Revision level in BOM

Dear All,
I want to bring the column of the revision level in Bill of material display screen
Regards,

Going a little farther with this concept:
If I have a material planned through MRP and there are multiple revision levels for the item, will the reservation for the material reflect the revision level at the time the reservation was made or the revision level at the time the material is required?  
For example, material A has a change record which creates a new revision level a month from today.  Today, MRP creates a reservation for that item due for production in six weeks.  Does MRP create RESB with the revision level as of today or as of the new change record?  What does MRP use for the revision level determination date?

Similar Messages

  • ECO number with revision level and release key

    Hi All,
    I have a requirement from client with regards to Engineering change manangement.
    The scenario is that we are maintaining BOM for materials.Whenever a change is required  for BOM a ECO number is created with release key.
    Once the BOM is changed against ECO number is created a workflow is triggered for approval.
    Then it goes through a series of approvals in the heirarchy.In each level the reviewer will propose a new value for the changed line item.
    All these changes have to be maintained in record.At the end the final approver reviews all the proposed changes and release the ECO number with the appropriate change.
    I had a thought of implementing the above scenario with ECO with revision level and release key.
    But I am unable to replicate the scenario due the fact that,when I select the ECO number with release key,I cannot select the material in Object type.
    Its disabled.Its available when I create a ECR with release key.
    Please suggest a way to create ECO number with release key and revision level for BOM.
    Regards
    Richie

    Hi,
    You create the revision level against the material (via MM02, basic data tab)) not against the serial. The serial number, by definition, would be unique to the combination of material and revision.
    Regards

  • Automatic revision level in CS01 on initial create

    Hi, I have a task to find out about BOM revision levels and if they can be automatically created when the BOM is created in CS01.  Our users are imaging that the step of choosing extras, next revision level will be too much for them to remember.  This would be for the rev level to automatically be created based on auth group and change master, but for the initial create and also the subsequent revsions.  They just don't want to manually choose the next revision level.  Is this a configurable option?  I have looked at OS54 and we have it set to automatc revision levels, but that is not what is happening with this.
    Thanks in advance.

    Hello,
    The automatic revision level assignment is not meant for this purpose.
    I think there is no standard functionality to automatically assign revision levels to BOMs, it can be done through development.
    Regards
    Prasad K

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

  • BOM Revision Level

    Hi,
    We are uploading the BOMs into server. While manual creation of BOM I am able to update the revision level of the BOM. But we are unable to update it while uploading through LSMW. Please suggest me in this regard.
    Thanks
    Ramakanth

    We have ECM in our project. 
    We have to take all the BOMs from the previous version of SAP and upload to the new all of them to the new version.
    All the BOMs have revision levels w.r.t. to a change number.
    While manually changing the BOM the revision level can be updated by entering the BOM w.r.t. a change number and then in the menu --> extras --> new revision level.
    Now we have to upload the BOMs through LSMW. It is not picking up the revision level while uploading.
    Please give your suggestions.

  • Bom- Multiple Revision level

    Hi,
    How to create and maintain a BOM with mulitple revision level.
    Thanks in Advance

    Dear Madhan,
    Do you mean to say you want alternative BOM's or else
    simple BOM,that's at one moment or one fixed point it should
    be having only one BOM ,with a revision level?
    See for deleting or modiying the BOM with revision level you
    need to use ECN - Engineering Change number.
    So whenever you are using an ECN for modifying the
    BOM,enter the revision level - in the field reason for change
    while creating the Change number in CC01 or using change -
    CC02.
    So this is one way of handling this issue.
    Please check & revert back if anymore help is needed.
    Regards
    Mangal

  • BOM REVISION LEVEL UPDATE!!

    Hi Experts
    i need a program to update Bom Revision Level.My requirement is It should have 2 functionalities.
    One radio button should be there which takes care of single BOM update
    · Second radio button takes care of mass BOM updates.
    So is there any Bapi  avaulable for it??please i need it urgently....
    Thanks&Regards
    Neha

    Moderator message - Welcome to SCN.
    Please do not use all caps. It is hard to read and is considered shouting.
    Do not use words like "urgently". Everyone's problems' are important.
    Do not ask the forum to do you work for you.
    Thread locked.
    Also, Please read Please read "The Forum Rules of Engagement" before posting!  HOT NEWS!! and How to post code in SCN, and some things NOT to do... and [Asking Good Questions in the Forums to get Good Answers|/people/rob.burbank/blog/2010/05/12/asking-good-questions-in-the-forums-to-get-good-answers] before posting again.
    Rob

  • Problem with Revision level for a Material

    Hi All,
    I have a problem with Revision Levels for a Material.
    I want to know the Revision Level for a particular Material for BOM Creation.
    Can anyone please let me know from which Table or Funtion Module can I get the Rev Level, once I pass MATNR (Material) and AENNR (Change Number).
    <REMOVED BY MODERATOR>
    Thanks and Regards,
    Harish Kalla
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

    HI,
    You can use table AEOI.
    Hope this helps.
    <REMOVED BY MODERATOR>
    Regards,
    Sipra
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of rev&#305;s&#305;on level on &#304;nspaction lot.
    But, with reference to the Rev&#305;s&#305;on Level only the Conf&#305;rmation w&#305;ll work both in Descrete and aswell as in REM.
    Say &#305;f yor Reves&#305;on Level &#305;s AB, and the date &#305;s 01.03.2008, then during confirmat&#305;on the sytem will explode the BOM with referenec to this Date.
    It may be poss&#305;ble that there may not be any BOM available on that date then there w&#305;ll not be any Components suggested for GI or backflush.
    Probably you can corelate the same th&#305;ng to your &#305;nspect&#305;on lot... ( inspect&#305;on lot not available etc..)
    Hope th&#305;s helps..
    Regards,
    Siva

  • Revision level in CS61

    Hi PP Gurus,
                     I have brought revision level in t-code CS01, CS02 initial screen by setting IMG. but same does not getting incoporated in order BOm t-code CS61, CS62. What shall have to do with IMG setting.
    Can I add or change column inside BOM in t-code CS61, CS62. (I want to bring revision level column beside change number column).
    Could you please guide me to come out of this problem.
    Regards,
    Maddy

    If u have created proper change no in cc01with assigned object material with proper validity period-> u can give revision level to material...
    Once rev. level is there in material...
    Creat PO..-> check in item detailsmaterial data tab  for revision field..

  • Make Revision Level Case Sensitive

    Hi,
    I am creating a new revision level for a material under a change number. Under that same change number I am changing the BOM and routing for the new revision level of the material. We use the drawing number of the material as the Material Number. If client does some changes in the drawing they capture it as the "Alteration Index" (we have mapped it as Revision Level in SAP). Now the requirement from client is that we should have Revision Level as case sensitive i.e. A" and "a" should be treated as different entities. How can this be mapped in SAP as in the system the revision level is not case sensitive?
    Any ideas please?

    Let me add some more information, so that someone may find this thread interesting to reply :). My client is using alteration index (Revision Level in SAP) as both capital and small letters i.e. revision level is case sensitive for them. I cannot map their Revision Level in SAP as they will have two Revision Levels "A" and "a" as a different entity, but SAP will take both as one. I discussed this with my ABAPer and I got some pointers:
    1) We can copy the revision level field, make a Z-field and make it as case sensitive. But this way we will have huge task to point to this new field where ever Revision Level field is referenced.
    2)We can make this field itself as case sensitive i.e. make this SAP standard field as case sensitive.
    I think that we can go with the second option, but do not know if it can cause any serious implication.
    Can someone advice please?

  • ECM revision level in material master record

    Hi experts
    I need to remove the last revision-number (REVLV) in a a material master record.
    The ECM is not relesead and we have used tcode MM02.
    I have seen that the tcode CCUNDO check the planned changes with tcode MM12.
    Thx in advance
    Marco

    Hello Rahul ,
    Please see the following link for more information regarding the Revision Level in Material Master.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/ff/5160a249d811d182b80000e829fbfe/frameset.htm
    A revision level identifies a specific change status of a material with reference to a change number. It is used, for example, to identify changes affecting other areas such as Production.
    You generally assign a revision level when processing a material BOM (bill of material created with reference to a material master record). However, you can also assign a revision level when processing a material master record.
    You can display a revision level assigned to a material by choosing Display revision level on a departmental data screen in a material master record.
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Revision Level in Material Master

    Hi All,
    What's the purpose of Revision level in Material Master and some times we see it in PO material tab.
    What's the Business Application of this.
    Please help.
    Thanks

    Hello Rahul ,
    Please see the following link for more information regarding the Revision Level in Material Master.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/ff/5160a249d811d182b80000e829fbfe/frameset.htm
    A revision level identifies a specific change status of a material with reference to a change number. It is used, for example, to identify changes affecting other areas such as Production.
    You generally assign a revision level when processing a material BOM (bill of material created with reference to a material master record). However, you can also assign a revision level when processing a material master record.
    You can display a revision level assigned to a material by choosing Display revision level on a departmental data screen in a material master record.
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Manual Change Revision Level in Production Order

    Dear guru ,
    The revision level in the production order (for material to be produced and for the component)  isn't manual changeable.
    Does exist a chance for a manual change of revision level ?
    Thanks in advance.

    Dear Suresh ,
    i know the link with ECM. In production order i can change the component revision level if i work with bom explosion date in read PP master data. But this solution isn't flexible. Imagine that i want to read PP master data with different explosion date for different component ...
    Why in the purchase order the system allow a manual change of revision level and this chance doesn't exist in production order ?
    Thanks in advance.

  • Revision level

    hi all,
    In a PO, i have for an item a 02 like a  revision level. But in t code MSC3N to display a batch retated to this item i see 01 as revision level (knowing that 01 is above 02), the reception of PO has been made with 01.
    In ME23N, I have not identified that changes were made!!! the same thing with MSC3N for the batch
    I need to know what could happen !!!!
    think you all !!!

    When a Material is changed to revision level A, the BOM which uses this material also has change to use this new revision of material. So also, Routing.
    Now, for BOM and Routing we identify this new structure by using ECM and its valid from date. ( we don't use revision level there obviously because other changes also could happen to these data not related to material and then we can't identify that revision B of routing and revision B of material are related- so, ECM is the best choice)
    The ECM number thus helps to track the assciated change for other master data due to a revision in material master. To know which is this ECM number that helps the tracking, along with the revision we input the ECM number also for the material.

Maybe you are looking for

  • AP Check printing issue- amount distorted

    Hi,      When I am printing or creating a check for a Vendor other than US , the amount on the check gets distorted. For e.g I  clear an invoice ( doc curr - USD, local curr - USD ) but for a vendor whose country in IL ( israel) , the amount changes

  • SOFM in user decision step - provide reason in UWL

    Hello Everyone, I'm working with a customer who wants to use a user decision step and add a reason for the rejection only.  This step will be executed in UWL - since UWL doesn't support syncrhonous dialog chains, it can't be implemented by adding ano

  • Disable a hot key

    I'm looking for a way to disable the delete immediately hotkey. I know its: Apple, Option, Delete. I've tried the Keyboard Shortcuts in the System Prefs but this key combination is not available to edit there.

  • Cannot update Flash Player 16 to MacBook Pro 10.8

    I have all of the prerequisites for updating Adobe Flash Player 16 onto my MacBook Pro 10.8.5. After WEEKS of trying every so-called "solution" I could find, I am still unable to complete the update. I have now solved the sign-in problem, I can "init

  • Trying to update Lumia 630 OS

    My Lumia 630 is persistently asking me to connect to WiFi to download a critical update since some couple of months; a month ago I took it to Nokia care, they said I have to change its slightly cracked outside screen before they could update it for m