Return of raw material on production order

Dear Experts
    Is there is any way to return raw material issued in production order back after issuing it

Hi,
Here is the solution for you( Hopefully)..
If you proceed in 262 movement it ll reverse all the materials against the order.
For that ,You have to reverse " to reservation". befor that change the production order BOm with the actual consumed QTY.
In production order the reservation number will be 12356.
For that particular material you ll have the reservation number be 12356-12( this you can get from double clicking the line item number of the material).
In MB1A , Give the reservation number (both the nubers 12356 and 12) And find it solved..
hope this clarifies..
karthick
Edited by: karthick PP on Mar 23, 2009 7:58 AM

Similar Messages

  • Excess Issue of Material against Production Order

    Hi
    For Goods Issue of Material against Production order , i want the system to control excess issue of material against Production order.  How can it be controlled.
    Regards
    Madhesh Kumar

    Hi Madhesh,
    there are many loop holes to issue excess stock against production order
    so better you use user exit so that when ever any material issued against production order and it is in excess then throw error
    Thanks
    Bala

  • Error while issue material against production order

    Hi,
      In our development server recently we have created on ecompnay code and plant by copying the one existing company code and plant,  now for this new plant I have created new profit center with KE51  and after that I have create done cost ceneter in that this new profit center is assign   now while goods movment with MB1A with movmen type 201, 202  it works OK system is not giving any error  but while issue the material against production order in MB1A with movement type 261 system is giving error message
    No postings can be made to profit center DUMMYBAOPC in company code MT50
    Message no. KM183
    Diagnosis
    Profit center DUMMYBAOPC cannot receive postings in company code MT50.
    this profit center DUMMYBAOPC we use in old compnay code and for this new company code is not activated  for new we have new profit center  then it is  linking to that  what can be the solution.
    regards,
    zafar

    Hi,
      After asigning new profit center in the Production order problem solve.
    regards,
    zafar

  • Revision number for Header material in Production order.

    I have maintained Revision number in material mster  for Header material in Production order and also for components.
    1)Revision number for Header material in Production order is not appearing in AFKO table against production order.
    2)Revision number for components in Production order is not appearing in RESB table against reservation.
    Any settings for that please guide.

    Hi,
    Revision number generation is using ECM only possible. Are you using the ECM with revision levels. Check this.
    Regards,
    V. Suresh

  • Material costed, production order with no target cost

    I've a case of production order and I don't where to find information to solve it.
    I've a product A costed from March. Standard cost is correct.
    I'm creating a production order now. The cost estimate is calculated during the delivery.
    I've confirmed order by CO15. I've created a variance by deleting 2 items in bom of order. And confirm less than wanted on other component. But I don't think these variances are linked to my problem.
    In CO02 and cost analysis : target cost of my product equals 0.
    I've checked my prod cost variant and choices are : std price, L price from PIR, moving average price.
    Thanks for your helps
    Christophe

    How can I see that ? I've checked that material cost has taken the bom during the cost explosion. Components are also costed.
    I've noticed that target cost appears after variance calculation for product.

  • Defaulting Valuation type of header material in production order

    Hi PP users,
    I have a scenario where a Semi-finished material SF is subject to split valuation as per valuation type = In-House & Export.
    However, the production of SF is always done in MTS environment and client wants that each production order for this SF should be posted for GR (through order confirmation) with valuation type = In-House. When they will have the requirements for SF to be exported, then they will be doing MB1B/309 for SF from valuation type = In-House to Export and then sale from valuation type = Export.
    Now I have seen that for split valuated SF or FG, when you create production order then in the GR tab of order, a field is autoamtically made available for Valuation type. This field is not a mandatory one and hence can be left blank also.
    At the time of order confirmation for SF, the valuation type field is open for input under 'Goods Movements' details. So, even though it is intended to do GR for valuation type = In-House, user can by mistake put valuation type = Export.
    Is there any way in SAP whereby the valuation type (whenever applicable as per header material) field in production order is made mandatory or even defaulted with desired valaution type (in our case, valuation type = In-House)?
    Once either of the two options will become possible, I will be using transaction variant for order confirmation transaction to make the field Valuation type for Output only (not ready for input).
    Thanks in advance,
    PP_HKV...

    Hi
    The field - Valuation type can be made mandatory in T-code MIGO. There is a setting in customizing as Enjoy Setting in Material Management. Using this you can make the field mandatory in MIGO (GR).
    Similarly bu using screen variant you can also make the field mandatory in Order confirmation - Goods movement. (CO11N).
    For making the valuation type as default, there might be a solution in BAdI. Please check with your ABAPer.
    Regards
    Amit parkhi

  • Availability check of raw material during sale order processing

    Dear experts,
                           When i am entering the finished good in sale order processing,system should check the raw material availabilty.Is it possible in STD sap
    Regards,
    murali.R

    thanks to you all for your reply,
    My customer is bright bar manufacturer,They just buy the steel bar & process it & sell it to the customer.So there is only one RAW MATERIAL.
    Their all the activities are mainly based on raw material.So customer wants.....when we enter the finished good system should check the RM stock,based on RM STOCK,sytem should do the availability check...& confirm the delivery date
    I have mapped customer requirement,after modifying item category & assignment......
    Sales BOM explosion & delivery group is maintained for header material.availability check is on at component level & header level.So now system consider the raw material stock & it conform the dates when  i do availability check combinely.
    I would like to know how it will affet the MRP incase of alternative BOM....FURTHER PROCESSING
    Is it the right practise.....Please reply...............

  • Purchase order for stock material in production order

    Hi
    does anybody know how to link a purchase request to production order in case of stock material ? When MRP runs aggregate all requirements for stock materials in one purchase request, and I wold like to find list of order that generated the request,
    thanks
    Gabriele

    Gabriele Montori wrote:
    >
    > 2) I would like to know if there is a way to bind purchase request to Production Order (not planned order) BEFORE the MRP runs and create a Purchase Order, because when creates a PO for stock it aggregates all requests in one order.
    I think I understand what you are trying to achieve -> this sounds like you would want to do what SAP standard would do with KD/E-requirements (customer specific) = every material=item=position in a SD-order will create it's PR or production order. In the same way you want to generate one PR-item per production-order component - wait! - Maybe you want to create a single PR for every component in the production order???
    Gabriele Montori wrote:
    >
    > I hit that road but for stock material, RESB-AUFNR is left empty in table..
    You will have to talk to your MM/PP-functional ... if you do not have RESB-entries I have no idea how this process is setup. You probably do not have components in those production orders, only one header-material (CAUFVD-MATNR).  Depending on what is configured in the material-master MRP views + what modifications/enhancements are installed around the complete process, you could have almost any setup. It's impossible to say without seeing it. Make sure s/he explains to you exactly, since even with different stock-materials there could be different setups for procurement.
    Edited by: Mylène Dorias on Jul 22, 2010 11:37 AM

  • QUANTITY OF MATERIAL IN PRODUCTION ORDER

    CAN THE QUANTITY OF MATERIAL CONSUMED DURING THE CONFIRMATION OF PRODUCTION ORDER BE MORE THAN THE REQUIREMENT QUANTITY OF
    IN COMPONENT OVERVIEW?

    HI
    It is possible if manual changes are made in Goods movement during confirmation.
    Regards,
    Krishna Mohan

  • Excess material for production order

    Hi,
    I have issue in SAP, a particular  production order unexpectedly propose very high material usage. Let's say, that actual usage per production order is 10pcs only, but SAP propose to use 15pcs.
    Please help me to understand what need to be check.
    Thanks,
    Richard

    Hi Suman,
    From your message i could understand that you are trying to create a production order for Finished materail.
    Now if semifinished material is not available in stock, then you need to Confirm/GR its relevant production order.
    If you are just testing some scenario, then you can use txn "MB1C" movement type "561" to increase the stock of the semifinished.
    Generally goods issue is done with referance to Production order/Reservation,this would not allow additional issue. However unplanned issue is possible with just referance to order. This would affect the order cost and the cost difference is likely to get settled to Material.
    Hope this helps..
    Regards,
    Prasobh.
    Reward your points if this was helpful

  • Issue in committing material for production order

    Hi, we are facing an error situation that when we try to release production order there came an issue that few component committed quantity is less than required quantity. When we check the stock of the components they were having enough stock to consider for this production order.
    What could be the other reasons or cause for this situation. Can any one suggest for the correction action.
    would reservation cause this problem when i check the component availability overview it has ATP 0.   will it cause this.
    When i look in to the system there were several Orders that were in CRT state that were using same components as used in the current order under discussion.
    Edited by: kkr_chandran66 on Jan 6, 2011 3:16 AM

    Hi All
    Even MD04 also seems to be showing as if the material is available.  Pl. see the data against 13/12 hereunder.
    06.01.2011     Stock                                                            6,370/      6,370
    08.12.2010     Ord.DS     4604767106/00100                         80-/     6,290
    09.12.2010     OrdRes     420252                         2,740-/     3,550
    13.12.2010     OrdRes     420268                         3,420-/     130
    availability overview CO09 shows as follows for the component:
    13.12.2010     OrdRes     Totals record     3,420-(receipt/req)       0(confirmed)
    13.12.2010     OrdRes     420268                          3,420-(receipt/req)        0(confirmed)                       0(ATP quantity)
    scope of check:
    to include
    purchase order
    include dependent requirements
    sales requirements
    deliveries
    include shipment notifications
    all reservations
    check releases for transport orders only
    take all productions orders into account.
    With this scenario what can i do get it working.
    Edited by: kkr_chandran66 on Jan 6, 2011 6:46 AM
    Edited by: kkr_chandran66 on Jan 6, 2011 6:59 AM
    Edited by: kkr_chandran66 on Jan 6, 2011 7:00 AM

  • Problem of Raw Material & Finished product

    Dear Experts,
    My problem is related to Item Data Master when i am trying to select in Excisable Category Material Type Finished Goods,Raw Material & Capital Goods then opposite result i get. When i select Raw Material Category then i get result Finished Goods.Acutally i select item & Item Group same.
    Regards
    Amol

    Amol,
    Click on the link to get to the Support Page. 
    https://websmp203.sap-ag.de/support
    Use Report a Product Error link
    Suda

  • Can serial number be entered for a BOM child material in production order

    Hi,
    Kindly let me know whether it is possible to enter serial numbers for a BOM child material in a production order. In case yes, then under what circumstances (parameters) and where do we display it in a production order? e.g. for a BOM parent material, we display it in transaction CO03 --> Header --> Serial Numbers.

    Dear Sourav,
    In myunderstanding I dont think we can maintain the serial numbers for the components in the production order,but however
    while performing GI using MB1A or during CO11N(,if backflushing is activated) we can enter the serial numbers for the
    components and then using documented goods movements we can trace for each production in CO03 or else in COOIS.
    But kindly check with T.Code COIB which seems to define the header-component serial no relationship.
    Check and revert with your findings.
    Regards
    Mangalraj.S

  • Function modul for a material  throufh production order

    hi,
    Is there any function modul available in SAP for production order for a material
    ie passing input as production order to get the material no and production order date .

    Hi ..
       No ya these 4 func.modul is not in 4.6c can you pl send a right fun.mod. for 4.6 c ver.  so that i can use it.
    regards,
    Lakshman

  • Error when no production BOM exists for material in production order.

    Experts,
    I have materials with production BOM's and other materials without production BOM's.
    When I create a production order, I get an error message (not blocking) that I don't have production BOM.
    Can I configure my production order type in a way that a production BOM is optional?
    Many thanks!
    Jan

    Hi,
    Please cheeck with OPJB.
    SPRO-> Shop floor control->Sytem modfications-> Define sytem message attributes.
    As you can convert the meassages only defined here
    SPRO ( Production > Basic Data> BOM > General Data > Change Message Type .
    Or
    Goto SE91; press F4; select SAP Applications as PP and find all messages under it
    Regards,
    R.Brahmankar

Maybe you are looking for

  • How do I transfer a few songs from old library without bringing the entire old library to the new one?

    I am trying to condense my itunes library from a desktop to a laptop. I only want a few songs from my original library so I can have more room on my ipod, I turned on home sharing so I could import the songs i wanted. then once I imported the select

  • Browse in Bridge CS6 from Photoshop CS6

    I'm really looking for a "reveal in Finder" function. Seems like the "Browse in Bridge" is the nearest thing in Photoshop CS6. The first time I used the browse-command, it showed me the picture in Bridge. All good. Suddenly it only switches to Bridge

  • Slices - HTML and CSS??

    Hello, I was wondering if someone with extensive experience with HTML and CSS AND PS could help me with my question: I have been marking up HTML and CSS for some time now using a basic text editor. As my designs have advanced, so has my ability in Ph

  • Deleting operations in master recipe of process orders

    Dear Guru's,        I want to delete the operations in master recipe of process orders. The operation numbers are different in different process orders. This activity has to be performed on bit large number of process orders. Can anyone help me in pr

  • Help - Symantec Enpoint Manager 11.x - MARS integration

    I'm at a loss here. I have raw messages that regardless of whether a keyword rule is created to handle them or a custom parser. No matter what MARS simply ignores the messages as parsing errors. MARS has built in support for Symantec AV 10 and lower