Revenue Recognition Tied to Invoice

Hi All,
We have a following requirement to meet for our revenue recognition process. I would like to know if it is possible to achieve in version 11.5.10.2.
Currently in Oracle 11i (11.5.10.2), revenue recognition is tied to invoices. We have created accounting rules, and invoicing rules to recognize the revenue. However, since the revenue recognition is tied to invoice, we are facing the following problem.
For Example, We have a contract spanning three years duration with the total contract value of $300,000. The client pays $50,000 in first year, $100,000 in second year and $150,000 in the final year. As per the functionality in 11i, our first year revenue recognition is breaking into $4166.66 every month ($50,000/12 Months), second year revenue breaking into $8333.33 ($100,000/12 months), and the third year revenue breaking into $12,500 every month ($150,000/12 Months). Instead of this, we would like to recognize the monthly revenue as $300,000 / 36 Months, even though the invoice schedule is as mentioned earlier (50k invoice in the 1st year, 100k invoice in the 2nd year, and 300k invoice in the 3rd year).
1. Is this functionality/requirement possible to achieve in 11i ? with or without customization? if with customization, please provide details on what API/package/process/setups to be customized?
2. Is this functionality/requirement already available in R12? partially achievable or completely achievable?
Any suggestions/inputs will greatly help us.
Thanks.
Abm

Hi Abm,
You have rightly mentioned in your first note that the revenue recognition is tied to the Invoice. At given time, the amount of revenue recognized on an invoice is always less than or equal to the Invoice Amount. So, in order to recognize the revenue, you need to have an invoice.
You have mentioned in your previous note that you may generate one or multiple invoices in a year and no mater how many invoices you generate, you still want to recognize 8333.33 (i.e. 300,000/36) each month. As per standard functionality, this is not possible. Reason - Revenue Recognition is based on the Invoice and the Invoice amount. Your requirement actually gives rise to another question. If you havent invoiced the customer in the first month, what will be the accounting entry for the revenue recognition of $8333.33?
I can think of some workable solution, but first I need to understand the accounting for this.
Thanks,
Anil

Similar Messages

  • Price Change for Revenue Recognition

    Dear experts,
    I am using Revenue Recognition of type B with Revenue Recognition before invoicing.
    I have an issue/question about the way price changes are treated in the functionality.
    The below example is used to describe the issue for your understanding:
    1.Pricing master data: $100/EA
    2.Price of item in sales order: $100/EA
    3.Qty in sales order: 10 EA
    4.Delivery & Goods issue: 10 EA
    5.Revenue Recognised (VF44) for: $1000
    Accounting Entry:
    DR Unbilled Accounts Receivable $1000
    CR Revenue $1000
    6.Change in pricing master data: $120/EA
    7.Partial Invoice for: 2 EA @ $120/EA
    Accounting Entry:
    DR Customer $240
    CR Unbilled Accounts Receivable $240
    8.Partial Invoice for balance qty: 8 EA @ $120/EA
    Accounting Entry:
    DR Customer $960
    CR Unbilled Accounts Receivable $760
    CR Deferred revenue $200
    9.Subsequent Revenue Recognition (VF44)
    Accounting Entry:
    DR Deferred revenue $200
    CR Revenue $200
    As you can see in the example above, the amount of the price difference is not credited to sales in step 7. From what I have seen so far the additional amount due to price difference gets credited to sales only after the total invoice value for the item exceeds the revenue recognized.
    Is there any option to set the system so that the price difference is taken into account for revenue recognition during each invoicing (even
    when the invoicing is partial) ?
    Thanks in advance for your help.

    The price difference will not go to Sales in Step 7.  The reason being Revenue Recognition works on the item rather than the amount.  Since you have run F-44, the system finds the same in Unbilled Receivables and posts to that account.
    For updating the price changes, you have to run VF46 to cancel the original RR entries.  In this case, it will just clear of the RR lines if realization has not happened and post a reversal if realization has happened.  This txn will also create a new RR line for VF44 which you can process.
    Refer Note 820417 Implementation guide for RR.  Download the attachments and look into Part2 doc page 13.  This explains how to deal with price changes in sales document.
    Hope this helps.
    Ravi.

  • Service Based Revenue Recognition - Prov Account Missing when using WBS

    Hi,
    I´ve activated RR functionality using service based and aceptance date.
    I've followed the intructions from the best practices documents and the notes:
    Note 820417 u2013 IMPLEMENTATION GUIDE FOR REVENUE RECOGNITION
    Note 1172799 u2013 NEW VERSION OF BEST PRACTICES FOR REVENUE RECOGNITION
    Note 678260 CONSTRAINTS
    Note 777996 u2013 ACCOUNT SETTINGS FOR  REVENUE RECOGNITION PROCESS     
    Note 779366 u2013 REVENUE RECOGNITION IN THE SD MODULE
    Note 1166848 u2013 CUSTOMIZING SETTINGS
    Note 782758 u2013 PREREQUISITS FOR USING REVENUE RECOGNITION
    Note 835367 - Activating SAP ERP SD revenue recognition
    Note 1000830 - Revenue recognition through incoming invoice (third-party
    Note 1025066 - Revenue recognition by proof of delivery (POD)
    Note 1120297 - Revenue recognition by acceptance date
    Note 1125456 - Revenue recognition due to customer-specific event
    We are implementing SD, FI (using New Gral Ledger), PS, CO and MM in a company that sells projects. Therefore we're posting everything to the WBS elements.
    We need to post the revenue values to the WBS elements too.
    The problem is that when we create a sales order for RR indicating a WBS element and try to save it, the system activates the incompletion log saying that the provision account is missing, despite the account is in VKOA.
    The strange thing is that if we use a material with profit center (without any WBS or order indication in the sales order) all the revenue recognition process runs perfectly (we save the order, VBREVK is fullfiled, VF44 is run and the invoice is done correctly).
    Does anybody know why when using a WBS element in the sales order, SAKN2 field is not fullfiled and the incompletion log is activated???
    Is it a program error? Or are we doing something wrong?
    Quick responses will be apreciated since we need to move on within two weeks!
    Thanks in advance!
                                     María del Valle Pintor.
    Moderator: This thread has been locked due to crossposting.
    Please do not post the same question in different forums.

    sap note 883544

  • HELP: AR Open Invoices Conversion with Revenue Recognition (Daily Revenue)

    Hi,
    I need some help on Conversion of AR Open Invoices with Accounting Rules in R12, Here the client wanted to use Daily Revenue Schedule rule,
    I am developing Functional Specification Document (CV.040); Need to understand the Assumptions, Approach and Which data needs to be extracted from Legacy System.
    Appreciate your reply at the earliest
    Thanks
    Ravi

    Anil,
    Thanks for your response, Here are the answers to your questions.
    1) The invoices that you want to convert - Do they already have revenue recognition on them?
    Ans: Yes they have Revenue Recognition On Them.
    2) Are you bringing only Open Invoices? What about Invoices that are closed (paid), but still have unrecognized revenue on them? DO you want to bring them
    over? If no, how will be mage the recognition of those invoices?
    Ans: We want to bring only Open Invoices. i.e the following scenarios want in Data Extraction
    a) Invoice is Fully Paid (REC is Zero) and Unearned is Full Invoice Amount, Revenue is 0
    b) Invoice is Partially Paid (REC is Partial) and Unearned is Partial, Revenue is partial
    c) Invoice is fully Paid (Rec is Zero) and Unearned is Partial and Revenue is Partial
    d) We do not want to bring the invoices with Fully Paid and Fully Recognized, Unearned is Zero
    3) What about partially paid invoices? How do you want to bring them in?
    Ans: See above scenarios.
    4) Do you want to bring in all Invoice details,or just bring in a summary line with the outstanding amount?
    we assume only Summary, but if the Invoices with Several Lines and Different Accounting Rules, We may have to bring them too
    Appreciate your response; Suggest some possibilties?
    Thanks
    Ravi

  • GAAP Invoicing and Revenue Recognition EITF 00-21

    Does anyone out there have any experience with GAAP invoice and revenue recognition rule EITF 00-21, dealing with Multiple Element Arrangements?
    This is the scenario where a contract or sales orders includes support or service that is packaged with a product, therefore customer sees its price as $0; however, when is comes to revenue recognition, vendor needs to account for the revenue according to the typical price for the support or service and percentage of the total contract or sales order.
    This would be something that is imlpemented in Advance Pricing, Order Management and AR.
    Thanks!!

  • Revenue Recognition (AR Closed for future month in error)

    Need help with revenue recognition. In the month of June in AR July was opened in error, so it was put in to close pending. Since July was closed the last 3 days worth of June invoices did not have any revenue recognition for July. Instead July's revenue was posted in to August since August was showing as a future period, and July was closed. Is there any fix to change the revenue recognition without doing a credit and rebill of 3 days worth of invoicing? If we reopen June, and run revenue recognition again, will that help? Thanks in advance for any help.

    Well there are a few ways you can go ahead and fix this, but it depends on lot of factors.
    Lets say you have 1 invoice for which the revenue has been recognized in August and not July, now you can query up that invoice in the transaction's workbench and incomplete it. After incompleting all the revenue recognized distributions would be deleted(applicable 11.5.10 onwards) and when you complete the invoice again & run the RR program the revenue would be recognized in July(provided it's in an open status). Please note though that you can incomplete a transaction only if it doesn't have any activity against it!
    Now coming to the real world it's possible that the number of transaction's you have could be quite large and doing this manually through the screen might not be feasible. So you could possibly write a small pl/sql script to loop through those invoice's and incomplete them by calling the complete/incomplete group transaction's api. And then again complete them and re-run RR program to complete the fix.
    Please note though that you can incomplete a transaction only if it doesn't have any activity against it!
    With posted transaction's or transaction's having other activity, it's possible to fix them too but that would be taking things too far and Oracle Support/Development would be best equipped to provide you the fix in that scenario.
    HTH,
    Jasmeet.

  • Pricing procedure not to bill customer but revenue recognition

    I'm looking for guidance on how to setup a pricing procedure conditions.   First let me explain the situation.  What happens is the customer buys say 2000 software licenses on a sales order. The customer is billed and the customer account is debited and a deferred account is credited. Now the customer activates one of the licenses. The pricing from the sales order is copied to a contract. This contract has a start and end date for the license. Now that license can start to be recognized based on the period of the line item contract dates.. The issue we have is that normally for deferred revenue billing takes places. Problem is customer was already billing on the sales order. Somehow the pricing procure has to credit the deferred account that was posted on the sales order and then credit the revenue recognition account that can be used by transaction VF44.
    So on the invoice associated with the sales order Invoice  from sales order
    Dr Customer $1000
    Cr 2370 $1000
    The account 2370 is the deferred account. This part is fine.  
    Now we activate 1 of the licenses.
    So the pricing procedure has to do the following with no billing to the custo0mer account Invoice from contract
    Dr 2370 $120
    Cr 2371 $120
    This is the problem part. crediting the deferred account 2370 and then posting into the revenue recognition account 2371
    Rev Rec – VF44 for Period1
    Dr 2371 $10 Cr 4340 $10 Any ideas would be appreciated

    Hi
    In SD billing documents customer is always debited or credited based on nature of transaction. For posting in two different G/Ls instead of customer account there is only one possible way which I know. In free goods pricing system can post debit and credit entries to different G/Ls and these G/Ls are controlled through account keys which you assign to condition types in pricing procedure.
    Do you have any Idea of free goods pricing and its posting? Explore this and give it a try. I am not sure about this because I didn't test this. You can test and see if it helps.
    In this for contract item category you have to use free goods pricing which you set in item category settings in VOV7.
    Thank$

  • Config of billing type G2 for Revenue Recognition

    Hello Experts.
    I have a situation where I need to configure billing of credits for revenue recognition.
    For normal builling we have copied doc type SO to ZBCS and added ZTAD item category (copied from TAD) for the RR.
    To do this for credits I copied doctype CR to ZBCR and assigned ZTAD item category to it.
    When billing the ZBCR not I get the message "Item category ZBCR ZTAD cannot be invoiced with billing type G2".
    How can G2 be configured to allow this?
    This is G2's current setup.
    Billing Type G 2 C red tM e m o Created by
    Number systems
    No.range int.assgt. 19 Item no.increment 0
    General control
    SD document categ. O C re dit m emo Posting Block
    Transaction group 7 B il lin g doc um ent s Statistics
    Billing category
    Document type DG C us tom er cr ed it me mo
    Negative posting N o neg at ive p ost in g
    Branch/Head office C us tom er =Pa ye r/B ra nch =s old -t o p ar ty
    Credit memo w/ValDat N o
    Invoice list type
    Rebate settlement Rel.for rebate
    AcctDetermProc. KOF I0 0 A cco unt De e rm n ato n
    Doc. pric. procedure
    Acc. det. rec. acc.
    Acc. det. cash. set.
    Acc. det. pay. cards
    Output/partners/texts
    Output determ.proc. Z10 00 0 B il lin g Out pu t Application V 3
    Item output proc.
    Output Type
    Header partners FK B iln g D ocu m en t
    Item partners FP B il lin g Ite m
    TextDetermProcedure 03 Invo c e hea de r
    Text determ.proc.itm
    Delivery text

    Hi,
    You may be maually given the PR00 in ZBCR. But in your copy control (VTFA) --> item category ZTAD  --> pricing type, you may be maintained B (Carry out new pricing).
    If you maintain B, you have to change it to "D ". 
    When you maintain B, the system will search the Pricing again in Credit memo. All manual prices will be lost.
    Thanks
    M. Lakshmi Narasimhan

  • Cost of Goods & Revenue Recognition

    Dear All,
    I have a typical requirement related with the cost of goods sold (COGS) G/L account & the revenue recognition.
    Under SAP best practice, the COGS account is updated together with the Inventory account when post goods issue (PGI) is done.
    there are 2 scenarios here -
    1. Normal Sales - delivery related invoicing. Here the invoice is created immediately after the delivery. So here the revenue & cost recognition matches.
    2. Project sales - PS not being used. Just created milestones using milestone billing. Here the invoice is order related with billing plan. So the milestones are
    a. 50% after order confirmation.
    b. 40% after delivery.
    c. 10% after installation & commissioning.
    Here the revenue will be generated at three stages & the COGS will be updated after delivery (PGI).
    Is there any way we can update the COGS at the time of invoice in standard SAP.....?
    With best regards,
    Niyaz.

    Hi friend,
    Pls use T-code OMJJ and OBYC to setting as stop update acct in PGI! I only know the location to impact about it! With update acct in Invoice, I need to verify again for! I will update when I cover it. Hope this help
    Best regards,

  • Not able to delete a delivery after revenue recognition is reversed

    Hello Gurus,
    We have a situation for certain Sales Order types after creation of Sales Order -> Delivery and PGI, we do revenue recognition. But there was some mistake and delivery needed to be deleted and recreated if needed. So after doing revenue recognition reversal we are reversing the PGI. After this when we try to delete the  Delivery ( which would have got deleted if there was no revenue recognition process ) we get the below error.
    Is it a problem with the way Revenue recognition is configured or does the standard behave like this. If the Invoice is also present in the above I am able to cancel the Invoice. If you think its a problem with the way Revenue reccognition is configured please advise.
    Item 000010 cannot be deleted (revenue recognition status)
    Message no. VL896
    Diagnosis
    The delivery or delivery item cannot be deleted.
    System response
    The document cannot be deleted since the delivery contains items that
    reference sales document items that are relevant for revenue
    recognition. When the goods issue was posted, the system created revenue
    lines that had already been recognized. This means that there are
    subsequent documents in revenue recognition for this delivery.
    Procedure
    If you no longer require the delivery or delivery item for deletion, set
    the delivery quantities to zero and repost the goods issue. Make sure
    that the quantity zero is allowed in Customizing for the delivery item
    category. When the goods issue is posted, the overall processing status
    is set to C and the delivery can be archived. Message determination
    should be configured not to send any messages in this case. To make sure
    that the system makes revenue corrections if there are differences
    vbetween billed and recognized values, set a billing-relevant rejection
    reason in the sales document item if more than one partial delivery is
    allowed.
    If you still want to use the delivery, adjust the delivery quantities
    accordingly. Alternatively, deliver the referencing sales document item
    again. Note that the sales document item cannot be delivered again if
    only a partial delivery is allowed.
    What are the changes I can do to Delete the Delivery?
    If I cannot Delete the Delivery, Should I make the Delivery as 0 qty and create a new delivery with changed qty and do further process. Or should I reject the Sales Order and create a new sales order with exact qty and do further process.
    Please advise.
    Regards,
    SNK.
    Delivery has one line item. For the above case scenario, invoice is there for some deliveries and for some deliveries there is no invoice. Eg: SO -> DN -> PGI -> Rev Recog -> Iv or SO -> DN -> PGI -> Rev Recog. Requirement was SO was wrongly created as the qty was wrong or in some cases SO needs to be rejected. I am able to cancel Invoice. Rev recog is reversed. PGI is cancelled by VL09. Not able to delete Delivery and I get the above error. Ideally I thought since Rev recog is reversed, Delivery should have been deleted but not happening and above error comes.
    SO - Sales Order DN - Delivery IV - Invoice
    Edited by: sapconsultnt on Dec 16, 2009 5:06 AM

    Hello,
    Please review the Note 1224871 which introduced this functionality.
    Regards,
    Raghavendra YN

  • Revenue recognition at the time of Delivery - COPA

    Dear Gurus,
    Our sales cycles are bit different than the standard sales process.
    In one of the sales cycle the business does the Billing first and delivery later and the revenue recognition should happen at the time of delivery not billing.
    How do I achieve the same in COPA data flow and is this a reason why I should activate account based copa?
    Regards
    Roy
    Edited by: roy001 on Mar 27, 2011 8:03 PM

    Hi
    Thank you for you comments.
    Our business scenario is car sale- The car dealer looks into portal(called dealer portal) and checks the availability of a car.
    Once the dealer makes the car selection, he then places an purchase order to the car manufacturer.
    Based on the order the car manufacturer asks for the full payment from the dealer. After receiving payments, the car manufacturer delivers the car.
    Therefore the invoice is raised before delivery.
    The problem that we have in the above scenario is the COPA value flow. How do I flow the values into copa?
    Any input?
    Many thanks.
    Regards
    Roy

  • Changing Profit Centre in Revenue Recognition document

    We have recently changed the profit centers in material master. The already existing invoices are carrying those old profit centers. Now if we create revenue recognition documents for these existing invoices then the old profit centers gets referenced.
    Is there any way that the updated profit centers from the master are copied into the revenue recognition documents. I believe in the invoice documents the profit canters cannot be changed.

    hi
    The system proposes the profit center in the cost center belonging to the responsible work center. You can overwrite this, however.
    If you change the responsible work center in the order, the system does not automatically overwrite the profit center on the additional data header screen. If required, change this manually.
    You can change the profit center in the order, provided that no actual data exists for the order yet
    regards
    thyagarajan

  • Revenue Recognition in Project System

    Hello All,
    At my current client, they are using the Project System (i.e. WBS) only for Cost and Revenue collection. POC,RA,Milestone billing,Network, Activities are out of scope. Keeping the above thing in mind, I need to know how I do the Revenue recognition thru WBS.
    Mu understanding is that If I assign a WBS element on a Sales Order line item, as an account assignment it should collect the Revenue. The only requiremnt should be that WBS should be a billing element and Cost/Revenue profile should carry SD relevant settings. Once the billing is done and invoicing is done, the Revenue should appear against the WBS on running the report S_ALR_87013563/64/65/66.
    Please let me know if this will work or do I need to do some more configuration from PS perspective.
    Thanks
    Sarang

    Hi Sarang,
    1. Mark WBS as billing element.
    2. Assign the sales order line item to the WBS in point 1 or any WBS below that in the hierarchy.
    3. Create a billing plan for the sales order line item.
    4. The billing plan amount would appear as planned revenue against the WBS element (provided no credit hold useVKM3 to release).
    5. Once the line item has been billed ie. Billing document has been created using VF01 or VF04, the Actual revenue would appear against the WBS element.
    In terms of Config:
    Creat a planning profile that allows Automatic Revenue planning form Sales Order (tcode: OPSB)
    Ensure that the planning profile is attached to your project profile (Controlling tab) (tcode:OPSA).
    Please let me know if this helps.
    jibat
    Edited by: Jibat Sankar De Sarkar on Jan 21, 2009 2:49 PM

  • UNBILLED RECIEVABLE ACCOUNT- SERVICE CONTRACT WITH REVENUE RECOGNITION

    Hi SAP Gurus,
    I want to draw your kind attention towards my problem:
    I have created  service contract with one year contract and created an invoice for the whole year in advance.
    Now in-between i cancelled  a contract (after three months) and want to recognised a revenue for the contract period , so i'm creating a revenue recognition for the three months one by one using  transaction code-VF44,
    first month revenue recogniton is working fine as first month amount is going from deffered account to revenue account
    But for second month instead of deffered account ,system is using unbilled recievable account  ,which is wrong .
    Can anybody tell me why the system is picking unbilled receivable account instead of deffered account in case of second month revenue recogniton.
    This may help us:
    "When i was cancelling a contract ,at that time i was entering a billing plan end date in billing plan tab at an item level.
    and just after entering end date ,system was creating two lines instead of one in billing plan tab and i think because of that extra line system is picking unbilled receivables in second revenue recognition."
    Thanks in advance
    Ujjawal
    Edited by: Ujjawal Singh Karki on Dec 29, 2010 12:05 PM

    Hi,
    Thank you for your reply.
    I am doing a contract billing for overall period that is for 12 months (contract is of 12 months).
    Just after 3 months i have realized that somehow we have to cancel the contract and we canceled that in 3rd month.
    I had created the created a contract with periodic billing plan and for canceling that contract i'm putting contract end date in BILLING PLAN TAB as 31/03/2011 (Let say contract is from 01/01/2011 to 31/12/2011).
    Can you/anybody please tell me whether is this the correct way of canceling the contract with periodic billing plan?
    As per your analysis:
    "It seems you have done the billing document for one period and you are doing the RR document for multiple periods and hence the revenue is going to unbilled receivable account for the period for which billing document has not been done"
    As i have billed the customer for 12 months but contract was only for 3 months so i'll create RR for only 3 months and for rest of the period (i.e. 9 months) i'll create credit memo and send it to customer.
    "Please use a billing type where you will specify only start date and end date of the contract and not the billing plan in contract"
    How can we use billing type for contract start and end date .
    I think as soon as i'm changing the dates in billing plan tab system is proposing another line item with different  billing dates and that is not getting covered under deferred account that is still unbilled amount .
    Waiting for your valuable inputs.
    In case of any clarification kindly revert to me.
    Thanks,
    Ujjawal
    Edited by: Ujjawal Singh Karki on Jan 20, 2011 11:10 AM

  • Data Migration of Contracts with periodic billing and revenue recognition

    Hello Experts,
    I am trying to develop a legacy data migration plan for Contracts with periodic billing plan and revenue recognition.
    Example of the scenario is given below:
    Customer signed a contract for one year starting 01/01/2009.
    Customer is billed quartely, billed in advance.
    SAP going live on 04/01/2009
    Customer is billed for 3 months and also for initial set up fees.
    Revenue recognition is done monthly.
    We have to migrate this contract to SAP.
    Billing document posting may be necessay as it affects revenue recognition which spans across the total contract period.
    Any ideas how to do this?
    Thanks  A Lot
    Anil
    Edited by: Anil  Jose on Sep 17, 2008 9:38 PM

    Hi Anil
    How did you manage this? We also had the same problem in one of our contracts and what we did was that we copied the contracts from the legacy with the full value. That is suppose SAP went live on 1st April, 2009 and the contract was created on 1st January 2009 for a value of suppose 100 USD, with the first billing being done on 1st Jan for 33.33 USD for 4 months. We first created the contract with a validity from 1st Jan 2009 in the new system. We billed it with a billing type that we created that did not actually create new accounting entries as the accounting entries had already been created in the legacy system. In the new system then we recognised the revenue till the go live, so that the actual value remaining of the contract reduced. Then we started the billing plan of the contract from 1st of April 2009 for the remaining amount. So next invoice was created on 1st april for 33.33 USD. Can you share your solution.
    Regards
    Indranill

Maybe you are looking for

  • How can i transfer al my data from a Sony laptop to a new macair?

    Hoy can i transfer all my data from a Sony laptop to new Mac airé?

  • How to synchronize files in the iFS and a record of table ?

    I have table that contains information about a documents. Document's name, author, project number, etc... Documents are files made by Word or Autocad etc.. Documents are saved in the iFS. One record in the table should correspond one document in the

  • SJSAS 2005Q1 JMS ConnectionFactory error

    Hi all, I am finally very close to getting a test JMS Topic connection working, but I am running into the issue with Root exceptions when trying to provide it with a INITIAL_CONTEXT_FACTORY. The SJSAS server is located on a different computer. My que

  • When using  Vikas' program to load large files  getting error

    Hello, I am using Vikas' program to load large data files: http://htmldb.oracle.com/pls/otn/f?p=38131:1 This works fine, except when I click on the button to create table, then I get a "not found" error-- failed to parse SQL query: ORA-00942: table o

  • Unable to connect via wrt54gx2 wireless

    Had this router for a couple of years - was working fine last time I was on, about 2 weeks ago.  Using with an HP with Vista, via a broadband.  LAN connection works fine. Wireless Drivers are still there, and I'm able to view my network in the Manage