Reverse subcontracting process

Hi,
I have an issue in subcontracting purchase
I have created PO for quantity 10,
Made transfer posting to vendor in MB1B 541 mvt for 10 qty
created subc. challan for material doc.
Made GR for 5 quantity, and challan is reconcilled for 5 qty.
but the issue is the GR made is wrong.
I want to cancel the  GR material document now, how to go ahead with reconcilled quantity now. please suggest the solution for this issue.
Regards
Madhu

Dear,
You have done the GRN wrongly and reconcilled the same with the challan number. Assume the GRN no is 500000123 and the challan number is 20001.
Now the challan qty 20001 is  10 pc
GRN qty is 5 pc,  so after reconciliation the challan balance qty is 5 pc. And the status of the challan will become A-assigned.
Now on this situation you have to do the following:
First do the "deletion assignmen" in J1IFQ.  ( enter the GRN NO 500000123 and document year).
Then dont press "enter" key or "execute" F8 key.
Just go to the tool menu " Quantity recon" then select " Delete assignment"
Thats all, the relationship between the GRN and Challan is now removed.
Now the challan status will become again to P-Posted.
Now you can cancel the GRN, this is independent only.
Then do the GRN correctly and reconcile properly.
The above is the general proceudre. But since you have done cancellation and challan reversal everything, first  tell me these details
What is your challan status - Check in J1IFR ( is it R-reversed, A-Assigned or C-complete)
Then what is the balance qty showing in your challan.
Pls give these details so that I can answer accordingly.
Thanks
Vijay

Similar Messages

  • REVERSE SUBCONTRACTING PROCESS WITHOUT EXCISE DUTY

    Business Process,
                                 Raw material got from the Customer & it is processed by Client,finished goods are made the same will be delivered to the Customer without excise duty.
    Details:
    1.     Sales order will be created with the details of raw materials that customer agreed to give & finished product that customer need after getting the P.O from the customer.
    2.     Customer will send the material with annexure -2 with first part updated.
    3.     When the client receives the material in the  Annexure -5 register first portions qty is updated.
    4.     Raw material issued to production, the issued qty updated in Annexture-5 register is updated in the second portion.
    5.     Finished product received by stores from production the received qty updated in Annexture-5 register in the second portion.
    6.     The received Raw material processed by client converted to finished product partly. Part of the finished product is issued to the customer against the sale order with annexture-6 with Annexure -5 register second portion update.
    7.     All the remaining raw materials converted to finished product & it is the last consignment issued to the customer against the sale order with annexture-2  part-2 updated. And the issued qty is updated in the Annexture-5 register second portion updated.
    8.     In this process all the movements of the material is updated in the Annexture-5 register.
    Pl giude to maintain the above process ican be mapped in cin
    Regards
    UMAPATHY.M

    This can be mapped in SAP but there is no standard Tcode to do this. You have to develop Z Transaction code with the help of ABAPer.

  • Subcontract Process with vendor supplied component

    Hi,
    We have a subcontracting process, when we send 3 components to the vendor, the vendor apply another component and return the semi finished to me.
    I have a BOM of this semi finished Good that includes all the 4 components.
    We sent the 3 components via mb1b.
    We create a PO of the Semi Finished Good if we verified the components the 4 components are there.
    When we try to receive via MIGO and click in verify The 3 itens that I send is OK ... But the item that is supplied by the vendor show me an error message that there is no stock.
    What should I do to receive the component supplied by the vendor ?

    Hello,
    1. Create subcontracting with item category "L"  and second line item in same PO enter with Item cateogroy means STD.
    2. Item level of the  Delivery address tab, tick SC Vendor and enter the same Vendor code there.
    3.Go for  GR for only for  2nd line item first. This stock will automatically picks 101 O Mvt, and u can view this stock as Vendor stock.
    Check MMBE  stock overview , Material is showing provided to Vendor at plant level.
    4. Provide other 3 components with MB1B- 541 Mvt.
    5. Go for second GR for finished Product.
    4th Material shown as Material provided to Vendor in stock overview. if you want to get back that same material to your stock. reverse that stock use  t code MB1B with help of Movement type 542.
    Or else.
    Through subsequnet settelement you can send the 4th Material to your subcontrcator MB04.
    Regards
    Mahesh Naik

  • Steps in Subcontracting Process

    Dear Experts,
    In Subcontracting process if the subcontracting period of 180 days is completed and if material is still with Vendor, how to complete the process.
    Also how to reverse the Cenvat Credit.And how cmplete/reconcile the challan.
    Please explain detail steps and Tcode.
    Thanks and Regards,
    Sapmm user

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product ) 0
    (material provided to Vendor is now charged to expense)
    (5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Note:: At the Time of GR 543 Mvt is up dated for Raw Material.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to be created for the material(2) calling for material(1)
    4. Info record and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    u2013 You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    u2013 If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    u2013 You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.

  • How subcontracting challan is manged in multilevel subcontracting process??

    Hi Gurus,
    ***How subcontracting challan is manged in multilevel subcontracting process??
    **In this scenario  *** when we send material to sub con vendor A1 for  job work,with this we create subcon challn(J1IF01) & send it to vendor, when this vendor  completes his job,he directly send this matrl to subcon vendor to B1 for the finishing work, after this vendor B1 will directly send finished matrl to company***
    Here - how the subcontracting challan is managed?? please guide.

    Hi,
    The challan is also widely known as the 57F4 challan, after the law under which it was defined up until the 2000 budget. This law has now been superceded by a new one, 57AC. The challan consists of a header and line items. The header, in addition to T-code is J1IF01 to create subcontracting challan. organizational data, allows you to enter:
    Preprinted number
    Additional data
    Identification marks
    Nature of processing
    Furthermore, each challan has two numbers, an internal document number and a challan number, which the system assigns to the challan when you save it. From a business perspective, this is the most important number. Each challan also has a status, which shows you what stage in processing it is at.
    The line items are copied across from the transfer posting when you create the challan. You can also enter additional data for each item
    T-code for completing the challan is J1IF13. You use this function to close a challan completely after all the materials have been accounted for. If a challan's return date has elapsed, and thus your right to the CENVAT credit, you use it to reverse the excise credit u2013 or, should your subcontractor return the goods subsequently, to re credit the excise credit
    Reconcillation of challan (J1IFQ): Once a subcontractor has processed your materials and returned them to you, you match the items in the challan against those that have been returned . I hope this will resolve your issue. Thanking you.

  • Error while releasing Billing document in Subcontract process

    Hi All,
    We are working on Subcontract process as explained below:
    Company code X purchases the component A and sends it to Company code Y on Subcontract. Company codes X and Y belongs to one company using single operative chart of Accounts, Controlling area & operating concern. FI configuration has been maintained in OBYA by treating above company codes Inter company GLs. The component A is sent to company code Y as non value added item. Through 501 movement type, as the component is sent by Company code X.
    Company code Y will add some components (like B,C and charges some expenses as service component D for preparing Finished good) and send this FG to Company code X. For this company code Y will raise a Sales order and followed by MRP run and Production order is created.
    In VA02 of above Sales Order, while entering Item details, where the Settlement rule is asking for PA Transfer structure (in Account assignment tab of Item details) and giving the following error analysis:
    Enter a PA transfer structure
    Message no. KD 044
    Diagnosis
    A PA transfer structure is required for settlement to profitability analysis.
    System Response
    You cannot save this settlement rule.
    Procedure
    Enter a PA transfer structure. To do this, choose the "Parameters" function in the settlement rule. As part of customizing, you can also store a default value for the PA analysis structure, in the settlement profile. The system then uses this default value when you enter a settlement rule.
    In addition to above, another issue has raised while releasing the Billing document after doing PGI. Accounting document is not getting generated and while releasing the Billing document (VF02) it is throwing an error as
    “Enter profitability segment as cost object for Revenue and COGS posting”
    Message no. ZC 001.
    MM,PP,SD & FICO configuration settings maintained:
    1. All required OBYC settings
    2. All cost element and Cost element categories have been maintained
    3. From MM side the system is generating FI & CO documents
    4. Settlement profile in Production Order type is maintained (in KOT2). Allocation structure and PA transfer structure were maintained in (OK06, OK07 & KEI1).  In PA transfer structure we have assigned the required Sources and Value fields and settlement cost elements.
    5. In VKOA condition types KOFI and KOFK were maintained for relevant Customer & Material Account Assignment groups.
    6. Required settings have maintained in OKB9.
    Movement types 501 (sub contract), Received back to Company code X through Movement  type 101. In spite of these settings still we are getting the above mentioned errors.
    Could any one help to provide some inputs on the above issue as early as possible.
    Thanks in advance.

    Hi,
    check  in the sales order line item procurement tab . u can get the requirement type. in SPRo check the requiremnt class for the requirement type. in that requirement clas u will get settrlemnt profile for the sales order. Check that settlemnt profile there u have to maintain the PA transfer structure.
    I think both problem will get solved by maintaing the PA structure..
    You are doing sales order costing right....and i hope it is non vsaluated sales order costing .....
    If help ful please assign points.
    cheers
    Prabhat

  • Goods Receipt in Subcontracting process

    Hi,
    I am beginner in SAP.
    This is regarding Goods Receipt in Subcontracting process.
    I have provided raw material Quantity = 100 Nos. to subcontracting vendor.
    Subcontracting vendor done machining on 80 Quantity, and we have done Goods Receipt for 80 Quantity as Finished Parts.
    Subcontracting vendor found 20 Quantity as Defected.
    Shall I take back 20 Quantity by Movement Type 542.
    OR
    Shall I do Goods Receipt of 20 Quantity as Finished Product and price = 0. & then stock transfer of Finished to Raw Material.
    Please reply.

    Hi,
    It depends on what you want your subcontractor to do with the faulty raw material stock - if you want them to scrap it you can scrap stock from subcontractor stock using movement type 551 and special stock "O" (the system should prompt you to enter the vendor code). If you want it returned for you to scrap it - movement 542 to return it then scrap it from your own stock.
    You shouldn't receive an additional 20 of the finished parts - as you only received 80 not 100. Close the purchase order off to close off the balance of 20 remaining.
    Thanks

  • Error M7019 BAPI_GOODSMVT_CREATE - Subcontracting process

    Hi,
    I am developing a subcontracting process and using the BAPI_GOODSMVT_CREATE to return the goods, but when I do the low inputs (mov 543) the BAPI returns the following message.
    TYPE       E
    ID               M7
    NUMBER      19
    MESSAGE Combination of movement type 543  and function selected not possible
    LOG_NO     
    LOG_MSG_NO     0
    MESSAGE_V1        543
    MESSAGE_V2     
    MESSAGE_V3     
    MESSAGE_V4     
    PARAMETER            GOODSMVT_ITEM
    I'm using GOODSMVT_CODE = "07" (MB04).
    When I run the same procedure via transaction MB04 I can create the document.
    Has anyone experienced this? Would have any suggestions?
    Thanks
    Sandra Avila

    Hi,
    Successfully execute the BAPI using the help of SAP
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/HowToGoodsMovementswith+BAPI#HowToGoodsMovementswithBAPI-MoreinformationonLINEIDandPARENTID
    Thanks to all
    Sandra Avila

  • Serial numbers for subcontracting process

    Hello Experts,
    We are using SAP ECC 6.0 and trying to implement the subcontracting process with serial numbers. This scenario is focused on those materials that we need to keep track on how many times it has gone to repair (for example, a motor) by specific item. Suppose there's a material called "Material A". However, there are MANY "Motor A"'s, and thus, the need for serial number to keep track on the number of repairs each one has had.
    So, having said that, the scenario is working so far. However, the user CAN'T type in the serial number of the material at the REQUISITION LEVEL. This can be done at the PO level and at the goods receipt level.
    This brings a problem since the Purchasing dept. doesn't know the serial number. This information is known by the user, but there's "serial number" functionality in the requisition. Is there a configuration for this? Could it be possible for the serial number to be in the requisition and then inherit it to the PO?
    We want this in order to automate the process.
    The configuration we made was in the "Plant Maintenance and Customer Service" section, using procedures MMSL "Maintain goods receipt and issue doc." and POSL "Serial numbers in purchase orders". There's no procedure for purchase requisitions. If this can be also done from a Work Order, that will be just fine.
    Let me know if it is possible or if you have any idea on how to do this.
    Regards,
    Gilberto Gallardo.

    Hi,
    Serial no can be used for the following business transactions.
    1. Goods Receipt/Goods isssue and other inventory postings.
    2.sales orders and delivery notes
    3.maintenance orders
    4.production orders.
    Settings:
    1. create a serial number profile in customising.
    2. Assign the serial number profile in the material master record in work
    scheduling view for fert and raw material in plant data / stor2  view..
    Business procedures may be assigned in configuration to a serial number profile.
    The assignment to the serial number profile determines if serial numbers are required , can be assigned, must be assigned,are assigned automatically
    MMSL : Goods issue , receipts,stockj transfers,stock transport orders
    Thanks
    nandha

  • Third Party Subcontracting Process doubt

    Hello all Gurus,
    I have one doubt regarding the third party subcontracting process. I have created a PO with delivery address as that of SC vendor.
    Now how to do the GR for components if the SC vendor lets me know that he has received the materials from the 3rd party vendor??
    Can someone tell me the process after a PO is created for this scenario???
    Thanks and Regards,
    Umakanth.

    Hi,
    As I perceive you are speaking about the provision of subcontracting components from one of your vendor directly to another one,
    In this case you did well if you wrote the vendorID in the suitable field on 'Delivery address' tab of your PO. 'SC Vendor' thickbox should be also checked. This is not the subcontracting PO itself, it is only a PO to procure the components for subcontracting - your SC vendor receive the components directly. That's why there's no point in speaking about 'L' item category.
    After getting information from your SC vendor about the arrival of the goods (components) the only thing you have to do is to do a GR against your PO. The goods will get to your SC vendor's special stock via mvt 101 + 'O'.
    That's all.
    BR
    Csaba

  • ME59N - Intercompany Third party subcontracting Process

    Hi Experts,
    In Intercompany third party subcontracting process, PR is created from the sales order. PR has the account assignment category X and Item Category L.
    Fixed source of supply exists. Subcontracting Info record has been created.
    Material components icon has been deactivated as it is generating from Sales order.
    While using ME59N, it throws Requisition could not be converted. One of our collegues told that if the subcontracting item has been automatically generated from SD Module, then ME59N will not convert the PR to PO.
    Please let me know if there are any settings needs to be done. Or standard ME59N will not convert the above scenario.
    by
    Prabhu

    There is no restrication that Automatic PO will not be created if the PR is created from the Sales Order.
    Please elobarate on the exact error you are getting.
    However please follow & check if these general settings are in place.
    1.Material has the auto PO checked in Material Master.
    2. Vendor has the Auto PO checked in Vendor Master.
    3.Source list is maintained if material master has source list checked.
    4.Valid conditions exist in the Sub Contracting info record.
    5.Right variant ex - doctype,Plant etc exist or are entered in ME59N.

  • Tables for subcontracting process

    Hi All,
    Pls tell the tables for components in subcontracting process.
    Regards
    Sunil

    Hi
    After creating a subcontacting po, it will update the following tables
    RESB , EKET , EKKO, EKPO
    Join the two tables RESB and EKET with RSNUM , PO NUmber, Line item as the linking field, if u pass the PO Number in the EKET Table then you can able to see all the components that you have mentioned in the PO for the Final Product. This component is not from the Material BOM , its from what you have maintained in the PO.
    Pls clarify in your query , completing means closing the PO with GR,IR or just PO creation.
    Regards
    Amuthan M.
    Edited by: Amuthan M on Nov 3, 2009 2:28 PM

  • Getting Error while doing Reverse Engineering Processes.

    Hi all,
    I am new to ODI, i tried ODI with SAP ABAP, after i my all settings after doing reverse Engineer Processes, I cant able to see the Metadata browser while checking Log i am getting the below given error.
    ODI-1217: Session Sap ERP Source (27001) fails with return code 7000.
    ODI-1226: Step Sap ERP Source fails after 1 attempt(s).
    ODI-1229: An error occurred while performing a Reverse operation on model code SAP_ERP_SOURCE.
    Caused By: org.apache.bsf.BSFException: BeanShell script error: Sourced file: inline evaluation of: ``//////////////////////////////////////////////////////////////////////////////// . . . '' : Class: DestinationDataProvider not found in namespace : at Line: 275 : in file: inline evaluation of: ``//////////////////////////////////////////////////////////////////////////////// . . . '' : DestinationDataProvider
    BSF info: Create Java Classes at line: 0 column: columnNo
    Pl. help me to come out from this error.
    bdharanr

    Hi,
    Thanks for the reply.
    I am trying to reverse SAP tables. Initially the Reversal process stuck at Set MetaData step. I stopped the session and restarted it then Set MetaData completed successfully but Set FlexFields give the error.
    Any idea?
    Regards,
    Arsalan.

  • G/L accounts updation  in subcontracting process

    Hi,
    i request you provide details of G/L accounts while ;1) updation while we supply materials to vendor
    2) while we recieve the finshed product.3) And while settlement to vendor.
    Thanks & Regards,
    Ramesh kumar.

    Hi,
    If Material has Price Control as "V" (MAP)
    (BSX) Stock A/c of Assembly - Dr
    (BSV) Change in Subcon Stock - Cr
    (FRL) Subcontracting Charges - Dr
    (WRX) GR/IR Clearing A/c - Cr
    (BSX) Stock A/c of Components - Cr
    (GBB-VBO) Consumption A/c of Components - Dr
    If Material has Price Control as "S" (Std. Price)
    If Material is having Price Control as "S" then Price Difference A/c will also in picture.
    This depends on configuration; SPRO > MM > Inventory Management and Physical Inventory > Goods Receipt > Price Differences for Subcontract Orders at Goods Receipt
    Price Differences for Subcontract Orders at Goods Receipt
    In this step, you configure for each valuation area whether price differences are generated for a Subcontract order at the time of a goods receipt if the manufactured material is managed at standard price and the standard price varies from the receipt value (externally performed service + value of components + delivery costs).
    Example
    Finished product: $400 (value at standard price)
    Subcontract order:
    o Ext. service : $250
    o Components : $100
    Posting schema without price differences:
    Stock account FERT : 400 +
    Stock change : 400 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    Posting schema with price differences:
    Stock account FERT : 400 +
    Stock change : 350 -
    Price difference : 50 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    And cost center is mandatory for subcontracting process
    the accounts for the BSX FRL and GBB-VOB needs the cost elements
    Sometimes if you have freight the key FRN also gets used.
    Edited by: venkatesh kumar on May 11, 2010 12:46 PM

  • Options in excise tab ( subcontracting Process)

    HI,
    Subcontracting business process
    i am getting No excise duty, Create RG23D, and create RG23D for existing excise invoice options in Excise invoice tab at MIGO.
    i have checked above settings in the system...but still the same error
    please suggest
    Regards,
    Girish

    Hi,
    If you are making a process of Subcontracting , then you should be able to get Refer Subcontracting Challan in MIGO , for that in CIN--> Plant Setting you should REMOVE Tick from Depot against that plant  also check that for the Excise Group if it is a subcontracting process Depot Setting should NOT be there.
    If you put a tick against Depot in CIN --> Plant Setting and Depot Setting for the Excise Group, you will get RG23D tabs in MIGO
    Regards,
    Vikas