Rework Process of Process Manufacture

HI,
   Can you give me some help on setting up a rework process for process manufacture factory?I don't see some function in PI factory, like reference operation set (trigger point)in discret manufacture factory....I don't know how to make it...thanks..

Monst Yang wrote:
HI,pushpalas and all of you:
>  thanks very much for your quick reply..
>
>  but I need a rework process for PI...I can't find a trigger point function in C201(reciept) to insert a reference operation set...can you tell me how to make it via process order(reciept,resource) instead of production order(router,work center)..
>
>
> thanks..
Hi,
The below mentioned process hold good for Discrete as well as Process manufacturing
Let it be normal routing or master recipe
Open routing and select the operation line item
To assign the Trigger Point function press GOTO MENU and then select Trigger Point Overview
enter trigger point usage and description
Now select trigger point usage line item and click DETAILS menu and select "TRIGGER POINT"
Create Routing Trigger Point Details will appear
Select the check Box="Insert reference operation set"; Sys Status=PCNF; Active=1
now on the top Press the "PARAMETERS BUTTON" assign the group and group counter
come back to the operation overview and save
Regards,
Raj

Similar Messages

  • PP-PI - Process message processing and batch management in PI_CONS message

    Hi All,
    Hope you can help me to find the better solution... I will try to explain my scenario
    Scenario: to control the production run PP-PI module is in use. Process order are created in SAP system and then transferred to the process control system where the execution of the process order is controlled On-line. Once per month the confirmations are transferred from this control system to SAP. In the Process control system batch are not managed. For good issue posting standard process message PI_CONS is used.
    Now we have the situation that some raw materials used for process order processing are managed with batch. During the process order creation the batch related with this raw materials can be determined, only during the month when the raw material is entered in the plant is where the batch is determined. At the end of the month the batch of this materials is available in the SAP system (not in the process control system). Due to behavior of PI_CONS regarding batch if this characteristic is not informed in the process message or in the reservation an issue is trigger.My doubts are:
    1.- If I need inform the batch  during this confirmation ,an even split the quantities in the process message according the batch availability, I'm force to use a custom process message or there is other workaround? (remember is not feasible send the batch to the process control system)
    2.- probably i miss something because I'm can't debug the execution of the process message. How can I debug the execution of a manually created process message?
    Sorry for the long explanation I try to explain my scenario as better as possible.
    Thanks in advance for your valuable inputs.

    Thanks for your replay.
    No really I don't like to make  the batch mandatory, during the good issue is not feasible inform the batch due to it is not managed in the Process Control System. Due to the behavior of PI_CONS if for batch managed materials the batch is not informed in the message or in the reservation an error is trigger. In the reservation snot feasible inform the batch because in that moment is unknown.
    My question is if it is feasible some how have like FIFO batch determination when the process message is processed without creating a custom message.
    Thanks in advance

  • Bussiness Process, Integration Process, cc-BPM, BPM

    Hello Everybody!!! Please help me!
    1) In XI, Business Process = Integration Process = cc-BPM = BPM ??? Are these four the same thing?
    2) Please tell me if I'm wrong: we have two types of message exchange in XI, stateless (through simple message exchange) and (ii) statefull (with BPM). There is no other type, ok?
    thank you
    Julio

    Hi Julio,
    This is an excerpt from one of the posts:-
    BPM- Business Process Management- in XI BPM and ccBPM interchangeably used. for more on BPM- as an SAP standpoint or Business Process level - -/people/thomas.volmering/blog/2005/09/21/welcome-to-the-new-bpm-corner
    ccBPM- Cross Component BPM -
    https://sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/xi/archive-xi_ppts_internal_etc/sap%20netweaver%20rig%20webinar%20-%20cross-component%20business%20process%20management%20with%20xi%203.0.pdf
    http://help.sap.com/saphelp_nw2004s/helpdata/en/3c/831620a4f1044dba38b370f77835cc/frameset.htm
    Hope this helps.
    Regards.
    Praveen

  • Parallel process in process chains

    Hi All,
    I have created a process chain with two parallel jobs (for forecast run) in APO DP. whenever i'm checking it, it is showing me that <b>"Too many parallel processes for chosen server"</b>
    In the diagnosis, the message is "On the server  you have chosen, there are only 1 batch processes available. The process chain has been designed in such as way that 2 processes must be processed parallel".
    Do I need to maintain any settings.Please let me know.
    Thank you.
    Regards,
    Raj

    Hi Raj,
    What it is complaining about is that the number of batch processes(background processes) available on the system are only 1 and you have given it 2 background processes..now if the system only has 1 bckgnd process,, how will it run 2 processes ) ??
    You can check the number of background processes in SM50 and then modify the number of background processes in RZ10(start up profile)......Ask your basis guy to increase/check that???
    Thanks
    Abhi

  • How to identify which process in process chain executes in Batch and Dialog

    Hi, We want to identify which processes in process chain is running in Batch mode or Dialog mode. Is there any where we can identify this from any table or transaction. (Eg Loading, DTP loading, Attribute change run, deletion of index, deletion of overlapping request, AND process, ABAP program , Master Data loading, Full Load, Delta load, Hierarchy Save, Start Process).
    Regards
    Vishwanath

    Hi Vishwanth,
                      In Process Chain proces runs in background only.
    refer here......
    http://help.sap.com/saphelp_nw70ehp1/helpdata/en/7b/d4313b38bea774e10000000a114084/content.htm
    Thanks,
    Vijay.

  • How to stop a process in process chain

    Can anyboday help , How to stop a process in process chain .
    Thanks
    PP

    Hi Phani
    In RSPC, Open the Meta Chain, In Process Chain Manu bar,
    Select the option "Remove From Schedule"
    Hope this will help you
    Regards
    Saravanan.ar

  • How to connect processes in Process chain

    Hi,
    How to connect processes in Process chain.
    how to make it as black,green,red.
    Thanks,
    Madhu.

    Hi,
    u can connect first process in a Process chain to second, just click on first process and drag and drop onto second one.
    3 options will appear:
    1. succesfull---green line
    2. unsuccesfull----red line
    3. always-----black.
    select one option then linked will be formed.
    green line means the second process will be executed if and only if first process ran successfully.
    red line means the second process will be executed if and only if first process ran unsuccessfully.
    black line means line means the second process will be executed even if first process ran successfully or unsuccesfully.
    bye.
    "assign points if info. is helpful"
    Narendra reddy.

  • Back ground processes, dialogue processes and Process chains

    Hai all,
               I am going through making process chains and I am struck with one thing:
    "How many background process chains and dialogue processes you have during run time"
    This is the problem. I understood everything else except this.The concept says that I have to know what is the capacity of the system, how many background and dialogue processes it could accomodate, how many are left and how many you can use for your process chain.How do we find out this? and could somebody please explain me or refer to documentation about the Back ground processes, dialogue processes and Process chains.
    Thanks.

    Hi Visu,
      You can see the number of dialog and background processes by using transaction SM51 and then double clicking on the server (we only have one but it may be different for each). Our BASIS folks take care of the number of processes as well. And, for us we have a schedule that changes the number at a certain time of day because you tend to need more dialog during the day but more batch at night.
      The transaction to look at and change the settings is RZ03. Then use the menu path Edit->Operation Modes you can select either Configuration or Timetable here. Both give information in different ways. I tend to double click around to see what it might tell me.
      I hope this helps a bit,
    Diane

  • Automatic Row Processing (DML) process is not updating the record

    Hi all,
    I have an application which was working fine last week and tested and backuped to new application. This Monday, one of the form in that application is not updating the data all of a sudden. I debug that by having page 0 variable and assign the value from the column variable to page 0 variable. Whatever value I changed to the column variable was getting updated to page 0 variable. But it is not updated in the database. So, I changed the success message of the "Automatic Row Processing (DML) process" and I can see the success message on the page, but the column value does not get updated. But when I go back and checked my backup application, that page is working fine. For now, I copy that from the backup application, but I would like to know why this is happening?
    Thanks
    SHY

    Hi Scott,
    Thank you very much for your response. Because of the database complexity, I can't create/import the application on the apex.oracle.com. I am just wondering why this is happening. One of my coworker said same thing happened to her in one of her project and it gets resolved once she restart the server. I am not able to restart the server to check and see if this resolved as the application is on the client server. Do we need to clean up any log file? Thanks.
    SHY

  • Strange behaviour  Automatic Row Processing (DML) process

    Hi all,
    I'm executing a process with a fetch Automatic Row Processing (DML) over a synonym and it works perfectly but when i change the table owner it doesn't work anymore and give the error:
    ORA-06550: line 1, column 17: PL/SQL: ORA-00936: missing expression ORA-06550: line 1, column 9: PL/SQL: SQL Statement ignored
    Unable to fetch row.
    I thought it could be from the permissions of that owner over that synonym so i give it all grants, but still no luck.
    Does anyone knows if there are some limitations for the Automatic Row Processing (DML) process?

    Once again thanks for the reply Munky,
    The original table created on schema1 (ADMGIN) :
    SQL> desc MAN_ALT_TAB
    Name Null? Type
    ALT_ID NOT NULL NUMBER
    ALT_DES VARCHAR2(50)
    AAT_COD NOT NULL VARCHAR2(10)
    ALT_ID_REL NUMBER
    ALT_MUL_REG VARCHAR2(1)
    ALT_FOR_DES VARCHAR2(4000)
    The synonym created in schema2 (PORTAL) :
    CREATE OR REPLACE SYNONYM "PORTAL"."MAN_ALT_TAB" FOR "ADMGIN"."MAN_ALT_TAB";
    Grants on the schema1 (ADMGIN) owner:
    GRANT ALL ON MAN_ALT_TAB TO PORTAL;
    There isn't a new table in the schema2 only a synonym.
    The synonym isn't created in schema1 it was created in schema2.
    Regards Pedro.

  • DataPackage1:arrived in BW, Processing 2nd processing step not yet finished

    Hi BI-experts!
    I would like to load e.g. transaction data from SAP ECC system into SAP BI system.
    The Loading process is hanging in processing step u201CSERVICE APIu201D.
    The process  in hanging in status "yellow" and then changed after a while to status u201Credu201D.
    [0FI_AR_4 |http://www.file-upload.net/view-1447743/0FI_AR_4.jpg.html ]
    The following steps within Load process are yellow and then red:
    Extraction (messages): Missing messages
    Missing message: Request received
    Missing message: Number of sent records
    Missing message: Selection completed
    Transfer (IDocs and TRFC): Missing messages or warnings
    Request IDoc : Application document posted (is green)
    Data Package 1 : arrived in BW ; Processing : 2nd processing step not yet finished
    Info IDoc 1 : sent, not arrived ; Data passed to port OK
    Info IDoc 2 : sent, not arrived ; Data passed to port OK
    Info IDoc 3 : sent, not arrived ; Data passed to port OK
    Info IDoc 4 : sent, not arrived ; Data passed to port OK
    Subseq. processing (messages) : Missing messages
    Missing message: Subseq. processing completed
    DataStore Activation (Change Log) : not yet activated
    Question:
    Can some one tell me whether my distribution model or other settings are wrong?
    I created 2 distribution model (BD64), one from SAP BW system and other from SAP BI system with message types RSRQST, RSINFO, RSSEND
    Thank you very much!
    Holger

    Hi!
    Many thanks for your response.
    The tcode WE05 on source system showing the following:
    Inbox IDoc's: RSQRST (amount: 1)
    Outbound IDoc's: RSINFO (amount: 4)
    When I go to SAP BW System (tcode WE05) i cannot detect any Inbound IDOC's of message type RSINFO.
    What is wrong in my configuration?
    Thank you very much!

  • Set delay for process in process chain (BI7)

    Hi gurus.
    Can anybody advice me on how to set delay for a process in process chain in BI7
    Thanks in advance

    Hi,
    If you right-click on a process in the Process Chain, there should be an option called Debug Loop. Here you can enter the number of seconds to delay a process.
    The only difference between 3.5 and 7.0 is that Option Waiting Time in context menu of "any" process is replaced by Debug Loop.Here you can enter the # of seconds for which you want your process to be delayed.
    See below:
    Re: Start a Process Chain after every 15 mins
    Hope this helps.
    Regards
    CSM Reddy

  • Difference between business process, sales process and order process

    what is the difference between business process, sales process and order process?

    Dear Gopala,
    business process is a general definition of the process which you have:
    for example, you get an order, you have no goods, but you can produce them, you start an assambly processing, the production order will be created, then the goods will be prepatred, then the delivery will be created, the goods issue booked then your customer gets thwe goods and send the delivery confirmation, you create an invoice etc.etc.
    sales process is a part of  a business process.
    Sales process shows how you sell the goods, there are different sales document  categories to do this: sales orders, contracts, scheduling agreements etc.
    order process is only one of possibilities of the sales process.
    Order process is used if you get really a one-time (or at lease not on a regular basis many times) the simple orders where your customer says what goods he would like to receive and when. Then you create a sales order (in dialog transaction VA01) and can create a delivery. There are different types of sales orders in the standard. The customizing of sales order types is available under the transaction VOV8.
    I hope, this info help you a little bit further to understand SD design.
    Kind regards,
    Akmal Vakhidov
    Development Support SD, SAP

  • Difference between Integration Process & Business process in SAP XI

    Hi Friends,
    Good Evening. I am getting  a lot of confusion between Integration process & Business Process. Could you please explain me with good example?
    Thanking you all in Advance.
    Thanks & Regards,
    Nagarjuna.

    Hi,
    The IP and the BPM are not different.
    its explaniation from [help.sap|http://help.sap.com/saphelp_nw04/helpdata/en/3c/831620a4f1044dba38b370f77835cc/content.htm]
    The design and processing of integration processes is also known as cross-component Business Process Management (cross-component BPM, ccBPM).
    At configuration time, you configure the receiver determination for the integration process in the Integration Directory of the Integration Builder.
    At runtime, the Business Process Engine executes the integration processes. The Business Process Engine is part of the Integration Server.
    Cross-component Business Process Management is integrated with the business workflow. An integration process can send messages to a workflow and, conversely, messages from a workflow can be processed in an integration process.
    Thanks
    SaNv...

  • Data Package 1 arrived in BW ; Processing :2nd processing step not finished

    I am currently working on BI 7 and trying to pull data from r/3.
    I have succesfully loaded the data into the PSA and now when i try updating the data (only 66 records, its a init run) into an ODS, but the system is taking a long time. On monitor Details in
    Extraction:Errors occured.(with a delta warning sign), and
    Transfer:Data Package 1 arrived in BW ; Processing :2nd processing step not     finished.
    On status Tab its yellow with message : Correct data request; processing running.
    Hope i have made it clear.Please help.

    Hi,
    I will suggest you to check a few places where you can see the status
    1) SM37 job log (give request name) and it should give you the details about the request. If its active make sure that the job log is getting updated at frequent intervals.
    2) SM66 get the job details (server name PID etc from SM37) and see in SM66 if the job is running or not.
    3) RSMO see what is available in details tab. It may be in update rules.
    4) ST22 check if any short dump has occured.
    Once you identify you can rectify the error.
    If all the records are in PSA you can pull it from the PSA to target. Else you may have to pull it again from source infoprovider.
    If its running and if you are able to see it active in SM66 you can wait for some time to let it finish. You can also try SM50 / SM51 to see what is happening in the system level like reading/inserting tables etc.
    If you feel its active and running you can verify by checking if the number of records has increased in the new data table.

Maybe you are looking for

  • AIM 5.9 and iChat

    I've been working on doing video chat from my Mac to my in-laws PC. We got it to work last night with them using AIM 5.9. The only thing is that the window which they see us in is only 1"x1 1/2" (rather small). First, is there a way to change that wi

  • Project spartan does work and give amassege

    project spartan does work and give amassege  no internet but the other brawsets work 

  • Macbook pro on yosemite slow

    i have the same problem if someone could please help Problem description: macbook very slow after installing yosemite EtreCheck version: 2.1.8 (121) Report generated 12 March 2015 at 1:56:10 PM SAST Download EtreCheck from http://etresoft.com/etreche

  • Restore from level 0 backup

    when i restore the db. Rman is looking for the backup piece which was not part of level 0 backup. ORA-19870: error reading backup piece /prd/backup/gbl/PS/l0/PS_qlm6nudf_1_1 ORA-19505: failed to identify file "/prd/backup/gbl/PS/l0/PS_qlm6nudf_1_1" O

  • IPhone 4 update to ios 7 frozen for the past hour on less than 10%. What should I do??

    Same thing happening on both phones. Have incredibly fast wifi so that isn't the problem. Should I just wait it out??