Retraction cost center plan data from BPC to ECC

HI Experts,
We are integrating BW-BPC.
The client wants to Retract the data from BPC to ECC System for reporting purposes.
u201CIn order to be able to calculate standard costs correctly in production plants planning data from BPC is needed in SAP ECC.
The data needed is the planning data on cost centers which are currently entered into SAP manually via transaction KP06. This data will now be entered into BPC instead and therefore it is required to get an interface between BPC and SAP ECC for transferring data.
A description of the process and the data needed is available in the section u201CSAP ECC Screen Dumpu201D sectionu201D including screen dumps from ECC
If this interface is not created the task of entering in the planning data will double as the data must be entered both in BPC and SAP ECC. The process of entering in the data twice I estimate will add 1 u2013 2 extra days of work for each subsidiary involved in this.u201D
What is the options to support this Business Process of getting data from BPC to SAP ECC.
Regards
venu
Edited by: venu WAD on Aug 19, 2011 7:19 AM
Edited by: venu WAD on Aug 19, 2011 10:17 AM

Hi Keyrun:
Please refer to slide 7 of document below.
"SAP NetWeaver 7.0 Data Retraction in BI Integrated Planning"
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/30af46fb-eb4f-2a10-4899-9167af035742?quicklink=index&overridelayout=true
>Online documentation: http://help.sap.com/saphelp_sem60ep1/helpdata/en/99/97157967e3440a94d199538959cd0b/frameset.htm
>See SAP Note 525543 for additional documentation on field mapping.
Regards,
Francisco Milán.
Edited by: Francisco Milan on Jun 22, 2010 8:13 PM

Similar Messages

  • Retraction Cost Center Plan Data into SAP R/3

    Hi All,
    I am working on Integrated Planning and we have a requirement to retract the Cost Center Plan data to SAP R/3. Can anyone tell me how to do it in SAP BI-IP envirinment.
    Regards
    keyrun

    Hi Keyrun:
    Please refer to slide 7 of document below.
    "SAP NetWeaver 7.0 Data Retraction in BI Integrated Planning"
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/30af46fb-eb4f-2a10-4899-9167af035742?quicklink=index&overridelayout=true
    >Online documentation: http://help.sap.com/saphelp_sem60ep1/helpdata/en/99/97157967e3440a94d199538959cd0b/frameset.htm
    >See SAP Note 525543 for additional documentation on field mapping.
    Regards,
    Francisco Milán.
    Edited by: Francisco Milan on Jun 22, 2010 8:13 PM

  • RE: Cost Center plan data

    Hi,
    Can anyone tell me in Cost Center plan data KP06 i want to give uers only layout access we have several lay outs how do i restric other layouts
    Rds
    venkat

    Hi,
    You can restrict this by planner profiles.  In the role assigned for planning to the user, there will an authorisation object K_TKA50, where you can restrict the planner profile.
    And as you may know that layouts are assigned to planner profiles in customising; the layouts are thus restricted by the ones assigned to the planner profile.
    To reach this customisation, navigate as follows in the IMG:
    Controlling -> Cost Center Accounting -> Planning -> Manual Planning -> Define User-Defined Planner Profiles
    So the steps will be:
    1.  Create Layout
    2.  Create Planner profile, assign layout to profile
    3.  Modify user role to restrict planner profile to the one created above.
    Cheers.

  • Cost center planning data table and transaction code to view

    Hi,
    I want to see the cost center planning document. In which transaction code, I can see this document.
    In which table, cost center planning data is stored?
    Regards,
    VS ramaiah
    Moderator: Please, search SDN

    Hello,
    I do not think that COEP contains the plan line items*. For plan line items it is COEJ. But as suggested by Christian the better option in case you want to create a report is you use COSS/COSP and COST. The latter is for activity type planning (KP26) and the other two are for cost planning (KP06).
    The transactions to view the plan document is KABP and line items is KSBP.
    * Christian, do correct me if I'm wrong. I was not able to see anything with value type 01 in COEP.
    Kind Regards // Shaubhik

  • Cost center planning data-Plan Variable Costs in Object Currency

    Dear All:
    I have copied a standard planning layout and for the field, 'Planned Fixed Cost' and 'Planned Variable Cost', I have selected 'Plan Variable Costs in Object Currency' and 'Plan Fixed Costs in Object Currency' as the Key Figure.
    I am doing this because our Controlling Area currency is TWD and the other company will upload the planning data in RMB .
    However when I do the above settings and try to save, I am getting the following errors.
    The column 'Plan Fixed Costs in Object Currency' can input correctly but the column 'Plan Variable Costs in Object Currency' canu2019t be update in KP06 .
    ex.
    Planner profile: SAPALL
    layout :1-101
    I can't update the column "Plan Variable Costs "
    I copy the layout 1-101 and change the column to  'Plan Fixed Costs in Object Currency' and it  still can't input variable cost
    BR,
    Carol

    Hi Carol
    I have done this many times and never faced this issue
    Just delete the copied layout and Copy it again from 1-101....
    May be delete the existing columns of the layout and choose the desired key figure of object currency
    Then assign the layout to Planner Profile
    Regards
    Ajay M

  • Table for Cost center plan data by version

    Hello,
    I need to find out which tables in sap hold the cost centre and profit centre plan data by version.
    I am having trouble finding the tables if anyone can help?
    Thanks

    COEP     CO Object: Line Items (by Period)(costing document line item information)
    Orders, sales document items or cost centers can be described as object types. The connection of an object to its CO data is given by the general object number (OBJNR field in the CO tables, such as COEP-OBJNR). This field provides you with information about the object type and, if needed, about the object key (such as the order number).
    GLPCP   EC-PCA: Plan Line Items

  • BPS : Problem in retracting 0QUANTITY in cost center planning.

    Hi folks,
    I tried the standard retractor for retracting the Cost Center plan data from BI to ECC. I followed the blogs "BPS Retraction for Cost Center Accounting - I&II (Primary Cost & Qty)" by Praveen Mayalur and made the settings accordingly.
    I am having problems in retracting the 'quantity' to ECC and hence I tried the following scenarios and got different results.
    Scenario 1:
    In the level, if I select Keyfigures "Amount" and "Quantity" --
    When I execute the function, the system does not pick up any data. The message given by the system is "0 data records were read, 0 of them changed, 0 generated"
    Scenario 2:
    In the level, if I select only Keyfigure "Amount" --
    When I execute the function, the system does the retraction without error and with the message - "Retraction: Update completed without errors. No. of records: 4.   4 data records were read, 0 of them changed, 0 generated".
    I am able to see the amounts in ECC also.
    Scenario 3:
    In the level, if I select only Keyfigure "Quantity" --
    When I execute the function, the system gives the message -"Retraction: Update completed without errors. No. of records: 3.   3 data records were read, 0 of them changed, 0 generated".
    But I am not able to see the quantities in ECC.
    If anybody has worked on quantity retraction, kindly guide me through the settings.
    Regards,
    Mike

    Hi,
    Did you check the below point when you define sender structure?
    Make sure to pass the Unit of Measure when passing the Quantity else retractor wont update the Quantity in R/3. (Either you can map the field or maintain constant in the sender structure)
    Bindu

  • Cost center plannig data was deleted in production client

    Hi All Please look into below problem.
    2008 GP1 cost center planning data(KP06) that is entered in SAP Version 1 and 3 and assessed with planning assessment cycles has been mysteriously deleted from SAP.   The data is entered and re-enterd every month.   There are no line items in GP1.  The data is in GB2 to prove it was in GP1 when a snapshot of GP1 was taken to refresh GB2.   We need a root cause analysis.   Screen shots of GP1 and GB2 are attached for one cost center as an example
    Please let me know your opinions and thougts.
    While i am executing KP06.in Assurance i am getting Actual and planned costs values, but the same one while i execute in production values are displaying in Actual costs not displayed in plaaned cost.
    Please suggest to me tables which which is
    Double-post

    Hi,
    "deletion" of CO plan data is possible but not "mysteriously...
    Just copy an empty plan/actual version to a plan version containing plan data.
    T-Codes: KP97 or KP98, the important thing is, the source version needs to be empty, copy "all data" and flag "reset and overwrite".
    Pls. ensure that this T-Codes are not executed by mistake.
    Best regards, Christian

  • RE: Cost center Plan

    Hi,
    Can anyone tell me in Cost Center plan data i want to give uers only layout access we have several lay outs how do i restric other layouts
    Rds
    venkat

    Hi Venkat,
    I think what you could do is create new Planner profile, containing only the planning layout you want and then assign this planner profile to the user parameters in user master record. SPRO - Controlling - Cost center accounting-planning - manual planning-Define User-Defined Planner Profiles
    There can be also an authorization restriction if you want to prevent user from changing the planner profile himself.
    Greetings

  • Copy cost center planning to profit center

    Hi dear,i did cost center planning with KP06,then i try 1KE0 to copy cost center planning data to profit center,but seems it does not work,because there is no relevant planning data when i use KE5Z to check planning data
    can someboyd kindly tell me what i need to do to transfer cost center planning to PCA,THANKS

    Hi,
    To integrate cost center accounting (CCA) planning with PCA, for each fiscal year in Maintenance of Versions, the Integrated Planning checkbox should be checked . Also in PCA, maintenance of plan versions -> settings for Profit Center Accounting, the Online Transfer checkbox should be checked so that the postings are transferred to Profit Center Accounting for each activity automatically
    Tcode KE5Z is for Profit Center Actual Line Items. So even if you select record type 1 here, it will not give planning data. Similarly, tcode KE5Y is for  Profit Center Plan Line Items. If you select record type 0 here, it will not give actual data. If Integrated Planning is activated (as mentioned above), then KE5Y will give you all planning data, irrespective of whether it is planned using PCA or CCA.
    Regards,
    Sangeeta

  • Change Cost center valid date

    Hi, Export,
         Can we change the cost center valid date from 2007.10.01 to 2007.08.01? If it can change, Pls tell me how to change it.Thanks.
    best regards
    Park Han

    Well, it's a little late to reply to the original question, but I found this thread while trying to figure out how to do the same thing myself and thought I would update it with the answer in case anyone else stumbles across this thread while searching as I did.
    You can actually make a change in the valid from date by using a KS01 Create Cost Center transaction and referencing the original cost center to create the additional period you want to add. 
    In this case in KS01 you would fill out the fields in this manner:
    Cost Center: Existing Cost Center to be changed, let's say 1000
    Valid From 2007.08.01
    Valid to: 2007.09.30
    Reference Cost Center: 1000
    Controlling Area: Whatever the controlling area is
    In effect, rather than changing the cost center, you are creating the extra time period from the new from date to the original from date and referencing it to the cost center.
    The end result for us was that KS03 shows the cost center with the new from date and the old to date, which was the change we wanted.
    Not quite as obvious as a change, but it worked for us.

  • ALE for G/L and Cost Center Master Data

    Dear Expert,
    I am a fresher in ALE  and want to distribute G/L and Cost Center Master Data from our production system to Development and Q/A system. Can you give some guidances? and how to configure ALE for this purpose?
    Regards,
    MAL

    hi,
    steps to configure ALE :
    1.first u hav to create 2 logical systems for ur 2 clients in BD54.
    2.then assign thm in SCC4 for both clients.
    3.thn crete rfc destination in SM59.create in client from which u want to send only.
    4.create port in WE21 for sender.
    5.create partner profiles in We20 for both clients,outbound for sender and inbound for reciever.
    6.now create distribution model in BD64.
    generate partner profiles and distribute.
    now ur ale configration to send data frm 1 clnt to other is ready.
    u hav diff methods like master data,change pointers,idoc extensions,idoc reductions,...... to send data .
    hope this helps.
    reward points if helpful.

  • BPS Copy plan data from one cost center to another using vairables

    Hi experts,
    I am trying to copy the planning data from one cost center to another in BPS.
    I have just done it using a copy function and in the parameter group entering the costs centers for source and destinations.
    What I am trying now it is to let the user select what this destination cost center could be.
    I don`t know if this can be done using a variable. What I am thinking is; when the user enters executes the parameter group a pop-up appear that let him select the cost center for the destination.
    May be this is not possible. Can you suggest me other ways of doing this?
    Thanks in advance

    Hi,
    u can achieve this by creating a variable with the replacement type as  'User Defined Values'. You also need to enable the check box 'Input Allowed by user'. And at the planning level, in the 'Selection' tab, you should map the charecteristic (Cost Center) with the created variable. Same thing should be done at the planning package level.
    Then, when you execute the parameter group, a pop-up comes asking for the value of the costcenter.
    Regards,
    Srinivas Kamireddy.

  • Best practice for retraction of data from BPC 10.0 to General Ledger

    Hi All,
    I have the requirement to retract data from BPC 10.0 to General Ledger.
    What is the best practice for doing this?
    I have read the "How To... Retract data from BPC 7.5 NetWeaver to SAP ERP Cost Center Accounting, Part I", but this is prepared to transfer data to Cost Center accounting. Will General Ledger be populated automatically?
    What is your opinion on this?
    Best regards,
    JA

    Hi Rich,
    In BPC 10 NW, the data entered in Input Forms has to be retracted to ECC.
    For this retraction we are following below link.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c029accf-6d95-2d10-79aa-cc291180bf73?QuickLink=index&overridelayout=true&59180354379512
    In this document, I am unable to get the details of class ZCL_BPC_RTRCT_SUPERCLASS.
    as it is Z class, i am unable to create in my system.
    could you please help me.

  • Retract data from BPC 10.0 to ECC

    Hi All,
    We are attempting to retract data from netweaver BPC 10.0 to ECC.  We have followed the how to guide (How To... Retract data from BPC 7.5 NetWeaver to SAP ERP Cost Center Accounting,)  which details steps for version 7.5. 
    We have attempted to implement the transport in the appendix of this guide which implements class ZCL_BPC_RTRCT_SUPERCLASS.  This transport fails as it is missing method GET_APPL_DATA.  Has anyone had any experience with this class in 10.0, or even 7.5?  Alternatively, does anyone have guidliness for implementing retractionto ECC in BPC 10.0?
    Many thanks,
    James

    Hi Rich,
    In BPC 10 NW, the data entered in Input Forms has to be retracted to ECC.
    For this retraction we are following below link.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c029accf-6d95-2d10-79aa-cc291180bf73?QuickLink=index&overridelayout=true&59180354379512
    In this document, I am unable to get the details of class ZCL_BPC_RTRCT_SUPERCLASS.
    as it is Z class, i am unable to create in my system.
    could you please help me.

Maybe you are looking for