Route determination and Ship Schedule Change address

Hi all,
We have requirements from client and i have list of address and route combibnation.
August 2nd. Currently all DSD's are setup with a Route of 0DYDSD - need to see if the route can be changed for some of the Satellite addresses, if not upon delivery note creation the picking, loading and planned GI will need to be manually updated.
How i need to proceed further to update and change this request,
Can u please guide,
Regds
Ram

Hi all
Is there any updates about this thread.
Thanks
Best Regards
-Ram

Similar Messages

  • Route Determination and Shipping Point

    Hi,
    In what way Route Determination and Shipping Point are connected.
    advise please.
    thanks

    Simon,
    The country and transportation zone of the Shipping point is also considered for determination of Route in sales order and also for redetermining it in delivery.
    The system can automatically determine a route for each item during order entry. If visit lists/plans underlie order entry the system uses the routes from the visit lists/plans. If no visit lists/plans exist, the system performs standard route determination. The following criteria affect route determination in an order:
    ·        Country and transportation zone of the shipping point (departure zone)
    ·        Shipping condition
    ·        Transportation group of the material
    ·        Country and transportation zone of the ship-to party
    the system is to perform standard route determination in the delivery again, it also takes into account the weight group (weight of entire delivery). The system saves the delivery route in the delivery header. As it is saved in the document header the route applies to the whole delivery
    Regards

  • Route Determination and allowed substitutions

    Can anyone please help with the following issue.
    I need to make changes in config so that a customer can receive a delivery on a different route than originally on the delivery.
    i.e. customer x has an order with route a. The LSP shippes the order but changes the route to b or c.
    How do I make the changes in config for a specific customer or Sales organisation to allow more than one route.
    Thanks

    Hi,
    The system can propose route automatically via customizing.If alternative values are defined for your system you can change route manually in the delivery.It also  depends on weight group(if product unit is weight) and configuration of delivery type(T-code-OVLK) for redetermination of route.
    Route determination:
    Departure zone of shipping pointShipping conditionTransportation Group+Transportation Zone of ship-to-party.
    If you change any one of the above four criteria Route changes.
    LE-Shipping-Basic shipping function-Routes-Route determination- Select Departure zone and receiving(destination) zone   and Double click on the folder on Left hand corner (Route dete.with weight group or without weight group).
    Maintain all required Shipping conditions,transportation group and actual route.
    If you maintain these entries,it will allow you to change route manually in the delivery.(You need to hit F4 to display all possible routes).
    2)If transportation zone of the customer is changed then you need to create another ship-to-party record for this customer.
    Thanks,
    Vrajesh

  • Route Determination and Carrier

    I have been assigned to a project in which I need to set up route determination for all customers.  I have reviewed the documentation carefully, and understand the high-level configuration that is necessary.  However, one item I cannot seem to find is how route determination can specify a carrier to be used for the shipment. 
    For the majority of our customers, we don't have specific routes with different legs, we simply have weight groups which determine the carrier we will use.  For example, for customer ABC, if the weight of the delivery is between 1-20lbs, we will use Fedex Air, and if the weight is 20lbs+ we will use Fedex Ground.  Another customer could have a totally different set of weight limits and carrier(s) they would like to use.  We do have a few customers who would like to specify the specific physical route the shipment should take (east coast to midwest, then down to the south, or something like that).
    For the first type (by weight) I understand that I can set up weight groups which will help derive the route, but I do not want the route to just equal the carrier.  Instead, we would like to use route determination to help us determine both the route (physical legs in the trip [likely to be defaulted to a general route for most customers, but leaving the solution open for the future]), and the carrier, which would likely be placed as the Forwarding Agent.
    Sorry for the long explanation, but if you have any suggestions, it would be greatly appreciated.
    Thanks!

    Routes will be determined either by
    a)  Origin Country and Destination Country (with or without weight group) or
    b)  by Delivery Type
    and I am not sure, where we define transport vendor per route. Right now, I dont have access to SAP and hence, am unable to confirm this.   In fact, one route can have en number of vendors.  When we create a shipment document, you can key in manually the transport vendor which also depends on your shipment type configuration where for the field "Copy routine", whatever assignment is made, based on that system will fetch the data.
    This being the case, you can very well manually key in the required transport vendor in VT01N.
    thanks
    G. Lakshmipathi

  • HT3412 iPhoto books and Shipping to another address

    Can I create a book and have it shipped to somebody else's address overseas if it is a gift?

    No.  The shipping address needs to be in the same country as the credit card's billing address.
    Happy Holidays

  • SD : Ship to party and bill to party address getting changed in sales order

    Dear All ,
    We are facing a problem in production client regarding Ship to party and bill to party address getting changed at the sales order level. First of all , i would like to discuss the sales business process in which the problem is getting faced.
    Step 1 : The sales order is created for machine with all relevant details and the ship to party and bill to party address is changed as per the business requirement.
    Step 2 : The outbound delivery is created with reference to sales order.
    Step 3 : The commercial invoice, intercompany invoice and excise invoice is created.
    Step 4 : The Credit memo request is created with reference to commercial invoice no.
    Step 5 : The Credit memo is created.
    Step 6 : The FOC value contract is created with reference to credit memo.
    Step 7 : The FOC release order is created with reference to value contract, where ship to party and bill to party address is changed as per requirement.
    Step 8 : Outbound delivery is created for realse order.
    Step 9 : The FOC invoice is created.
    The problem is the moment we change the address in step 1 , the system gets in manual mode. Hence, whenever Bill to party and ship to party address is changed at Step 7, the same gets replicated at the machine invoice level which is incorrect.
    Please comment / reply ASAP.
    Regards.

    During the manual change if you  want to assign a new address number (which
    prevents the changing of the address in the preceding document),
    you can use Note 97832 (modification).

  • Route determination from scheduled agreements?

    Hi experts!
    Can someone tell me if route determination is possible in outbound scheduling agreements (VA31) and how it can be enabled ?
    Thanks in advance
    Antti

    HI Antti,
    Route determination is possible in outbound scheduling agreements, as in the same way as doing in a Sales order creation.
    Just go to the main page (transaction code:- SPRO) and click on the shipping tab then route----route determination. Now scheduling for OR (sales order).
    (This is how route determination for a sales order is activated.
    **DUNT FORGET TO REWARD POINTS IF YOU FEEL THIS TIP IS USEFUL.**
    Regards
    Anil

  • ATP and Route Determination at Storage Location Level

    Hi Experts,
    I'm working on a project currently and one of the requirements is to have ATP and Route Determination at Storage Location level. I know SAP standard for this is at plant level but was wondering if anyone has had this requirement before, and if so what course of action they took to solve this issue.
    Any help would be greatly appreciated.
    Thanks,
    Mark

    Hi Mark,
    in my previous project we have a customized table created for all the route determination and used mv45afzz move field to vbap to determined the route.
    not sure if there is a easier solution but at least it is doable through customization for sure.

  • Ship to party address in sales order header

    Hi
    We changed the ship to party address at the header level and new address number got generated and updated the table VBPA.
    We need to revert the address so that the original address number of the ship to party should be updated in the table VBPA.
    Eg : Ship to party address number -  123
    During the creation of the sales order,  123 is updated in VBPA.
    We changed the address of the ship to party at header level and new addess number 963 got generated for the changed address and updated in the table VBPA.
    Now we need to revert the changes so that original address number 123 should get updated in VBPA.
    Please help us to resolve this issue.
    Thanks in Advance
    Shaju

    HI Shaju,
    This is not SAP standard, but a trick we learned and we have used successfully.
    Go to the change mode of sales order. Delete the ship-to and press enter. It will give you a warning, still press enter. If its very compulsory then put some other ship to party and then press enter. DO NOT save the sales order.
    There will be a lot of re-determinations, let them happen.BUT DO NOT save the sales order. Once all the re-detereminations happen. Delete the new ship-to and put in the old one. ANd you will have the old shipt-to with the oroiginal address and address number.
    Now save the sales order.
    The logic is when you put in the new ship-to then it re-determines everything including the address number. And then when you put in the old one, it will do one more round of re-determination and will copy the address number from customer master. Thus you get the original address.
    Hope this helps,
    Abhishek

  • What are the questions they will  ask for route determination?

    hi gurus,
    may i know configuration settings for the route determination and the questions
    on this topic will they ask in the interview.
    thanks a lot to all gurus.
    arun

    Hi
    The route determines the means of transport and the legs involved. It influences transportation scheduling. For example, the system can determine from the route that goods are to be sent by rail to Boston. Therefore, during transportation scheduling, it takes into account how far in advance loading space in the freight car must be reserved.
    For furthur notes:
    http://help.sap.com/saphelp_crm40/helpdata/en/dd/5607da545a11d1a7020000e829fd11/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/dd/5607da545a11d1a7020000e829fd11/content.htm
    for Q & A see below link
    http://www.techinterviews.com/?p=319
    nagesh

  • Userexits in Route determination

    Dear Friends,
    Where do I get a list of userexit for route determination.
    Kind regards
    Ravi

    Hi
    Goto SE84-Enhansement-Customer exits-Enhansment-Enter the Package ( VTRC) Route determination and select F8. You will get the list of User Exits.
    User Exit for route determiantion is EXIT_SAPL0VRF_001
    Rgds
    Rheya
    Edited by: Rheya on Aug 17, 2009 12:40 PM
    Edited by: Rheya on Aug 17, 2009 12:50 PM
    Edited by: Rheya on Aug 17, 2009 12:51 PM

  • Schedule date changing with change in ship-to-party address

    Hi Experts,
    When ship-to-party address in the "Partners" (tab_pg) is changed from one country to the other in the header level, the confirmed quantity date is being changed automatically in the Schedule lines (tab_pg).
    Any help is highly appreciated........

    Hi Sunil,
    Whenever the ship to party is changed on the Sales order the Country (picked from ship to party master) will be redetermined. Few other parameters being redetermined are Shipping point, route, transit time etc because of the Ship-To-party(partner receiving the goods) chnages in Sales order. According to that the above parameters will be changed in SO.
    Hope this helps you.
    Thanks
    Arun

  • Billing and shipping address changes

    I have tried to change my billing and shipping address from my New Zealand address to my Canadian address but there isn't an option to change the country from new Zealand to Canada. HELP I want to send a book I have created to my sister for Christmas!

    I believe that you shipping information must match your credit card information
    see http://www.apple.com/support/photoservices/account/ for moe information and a form to ask Apple questions
    Message was edited by: LarryHN

  • Transportation Group and Shipping condition fields in Route determination

    Hello Guys,
    Please, I heard that if I leave Transportation Group and Shipping conditions field empty Route determination would consider whatever value I put in Material/Custumer Master.
    But the determination just happen if I put the exact value in either the determination and the Material Master for Transportation Group field for example.
    Have you ever determined Routes leaving the fields empty?
    Thank you,
    Regards,

    Hi,
    Those fields Transportation Group and Shipping conditions available in Route Determination are essential to trigger the correct route in Sales Order level.
    If blank the available routes need to be picked manually at Sales Order level.
    Kindly check .
    Regards,
    SRK

  • Changing default province even after completing billing and shipping address correctly?

    I intend to buy in Apps Store, though I completed billing and shipping info with complete address, I am forced to enter value in Province field whereas it is not a mandatory field in my place of stay. Any hints are appreciated.

    As I reside in a country with no Province, the field is not applicable. however, I am forced to enter this value when I intend to buy an App in App Store. Is there a way to make this field optional?

Maybe you are looking for

  • How Do I Make a Complete Search Of My Mac

    I have a new iMac with the latest version of Yosemeti.  I am in the process of transferring every thing from my old MacPro to my new iMac.  I occasionally need to make searches of my iMac (particularly including the Library folders) to ensure somethi

  • Accidentally deleted a plugin now all streaming ads on just blink/flash. Help!

    I'm not sure what I was thinking but I literally deleted a plugin. Please help.

  • Open tab at anchor, from another tab

    Hi, am looking for a solution to this, which I thought would be relatively simple, but.... Currently am using Spry to create multiple tabs, and am linking from one tab to another using: <a href="#" onclick="TabbedPanels1.showPanel(0); return false;">

  • Can't recall the Airport Express password

    I've not been using my base station since Verizon came and installed FIOS and said I shouldn't use the base station in conjunction with their modem/router. I am aware this is not true and will get to that later. Tonight I want to listen to iTunes ove

  • Is there a way to link PM and assets

    Hi SAP experts, Is there a way to link PM and assets? For instance, if on assets we create an equipment as an asset, can it automatically create on SAP pm. Kind regards Emanuel