Route determination based on incoterm per plant

Hi Guru,
  Is there a way that route determination can based on incoterm instead of shipping condition, country of departure & destination and transportation group?
  For examples, for 2 different customer in US, the  incoterm can be 'CIP Destination/Dock' (will delivery the invty to customer dock), where the transit time is 4 days. But for another customer, the incoterm is 'CIP Airport' ( only delivery the invty to airport, customer will pick up at the airport), so transit time is 2 days which is shorter.
  Understand that shipping condition can use as a key to determine it, but due to shipping condition is maintain in customer master and it is share by different shipping point, so cannot simply manipulate the shipping condition to achieve this, as different shipping point will have different requirements.
  Any suggestion and idea.
Thanks,
LH Kwong

Hi,
We do not use any access sequeue for shipping condition, we just define the shipping condition in the config and use shipping condition as part of the key to determine route.
Are you saying that, we can use access sequeue to determine shipping condition? Can you tell me how to do and is there any document that you can provide.
Thanks for your information.

Similar Messages

  • Route Determinaiton based on shipping instructions.

    Hi Experts,
    I wanted to determine the route based on shipping instruction. How I can bring the shipping instruction field in route determination instead of shipping condition.
    Our current process is, route determination based on shipping condition but some times the routes will be different based on shipping instructions.

    Hi Jacob,
    Thank you for your response.
    Initially I have suggested the same solution but users are not ready to accept. The issues is, we have 100 to 1000 lines in purchase order and based on customer requirement the routes need to changed.
    If I use the shipping condition user need to change the lines manually one by one (Because the fast change is not possible for shipping tab fields) but if I use the shipping instruction then it is easy to change through fast change mode.
    As per the SAP note 356628 it is difficult to add the new fields(shipping tab fields) in fast change.

  • Enhance Route Determination

    Hi,
    Need help to evaluate if the below exit can work for the requirement. In VA01 we need to enhance route determination based on Plant and Customer.
    Enhancement 0VRF0001
    FM EXIT_SAPL0VRF_001
    Will this flag get impacted if the route value is changed?
    if i_likp-vstel (2) EQ '09'.
    move 'X' to c_flag_gen_grugl.
    Raise continue_with_standard.
    Endif.
    Thanks.

    Hi Reddy,
    Thank you for your prompt reply.
    Could you pls suggest me with the code snippet for the reqmt
    Customer C12
    1. Plant91 => Route 002
    2. Plant 92 =.> Route 001
    Thanks in Advance.

  • Volume based route determination

    Sir,
    can we have volume based ( dimension ) route determination.rather than weight.
    Plz can anybody tell me the difference between Weight & Volume in Material.M.R
    with an example.
    Regards.

    Hi,
    In standard system it is not possible.But if it is client's requirement , you need to take abapers help to write a program for route determination on the basis of volume.
    Volume
    Space that the material occupies per unit of volume. The volume refers
    to the unit specified in the "Volume unit" field.The volume and its unit always refer to the base unit of measure.
    Gross/Net Weight
    Gross/Net  weight expressed in the unit of weight specified by you in the
    Unit of weight field.
    The system can use the gross weight at a later stage, depending on what
    kind of capacity check you run, to check storage bin capacity for
    warehouse management purposes.
    Thanks,
    Vrajesh

  • Route determination third party sales order

    We are using third party sales order.  The process flow is as follows.
    Sales order -> Purchase requisition-> Purchase order-> Vendor ships material directly to customer.
    Route is currently determinined based on the following:
    1. Departure zone (from shipping point)
    2. Shipping condition ( from ship to customer master)
    3. Transportation Group (rom material master)
    4. Destination zone (Transportation zone of the Customer in the order)
    Shipping point is in US, but the vendor who ships material to customer is in China. So, we want the Departure zone for the purpose of Route tdeterimination to be based on address in vendor master, and not shipping point.
    Is there anyway, we can do this?
    Thanks,
    Srini

    Dear Srini,
    Welcome to SCN forum....
    I find route determination for third party sales not logical. Just think  in Third-Party Orders, theres is no Material-Movement  and no Deliveries from our Plant;
    In this case Route Determination will not be applicable. Customer has placed order to you and you have placed an order to your vendor, who directly deliver the goods to your customer. And you dont have to decide which route customer's transporter will take?
    So as per me you need not determine routes in case of third party sales order.
    Thanks,
    Raja

  • Route determination for PO and Delivery

    Hi Experts,
    I would like to ask how to set up route fro deliveries and Stock transport orders.
    Hope you can help me on this.
    Thank you very much.
    Regards,
    Mylene

    Working with Route Schedules
    Use
    Using a route schedule, you can control periodic customer deliveries of a particular shipping point to different ship-to parties (for example, customers or stores) in a certain sequence on a certain defined route. The planning is based on calendar weeks. The period unit is a day. Also, route schedules have a goods issue time.
    The route schedule function supports the following processes:
    Periodic deliveries from a shipping point to stores or customers are planned in advance on the basis of calendar weeks and weekdays, also without reference to particular deliveries.
    You adapt the schedules in the specific cases to the planning. For example, you can plan a GI date for a Monday at 8 o’clock, without knowing the exact date or the delivery.
    On the basis of this planning, deliveries that are to leave the warehouse at the same time are combined into groups. In Shipping you can thus distribute the workload by processing these groups.
    Features
    You can display all deliveries for a particular route schedule on a particular day, for a particular shipping point, and so on. In this way, for example, you can choose picking lists on the basis of route schedules.
    You can create route schedules for the following documents:
    Sales orders
    Stock transfer orders
    Deliveries that are based on sales orders, store orders, stock allocations, stock transfer orders, and deliveries without reference.
    The route schedule is displayed in the header data of the delivery. For each delivery within the route, the system prints the expected date and the expected time of the delivery (on the basis of the local time at the original shipping point) on the delivery note; the goods issue date is used for the goods issue posting and the stock valuation.
    In Customizing, you define for each shipping point, delivery type, stock transfer order, and order type whether or not route schedules are to be used.
    You create the route schedules in the master data for shipping. Here you define the route schedule determination and the validity period for the route schedule and the itinerary.
    As soon as the legs have been defined, you can branch to another screen to determine the actual itinerary, as well as the time (days/hours/minutes) required to get from one unloading point to the next. In this screen there is a field beside each leg. Here you can enter the number of the itinerary for the individual legs of the route. If, for example, you enter legs A and B, but assign itinerary number 2 and 1 to these, B is the first unloading point on this route. If you press Enter, the legs are displayed in the correct sequence.
    At the same time it is possible to control the route schedule determination for each delivery type, stock transfer order, and order type. It is activated in the same manner as the repeated route determination. If the route schedule determination for a delivery is active, the system automatically attempts, during creation or change of a delivery, to determine a route schedule and records this in the delivery. Simultaneously, the scheduling is adjusted. All the deadlines, for example, the transportation planning time, the picking time, the loading time, the goods issue time, and the delivery time can change.
    Deliveries with the same route schedule and the same date can be selected for the same picking run and the same goods issue. The same procedure can be used for printing delivery notes and freight lists, for the grouping of deliveries into shipments, and for confirmation of picking orders.
    Deliveries that leave the warehouse at the same time, but are assigned to different routes and can therefore have different route schedules, can be combined together and processed through the creation of wave picks. The only condition is that all deliveries have the same goods issue time.
    Route Schedule Determination
    If exactly one route schedule is defined for a particular combination of requirements, then the system will use this.
    For each combination of requirements for the route schedule determination, you can define several route schedules.
    In the case of a delivery without a preceding document, the system determines the route schedule with the earliest delivery time at the ship-to party.
    In the case of deliveries based on preceding documents (for example, stock transfer orders), the system searches for the route schedule that is nearest to the planned date/time of the delivery. The system uses the following search algorithm:
    - If a route schedule exists for the specified time, this is assigned to the delivery.
    - If there is no route schedule for the time specified, the system searches for the previous route schedule up to the GI time.
    - If there is no route schedule from the GI time to the planned time, the system searches for the next route schedule in the future and assigns this to the delivery.
    Requirements for Route Schedules
    The route schedules are determined by the following conditions:
    · Shipping point
    Where are the goods coming from?
    Ship-to party and unloading point
    Where are the goods going to?
    Shipping condition
    How are the goods being shipped?
    Transportation group
    Which goods are shipped?
    ® For example, which type of goods?
    Calendar week / year
    When are the goods to be shipped?
    If you do not explicitly enter the week and the year, the entry applies for each calendar week. If you enter a week and a year, the route schedule only applies for this week.
    You can only use route schedules if you have maintained the working times and therefore at least one of the following times in minutes:
    · Transportation planning time
    · Pick/pack time
    · Loading time
    · Transit time
    A route schedule can leave the warehouse exactly once in a week. If a route schedule runs several times, either on several days or several times a day, it must be copied to another route schedule.
    Special schedules and public holiday weeks are possible.
    Processing a Route Schedule
    Implementation Options
    Wholesale trade customers and stores can receive goods at regular intervals. These delivery rhythms have an influence on the workload in the warehouse. To help delivery planning, the route schedule serves as a tool for planning regular, repetitive customer deliveries on a particular route. At the time of planning, potential deliveries that have not yet been created are grouped in the route schedule. When the deliveries are created, the system can automatically determine a route schedule and assign it to the delivery. All deliveries with the same route schedule and the same date can be processed together in the shipping point. All these deliveries leave the shipping point together at a particular time. They are distributed along the same geographical route.
    · Deliveries for route schedule MO10H leave the shipping on Mondays at 10:00 in the direction of Philadelphia.
    · Deliveries for route schedule MO10M leave the shipping point on Mondays at 10:00 in the direction of Boston.
    · Deliveries for route schedule MO10S leave the shipping point on Mondays at 10:00 in the direction of New York.
    You can print picking lists for all deliveries that belong to route schedules MO10H - MO10S together.
    Prerequisites
    If you want to define route schedules, you must perform the following tasks:
    - Activate the route determination
    - Activate the delivery scheduling
    - Activate the route schedule for your shipping point and make the following settings:
    Transaction
    Activity
    Delivery
    Route schedule determination for delivery type
    Sales order
    Route schedule determination for sales document type
    Stock transfer order
    Route schedule determination for delivery type
    Set delivering plant and order type
    Maintenance of the itinerary should be uniform for all the route schedules used. To ensure exact planning, maintain the itinerary for all the route schedules. If rough planning is sufficient in this case, you do not need to maintain the itinerary for a route schedule.
    If you do not define any goods accepted times in the customer master for the unloading points of the ship-to party, the system assumes that the goods acceptance is possible at any time. The system determines the delivery time from the departure time in the route schedule plus the required traveling time to the ship-to party, as set in the itinerary (specific move time). This delivery time must be within the goods acceptance time of the unloading point of the ship-to party. If not, the respective route schedule is not determined during delivery creation.
    For more information on route schedules, refer to the Implementation Guide (IMG) under Route Schedules.
    Process Flow
    Select the shipping point you are working for and enter the number of the route schedule.
    Enter the data that defines the route schedule more exactly:
    - Description of the route schedule
    - Route
    - Departure day (weekday)
    - Departure time
    You define the route schedule determination. When you create the delivery, the system can determine a route schedule on the basis of the following data:
    - Shipping point
    - Ship-to party
    - Unloading point (if available)
    - Shipping condition
    - Transportation group
    - (Optional) year/period
    You enter this data (with the exception of the shipping point already entered in step 1).
    You decide whether or not you wish to define the itinerary for this route schedule.
    (Optional) You enter the itinerary and, if required, also the travelling time.
    Creating a Route Schedule
    Choose Logistics ® Logistics Execution ® Master data ® Transportation ® Routes ® Route schedule ® Create.
    In the screen Create Route Schedule: Initial Screen, enter the shipping point and the number of the route schedule.
    If you wish to use data from an existing route schedule as a reference, enter the respective shipping point and the number of that route schedule. If you also wish to copy the itinerary, check the Copy itinerary box.
    Press ENTER .
    The Create Route Schedule screen appears (here the system displays the number you just entered for the route schedule and the shipping point).
    Enter the following data:
    Description of the route schedule
    The respective route
    Departure day (weekday)
    Departure time
    In the Determine route schedule section, enter the following data:
    Ship-to party
    Unloading point (if available)
    Shipping conditions
    Transportation group
    (Optional) Year/period
    If you wish to define for this route schedule the itinerary according to which the individual ship-to parties are to be delivered to, choose Extras ® Itinerary.
    The Create Itinerary screen appears.
    Enter the itinerary and, if necessary, the travelling time.
    When you determine the travelling time from one ship-to party to the next, you should include the wait time of the vehicle at the previous ship-to party.
    If the same route is planned for several route schedules, define for each of these route schedules the same itinerary that should correspond to the stages and legs of the route.
    Choose Goto ® Back.
    You return to the Create Route Schedule screen.
    In this screen, the Itinerary maintained field is now selected. If you wish to add other ship-to parties, you must also maintain the Itinerary for them.
    Check your data and save your entries.
    Reward if helpful...
    Regards,
    Diogo

  • Intercompany return delivery route determination

    Hi SAP gurus!
    How can we setup route determination for intercompany return delivery based on Purchase Order?
    We setup in SPRO route determination by delivery type RL by adding route determination check "A" which means "New route determination without check". But this doesn't work - route doesn't appear in delivery, when returns for Purchase Order is created.
    What you would suggest?

    Hi,
    Route Determination is based on Departure Zone, Shipping Conditions, Transport Zone & Transport Group.
    Departure Zone: Identify the shipping locations (Plants and shipping points).
    Usually Plant, Shipping point and Departure Zone are same.
    If multiple locations share the route determination then the Departure Zone is same for all the locations.
    Shipping Conditions: Identify the shipping conditions to be used for Domestic, Exports and Intercompany.
    Transport Zones: The destinations are defined based on postal code, geographic area and transit time.
    For specific customers, specific carriers and specific warehouses special Transport Zones are required.
    Transport Group: The global design is that all the materials are mastered as transport group 0001.
    Thanks and Regards,
    Shashi

  • Transit time setting in Route determination

    Hi All
    I am configuring route determination. We have a transit time of 5 days for one route and if the system encounters a Sunday in between, it  considers sunday as holiday and confirms delivery after 6th day. Please note that we have maintained Sunday as holiday in the factory calendar because it should not allow shipping activities or any other activities on Sundays in the plant and shipping point, but transit should be allowed. (I mean, if a truck leaves on Friday, it will not take holiday on Sunday)
    Please let me know how I can do that

    Hi Monika,
    I havent really tried this...but my logic says that you maintain the holidays and working hours by factory calendar under
    SPRO -> Logistics Execution -> Shipping -> Basic Shipping Functions > Scheduling > Delivery Scheduling and Transportation Scheduling > Define Scheduling By Shipping Point
    Here you would be able to maintain working hours and holidays for your plant/shipping point and Sunday would be a holiday.
    In customizing for route determination maintain a new calendar with no holidays. So regardless of which day the truck leaves it doesnt have any holiday.
    Here you would need to activate delivery and transportation scheduling based on shipping point.
    Regards,
    Amit
    Edited by: Amit Iyer on Jun 8, 2011 3:56 PM

  • Route Determination and Carrier

    I have been assigned to a project in which I need to set up route determination for all customers.  I have reviewed the documentation carefully, and understand the high-level configuration that is necessary.  However, one item I cannot seem to find is how route determination can specify a carrier to be used for the shipment. 
    For the majority of our customers, we don't have specific routes with different legs, we simply have weight groups which determine the carrier we will use.  For example, for customer ABC, if the weight of the delivery is between 1-20lbs, we will use Fedex Air, and if the weight is 20lbs+ we will use Fedex Ground.  Another customer could have a totally different set of weight limits and carrier(s) they would like to use.  We do have a few customers who would like to specify the specific physical route the shipment should take (east coast to midwest, then down to the south, or something like that).
    For the first type (by weight) I understand that I can set up weight groups which will help derive the route, but I do not want the route to just equal the carrier.  Instead, we would like to use route determination to help us determine both the route (physical legs in the trip [likely to be defaulted to a general route for most customers, but leaving the solution open for the future]), and the carrier, which would likely be placed as the Forwarding Agent.
    Sorry for the long explanation, but if you have any suggestions, it would be greatly appreciated.
    Thanks!

    Routes will be determined either by
    a)  Origin Country and Destination Country (with or without weight group) or
    b)  by Delivery Type
    and I am not sure, where we define transport vendor per route. Right now, I dont have access to SAP and hence, am unable to confirm this.   In fact, one route can have en number of vendors.  When we create a shipment document, you can key in manually the transport vendor which also depends on your shipment type configuration where for the field "Copy routine", whatever assignment is made, based on that system will fetch the data.
    This being the case, you can very well manually key in the required transport vendor in VT01N.
    thanks
    G. Lakshmipathi

  • ATP and Route Determination at Storage Location Level

    Hi Experts,
    I'm working on a project currently and one of the requirements is to have ATP and Route Determination at Storage Location level. I know SAP standard for this is at plant level but was wondering if anyone has had this requirement before, and if so what course of action they took to solve this issue.
    Any help would be greatly appreciated.
    Thanks,
    Mark

    Hi Mark,
    in my previous project we have a customized table created for all the route determination and used mv45afzz move field to vbap to determined the route.
    not sure if there is a easier solution but at least it is doable through customization for sure.

  • Batch Determination based on date of consig recieve

    Hi,
    I am getting problem when i am trying to do manual batch determination in the outbound delivery.
    I have created a record in VCH1 based on customer/Material/Plant. In this i have maintained a sort rule also. what characteristaics i must use to make my batch determination based on customer consignment recieving date?
    If i go in MSC3n with Material, Plant and batch data then in the screen ( table MCHA, MCH1) onlt data available is for ERSDA, LAEDA  and LWEDT.
    In delivery when i click on batch determination button. my Sort rule is not automatically determined. So i have to maunally entered my soirt rule but at the same time my qty proposal in the same screen is 1 which is nothing but
    FORM CHMVS_001.
      DATA: lv_line TYPE kondh-chasp VALUE '1'.
      LOOP AT disqty.
        CHECK lv_line <= no_of_split.
        IF QUAN_TO_DIS > 0.
          IF DISQTY-AVAL_QUAN > QUAN_TO_DIS.
            DISQTY-QUANTITY = QUAN_TO_DIS.
          ELSEIF disqty-aval_quan > 0.
            DISQTY-QUANTITY = DISQTY-AVAL_QUAN.
          ENDIF.
          IF disqty-quantity > 0.
            quan_to_dis = quan_to_dis - disqty-quantity.
            MODIFY disqty TRANSPORTING quantity.
            ADD 1 TO lv_line.
          ENDIF.
        ENDIF.
      ENDLOOP.
    ENDFORM
    When i am taking characteristics LOBM_VFDAT for sort rule in Cu70 then i am not getting batch determination as i required even if i maintained Shelf expiry date in MSC3n.
    Please suggest where i must look into so that my batch determination would be based on date of consignment recieved.. currently if it s taking based on max qty available in MMBE.
    Regards
    Nitin

    I have already assigned sort rule in VCH1 but dont know which Characteristics i must assign for customer consignment stock on FIFO basis. Could you please tell me the characteristics for it which i must consider?
    LOMB_VFDAT i have already tried but its not working for me.
    Edited by: Nitin Agarwal on Oct 30, 2008 8:14 AM

  • Batch determination based on WM storage type stock positions

    Hello experts,
    I am hoping the get some advise on the best method to achieve this:
    We have batch determination turned on for select customers and the system is proposing stock that is mainly in our each or lose pick storage types (110), the issue with that is the fact that we do not pick in less then case qty for those customers so if the stock doesn't exist in our general storage the user must re-determinthe batch codes before delivery release.
    This process is becoming very time consuming so I would like to improve it.
    My first thought is to create a custom check in the batch search strategy that will only propose batch codes that exist in our general storage (search strategy based on WM stock positions)
    Are there any other options to achieve a batch search strategy based in WM stock positions other then the one above and does that solution sound practical?

    I'm not referring to the type of picking either (i'm not referring to picking strategies at all). I'm referring to storage type search criteria defined in OMLY.
    "We need batch determination based on WM storage type stock positions" -> you are running BD at delivery level and therefore, there is nothing from a standard perspective that we can do to run BD based on WM storage type again. Since the BD has already occurred, we need to find other venues to direct the pick to the appropriate storage types.
    This is what I'm understanding but I reckon there's something that I'm missing and so let's take the below example and then you can get back with corrections:
    R001 plant
    ZM01 storage location
    Z01 WH
    110, 120, 130, 140 storage types (110, 120, 130 are case/lose pick, and 140 is general)
    Since you had mentioned earlier that the BD is running at plant level, I'd assume the storage location ZM01 is automatically determined (since the batch resides in ZM01). Since the batch is already determined, based on your 'storage search strategy' (110, 120, 130) the system tries to pick this batch in these storage types. Now, when there is no full case, you have to manually change the storage type to 140 to pick and this is where the problem is. So, I was recommending that since there is no standard way to automatically pick the full case from 140, use the enhancement.

  • Route Determination in Inbound

    Dear All,
    How to configure the system to automatically determine the Route incase of Inbound Delivery Process?
    I know that the Route is getting detemined through the transportation zones & also the transportation group of the material.
    I have given the departure transportation in my vendor master record & receiving zone in my shipping point/receiving point address tab & also maintained a route for the shipping condition which I maintained in my vendor master & Trans.group in the material master.
    Inspite of doing all the above the route is not getting determined automatically.
    So please suggest a solution.
    Regards,

    Hi Amol,
    As you have suggested I have checked my material master trp group & its assignment to Shipping condition & route determination.
    Please note tht the goods receiving point is getting automatically determined as per the config but even though I have done the necessary assignment my route is not gettin determined automatically when I create a Inbound Delivery.
    To be more specific.
    I have given the Route for the TP zone given in my vendor master & TP zone given in the goods receiving/shipping point.
    I have maintained the Route for the combination of TP group given in my material master (sales view) & Shipping conditions given in my vendor master.
    Please help if you have any solutions.
    Regards,

  • Open STO reports with route determination

    How to get  Reports for open STOs with route determination.

    ME2N will find the open STO's but I agree finding them based on route is not standard
    or even vl10g can be used to find STO's needing deliveries
    after delivery creation data based on route can be found in many way's
    hope that helps

  • Route determination problem in Stock transport order

    Hi,
    At present,i am using the plant 0001 and storage location 0001.It is determining the Route as 000001.When i changed it in STO to 000002.It is automatically coming back to old one.
    How to change it to 000002?
    If we need to any customizing,please tell me the path.
    Thanks
    Srini

    The correct route should be maintained in the customizing for the departure country and the receiving country with the shipping conditions and transportation zone etc.
    You need to define this in customizing under logistics execution > transportation > Basic transportation functions > Routes > Route determination > Maintain route determination.
    Check the route here. Also check the route whici defined in your related customer master data

Maybe you are looking for

  • Firefox 4 won't run, no solution helps, had to remove and revert to 3.6 which works fine. When will bugs be out of firefox 4. I give up on it. Safe mode, reinstall, etc all never open

    on a vista computer running system suite11 for antispyware nothing I could do would get firefox 4 to run. I downloaded it severeal times after uninstalling, closed the previous attempt at firefox.exe to try again and even tried safe mode though none

  • Converting A Query To A Struct

    Been working on this for a while now with no breakthrough.  The query returns all the colors; the cfset structColors (commented out) held the colors previously.  I still want to use structColors but how would I use it with the query.   Please see ima

  • How interactive can Keynote be? - newbie question

    I've owned keynote for almost a year, but have never opened it up to use it since I don't do many presentations anymore. I primarily do web work, so I was wondering if keynote has any features to help with that part of my business. For instance, can

  • NLS problem in PDK v2

    I've installed oc4j_extended, PDK v2 examples in Portal 3.0.9.8.2 with Russian Language Supplement. My DB LNS_CHARSET is CL8MSWIN1251. NLS_LANG environment variable for starting Apache russian_cis.CL8MSWIN1251. So Question: Why when i change portal l

  • WCF-Sql port dehydrated

    Hello all !      I'm trying to use a WCF-Sql adapter (request - response shapes in an atomic scope) . It fails because the correlation needs to be initiated by the request and after that followed by the response (but request and response are transact