RFC Destination must same as Logical System

Dear All,
RFC   DESTINATION  SHOULD BE THE SAME NAME AS Logical system..
plz explain me above statement.
i have configured all thing for ALE(Vendor Transmission)
in TCode BD14 i recieve two success message(in client 100)
but i am not able to find VENDOR in client 800 what could be the problem.
plz its urgent
thanks,
RP

you need to  create same Name of LS system for both based on these only they reagister at gateway.
Regards
Sreeram.G.Reddy

Similar Messages

  • System alias does not work if not the same as logical system name?

    In most of the situations, we define the portal system alias same as the connected R/3 client logical system name.
    I also saw some exceptions that system aliases were defined differently from the connected R/3 client logical systems, and they were tested fine.
    However I forget the way to make that working.
    Could you help me  recall how is that achieved?
    Thanks!

    Hi,
    There is nothing tricky here. Just assign more System Aliases to the system connector !

  • Same ALE logical system for multiple BP

    Hello,
    we are using two processes to deal with the messages we receive from an external partner.
    For our system this partner is a logical system.
    My problem is now that we cannot give the same name to to processes.
    Do you have an idea how to solve it?
    Greets,
    Helge

    Hi,
    I now tried a bit with your input and the result is that I know gave the adapter specific identifier to one process (A) and in the receiver agreement I used a header mapping with A as the sender.
    I dunno why but now its working. Whatever the difference with the external partner my be ...
    Greets,
    helge

  • It is possible to transpor the logical system definition and the RFC

    Hello,
    To define the back-end logical system we need to link the RFC destination SM59. If it is not possible to TRANSPORT the RFC destination from the development system to the quality one, I need to create the quality back-end logical system without transport.
    In SRM there is a lot customizing in which we need to assing the back-end logical system. If I can not transport the back-end logical system definition from development to quality I must "re-create" a lot of customizing ditectly in quality (and later in production!)
    This is the normal way to work in SRM? Do I have to create the RFC destination, the back-end logical system, etc. in each eviroment (development / quality / training / acceptance / production) or there is a way to transport this?
    Cheers,
    Marta

    Hi Marta,
    transporting in SRM is different from the other SAP areas. There are several
    objects, which are normally customizing, but in SRM not part of the transportable
    objects. You have to do quite a lot of settings manually in QA as well in PROD.
    Start the discussion early to get the needed authorizations for doing the settings.
    The following doc gives an overview and explains:
    https://websmp201.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000310782007E
    Cheers,
    Claudia

  • RFC destination with CIF application case !

    Hi,
    Can someone explain the difference between
    Assigning a logical system to a RFC destination  and
    u201CAssigning a logical system to a RFC destination with CIF Application case" (there are 4 of them in all as i see - AC, RL, RQ, DG, AC- refers to availability check)
    e.g I have 2 entries in the system landscape settings.
    1)     Logical system u2013 RFC destination
    2)     Logical system- application case AC u2013 RFC destination.
    Even if I remove the 2nd entry, the relevant APO ATP FMu2019s are called  (just a negative testing to see what goes wrong without application case) but am clueless about this concept of CIF application case. Why such a provision to begin with. The context help says. some transaction need to have synchrious RFC and hence the need but i see the same even without his entry.
    Regards,
    Loknath

    Hello Loknath,
    If I understand your query correctly,
    1.Assign logical system to RFC destination is OK for you.
    2.Assigning the RFC destination to a specific CIF application is used in the following case,
    You have a system/service user set up for communicating with the R/3 system thru CIF & this is assigned to the RFC destination assigned to the point no:1
    & for debugging purposed you need a dialogue user, so you may assign this dialogue user to a different RFC destination & assign it here in the customizing (Assign RFC to application cases) to the application Debugging..so that while the particulat application is called (Debugging...CIF cockpit...etc)the corresponding settings from the different RFC destinations will be used.
    I could not understand your query, where u relate some ATP stuffs with this CIF topic...
    Thanks,
    Mahesh

  • Clarification regarding RFC destination

    Hi Ramesh,
    Thanks for your information, can you please tell me do we need to create port and logical system name for creating RFC destination.
    Thank
    siva

    Siva,
    You do not need to create port / logical system while creating RFC destination.
    Port and Logical system comes into picture while setting up Partner profile for idoc communication.
    Nilesh

  • RFC Destination Seetings Problem between R/3 and XI System

    Hi...
    In my RFC to File Scenario I cant see the messages in MONI......
    When we create RFC destination through SM59.....we will fill gateway host and service
    of R/3......Then we Configure the RFC Sender CC and fill same Program ID, Gateway host & service of R/3.
    My doubt is,after this should I have to configure SM59 at XI side ???.....
    I am getting confused in this RFC Settings between R/3 & XI....Can u explain the flow correctly.....
    Please help me out.....
    Thanks,
    Sudheer.

    Hello Sudheer,
    1.Configure the Sender communication channel by giving the programId there,                    
    2.You need to create RFC Destination at Sender R/3 system pointing to PI, there you need to mention the programId, specified in Sender CC,
    3. In RFC destination you need to specify your XI system details for  Host/ServiceName nameand gateway service .
    Note: programId is case sensitive.
    No need to create any RFC Destination in XI system.
    check the following thread for further clarifications.
    Re: TCP/IP connection for RFC sender adapter
    Regards,
    Prasanna

  • Logical system name vs. destination name - CUA -

    Hey experts,
    at the moment I´m thinking about using the CUA in our SAP environment for role distribution.
    In this scenario I need destinations to the child systems (of course!). In all manuals I found it say, that i HAVE to create destinations which have the same name as the logical system. However, this is not possible cause this is against corporate name conventions.
    So I tried to use different destination names, but when I use the function "text comparison" (SU01->Roles) it always fails and says that the destination to the child system is missing.
    So here my question: How can I tell the CUA not to search for destinations named like the logical system????
    Thx in advance, nice weekend
    Oliver

    Hey John,
    piece of cake ;).. that's what I thought at first. Unfortunately it´s not that easy. This is because of  partially really strict restrictions within the SAP-Software.
    At the one Module, you can choose the destination, is used for a particular group of functions. At the next, you simply can´t. SAP says "you need to have a destination, named as the logical system name". And there is no way around.
    Maybe I´am the first guy being disturbed by this "feature"....
    Of cause, I already placed several posts within the basis section... but still.. no way around. In one case I even opened a ticket at SAP... (I already posted the answer above) ....
    Thx anyways!
    Oliver

  • PI System Copy (JCO RFC destinations missing)

    Hi,
    We are doing a Homogeneous System Copy of a PI 7.0 system:
    - Source system --> PI 7.0 Production system ("PIP")
    - Destination system --> PI 7.0 Development system ("PID")
    We are executing the specific POST activities for a PI system (point 5.2.3.2.4 in the "System Copy for NW2004s SR2 Abap+Java" guide). In point 5.2.3.2.4.2, PI RFC destinations must be adapted in both Abap (SM59) and Java (Visual Administrator, JCO RFC Provider). The problem is that in all PI abap RFC destinations (AI_RUNTIME_JCOSERVER etc) the program_id is pointing to our PI
    Production system ("AI_RUNTIME_PIP"), is it OK?
    Besides, in Visual Administrator (JCO RFC Provider service), all the required RFC listeners for PI ("AI_DIRECTORY_PIP", "AI_RUNTIME_PIP", etc.) are missing after the system copy (???). Must these RFC listeners be manually created? How can we do it? Must we create them with the development SID ("AI_RUNTIME_PID") or with the production SID ("AI_RUNTIME_PIP")? Perhaps PI configuration wizard must be executed after the system copy of a PI system so that these JCO RFC destinations are created, but we are afraid executing the wizard could harm the PI configuration...
    Thanks in advance.
    Jon Larrucea

    Hi Jon
    Probably the best thing to do is just create these destinations manually. You will need to do this in SM59 and the Visual Administrator. See the link below:
    Creating RFC Destinations in the ABAP and Java Environments 
    http://help.sap.com/saphelp_nw70/helpdata/en/be/6e0f41218ff023e10000000a155106/content.htm
    Regards
    Mark

  • HOw to find out the RFC destination from BW system to ISU

    Hi,
    Currently my requirement is to call a function module which is written in ISU (remote enabled) from BW system.
    I am unable to find out the rfc destination from BW to ISU system.
    In CRM we have table like smofparsfa1. Is there any table in BW which can provide me the ISU destination?
    I need to compare the records stored in isu as well as in BW system.
    I need to call a function module which will provide me the data from isu.
    please help me in this regard.
    Krishna

    Hi,
    You can check it in SM59 if there are any RFC destinations for the above systems.
    Alternatively ,check the table RFCDEST if any entries are maintained
    Regards,
    Lakshman.

  • Logical System and Logical System Name

    Hi,
       I would like to create the following  and please tell me how do I go about doing this. I am doing this because I am trying to implement both RFC/Idoc to File and File to Idoc/RFC. The basis admin guys are unavailble at the moment so I am on my own at this moment.
    Creating a port(I suppose I need to do this on the R3. What are the steps involved)
    Create a Partner Profile

    Hi Sonia,
    For XI communicating with SAP R/3 through Idocs ALE settings need to be done,
    just go through the following steps and Configure ALE :-
    SAP XI
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (IDX1)
    a) Select create new button
    b) Enter the port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Load Meta Data for IDOC (IDX2) a) Create new
    b) IDOC Message Type
    c) Enter port created in IDX1.
    SAP R/3
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (We21)
    a) First Select Transactional RFC and then click create button
    b) Enter the destination port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Create Partner Profile (WE20)
    a) Create New
    b) Create the Partner no. name as same the logical system name of the destination system.
    c) Select Partner type LS
    d) Enter details for Type: US/USER, Agent, and Lang.
    e) Click on the + button to select the message type.
    f) Select Partner no. and LS which ever create above.
    g) Select Message type
    h) Select Process code related to the Message type.
    I) save.
    In SLD – System Landscape Directory
    TS for R/3 (Logical system):-Assign the client name created in R/3 as Logical system Name.
    Ts for Third Party (Logical system):-
    BS for SAP R/3 (Logical system):- Assign the client name created in R/3 as Logical system Name.
    BS for Third Party (Logical system):-Enter the XI logical system name.
    In Transaction SALE
    Define and Assign the logical system name.
    Regards,
    Ashwin M
    Reward If helpful

  • Logical System is not in the list of CentralSystem(CUA)

    Hi,
          I am trying to create Central User Administration (CUA) in my   landscape.
    CentralSystem:-
    I was created  one client 007 with user name CUA_ADM as Administrator and i have been defined a logicalsystem and assigned to it and created  RFC connecitons to clients in childsystem.
    ChildSystems:-
    In this way in child systems also created users, RFC connections and define logicalsystem and assigned to clients.
    1) My problem is i am trying to use transaction SCUA in that these       logical system of child system is not available.
    2) The logical system that is assigned for local clients is available after choosing those logicalsystems it giving error message like  cannot reach system PRDCLNT000 by RFC
    Any one please give me the suggestions regarding  how to solve it.
    Thanks,
    Vivek . Nellore
    Edited by: vivek.nellore on Mar 17, 2008 4:54 PM

    Hi Vivek,
    Please ensure that  RFC destinations named same as the logical systems of child clients are created in master client.These RFC destination will be of type 3 and will point out to thee respective child clients. Similarily you may also create an RFC destination corresponding to master client in the child clients.
    While it is not necessary to have 1:1 relationship in naming of RFC destination  and logical systems it makes the job very easy. Other wise you need to check for ports involved in respective partner profiles(WE20) and then make sure that the ports are pointing to correct RFC destinations(which will be checked using WE21).
    Regards.
    Ruchit.

  • Logical System Name after System Copy

    Hello,
    I have three questions about the logical system name after system copy.
    Q1) When I change SID D22 to S11 during system copy,
    do I have to change the logical system name of all clients in the target system? The target system is used for test, and the landscape has S11 and Virtial system. The target system S11 does not communicate with the source system D22.
    Q2)  If the answer for Q1 is YES, is it correct that the following procedure for changing logical system name?
    1.Tr-CD:BD54
       Add new logical system name for all clients in the target system.
    2.Tr-CD:SCC4
       As for all clients, select new logical system name with F4 help.
    Q3) If the answer for Q1 is YES, do I have to add new RFC connection entries with SM59 for all clients in the target system?
    I refer to the guide "Homogeneous and Heterogeneous
    System Copy for SAP Systems Based
    on SAP Web Application Server
    ABAP 6.40 SR1".
    thanks,
    Keishi

    Hi Keishi,
    As a good and ideal practice the answer to your first question Q1 is yes. Infact I would say that in case you are using ALE then it is must
    For Q2 there has to be an additional step which is most important one. Running BDLS transaction which would allow you to change logical systems in relevant tables from the one of source system to target system.
    For Q3  the answer is agaain yes and you can have two approaches>
    1. manually recreate all the RFC destinations after sys. copy.
    2. Export all the RFC destination data relevant tables before system copy and then reimport them after sys. copy.
    Regards.
    Ruchit.

  • BW / SolMan Logical System Change

    Hello all, I am having a BW related issue and would really appreciate some advice.  I realize some of this is for the solMan forums and will cross post (I normally dont)
    ENVIRONMENT
    New installation of Solution Manager EhP1 (19).  System name is ED0.  We are running Windows / MS SQL
    System is only for Solution Manager ops (client 001), and CUA master (client 950).
    BACKGROUND
    We want to use full SolMan capabilities.  This seems to include some limited BW interaction.  We do not use BW in the landscape, so will rely on the "internal" BW in SolMan.
    During installation, our person made a new client (000 > 400), set it as default (login/system_client), then ran tc:RSA1 and activated the content.  (This sets the client)
    Client 400 HAS NOT BEEN USED FOR ANYTHING other than the initial installation, and subsequent activation of BW.  It has no connections to other systems, no data, cubes, or anything
    PROBLEM
    We were NOT AWARE that he had ran RSA1 and activated content, and began using client ED0_001 as our PRODUCTION SolMan client.
    We are now unable to run RSA1 in anything but client 400.
    We are unable to change the client 001 logical system name because Solution Manager has been built around it.
    TROUBLESHOOTING
    We changed table RSADMINA / field BWMANDT to 001 from 400.  This changed the error from "You can only run in client 400" to "The logical system name has changed" (exit only)
    In sandbox I duplicated this problem, then deleted the 400 client (with T000 entry).  Changed the login/system_client to 001, RSDAMINA to 001, and ran function module RS_MANDT_UNIQUE_SET (set i_mandt to 001).  After restart, RSA1 gives same error, logical system name changed"
    On same sandbox after #2 above I attempted tc: BDLS to see if it would let me assign an exisiting logical system.  It did not
    QUESTIONS
    Will it have any impact on Solution Manager operations to have the "BW Client" on ED0_400 while Solution Manager production is on ED0_001? 
    Is it possible to change the BW operating client to 001 from 400?  (said another way, can I change the current logical systems BW is keyed with to a different, but existing, logical system)
    Assuming the answer to Q1 is yes, and the answer to Q2 is no, what steps need to be performed to make BW fulfill the SolMan requirements?

    Updated Information - Answer to Question #1.
    I am embarrased I missed this section in the master guide the first time around.  I will leave the question unanswered in case someone has an easy rememdy to changing the BI client logical system, as I would like to have it in my productive client if possible. However I am relieved I have the option of running it separately in case that can't be done.
    There are three major options to consider when planning your system landscape in regards to BI.
    BI in the Productive SAP Solution Manager Client
    In this scenario, BI is used in the same productive client as SAP Solution Manager. This option allowsfor simpler configuration, and isolates the BI activities conducted for solution life cycle management from the data on a production BI instance. This is SAPu2019s recommendation.
    BI in a Separate Client on SAP Solution Manager
    In this scenario, BI activities are conducted in a separate client on the SAP Solution Manager system. This scenario provides increased security, as user access is more restricted. However, you must maintain users separately and this increased your administration effort. There is no technical benefit.
    BI in a Separate, Non-Productive BI System
    In this scenario, the BI activities are conducted in a separate, nonproductive BI system in the landscape. Data is sent to this system from the SAP Solution Manager system via RFC. This is only needed in rare cases for sizing purposes.

  • SolMan / BW Logical System Issue

    Hello all, I am having a SolMan/BW related issue and would really appreciate some advice. I realize some of this is for the BW forums and will cross post (I normally dont)
    ENVIRONMENT
    New installation of Solution Manager EhP1 (19). System name is ED0. We are running Windows / MS SQL
    System is only for Solution Manager ops (client 001), and CUA master (client 950).
    BACKGROUND
    We want to use full SolMan capabilities. This seems to include some limited BW interaction. We do not use BW in the landscape, so will rely on the "internal" BW in SolMan.
    During installation, our person made a new client (000 > 400), set it as default (login/system_client), then ran tc:RSA1 and activated the content. (This sets the client)
    Client 400 HAS NOT BEEN USED FOR ANYTHING other than the initial installation, and subsequent activation of BW. It has no connections to other systems, no data, cubes, or anything
    PROBLEM
    We were NOT AWARE that he had ran RSA1 and activated content, and began using client ED0_001 as our PRODUCTION SolMan client.
    We are now unable to run RSA1 in anything but client 400.
    We are unable to change the client 001 logical system name because Solution Manager has been built around it.
    TROUBLESHOOTING
    We changed table RSADMINA / field BWMANDT to 001 from 400. This changed the error from "You can only run in client 400" to "The logical system name has changed" (exit only)
    In sandbox I duplicated this problem, then deleted the 400 client (with T000 entry). Changed the login/system_client to 001, RSDAMINA to 001, and ran function module RS_MANDT_UNIQUE_SET (set i_mandt to 001). After restart, RSA1 gives same error, logical system name changed"
    On same sandbox after #2 above I attempted tc: BDLS to see if it would let me assign an exisiting logical system. It did not
    QUESTIONS
    Will it have any impact on Solution Manager operations to have the "BW Client" on ED0_400 while Solution Manager production is on ED0_001?
    Is it possible to change the BW operating client to 001 from 400? (said another way, can I change the current logical systems BW is keyed with to a different, but existing, logical system)
    Assuming the answer to Q1 is yes, and the answer to Q2 is no, what steps need to be performed to make BW fulfill the SolMan requirements?

    Updated Information - Answer to Question #1
    I am embarrased I missed this section in the master guide the first time around.
    There are three major options to consider when planning your system landscape in regards to BI.
    BI in the Productive SAP Solution Manager Client
    In this scenario, BI is used in the same productive client as SAP Solution Manager. This option allowsfor simpler configuration, and isolates the BI activities conducted for solution life cycle management from the data on a production BI instance. This is SAPu2019s recommendation.
    BI in a Separate Client on SAP Solution Manager
    In this scenario, BI activities are conducted in a separate client on the SAP Solution Manager system. This scenario provides increased security, as user access is more restricted. However, you must maintain users separately and this increased your administration effort. There is no technical benefit.
    BI in a Separate, Non-Productive BI System
    In this scenario, the BI activities are conducted in a separate, nonproductive BI system in the landscape. Data is sent to this system from the SAP Solution Manager system via RFC. This is only needed in rare cases for sizing purposes.
    I will leave the question unanswered in case someone has an easy rememdy to changing the BI client logical system, as I would like to have it in my productive client if possible.  However I am relieved I have the option of running it separately in case that can't be done.

Maybe you are looking for

  • SD-How to find table of link between delivery and sales order?

    Hi Experts, I have a requirement as below. In LIPS table (SD document: Delivery: Item data), in this table has one kind data. One record has maintianed 2 fields PSPNR(Project definition (internal)) and PS_PSP_PNR(Work Breakdown Structure Element (WBS

  • UWC Login Problem

    Hi All, I am having a problem with UWC. Users can log into Calendar Express just fine, but Messenger Express and UWC fail. When I run start-msg I get the following: Connecting to watcher ... Launching watcher ... Starting store server .... 1433 check

  • Invisible shield for 5G 30gb ipod in london or surrey?

    Does anyone know a local store where I can buy this invisible shield? I'm currently in Surrey England and will be in another country by next week so I cannot order this item online. I'm giving this ipod as a present and I want it to be protected befo

  • Tabs/navigation

    Hi OAF Guys, I have to develop Tabs in my task. I created two funcitons first(through Application Developer--> application--> Function). then I created two menus of menu type HTML Tab and under each menu I specified the functions what i have created

  • Certain flash movies will not play - including Adobe TV movies with Dreamweaver tutorials

    For months, certain .swf movies will not play.  No error, won't even load the player.  I thought it was because of IE8 which I installed several months ago.  Now I loaded Firefox and Opera and the movies still do not play in those browsers either.  A