Routing creation with material assignment

Hello sap gurus,
    I have created routing for semifinished product.Now i want to create routing for finished material but i want to use the same routing as we created for semifinished product by material assignment function in routing.when i go to do like that i am facing one problem.when i go to component assignment for finished material to operation,it shows the component over there which are in Bom of semifinished product,not the component which are in Bom of finished material.so how to do the component assignment if i create the routing by materail assignment function?
        Hope u have understood my problem.

Hi Jitendra,
Instead of making the scenario complex, I suggest you to go for separate routing and BOM for the semi-finished and finished product.
How do you differentiate the routing of both the finished and semi-finished in only one ?
regards
Ram Kumar

Similar Messages

  • Deactivate manual PR creation with account assignment "N"

    Hi experts,
    How to Deactivate the manual PR creation with account assignment "N" in ME51N ,as these PR with account assignment "N" is to be made from CJ20N Tcode.
    Kindly help..
    Thanks

    Hi,
    The above proposed solution is not working.Kindly let me know if can be done through any development.If so,please tell me the USER EXIT for this requirement..
    There is no way through configuration changes to block the manual creation of PR for account assignment "N"
    Thanks
    Edited by: ARITRA MUKHERJEE on Sep 4, 2010 10:13 AM

  • PR creation with Material text

    Hi Everyone,
                          I am trying to create a PR with account assignment category "P" with material text. But it is showing error as       " enter the material number". Please let me know the reason behind this error.And also give your suggestion to create a PR without material number for acct assignment category "p".

    It looks like your project is setup as inventory managed.
    you can only manage inventory if you have a material number.
    http://help.sap.com/saphelp_470/helpdata/en/a5/6abf04787f11d2b6650000e82d8bd1/content.htm
    Edited by: Jürgen L. on Feb 18, 2012 12:02 AM

  • Std Network with Material assignment

    Hi,
    I am creating Project via Standard WBS and Network. I have also assigned few materials to this Standard NWP. There are few materials assigned to this std NWP all with Base QTY 1000.
    So when i add Execution Factor 10 when creating WBS, i expect system to divide Qty of material assigned on Std NWP by 1000 and then multiply by 10, but system is not dividing the Qty by 1000?
    Is there some config i need to do so that Base Qty maintained in Std BOM gets divided by the Qty of material that gets assigned to operative WBS being created?
    Regards,
    Jatinder

    Hi,
    To my knowledge, the execution factor is applicable only for the quantity at either the WBS or network activity level , not for the requirements it generates.  I may be wrong.

  • SC creation with material master

    Hi friends ,
    can we create SC with material master with a/c assignment object as ORDER.?
    if yes , then what could be product catefory be taken in to the shopping cart. ( ie  whether default product category or material group in R/3 ).
    Thanks & Regards
    venga

    Hi
    To display in account assignemnt you to activate OR in SPRO settings .
    Moreover OR must be assigned to GL account in SPRO .
    SRM Server ® Cross-Application Basic Settings ® Account Assignment ® Define Account Assignment Categories
    Supplier Relationship Management ® SRM Server ® Cross-Application Basic Settings ® Account Assignment ® Define G/L Account for Product Category and Account Assignment Category- Here your account assigment category /product category (material group) OR linked with GL account.
    You must defined in KNT attribute as a OR in POMA_BBP.
    Regards
    Muthu

  • PO creation with acct assignment "A"

    Hi
    I created 2 internal order types - one for IOs for expenses and another one for IOs for assets.
    When I create a purchase order with acct assignment "O", the system correctly checks the IO available budget.  But when I create a purchase order with acct assignment "A", the system does not require the IO when it should.  And even when I did place an IO number, the PO amount is not being reflected as commitment in the IO report.  Please advise on how what should be done.
    Regards,
    Thess

    Hi,
    Even if u make mandatory the io number in PO.
    You cannot settle the asssts to that IO and budget control also not possible.
    Thanks

  • Copy Routing Group without material assignment

    Dear Guru ,
    I want to create in CA01 a routing group copied from another routing group.
    But in this copy i don’t want to copy the material assignments.
    How can do this ?

    Dear nandha ,
    The SET / GET PARAMETERS in routing ( tcode op8b) is already enabled for the indicator of task list.
    But this flag indicates that the last group maintained is the default value in task list maintenance.
    So it serves to other purposes
    Regards,
    nandha

  • Routing Creation with multiple Wok Center -  BAPI_ROUTING_CREATE

    Hi Guru,
    I'm creating a Routing using a bapi BAPI_ROUTING_CREATE, currently i can only create routing with one work but it requires to have different work center for each operation. I've checked the my table for operation and sub operation and it contains the data for the two work centers, unfortunately when it gone through the bapi it only creates one work center for a given operation.
    Do I need to populate the table WORKCENTERREFERENCE?
    Please advise.
    Thanks and regards,
    jay

    Hi Jitendra,
    Instead of making the scenario complex, I suggest you to go for separate routing and BOM for the semi-finished and finished product.
    How do you differentiate the routing of both the finished and semi-finished in only one ?
    regards
    Ram Kumar

  • PO with Account Assignment P and NON Valuated Material

    Hi ,
    As per my undersatnding if I create a PO with Account Assignment "P" , system consumes it immediately and stock doesn;t get updated in any storage location.
    But
    If I use Account Assignment "P" with "NON valuated" stock , system is asking for Slocation at the time of MIGO and also updates Qtys in Storage location , although cost is being booked to consumption account.
    Could u pls help to understand the logic for this ?
    Regards
    Shrey

    Hi,
    PLease read this para from SAP help .. it is useful to undestand your scenarion
    Goods Receipt of Non-Valuated Materials  
    Use
    If the stock of a given material is only managed on a quantity basis, an account assignment must be defined in the purchase order. However, this account assignment does not result in the goods receipt being posted to consumption/usage. Instead, it results in the costs being debited to the account assignment object.
    The goods receipt is posted to the warehouse stock, thus increasing the unrestricted-use stock of the material.
    *It is not possible to post goods receipts of non-valuated materials directly into consumption/usage. You have to post the goods receipt into the warehouse first and then enter a goods issue.*
    Regards
    Krishna

  • Assign Source of supply is not working for contract with material group

    Dear Experts,
    I have searched all the threads and gone through before posting my query. So i would ask moderators to go through the thread properly before rejecting this.
    We have value contracts with respect to a particular material group without material and with item category W in the contract item, Please note that for the materials with this material group, the source determination is not set and source list is also not maintained.
    When we create PR for the material with this contract, and when we click on assign source of supply contracts used to get popped up, but recently from few days, when we click on assign source of supply we are getting an error " no source found for this item ".
    Can anybody help on this.
    Regards

    @ Biju,
    As mentioned earlier, we are not creating PR with reference to contract.
    first we are creating contract with item category W (material group), without material and plant details.
    we create PR with or without material with account assignment K and with the material group in the transaction ME51N, and after inputting all the fields, we click on assign source of supply, it was proposing the existing contracts with respect to material group earlier, but it is not happening for particular material group(it is working for all other material groups)
    Hope it is clear.
    @ Dev Patra,
    we are using DIEN-Service material types and we assign that particular material group to only service material type.
    we have not ticked, source list in the material master, we donot have any source list for the materials under that material group.( please check the note 457110- question number 14.)
    Regards

  • Creation of PO with account assignment:Q

    Hi,
    During creation of purchase order with account assignment category: Q, consumption GL account is getting triggered instead of Project Stock GL Account. What could be the reason for this?
    Regards,
    Srinivas.

    Check what account modification key is assigned to account assignment category 'Q'.
    T-code: OLME
    Purchasing --> Account Assignment --> Maintain Account Assignment Category
    Select the Account Assignment Category 'Q' and click on the details button.
    Check the Consumption Posting (P) , Account Modification key (VBR)  and the Special Stock field (Q).
    Depending upon the Account Modification Key, System picks the G/L from the OBYC (GBB) Setting (Tcode - OBYC).
    Regards,
    S Anand

  • Creation of Material Master for a material with Material Type NLAG

    Hello Sirs,
         I have to create a material which will be consumed directly. I would use the
    material type NLAG (Non stock material). If I create a material with this material type, will it contain an Accounting view where in I can maintain the price of the
    material? If it contains an Accounting view, which type of Price control should be
    used (Moving average or Standard)? Further, can we maintain an info record for
    a material with material type NLAG?How the price updation happens?
    Regards
    Yoga

    Hi Madhu,
        Thanks for your reply. But, I have one more doubt. For non stock materials, we
    will specify the cost centre and G/L account at the time of creation of Purchase order. Then, do we have to specify the valuation class at the time of creation of
    Material Master since there is no automatic account determination?
    Regards
    Yoga

  • Automatic number range assignment for creation of material issue

    Hi Experts,
    I need to create material with automatic assignment of internal and external number range .
    Already existing logic for one exit which is working fine in one system and I am using that same logic in other system
    where it is not working and  throuhging the following error:
    "Internal number assignment is not possible for the material type Operating supplies"
    Can you please suggest where i am dong wrong ?
    Thank you in advance.

    Hi,
    Please slect material type operating supplies  click on detaials. check  the external number assignment w/o check  checkbox
    Regards
    AKM

  • Print of GR without material no and with Account assignement K / Q

    Dear Freinds,
    I want make Print out of Material Document with Material text (without  Material code with account assignement K or Q Project). I made out put setting for WE03, Transaction event type WE Print version 3 and Print Item 1, Material document.
    But i am not able to print in after MIGO. In MIGO Disply, it is showing error as "The system could not create any outputs"
    But I can able to make print out for Material document with material no. i am facing this problem only for text without material no with account assignement like K and Project refernce.
    Please guide me.
    Rgds
    Madhavan

    Hi Madhavan
    Go to MN22 , put WE03 , prsee enter , if u r alrady created any condition record , that will be diplayed , now select one line item , and clik communication . then after going in second screen , u will find box as " LOGICAL DESTINATION " ,  put the logical destination ( LP01 ) and check the tick box " print immediately , and save the condition record ...
    after donig these things ur problem will be solved , as i was also facing same problem , after doing this i got solution

  • Materialized View creation with REFRESH FAST

    Hello ,
    Please see below case,
    TABLE A1(partitioned range+list)
    COLUMN C1  -- Primary key
    COLUMN C2  -- NUMBER
    TABLE D1
    COLUMN C1 -- PRIMARY KEY
    created MV log as below
    CREATE MATERIALIzED VIEW LOG ON A1 WITH ROWID,PRIMARY KEY INCLUDING NEW VALUES;
    CREATE MATERIALIzED VIEW LOG ON D1 WITH ROWID,PRIMARY KEY INCLUDING NEW VALUES;
    Trying to create MV like below:
    CREATE MATERILIZED VIEW mv1test
                                    REFRESH FAST ON COMMIT
    AS
    Select
    FROM A1,
                            D1
                    WHERE A1.C1 = D1.CI
    AND A1.C2 IS NOT NULL;
    It gives below error message:
    ORA-12052: cannot fast refresh materialized view schema.mv1test
    12052. 00000 -  "cannot fast refresh materialized view %s.%s"
    *Cause:    Either ROWIDs of certain tables were missing in the definition or
               the inner table of an outer join did not have UNIQUE constraints on
               join columns.
    *Action:   Specify the FORCE or COMPLETE option. If this error is got
               during creation, the materialized view definition may have be
               changed. Refer to the documentation on materialized views.
    However ,as discussed in earlier thread i checked all general restrictions of the 'Refresh fast' approach for join.
    Restrictions on Fast Refresh on Materialized Views with Joins Only
    Defining queries for materialized views with joins only and no aggregates have the following restrictions on fast refresh:
    1) They cannot have GROUPBY clauses or aggregates.
    2) Rowids of all the tables in the FROM list must appear in the SELECT list of the query.
    3)Materialized view logs must exist with rowids for all the base tables in the FROM list of the query.
    4)You cannot create a fast refreshable materialized view from multiple tables with simple joins that include an object type column in the SELECTstatement.
    As per above restrictions ,
    1) Group by clause is not present
    2)i do not understand 2nd point , i have added a1.rowid  and d1.rowid in  select statement of MV, but got same error.
    3) observed same as 2nd point.
    4)we have CLOB column in select list. Tried removing this column but got same error.
    Please do let me know any workaround on this.
    Thanks in advanced ..
    PM

    Basic Materialized Views show how to analyse MVs using dbms_mview. I'm not sure about creating MVs on partitioned tables, that partition maintenance might cause problems

Maybe you are looking for

  • Keynote 3.0.2 (iWork '06) Files Don't Work in Keynote 4.0 (iDon'tWork '08)

    I just got iWork ’08 yesterday, and tried to use a slideshow created in Keynote 3.0.2 with the new Keynote 4.0, and nothing works. The original file is an interactive slideshow of my office work portfolio, and has an initial slide with 40 project pho

  • Open windows on desktop go gray?

    Hello. I have a new Imac 2.4 ghz g5 and I am having a very strange issue. Whenever you open a new window on the desktop for any application the window act like you have clicked on the finder desktop and will "gray out". So if you are on Safari right

  • T42 2373-PS5 IBM Track Point and Ultranav are not working well

    I have a T42 2373-PS5 and recentrly reinstall the OS,  when I press on the left button or try to access to any application i wasn't able to do it, when I press the left button I have the functionality of the right button, and the left button are disa

  • N:n mapping of subtrees?

    Hi I need to map a sub-tree that occurs n times on exactly the same sub-tree in another structure (also occurs n times where n1 = n2). When I test my mapping it only creates the first sub-tree and igonres the rest. Is there anything special that I ne

  • Advanced text editing in WebDynpro Java

    Hi, Please let me know how can I add advanced text editing (making text bold or italic or changing the font of text ) in WebDynpro Java? Is it possible to do it in JSP and integrate in WebDynpro using IFRAME? Please advice me. Regards, Umapathi