Return delivery is to be excluded from Planning

Hi Dear PP Experts,
I am facing one issue that if Delivery - ->  Delvry (As seen in MD04) is existing for any material it is considered as requiremet during the MRP run and system is creating Purchase requisition for that delivery which is not required.
The scenario is as below:
Material is received and is rejected during analysis and hence I need to send it back. For this Delivery is created in the system and the same is currently open due to some issue. But, when system does MRP run it is creating Purcahse requisition against this Delivery which is not required.
I have checked Availability Check setting in OPJJ where "Include Deliveries" option is not selected but still system is creating Pur. Req.
Pl. let me know what can be the issue, am I missing something?
Thanks in advance.
Regards,
Prashant

Dear Dario,
Thanks for the reply.
The delivery is created after the goods receipt and the stock is sent to blocked stock after rejection by the QC department. In our case, since this is under blocked stock, the stock is not considered in MRP.
A delivery is created and if it is seen In MMBE the quantity is seen under scheduled for delivery. This is now considered as a requirement by the system during the net requirement calculation and system is creating PR which is not required.
Pl. let me know how I can exclude this during the MRP run. Do you need any other information.
Thanks in advance.
Regards,
Prashant

Similar Messages

  • Error while posting stock from quality to return delivery

    Hi ,
    I am working in decentralized warehouse. I am posting stock from quality to return delivery in t code QA32. The following is the error message i am getting . i have also checked the movement type settings they are fine for 553.
    "Posting only to free or blocked stock due to missing goods receipt".
    Please let me know if i am missing any thing in config......
    Thanks
    Ilyas

    Hi Ilyas,
    Can you check again the movement type? For return delivery movement type 122 is used and 553 is for GI scrapping from QI. You can check it in SPRO>QM>QI>Inspection lot completion> Define inventory postings.
    reg,
    Sudhir

  • RETURN DELIVERY (MVT122)from QM MODULE IN QA 11/12 t code

    hi dear,
    This is a problem in production server while doing return delivery in QA11/QA12 T CODE
    PO is  subcontracting in nature
    goods receipt done for 2 quanity,
    means movement type 101 for 2 semi finished item(XX), 543 mvt triggered for 2 components(YY).
    As material is subject to Quality inspection,during GOODS RECEIPTS in MIGO, system creats an inspection lot (no:10010321864)
    now  in usage decission screen qa11/12,materials needs to be rejected
    as per the business needs
    while doing return deliveryfor quanity 2 EA thru MVT 122 from QM module(thru QA11)
    SYSTEM GIVING ERROR MESSAGE:
    message id: M7
    MESSAGE NO:389
    Of the required quantity of material(YY),1 remain(s) open
    MORE INFORMATION:
    PRESENT STOCK OVERVIEW
    FOR THAT  PLANT:
    MATERIAL PROVIDED TO VENDOR STOCK:1 EA (YY COMPONENT)
    FINISHED ITEM STOCK(XX):2 EA
    thanks
    regards
    kumar

    Hi ,
    Thanx for ur quick reply, my requriment is prepare BDC program to create outbound delivery. So i dint even recorded just i was analysing that what are all the fields are required both mandatory and non-mandatory fields to create outbound delivery no. so i only created one outbound delivery no by giving only values in madatory fields to check what are all the fields are there in differnt sceens. If i get all the fields i ll send the excel file of the data conataing all the sceen field names just above i mentioned in my question and they provide me the appropiate data what they have in excel format after getting the data i ll see how many fields values are there and then i will start recording depending up on the data. so before that i should know all the fields which ll come while creating outbound delivery.
    so above i got 20 fields so i am asking if you have any idea about all the fields exists while creating outbount delivey Number please tell me .
    i have to analyise and i should give the details of the fields go the functional people and they ll see and provide me with the data they are availble seeing my fields . After they give me the data i ll check how many fields having data depending upo on that data i ll start recording and write the BDC program.
    Hope you might understood my requirement.
    <b>points ll be rewared</b>
    regards,
    sunil kumar

  • Output type for Proforma Invoice for return delivery from delivery type RLN

    Client require Output type Proforma Invoice for return delivery to vendor. As such return item category is not relevant for pricing so from delivery to proforma invoice can not have with p-ricing. I got quantity correct but pricing is coming Zero.
    Client have ZPAC as packing list output type from delivery which shows quantity and pricing. So decided to use the same logic to pull pricing for proforma invoice from delivery.
    Here delivery has standard output ZPAC as packing list with access sequence Z002 as Delivery Type.
    I want to pop up output type for all return delivery so using access sequence with delivery type/vendor.
    Vendor filed does not exist in delivery output type so brought that firld LIFNR.
    It is assigned to procedure and maintained ZPRO output type for Proforma invoice. Asigned VV21 on front end.
    Problem Still automatic output type ZPRO is not poping up. What type of access sequence will help me to pop up or what in configuration am I miising?
    Appreciate help for solution at earliest.

    Hi Padamsree,
    I know Pricing & output very well.  I need profomra invoice to be printed with quantity & value for return goods to the vendor. Pricing is associated with Item category RLLN for delivery type RLL which is return type delivery.
    I need to have pricing in my Proforma invoice which is copied from delivery to billing document VTFL. Just check well how it is working in the system & if you know please answer so that it should be workable on the system. As theoretical answer may not be helpful. Appreciate for your time.
    Thanks

  • How to make a "return delivery" from a goods mvnt  linked to a reservation

    Hi, I want to realize a "return delivery" from a goods mvnt that is linked to a reservation number.
    I'm using FM BAPI_GOODSMVT_CREATE.
    I'm able to create a goods mvnt, but this doesn't updates the quantity in the reservation document.
    For example:
    There are 10 units of a material reserved in a reservation document.
    I create a goods mov. linked to the reservation number by populating the field RESERV_NO and RES_ITEM in the GOODSMVT_ITEM parameter. In this document I fullfilled the TARGET_QTY field with 10. This the positive movement.
    After that, reservation document says that there are no units pending to serve. (10 reserved - 10 served = 0 pending).
    Now, I want to return 2 units of this material. I fullfilled the fields REF_DOC_YR, REF_DOC and REF_DOC_IT with keys (doc/item/year) of the first goods movement, and MOVE_TYPE with the reversal movement number. But this doesn't updates the quantity in the reservation document.
    I tried fullfiling RESERV_NO and RES_ITEM, but this generates a positive movement, not the reversal!
    Is there any other process that updates quantity in the reservation document?
    Could anybody help me?

    1) Create a button on the chapter menu with the text MAIN MENU (or whatever you want it to say).
    2) Select the chapter menu in either the graphical or outline view of your DVD.
    3) Click on the Connections tab.
    4) Select the MAIN MENU button in the source column.
    5) Select the main menu in the Targets column.
    6) Click the Connect button above the Targets column.
    After doing the above steps you should see the main menu in the Target column to the right of "MAIN MENU:Jump when activated" in the source column. Your MAIN MENU button will now take you back to the main menu.
    Message was edited by: John Link

  • Return Delivery from Project

    Hi  All,
    How to generate return delivery from CNS0?
    The scenario goes like this.
    1. Materials are attached to the network activities( both plant stock and Project stock materials exist)
    2. Delivery request is created from CNS0
    3. Goods are picked and PGI is done.
    Now, there is a goods return process which has to happen because of some reasons.
    Can i trigger this from CNS0 if YES then how?
    Waiting for your expert advice
    Regards
    Prasad

    Hi,
    you cannot perform the returns processing with CNS0. You have to use the "standard" sales returns processing.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    Kind regards
    Jan

  • No FI Doc created from return delivery transaction.

    Dear Guru,
    I did open PO for asset procurement. All processes from PO creation until LIV and payment were completed successfully. Depreciation was run for asset purchased for the period 9. After that period was closed successfully. In period 10, asset purchased in period 9 must be returned to vendor. I did issue credit memo and do return delivery (using MIGO). However, I found that FI doc was not generated and account was not posted. What is the cause and solution to the problem? Thank you very much.
    Cheers,

    Hai
    Try to reverse the depreciation documents first and then return the asset
    Regards
    lakshmi

  • TO split from one customer return delivery based on storage type

    Hello,
    How TO can be split from one customer return delivery based on storage type?
    For example,
    If I have 3 storage type,  ST1, ST2, ST3 then and how can I divide the items in to three different TOs of respective storage types from one customer return delivery? Can I use u201Ccontrol for performance data configuration? If yes then provide detail steps.
    Thanks,
    Milind

    Hello,
    Any thoughts/ideas?
    Thanks
    Milind

  • Unable to create Vendor return delivery from blocked stock

    Hello,
    Would like to know how to enable delivery picking from blocked stock.
    Some back ground : I am using Delivery type RL (Vendor returns). Required config is done in IMG.
    In our process we move defective material to blocked stock. Next create a Return PO to pick material from blocked stock.
    Next use VL10b to create delivery document against this PO.  We are able to create delivery & PGI from blocked stock.
    All above steps are executing seamlessly without any issue In our QA system.
    However in PROduction system delivery document does not find any qty in blocked stock inspite of being in the blocked stock.
    Please let me know where I could find the setting to enable delivery shipping/ PGI from blocked stock.
    Look forward to some good responses.
    Thanks,
    Ram

    Prerequisites
    When you enter a return delivery, you should reference the purchase order or the material document, so that the system can:
    Suggest data to simplify data input (for example, the storage location)
    Check that the returned quantity does not exceed the delivered quantity
    Reduce the quantity delivered to date
    Reverse other updates that occurred (for example, for a goods receipt into consumption) when the goods receipt was entered
    Before you enter a return delivery with reference to a purchase order, you have to determine whether the goods were posted to stock or to consumption, or whether they were posted into goods receipt blocked stock. If you posted the goods to a particular stock type at goods receipt (for example, quality inspection stock), you have to return them from the same stock type.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63351643a211d189410000e829fbbd/frameset.htm

  • Return Delivery from a Material Document

    Hi Experts,
    I have a scenario in my current project, where we perform a 261 movement (Consumption for a order) before the Order was completed.
    Once the order is completed and we know the real quantity consumed, we perform a Return Delivery from the previous Material Document, for the quantity not used. In this way we return to stock the quantity which was not used.
    The problem is that this action must be done automatically by a development, and we are looking for a BAPI that can perform this action. I have found the function BAPI_GOODSMVT_CREATE, but cannot be used (or at least I do not know how to use it) to create the movement I need.
    Can this BAPI be used? Is there any other BAPI that can help me? Any other idea?
    Any help will be highly aprecciated!
    Thank you very much in advance,
    Best Regards,
    LUCAS

    Hi Polly/Dirk
    Thank yoy very much for your answer...they were very helpful.
    I was triying the BAPI, but I still have a little issue. I am calling te function with the parameters specified, but whenerver I insert the Reservation and the Reservation item, the function posts a 261 movement (despite I inserted 262 in the parameters). If I do not insert the Reservation data, it post the movement correctly, but it does not make any reference to th reservation. Is it correct to post it without reservation number? Am I missing something?
    Thank you very much in advance,
    LUCAS

  • Return delivery and Planned delivery costs

    Hi guru
    scenario: I create a PO (Vendor A) with Planned delivery costs on order item.
    I store planned delivery costs in the purchase order item on the Item conditions screen. ( I enter a different vendor for "freight vendor" - Vendor B, select the desired condition on the condition screen and choose Goto - Details. Overwrite the content of the Vendor field).
    I create GR. OK
    I create a return delivery (122) but I have to pay invoice for "freight vendor" to Vendor B.
    Can I make it?

    Hi,
    At the time of GR;
    Stock A/c - 110 - Dr
    GR/IR Clearing - 100 - Cr
    Freight Clearing - 10 - Cr
    And when you return it then same entry gets reversed.
    So at the time of MIRO, it will not propose the freight value automatically but you refer the PO and select "Planned delivery cost" and then under "GL Account" Tab, enter Freight Expense A/c - Dr and "Simulate", it will credit vendor and then Post

  • Return delivery to vendor from GR-blocked stock

    hi experts,
    while doing return delivery from  GR-blocked stock(migo) to vendor
    it is asking for  " reason for movement " in the Where tab,
    but there is no list displayed to the select the reason
    how to make list for that reason why nothing is available in list
    how to retrieve the reason list
    explain please
    thanks
    ganesh

    hi
    go to OMBS
    here in control reason look for mov type 122 and 161 ,here u will find the reson is required
    now come back and check reason for movement
    here create new reasons for move type 122 and 161
    1 poor quality
    2 incomplete
    3 damaged
    this will solve ur problem
    regards
    kunal

  • Return delivery in QA11

    Hi All,
    One way to process vendor return delivery is using transaction code MBRL - Return Delivery with check box on as Create delivery. This will create delivery in background and process return to vendor referencing to original PO goods receipt created.
    Where as on QA11 Usage Decision, there is option to create material movements automatically from quality inspection stock. When you process UD the material movement take place as per proposal you made on UD stock movement screen. It post return delivery using movement type 122. But how to make an option enable that will create delivery automatically at the time of UD for return delivery as available for transaction MBRL. This will help for picking and packaging planning.
    Any suggestions!!!
    Thanks.
    V S

    sorry wrong forum...the question was answered in QM forum

  • Customs Duty to be Excluded from Budget

    Dear All,
    Scenario:
    In case of Import procurement, the Additional Customs Duty(ACD) is available for Setoff. For which client wants to exclude the amount of ACD to be excluded from Budget Consumption.
    Can Any one give the suggestion, how to do the above requirement.
    Thanks.
    Raja.

    Hi Alex,
    Thanx for the response.
    I believe, in case of Imports, there will be Planned Cost (Raw Material Cost) apart from this there will be local customs duty which needs to be paid, for receiving the goods, which are captured as Delivery Costs with different vendor at the time of MIRO.
    The exact problem in this case is, the initial commitment will be booked at the time of PO, and actual accounting entry will be post by system at the time of MIRO
    This is the problem, because during PO, total amount will be created as budget commitment and actual invoice will be booked after  some months at this time, even if the system reverse the extra commitment say after 3 months, it wont make much sense as for the whole 3 months, my budget amount is reserved as commitment against PO, which will be a  substantial amount.
    So, Please share some ideas, how to come out of this situation, as the rollout of FM is held up due to this point
    Thanks

  • Special Stock E not supported (check your entry) error in returns delivery

    Dear friends,
    While we are doing the returns delivery, we are getting the error " Special Stock E not supported (check your entry)
    Message no. M7146
    Diagnosis
    The specified objekt (Special Stock E) is not supported."
    This is an M.T.O scenario
    In the returns order the requirement type is 'KE"
    can u pls tell me how the requirement type is determined at sales order level. Can it be changed manually.
    How the strategy group is linked to requirement type.

    Hi,
    Requirement type KE you can not changed manually.
    For a strategy two requirement types are linked. One is from PIR requirement type,another one is from customer requirement type.
    For 20 strategy, customer requirement type is KE.
    For more detais Goto SPRO>Production>Production planning>Demand management>Planned ind req>Planning strategy>Define planning strategy.
    Here you can find the link between requirement type to a strategy.
    Regards,
    Dharma

Maybe you are looking for

  • How to Track changes of Detail and header at purchase document

    Hi I have one problem while issueing the output type i created new output type created new output routine and i have to track the header changes and issue proper output and prevent to issue wrong output type example : zne1 for header changes and zneu

  • Best way to work with multiple photograph angles?

    We are going to be taking 360 degree view photography shots of certain objects and placing these objects on to different backgrounds so the shots will look something like this: We expect to have about 20 shots of each object and about 5-10 objects pe

  • TIFF images in PDF documents

    Just looking for a short answer, no technical details needed: Is it possible to store TIFF images in PDF documents without losing information? Thank you in advance, k.

  • MRBR - Release Blocked Invoices

    I am experiencing that MRBR release invoices that have just been blocked due to variance. This without any change having taken place in the PO or anywhere else. E.g. 1) PO. 1 item of 680 USD. 2) GR. 1 item of 680 USD. 3) IR. 1 item of 360 USD. Blocke

  • Some Artwork missing in Album and Artist view

    So, after updating to iTunes 11 and my library being trashed. I now have a restored library on Windows 7 with all plycounts and ratings in place. So far so good but a lot of my artwork is missing in both Artist and Album view. I took the trouble to t