi Guys,
    I was testing this automatic result configuration in my system.
    I selected the u201C1u201D (i.e. Automatic Close) Recording Configuration indicator on the plant level in SPRO > QM > Basic Settings > Maintain Settings at Plant Level> plant > Result recording tab > Recording configuration > maintain Automatic Close.
    Next, I entered the three user parameter ID QAE, QAN, and QAS in the user parameter SU3. However, I leave the parameter value for these three ID blank as I donu2019t know what to put in.
    During result recording, I tested this MIC characteristic on both reject and accept scenarios (i.e. fall under lower/upper limit, and fall outside lower/upper limit). To my surprise, nothing happens. In another word, there is no automatic close incurs on the inspection characteristics (i.e. both the accepted and rejected checkbox still remain unchecked even I navigate around, and hit the u201Ccontinueu201D, u201Cbacku201D, or u201Csaveu201D button).
    Further, I have fulfilled the following prerequisite as specified in the SAP help portal on this topic:
    1 - The inspection scope is fixed scope of this MIC.
    2 - I entered the target sample size (i.e. both the value in the u201CInspectu201D and u201CInspectedu201D field is similar).
    3 - I think I should have the authorization because I have entered the three parameter IDs on the SU3.
    May I know what is wrong?
    Can it be the parameter values for the three parameter ID are blank in my SU3? If so, what value I should enter for these three param ID? If not whatu2019s going wrong?
    Thanks
    YY

    Hi Gajesh,
    For some reason, it doesnu2019t work.
    I think I will tell my guys to perform manually pressing the Lock icon button to force it to valuate and also become status 5, since this the two valuation checkboxes, i.e. accept and reject checkbox is either ticked correctly according to the sampling plan setup in the sampling schema.
    Further, I donu2019t see why this extra manual step is so difficult for my worker.
    Thanks for your help
    YY

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • In-process inspection- operation wise result recording sequence

    Hello Everyone,
    I have just come across a requirement and would be grateful if someone can help me out in this regard.
    1.     This is make to stock discrete manufacturing scenario.
    2.     Inspection type 03 has been activated in material master.
    3.     The setting in OPK4 are, error if no inspection results exist and error when operation sequence is not adhered to.
    4.     As a result of which I cannot confirm the operation in CO11N unless result recording is done for corresponding operation.
    The requirement,
    1.     User should not be able to carry out result recording for operation 30 unless at least 1 quantity of operation 20 (preceding operation) is confirmed. Likewise it should behave for rest of the operations.
    2.     Practically material is processed for operation 30 only if 20 is confirmed. Therefore operation 30 should be inspected after 20. System allows to input result recording for all the operations irrespective its confirmations.
    Is there any standard solution for this or should I go for any exit?
    Thank you,
    Anand Rao

    Hi Sujit,
    Thanks for so prompt response.
    I am using inspection point 100. Still it is not restricting. The operation confirmation is done through CO11N and not feasible for users to perform it through QM module.
    The logic is, if I try to carry out result recording for operation 30 , system should firstly check whether any confirmation number exists or (at least 1 quantity is confirmed)for previous operation i.e. 20. If not it must stop doing RR for 30 operation.
    Whether exits QEEM0011 and QEEM0015 can restrict this, as by their description I think these work after entering RR. Here it is required before RR. Any guesses?
    Thank you again for your kind reply.
    Regards,
    Anand
    An addition,
    Even though QEEM0011 works before valuation user is able to enter RR. The requirement is user should not enter the any RR irrespecive of valuation. If user enters RR and do not valuate it this exit may not work and eventually can allow to confirm OP30.
    Edited by: Anand Rao on Aug 24, 2011 1:21 PM

  • Error while doing calibration (result recording)

    Hi friends,
    while doing inspection lot processing, when i do the result recording it is giving the error : selected set not assigned to inspection points.
    when i checked the setting in spro as:
    QM-- Quality Planning -- Inspection Planning - General - Define Identifier for Inspection Points
    300: Inspectio of Equipments
    Default for valuation inspection point
    Plant : 1000             Selected Set: 18 (created as an selected set )
    now the system is giving the following error:
    Entry 1000 3 18 does not exist in QAPM (Check entry)
    Gurus please suggest me where i am doing wrong. is there any other setting which i need to check.
    waiting for you prompt answer.
    Pankaj

    i solved the problem
    thanx

  • Inspection lot result recording

    Hi,
    Some of the characteristic specification are fixed and we want it to appear as it is while result recording. So please confirm how it can be achieve.
    For example : If for product A our specification(inspection plan master) is moisture = < 2. So while result recording this moisture is considered as actual result and is not been changed so we want to fix it instead of typing again and again in result recording.
    Regards

    No, its not possible in standard SAP.  A simple search probably would have shown you that.
    You'd need to use a user exit and add code to pre-populate the values you want valuated.  Please research the user exits before asking the next obvious question.
    Craig

  • Block the authorization in QM results recording

    Hi All...
    I am a QM consultant ...Have some problem reg authorization...
    we have 2 level of authorization in QM module.
    Where 1st level is only allowed to record the results, they should not be allowed reopen the closed results and edit the result. This we tried to do by using the result record status (Tcode for results recording QE01). but not able to restrict the users. the thing is when user enter the result and after doing the valuaiton & closing the status becomes - 5. after that the user should not be allowed to reopen means status - 2. How to do it???
    Please share some inputs....
    srini

    Hello Srinivas,
    For the inspector to valuate the result he needs authorization of value 3 for QESTATNEW, for closing he needs value 5 for QESTATNEW and for putting in process he needs value 2 for QESTATNEW.
    Similarly, the initial status should be 1, 2, 3, 5 & 6 for successfully completing the operation.
    Say, if the he does not have 3 for QESTATNEW then the valuate button (balance) will be disabled so he wont be able to change the status of the characteristic to 3.
    If he does not have 5 for QESTATNEW then the close button (closed lock) will be disabled so he wont be able to change the status to 5.
    If he does not have 2 for QESTATNEW then the put in process button (open lock) will be disabled so he wont be able to change status of the characteristic back to 2.
    I hope I have cleared your doubt.
    Regards,
    Subbu

  • Result recording not saved

    Hi,
       PP QM Gurus,
       I m doing result recording for a insoection lot. Once i have saved valuated, locked and saved the results for same results only. When for other results i go through QE12 system is showing me all blanks results. The results which i have recorded before are also appearing blank. Why this is happning. Please help me out.
    Thanks and Regards,
    Harriesh.

    Hi,
    Normally if the result is recorded and the processing status is 5, it should not happen. Just for confirmation, Could you please tell me whether you are checking for the same inspection point and the Characteristic filter is "Closed characteristics"?
    Regards,
    Srinivas.D

  • Result recording  for calibration

    Hi
           In the result recording , actual reading say 179.5 and set reading as 180 , the system valuate it as rejection means system
    round off  and valuation accepted . But it should be rejected.
    with regards
    Gaurav

    Hi
    In the Quantitative data please enter The decimal places atleat 2.
    It seems that you have entered any thing so system will consider it as "0" decimal places hence rounding off takes place.
    I hope this will add some value
    Regards
    Sujit

Maybe you are looking for