Retractor from BW to R3 Demand Management

Dear all,
I want to know if there is any standard retractor from BW to R3 Demand Management. I am already aware of KELR which retracts data from BW to R3 CO-PA.
Regards
Sapna

Hi,
If you are talking about sales DM THEN
Using Openhub in BW and collected sales plan quantities in a openhub table. This table is read by a program which is triggered in R3. This program selects data from BW table and inserts to R3 S076 table. S076 table stores SOP data and can be filled by a program.
reading data from bw:
CALL FUNCTION 'ZBFL_BW_BTC0001' DESTINATION p_dest
TABLES
t_s076 = t_bwtab
EXCEPTIONS
program_error = 99.
IF sy-subrc IS INITIAL.
WRITE:/ text-001.
ELSE.
WRITE:/ text-002.
ENDIF.
ENDIF.
adding sales figures into SOP table
LOOP AT t_r3tab.
INSERT S076 FROM t_r3tab.
IF sy-subrc IS INITIAL.
WRITE:/ text-005 , sy-dbcnt.
ELSE.
WRITE:/ text-006.
ENDIF.
ENDLOOP.
function in BW
FUNCTION ZBFL_BW_BTC0001.
""Local Interface:
*" TABLES
*" T_S076 STRUCTURE /BIC/OHBTC0001
select * into table T_S076 from /BIC/OHBTC0001.
ENDFUNCTION.
Regards
Ram.

Similar Messages

  • Tranfser from demand management to SOP

    Hello All,
    is it possible to send  data from demand management (eg.MD61) to SOP - standard information structure S076 or flexible planning ?
    The idea is to put values directly to MD61 and use them later in flexible planning
    thanks a lot
    KS

    Dear,
    It is not possible. In sap, the planning cycle will be SOP -> Demand management -> MRP
    SOPu2019 is a forecasting tool enabling you to set up sales, production, and other supply chain targets based on existing, future, or historical data. SOP is most suitable for planning finished goods. SOP plans are passed on to Demand Management in the form of independent requirements (MD61), which in turn is fed in to MRP (Material Requirements Planning).
    Hope it clear your doubt
    Regards / US

  • How requirements from SOP are transferred to Demand Management

    How requirements from SOP are transferred to Demand Management? what is transaction code for it ?
    Madan S. Rode

    Hi,
    In mc82 view, after checking the capacity situation(By choosing view, capacity situation, show) you can check the load for that particular resource. Once the load is 100 %. You can save it.
    Use mc78, copy the inactive version no to active no. (a00).
    Then in mc82 view, go to Extras,
    transfer to demand management,
    Choose the strategy as LSF/VSF... according to your scenario & then click transfer.
    Regards,
    Senthilkumar SD

  • Which table are Demand Management data (MD61) are stored?

    Hello guys.
    I need to know in which table demand management data from (MD61, 62 and 63) are stored?
    Also I need to know if there is some tips/rules to prepare a load from a file to come from Excel spreadsheet?
    Is there any BADI or BAPI to load these information directly into the table?
    Just for information: My current client doesn't use SAP yet. It's being planned to make the implementation in the middle of the next year...besides they use SAP in other plants around the world...
    The main idea is to use MRP from SAP to get the suggestion for purchase requisitions and also planned orders and proceed the production and purchase activities in the legacy....
    Please give me some instructions.
    Thanks in advance.
    Harlen Pinheiro
    SAP PP
    Brazil

    Hello Harlen
    This information is stored on tables PBED and PBIM.
    You can use BAPI BAPI_REQUIREMENTS_CREATE to load data to demand management.
    Please also take a look on the following document before opening this kind of thread:
    Landing page for new users in SAP PP - ERP Manufacturing - Production Planning
    BR
    Caetano

  • SOP to Demand Management - Mass Transfer -RMCA0766 - Program does not exist

    Dear Experts,
    I am configuring the mass transfer from SOP to Demand Management.  I want to maintain the variant for the program RMCA0766 so that I can create the Mass transfer job.
    But I get the message RMCA0766 does not exist.  So, How do I generate this program in the client?
    Any help would be greatly appreciated.
    Reagrds
    Tom

    Hi,
    Please refer the below document. It speaks about the mass processing on SOP.
    http://help.sap.com/bestpractices/BBLibrary/documentation/M06_BPP_22_EN_NO.doc
    Hope you will get the answer you needed.
    Regards,
    Manimaran M.
    Edited by: M Manimaran on Aug 9, 2011 8:01 AM

  • Error during transfer to demand management in tcode MC88

    Hi Expert,
    I am getting an error 'No data maintained for material F1475078 plant 2000 in transfer period' during processing transfer to demand management in tcode MC88. Anybody know what is the root caused behind?
    I try to search in internet and no solutions have been found so far, I plan to inform basis to restart the SAP server and try whether can solve the problem or not, which is my last option.
    Hope to get a solutions from you guys soon.
    Thanks.

    Hi,
    Refer to the below threads, it should resolve your query, else revert.
    Error "No data maintained for material XXX plant YY in transfer period"
    No data maintained for material MAT1_AJ plant 0001 in transfer period
    Re: SOP transfer to Demand Management
    Regards,
    Vivek

  • Can anyone share how to integrate Demantra Demand Management to EBS R12?

    Hi all,
    Can anyone suggest how to integrate Demantra Demand Management to EBS R12?
    I use Demantra 7.2 and EBS R12.
    I search in Manual and in some blogs but not much data support. If possible, I want step-by-step starting from set up such as setup the instance.
    More of my concern are;
    - Is Demantra can integrate with MRP, without APS or ASCP?
    - Is that necessary to integrate by using seed data? If I implement my series with all new series, how can I suppose to link them to EBS?
    Thank you in advance.
    Best Regards,
    Tanya T.

    Hi Tanya,
    To begin with, you can refer to the Metalink doc 434991.1 for an in-depth explanation on the integration from a technical perspective. Apart from this, there is an ocean of knowledge in the Demantra Documentation libraby in the metalink.The Implementation Guide provides an overview of the integration processes that synchronize or move data between Oracle Demantra and E-Business Suite applications.
    Now coming to your concerns:
    - Can Demantra be integrated with MRP, without APS or ASCP?
    After going through the above mentioned documents on Demantra, if you still want an integrated instance of Demantra and MRP without using APS, then it will have to be a highly customized solution.This scenario will obviously have a great impact on various business aspects,which is out of scope of this discussion.
    - Is it necessary to integrate by using seeded data?How to link new series to EBS?
    The Demantra - EBS integration adds two new responsibilities for Demand Management viz. i)Demand Management System Administrator and ii)Demand Analyst.
    The System Administrator creates a new user in the E-Business Suite with the relevant responsibility for which the user is automatically created in Oracle Demantra.
    The user with "Demand management system Administrator" responsibility can create new series that get added in the Demand management component on creation. This series can then be used as per requirement.
    I hope my comments help.Feel free for further discussions.
    Regards,
    Shekhar

  • Demand management table

    Sir,
    We are following the process of SOP in REM as follows:-
    1) Creation of Product group.
    2) Upload the Sales plan for product group
    3) Desagregation of products
    4) Copy to active version from inactive version
    5) Transfer to demand management
    we reqire the table for Sales and operation plan and also after transherring to demand management which table is updated. This is required as we are preparing a report for Sales Plan v/s Production plan.
    Thanks & Regards,
    Nilesh

    Dear Nilesh,
    Check these tables,
    P445V                            Sales and Operations Planning: Versions
    PGMI                             Product Group/Member Allocation
    PGPL                             Sales & Operations Planning (SOP)
    PGPLE                            SOP Characteristic Values
    PGZU                             Product Group/Member Quantity Conversions
    Regards
    Mangalraj.S

  • Demand Management Through SOP

    Hello Everyone,
    I have a scenario where I receive an 8 week rolling forecast from marketing. This is transferred to production. 2 weeks before actual production the plan is firmed.
    I was hoping to implement this using SOP transfer to demand management. I was also planning to use an MRP type with a planning time fence. But am not exactly sure of the best practice to transfer Rough cut plann data to demand management. Do I directly transfer the Rough cut plan to a "requirements plan" version?
    If not what would be the best possible solution to run SOP?
    Also Please suggest as to any specific configuration settings to be maintained for SOP.
    Any help in this regard would be greatly appreciated.
    Sincerely,
    Aji Kurian Mani

    Hi
    It depends on at which aggregation level you are receiving the Forecast.
    if you are receiving at Plant -Material level. I would advice you to directly upload in to MD61.
    SOP is required, if you need to do any forecasting in SAP.
    or if you need to publish , analsyse the Historical and Forecasting Values at diffrent Org Levels(Plant, cutomer, Material,Sales org....etc)
    using the planning tables you can maintain the Figures at one Level, which gets aggregated automatically.
    Regards
    Ratan

  • Demand Management: single Supplying Plant to multiple Demand Plant

    Dear All,
    I have following scenario to mapp:
    There is one supplying plant (Plant A) and 3 demand plants (Plant B,C,D). Out of 3 demand plant, two plants (Plant C and D) are assigned to different company code then supplying plant while one demand plant (Plant B) is assigned to same company code as of supplying plant (Plant A).
    Material M1 produced at plant will be consumed at plant A to produce material M2 as well as will be supplied to plant B.
    Material M2 produced at plant A will be supplied to all three demand plant B, C and D.
    As plant A and plant are assigned to same company code and are in same campus, materials will be transferred using Transfer Posting (material movement 301).
    Material from plant A will be supplied to transfer to Plant C and plant D using Stock Transfer (movement type 351) or using standard sales cycle.
    Plant A will use total SAP but plant B,C and D don't want to use any planning functionalities of SAP (no MRP run) as they are using i2 product for planning.
    As except plant A no other plant wants to use SAP for planning run, it was suggested to enter demand at Plant A directly for all plants using Demand Management functionalities using different planning versions. But now the issues are:
    A) As demand from each plant (plant C and D) will be entered at Demand Level using different planning version for each demand plant, how to reduce PIR of corresponding demand version for delivery against sales order of corresponding plant.
    B) As materials will be transferred from plant A to plant B using transfer posting and not stock transfer, how to reduce PIR. As PIR is not reduced but stock reduces then system will create new planned order for PIR which already supplied to plant B.
    Any help will be appreciated.
    Thanks and regards,

    Dear Mario,
    Thanks for your reply.
    Can you explain in bit detail what is option 2 and how can I do same in system....
    I tried using Special Procurement Key 40 in demand plant and maintained PIR in demand plant with MD61 which results into Stock Transfer Order created in demand plant. Now the problem is when I issued material from supply plant to demand plant against stock transfer order, system also reduced the PIR for external sources I maintained in supplying plant. Hence there was two reduction in Supply Plant, one for Stock Transfer Order reservation and second for PIR maintained for external demands (other than demand plants).
    How can I stop reduction of PIR maintained for external sources while delivering against stock transfer order?
    Thanks in advance.
    Regards.........

  • Release of APO Demand Planning to R/3 Demand Management

    Hi All,
    Is there a way to release the forecast in Demand Planning in APO to R/3 Demand Management without passing overwriting the historical buckets in R/3. I have created a special data view that does not contain any historical weeks. However, if we are in week 2 of the month, it overwrites week one of the month in Demand Management with a 0 value when we execute the forecast pass to r/3 job. I don't want to overwrite week one and we actually want to keep the old value there, How can we prevent this from being overwritten?
    I have created a data view that does not contain any historical buckets and I am using this in the
    Regards,
    Rumi,

    Hi,
    For releasing from DP to ECC , you have taken care of:
    ○       A future planning horizon only
    ○       A planning buckets profile with one periodicity only.
    I assume you are using "Week" bucket , please confirm.
    In SAP ECC Demand Management, planned independent requirements are created in the same buckets as those of the data view on which the mass processing job is based.
    With above things in mind, it  not clear why APO DP release shoud overwrite historical week data, unless you are releasing in monthly buckets rather than weekly buckets.
    Regards
    Datta

  • Workflow Start "Failed But Not Blocking Correlation" - Project Server workflow for Demand Management

    Hi,
    I'm trying to "Create a Project Server workflow for Demand Management" with project server 2013 just like is explained
    here.
    But when I try to create a new project the implemented workflow failed to start with the follow state message in the job queue: Failed But Not Blocking Correlation.
    The detailed error display the follow message:
    Exception Starting Workflow: The scope _/SharePoint/default/139e833f-7a85-4ccf-b7a2-b3fea9ce50b9/6799b7e5-e519-40f4-9371-0b3bc3d5c208_ has no workflows under it. HTTP headers received from the server - ActivityId: 52fef415-409b-4545-a9f6-ed75519b425c.
    NodeId: My-Computer-Name. Scope: /SharePoint/default/139e833f-7a85-4ccf-b7a2-b3fea9ce50b9/6799b7e5-e519-40f4-9371-0b3bc3d5c208. Client ActivityId : 9ded4d9c-7733-7004-2661-c8977270af98.. Trace:    at Microsoft.Workflow.Client.ClientHelpers.SendRequest[T](HttpWebRequest
    request, T content)   at Microsoft.Workflow.Client.WorkflowManager.StartInternal(String workflowName, WorkflowStartParameters startParameters)   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowManagementClient.StartInstance(String
    serviceGroupName, String workflowName, String monitoringParam, String activationKey, IDictionary`2 payload)   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowInstanceProvider.StartWorkflow(WorkflowSubscription subscription, IDictionary`2 payload)  
    at Microsoft.Office.Project.Server.BusinessLayer.Workflow.StartWorkflow(Guid projectGuid, Guid enterpriseProjectTypeUid, Boolean isNewProject, Guid previousEntepriseProjectTypeUid, Boolean skipStage, Guid stageToSkipTo):
    WorkflowExceptionStartingWorkflow (35115). Details: id='35115' name='WorkflowExceptionStartingWorkflow' uid='e3bbb06b-1d38-e311-940a-001cc094718e'.
    Error:
    WorkflowCannotStartWorkflow (35100). Details: id='35100' name='WorkflowCannotStartWorkflow' uid='e4bbb06b-1d38-e311-940a-001cc094718e'.
    Queue:
    GeneralQueueJobFailed (26000) - WorkflowStartWorkflow.WorkflowStartWorkflowMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='e5bbb06b-1d38-e311-940a-001cc094718e' JobUID='68ee1040-1d38-e311-940a-001cc094718e'
    ComputerName='90f7432c-fbc8-4ebd-86f3-0236ce62661c' GroupType='WorkflowStartWorkflow' MessageType='WorkflowStartWorkflowMessage' MessageId='1' Stage='' CorrelationUID='9ded4d9c-7733-7004-2661-c8977270af98'. For more details, check the ULS logs on machine
    90f7432c-fbc8-4ebd-86f3-0236ce62661c for entries with JobUID
    68ee1040-1d38-e311-940a-001cc094718e.
    with this detailed entries in the log file
    10/18/2013 13:47:57.38  Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue                        
     ad3fy Critical Standard Information:PSI Entry Point: <unknown>  Project User: <unknown>  Correlation Id: <unknown>  PWA Site URL:   SA Name: <unknown>  PSError: <unknown> A queue job
    has failed. This is a general error logged by the Project Server Queue everytime a job fails - for effective troubleshooting use this error message with other more specific error messages (if any), the Operations guide (which documents more details about queued
    jobs) and the trace log (which could provide more detailed context). More information about the failed job follows. GUID of the failed job: 68ee1040-1d38-e311-940a-001cc094718e. Name of the computer that processed this job: 90f7432c-fbc8-4ebd-86f3-0236ce62661c
    (to debug further, you need to look at the trace log from this computer). Failed job type: WorkflowStartWorkf... 9ded4d9c-7733-7004-2661-c8977270af98
    10/18/2013 13:47:57.38* Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue                        
     ad3fy Critical ...low. Failed sub-job type: WorkflowStartWorkflowMessage. Failed sub-job ID: 1. Stage where sub-job failed:  (this is useful when one sub-job has more than one logical processing stages). 9ded4d9c-7733-7004-2661-c8977270af98
    10/18/2013 13:47:57.38  Microsoft.Office.Project.Server (0x0948) 0x14F0 Project Server                 Queue Jobs                   
     ad3fy Medium   Error is: GeneralQueueJobFailed. Details: Queue Attributes:  68ee1040-1d38-e311-940a-001cc094718e  90f7432c-fbc8-4ebd-86f3-0236ce62661c  WorkflowStartWorkflow  WorkflowStartWorkflowMessage  1   
    9ded4d9c-7733-7004-2661-c8977270af98  . Standard Information: , LogLevelManager Warning-ulsID:0x000DD158 has no entities explicitly specified. 9ded4d9c-7733-7004-2661-c8977270af98
    Any idea?
    Thanks in advance,
    Alexander.

    Hi Alexander,I have seen that error when the workflow manager has not been registered correctly with the PowerShell command - that should be in the docs referenced - or
    http://technet.microsoft.com/en-us/library/jj663115.aspx.  Let me know if that doesn't appear to be the issue here and I can dig deeper.  Best regards,  Brian
    Blog |
    Facebook | Twitter | Posting is provided "AS IS" with no warranties, and confers no rights.
    Project Server TechCenter |
    Project Developer Center |
    Project Server Help | Project Product Page

  • EPM Multi language support for custom list in demand management

    Dear Team,
    We have installed EPM 2013 with English as base language and Arabic language pack as secondary language. We have implemented demand management and portfolio management as part of EPM implementation. Currently demand management have some workflow and
    custom list supporting these workflow. Just want to check, when user changes language setting from English to Arabic then all the forms ( build using custom lists) supporting English input forms should able to take Arabic text as input to these forms.
    Please let us know how we can achieve.
    Please help..:(
    Regards,
    Anup  
    Anup Kumar Presale Lead Wipro

    Was able to do it by adding new files to the shared folder and updating the style in the lang folder to point to the new files.

  • Demand managment tranfer problem

    Dear PP guru's,
            When ever i am trying to transfer data from demand managment systeam shows msg that no data is maintain for material,plant in tranfer period ,how to solve this query
    Regards
    Amit Naik

    Hi,
    In MC74 you have to select the option of radio button for Production plan for material or PG member, You have to select requirement type and version with date and then save the it will be copied to Deman Management which you can see in MD62.
    Or you can try to transfer from MC87 create the plan then go to Extra--Transfer to demand management.Deselect invisable tranfer maintain period with active versio.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Demand Management Reorganization QN

    Hi
    When we are trying to remove the demand management for one week , the values stick on that week. We have more sales then the requirement for that week.
    Parameters : We have 10 days as the key date. / Backward consumption for 999 days / Planning strategy is 40 .
    QN :  1) What is the intention of 999 days ?
              2) Why reorganization is not deleting for that week?
              3)  Suppose if one week demand is not consumed, then how it can be consumed by the adjacent week.?
    Thanks for reading
    Nick

    Hi
    Go to OMP8 t.code and Define the reorganization interval for your plant.
    Define the reorganization interval
    The reorganization period specifies the key date for the reorganization of the planned independent requirements. The key date is calculated by subtracting the specified time from the current date. The planned independent requirements that lie before the resulting date are reorganized.
    Thanks
    S.Murali

Maybe you are looking for

  • I borked my server... (can't get eth0 to connect to router)

    Hello, While trying to fix another problem, I inadvertently screwed up my entire server. I went ahead an replaced my /etc/resolv.conf file to point to the OpenDNS servers; before, it was using my router as a nameserver (192.168.1.1), and the router t

  • ? read from clob and store each line in database

    Greetings, i would like to read LINE BY LINE the contents of a CLOB column( which stores the contents of a plain file .txt) and store each line into a table. Is that possible?

  • Using ALV as a search Help

    Has anyone used ALV as a search help presentation/selection method.  I'm thinking, in a simplistic sense, it would be just creating an itab and presenting it on a grid in a container on a new screen called by an exit.... Probably too simple, huh?   

  • ITunes on Windows gone due to crash. Switched to an iMac. Now what?

    Brother-in-law lost his iTunes library due to Windoze machine dying. He switched to an iMac. Still has his iPods but no associated iTunes library with it now due to the crash (and no backup). What can he do in this situation to get his library back a

  • What does an orange triangle on the file

    I am using InDesign CC-2014 on Mac I have copied a full project to the CC Desktop folders. It includes a variety of files, including an InDD book with 14 documents. The InDesign files (.indd) themselves have all been marked with green ticks. The fold