Route Schedule missing from Sales Order

Hi,
I'm relatively new to this area of SAP. I've created a Sales Order that has picked up the correct Route but, looking on the schedule line, no Route Schedule has been defined even though, I believe I've followed the required steps.
Can you point me in the right direction as to how to check if my Route Determination process is complete.
Many Thanks,
Mike

Check the following
· Shipping point
Where are the goods coming from?
Ship-to party and unloading point
Where are the goods going to?
Shipping condition
How are the goods being shipped?
Transportation group
Which goods are shipped?
® For example, which type of goods?
Calendar week / year
When are the goods to be shipped?
If you do not explicitly enter the week and the year, the entry applies for each calendar week. If you enter a week and a year, the route schedule only applies for this week.
You can only use route schedules if you have maintained the working times and therefore at least one of the following times in minutes:
· Transportation planning time
· Pick/pack time
· Loading time
· Transit time

Similar Messages

  • Scheduling dates from sales order not confirmed

    Hi All,
    I have configured CRM_APO_ECC integration in system. But getting few error on CR$M-APO side. Can you please sugest on these queries:
    1. order entered in CRM, ATP check is triggered in GATP & confirm dates & vendor (plant) populated with 2 schedule lines. But when I save the order, I get RED signal on item details tab, also I could not see order in RRP3.
    2. Second query is regarding RBA. I have configured location sub rule. But when the qty in initial plant is less, it does not give me the substitute location, rather it proposes me later date considering the checking horizon maintained in product master.
    But when I manipulate the same material with error (i.e. by removal of ATP group in product-loc master), and create order for same material, I can see the rule in place when ATP is triggered and can see 2 line items on ATP screen, first showing RED light (for which ATP grp isnt maintained) and 2nd is one with substitute location. In this case, it works. Where is my config missing?
    Please help me with these 2 situations.
    Many thanks,
    AP.

    Hi All,
    I got answer to this (i.e. query # 2), rule based plant was not available when triggered from CRM.
    Now i can see it, Solution is - Activation of preselection activation key. I activated it in APO Requirements profile for CRM & also in Check instructions.
    Thus I can see all sub plants.
    However, my 1st query is still under search. My scheduling dates are not getting confirmed. Following is the scenario:
    initial plant (USA1) has no stock in RRP3, but still showing green & accepting orders:
    When I chose alternative plant USA2 where I have stock, 2 scheduling lines are generated, 1 for initial plant & 2nd for USA2. There is no error message till then. And when I hit save, I get availability confirmation error, schedule line is not confirmed.
    After saving, only one line item remains, and plant is USA1, i.e. initial where there is not stock.
    Can you please suggest what config might be missing?
    Thansk,
    AP.

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • How to create Subscription Schedule for a Contract created from Sales Order

    Hi Gurus,
    Need help in creating subscription contracts from Sales Orders.
    We know that Service Contract is created from Sales Orders by adding covered item and service item as two lines in a Sales Order.
    1. Does anyone know how to a create Subcription Contract by adding single item or BOM item(Model) to a Sales Order?
    2. Can we have a BOM item created as Subcription item and reference this to the Service Item in the Sales Order, so that we get the Service Contract created with the BOM item as Covered line.
    3. Whenever we create the Service Contracts from Sales Orders, the Billing Schedule Level is set to 'Top Level'. Can we get this changed to 'Equal Amount' by using any profile options.
    Please advise as we are in a critial design phase and need to make a decision quickly.
    Thanks,
    Sid

    Hi Mani,
    I have a similar requirement but i need to transfer the values to the same page... what then. I have seen the developers giude and the example shows how to tansfer values to another page but no clues what so ever if i have to transfer them to the same page different region. Do u have any suggestions ....
    Regards,
    Amit.

  • Creation of automatic PO from sales order in 3rd party scenario

    hi ,
    we know, as per standard SAP ,  creation of PR from Sales order happens when we save SO. how to create PO automatically from sales order? and where where to put document type for  that PO ? ( in schedule line category we can set document type for PR)

    Hello
    In addition to what Kapil suggested,
    3 - The Outline Agreement or Purchasing Info Record shall be maintained which will allow the automatic copying of unit price and other conditions into PO and
    4 - The Source List shall be maintained for the nominated vendor which was shown in either the Outline Agreement or Purchasing Info Record.
    By activating those config you can automatic create PO from PR.
    For that use TCode ME59 to automatically convert the current PR into PO.
    But, you can not automatically generate PO from sales order similar to that of PR.
    Thanks & Regards
    JP

  • PO creation from sales order

    Hi 
    we have a scenario where in we are creating a manufacturing order ( This is a sales order with no delivery relevance and billing relevance ), we use this to transfer requirement fo sales order to production( production is not in SAP) via interface .
    We need to create  PO when we get the confirmed dates from legacy system . We planned to create the PO from sales order directly . How can we do this ?
    Also my dubt is when we get the confirmed dates from  legacy system in to SAP , do we need to update the PO which in turn would need to update sales order schedule lines or can we directly update schedule lines in Sales order .
    IPlease let me know in detail if possible .
    Regards
    Ramanathan

    Hi
    You can use BAPI : BAPIPO_CREATE1_   for creating PO from sales order , you can pass the SALES ORDER no into the item level field : CRM_SALES_ORDER_NO---'' YOUR SALES ORDER '' . and fill the corresponding ITEMX for the field .
    Regards
    Swapnil

  • Automatic creation of project from Sales Order?

    hi..
    can someone guide me how to automatically generate PS Projects from SO USING TCODE HBS0?
    i have been able to generate projects automatically when i use tcode VA41 but my need is to do this for RE using sales browser and creation of Sales Order is by Tcode HBS0.
    when i save the sales order, no project is created. ( Note: Material i used is same one i used successfully in VA41+)
    thanks in advance..

    Hi Ramesh,
    Creation of project from sales order in SAP Project system is described as assembly processing.
    In the Project System only networks can be generated directly from a sales document during assembly processing. Indirectly the system can also generate work breakdown structures, when it creates the network.
    1.You start assembly processing by creating a sales document for a material. This sales
       document can be inquiry,quotation, sales order.
    2. The system then
        Configures the material, if necessary
        Creates a network using the standard network as a template
        Configures the network, if necessary
        Schedules the network backwards from the required delivery date
        Checks material availability
        Costs the network and transfers these costs to the sales document.
    3. When you save the sales document, the system saves the network together with the sales
        document. If applicable, it also generates a project definition and work breakdown structure.
        The project number is derived from the sales document number.
    Please refer link mentioned below to know more details
    http://help.sap.com/saphelp_47x200/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
    Regards
    Tushar

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • Auto Po creation from sales order.

    Hi ,
              I have a requirement to create a PO automatically from sales order.
    We will be creating a third party sales order, corresponding to which system creates an purchase requisition. Now the requirement is that this Purchase requisition should be converted in to PO automatically.
    For this in the item category config i have ticked the auto Po check box . Also the source of supply is unique so that  purchase requisition is automatically assigned with source of supply.
    But still the PO is not created automatically. What are all the configuration and workflow  needs to be done for this.?
    Kindly help me.
    ram.

    Hi
    From SD settings i dont think a purchase order can be directly created based on sales order thro standards
    You can trigger only purchase requestion
    In VOV6 if you mention order type NB for your schedule line category then a Purchase requestion is only created up on saving your sales order
    Item category in VOV6 should be 5 (third party)
    Account assignment category should be X
    This is third party sales settings
    In MM01 also in the purchasing tab of that material create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    In VOV7 create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    Involve your MM people also for this requirement
    In MM people can create automatically PO from PR and there are a lot of threads in MM forum regarding that
    For automatic PO creation from PR, follow the steps. taken from MM forum
    1) Material Master purchasing view tick automatic PO check box
    2) Vendor Master purchasing view tick automatic PO check box.
    3) Maintain Source list for Vendor & Material.(ME01)
    4) Maintain Purchase Info Record.(ME11)
    5) Create a Purchase Requisition.(ME51)
    6) Use T .Code: ME59 & execute for PR for vendor, you will be able to create automatic PO.
    7) Note-1:
    During creation of PR , select check box of Source Determination in the 1st screen of ME51
    Ensure that Purchase Info Record should be there.
    If you have more than one vendor then fixes only one vendor in source list.
    Regards
    Raja

  • Copy "Ship to party" from sales order to "Delivery addreess" in PO

    Hi All,
    when i create a Purchase Order in ref to the Purchase Requistion of the Sales Order, I want the Ship to Party address from line item of the Sales Order needs to get copied to the Purchase Order line item in "Delivery address" tab of the PO.
    Please tell me the required configuration settings to achieve this.
    Awaiting your responses.
    Thanks in advance.
    Rgds.
    Anil.

    Hi All,
    This is a third party scenario. And in third party scenarios I guess the ship to party address from sales order will be automatically copied into the delivery address of the PO (Standard Functionality of SAP). But some how this is not happening and use to happen till the sixth week. Do I still need to check the enhancements given by the experts above? or we can achieve this with some configuration settings from schedule lines etc?
    Rgds,
    Anil.

  • Service order creation from sale order

    Hi Friends,
       Could you please tell me where is the setting for the automatic creation of service order from sale order.
        Iam using LEIS , TAD and CD as the sales documents and SM01 as service order document.
        Am I missing something?
        Please let me know.
        Regards,
        satish

    Hi Satish,
    The setting for creation of a service order from sales order can be found in the Requirement class configuration.
    To know how to link, check the procurement tab in the sales order, note down the requirement type associated to the line item. Requirement type is linked to requirement class. In requirement class you find the configuration.
    Standard SAP creates SM03 (refurbishment) type of service order from sales order.
    Reward points if useful.
    Regards
    Ananth

  • Restrict transfer of requirments from Sales Order to MRP.

    Hi Friends,
    I have a requirement where in I have to stop/restrict transfer of requirements from Sales order line item to MRP.
    Generally, If the material in Sales order is for Internal production then the Planned order it triggered in MRP and If the material is Externally Procured then a Purchase Req is triggered in MRP. The MRP run is carried out using Transaction code - MD03
    Is there any technical enhancement where I can restrict the transfer of requirements to MRP from Sales order.
    I know I can control it functionally by changing the schedule line category, But We need a technical development to do this as the user would not every time go to Sales order change and then change the schedule line Category.
    Please Advise.
    Thanks & Regards
    Nayan Shah

    Hi Nayan,
    Please try user exits EXIT_SAPLMDR2_001/2/3 if it helps.
    Regards,
    Gaurav

  • Transfer of material from sales order stock to subcontractor

    Iam having subcontracting operation in routing. But i am not able to transfer of material from sales order stock to subcontractor when i do 541 movement

    Dear Mayuresh,
    You cannot move Sales Order assigned material directly to Sub contracting Vendor stock.
    For doing so firstly unassign the Sales order stock by transaction MB1B & movement type 411E.
    After this you can provide the stock to the vendor by transaction MB1B & movement type 541O.
    Other way is to create account assigned Purchase Orders. Thereafter create virtual sub contractor storage location in your plant. Transfer your Sales Order assigned material to these Virtual locations so that you can see the stock provided to the vendor. Now during Goods Receipt of the finished goods you can consume the material by movement type 543E.
    Regards,
    Subha.

  • Item text from sales order to purchase requisition

    Hi Experts,
    I have below queries ,
    1. What are the controls to generate/create a purchase requisition from a sales order.
    Is this possible that a Pur. req generated from a sales order but sales order is not its account assignment.
    How item text from the sales order can be copied to purchase Requisition, does settings in purchase requisition in SPRO (Purchasing Purchase req-text for purchase req----define copying rules) works only for automatically created Pur req.??
    item text from sales order can be copied for PR created through MRP or planned orders converted to PR.??
    I will appreciate if someone can provide me documentation on basics of sales and distribution at my email
    [email protected]
    Thanks in advance
    anand

    hello, friend.
    i can only answer part of your question as i am not sure of the others.  however, yes... you can automatically create a purchase requisition from the sales order. 
    one example is third party sales.  because of the item category group that you specified in the material master, the sales document determines an item category (and schedule line) that controls the creation of the purchase requisition.  here, the system knows that you must source the material from your vendor for delivery to your customer.
    further, as in the above case, when your company creates the PO with reference to the PR, your company appears as the buying entity but the ship-to address is that of your customer.
    i did not understand your question on account assignment.  please elaborate and we'll see if we can come up with the answer.
    if you wish to see documentation, you could refer to SAP's article on Third Party Sales.  other scenarios such as just-in-time inventory for trading companies or make-to-order companies may also apply.
    regards.

  • Copy Control From Sales Order to Purchase Order

    Hi Experts,
    I want to ask how the copy control from Sales Order to Purchase Document can be done? Because they are instances that the users have some items in the Sales Orders not copied to Purchase Document.
    Thanks a lot!

    Hi Experts,
    I have seen the documentation for 3rd Party Sales, thanks to some suggestions. However, there is a report which does not work in our Test Environment, the program name is SDMFSTRP. As suggested by some forums, this is another way of connecting Sales Order to the created Purchase Requisition. So I'd like to ask if there are other ways to connect the 3rd Party Sales to the created Purchase Requisition.
    And also may I know your scenarios when there will be missing items from Sales Order to Purchase Requisition. There are some instances that from Indent Orders, some SO items are not copied to PR.
    Thanks a lot!

Maybe you are looking for

  • Oracle 8i Installation problem on Windows 2000

    I had purchased a Oracle8i (MS/Windows NT CD (E-Commerce), part Number A94674-01 in the month of Jun 2000. When I tried to install Oracle 8i personal edition of Windows 2000 ver. The installation got completed smoothly. But after that I was not able

  • How to transfer site files from one computer to another?

    I've got a couple sites archived on my MacBook Pro that I'd like to move over to my iMac. Is there an easy way to do this that will retain all the site settings and so that the sites will show up in the site files window as I'm used to working with?

  • Printer setup when print program is called through a BAPI from a VB program

    Hi All! I have a BAPI being called by a VB program. The BAPI prints successfully when executed using the SAP GUI but fails to print when called via the VB program. Is there any special printer setup needed for this? Thanks!

  • WRV210 issues.

    Hi guys. About a week or so ago i bought a Cisco WRV210 and since then i've come accross a number of issues which resulted in spending about 2 hours trying to get it going again. My first issue is this, whenever anyone in the house tries to use anyth

  • Cannot open .jpeg files in emails on 4s

    When I receive an email with a jpeg attachment I cannot open it