Routing operation split

hi all,
I have defined 2 splits in the work center. Operation split is ticked in routing.
When I create an order for 10 units , it is getting split as 7.5 and 2.5. i would like to know where this proportion is defined if it can be ?
Regards,
Yogesh

Yogesh,
In the operation details you need to activate the Required Splitting indicator and maintain the minimum time for splitting, based on this system calculates the number of splits by dividing the processing time for the operation by the minimum processing time.
Regards,
Prasobh

Similar Messages

  • Parallel Routing - Quantity split in operations

    Hi all,
    I need help regarding the parallel routing,
    operation description
    Sequence 0  1
    10
    20                20
    30
    40
    I have parallel routing with sequence no's 0 and 1
    if I have a production order for 10 Nos
    1) operation 10 is confirmed  for 10 Nos
    2) operation 20 in sequence 0 system proposes for 10 Nos
        for confirmation
    3) Operation 20 of sequence 1 system proposes for 10 Nos for
        confirmation which is not so
    There should be a split in the quantity for parallel  operation like 5,5(Nos) for both opeation 20,20
    how do i obtain the slipt in quanty flow to subsequent opeation
    also after confirmation of both operation 20,20 system should propose cumulative quantity(10 Nos) in operation 30  for confirmation.
    Thanks in advance
    Raghavendra

    Hi Raghvendra,
    If more than one operation has to be carried out simultaneously then one has to go for parallel sequence
    Like taking your example if second & thrid operation takes place at the same time then it is caaled as parallel sequence
    any way for your requirement you have to go for operation split
    you dont need to maintain two seperate sequences for operation splitting
    you want to split between m/c in the same work center(like one work center with 2-3 machines-Machine category) then its possible to do the splitting-you need to maintain each machine as "indvidual capacities" in the work center under capacity header
    Then in the operation overview select the required operation(2nd in your case) operation details-->Cap reqmnt assigment here you split the qty & assign to different machines
    Basically you have to do capacity levelling,it can be done in CM27,CM25
    Hope the above is clear
    Revert if you have doubts
    Regards,
    SVP
    Hope the above is clear
    Revert if you have further doubts
    Regards,
    SVP

  • Operation splitting

    Hi,
    I have created individual capacities say for example w1 and w2 in work centre wrc1.in routing I have mentioned required splitting and given 2 as splits.in routing work centre wrc1 is assigned to operation.
    I want to dispatch operation quantity 10 into these two work centres w1 and w2 , 5 quantites each so that both the operations can start at thje same time and finish quickly.
    how to do this capacity levelling?In CM25 i can see work centre wrc1 but not its individual capacities i.e w1 and w2?
    please reply.
    Regards.

    Dear,
    Capacity leveling transaction "CM21" you would be able to dispatch individual operation quantities to the individual machines.
    For operation split you have to createM/c with 2 Indiviudal capacities and have also defined the Individual Capacities by name in the Capacity header CR02. Also in the capacity header you should have activated "Relevant for Finite scheduling".
    In the Scheduling parameters for the order type/Plant you should have activated check box for "Generate Capacity requirements" in transaction OPU3.
    You can only "Dispatch" the same in CM27 by assigning in "Cap. reqmt assignment" in production order. The indicator "D" is set only after the split is dispatched.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Need to select all equipments (PRT) for a plan (routing) operation (PLPO)

    hi,
    I need to select all assigned equipments (PRT) for a plan (routing) operation (PLPO).
    Can anybody tell me the database table relation or is there a function module or a BAPI or something like this !?
    Thanks
    Olaf
    Edited by: Olaf Krüger on Feb 20, 2008 12:03 PM:  BADI to BAPI

    I suppose you have every PLPO needed (else look at function module WOSTS_TASKLIST_READ_FROM_DB)
    Then read
    PLMZ Allocation of bill of material items to operations
    STPO BOM item
    SELECT * FROM plmz INTO TABLE t_plmz
        FOR ALL ENTRIES IN t_plpo
        WHERE plnty = t_plpo-plnty
          AND plnnr = t_plpo-plnnr
          AND plnkn = t_plpo-plnkn.
      SELECT * FROM stpo INTO TABLE t_stpo
        FOR ALL ENTRIES IN t_plmz
        WHERE stlty = t_plmz-stlty
          AND stlnr = t_plmz-stlnr
          AND stlkn = t_plmz-stlkn.
    Regards

  • BAPI to update Routing operations

    Hi
    I want to update inspection characterstics in routing operations,
    can you plz suggest any BAPI to update.
    Regards,
    kranti

    Hi Dhirendra,
      I want to update Char.number,Material Insp characterstics,method and sampling Procedure.
    as u mentioned in that BAPI,    BAPI_QPMK_SAVEREPLICA,i have found,Material Insp characterstics,method these two parameters,
    so how can i uplopad Characterstic no and sampling procedure?
    Regards,
    Kranti

  • Routing operation validity

    I can find out the operation Valid from date from table PLPO or PLAS, but from which table can I find out the Valid to date of the routing operation ?

    Hi Amit,
    There is no seprate valid from date for operation, routing operation will take from header valid from date
    check table PLKO fields DATUV
    Regards,
    Sankaran

  • Classification for Routing Operation (PLPOD-KLAKZ)

    Hi experts,
    I have to check if a routing operation (CA03) is classified. In CA03 there is an indicator that shows if a classification exists.
    (PLPOD-KLAKZ) I already checked function group CPCL but I didn't find any function module which fits to my needs.
    If there is any function module or database table this information is stored please help me to find it.
    Thanks.
    CJ

    Dear,
    The classification data of the resource has not yet been converted.
    So that the same classes can be used for defining the selection conditions as for classifying resources, a conversion must be carried out for class type 019.
    Please start report RCCLUKA2 in SE38  with the following parameters: Object table:      CRHD
    Class type:        019
    Regards,
    R.Brahmankar

  • Displaying all Operation Splits for an Order in WorkOrderList MAM3.0

    Hello Experts,
    I have the following requirement in MAM3.0.
    Mobile Infrastructure 7.0
    1.     All the Operation Split details from operation list needs to be added in orderlist based on the check for userid from MAM30_090.
    2.     Order List to be sorted, arranged in a particular manner and hiding certain fields in the jsp.
    Please provide the solutions ASAP.
    Thanks and Regards,
    Mani

    Hi,
    As far as I know thats how standard MAM works. For any gloabl order, if you create notifications on the client, they fall under order objects list.
    The only way from the client you can achieve your requirement is, when you create both order and notifications on the client locally. That means, first create the order locally, and before sync, rom the order header details click on notification create button and then create a notification. This way both order header will have notificaiton number and viceversa. And later, all the notifications created for that order falls under order objects list and the first created notification in the order header.
    For your second question of status change of order, from the error it looks like you are changing the status on the client and the middleware detects a conflict when you do a sync(but i think you are not modifying on the backend at the same time). Kindly check on the backend if you have missed to apply any related notes.
    Regards,
    Siva.

  • Load Program to Assign Class to Routing Operation

    Hello Experts,
       I used the standard batch direct input program to load Routings/operations/bom component allocation etc.
    We also have a requirement to assign Class(for class type 018) to each of these operations.
    Please suggest a standard load program to assign classification to a routing operation.
    Thanks
    Kishore

    Found the answer

  • Routing Operation item field update in configurable material

    Hi All
    Material is a configurable material ,which is having a selection options in a sales order and based on the selection options there is characteristics BOM quantity gets updated based on the formulae.
    If you go to routing and double click on the operation to see the details , you will see the unit of measure conversion with the header and Operation fields. I want BOM quantity should get updated in the operation field (UMREN).
    I was using the Reference characteristics with PLPOD table and UMREN field to update the value in the UMREN field. And i created a procedure with a logic and is assigned to configuration profile and the Routing operation.
    Process is MTO process, Production order is generated when the sales order is created. i checked in production order after creating a sales order, UMREN field is not updated and dont know what where i am doing mistake and i also checked in the Routing Master Data there also its not updating.
    Above mentioned is not an requirement but to calculate the costs accurately, we have to approach this way.
    Please suggest.
    Thanks,
    Quantum

    hi all,
    this problem is solved...its was a simple thing...go to extra in operation tab of routing, then go to references and there is an option of unlock....
    and bingo...the problem is solved.
    best regards,
    Maulin

  • Tables for knowing depedencies associated to routing operations

    Hi everyone,
    I have created a routing with some operations which I have assigned to a configurable material.
    Some of these operations have an associated dependency.   
    I would be very grateful if someone could explain me which tables should I review to know which dependency is associated to each routing operation.
    I have also the same problem with BOM positions.
    Thanks a lot in advance and best regards.
    Ben.

    Hi,
    Most of routing related informations are stored in the following tables, pl check
    PLPO, CRHD, PLKO
    Regards
    Merwyn

  • Operation split in setup time formula

    Hi, while creation of Work centers, i have seen the formula for setup as setup * operation splits. what is meant by operation split? pls explain?

    Hi,
    Operation split means no. of workcenters.
    It is used in workcenter scheduling tab processing formula.  For example operation split is 2. Say a process required processing time 1hr in one machine scheduled from 9.00am to 10.00am . If operation split is 2, system scheduled from 9.00am to 9.30am due to 2 machines.
    And it is used in capacity tab setup formula. For example operation split is 2. Say a process required setup time 10mins in one machine. If operation split is 2, system will calculate setup time is 20mints because 10mints x no.of workcenters (split).
    Regards,
    Dharma

  • Unplanned Inspection Characteristics in Routing - Operation

    Hi experts,
    What is the use of  the function Unplanned Inspection Characteristics in Routing - Operation ? Its normally grayed off.
    I am aware of the same in RR of the Inspection Lot.
    Thanx
    George

    Hello Jomy,
    Ok so you were asking the same for Production order. You wrote routing operation and my mind stuck there since I read it. I was searching for it. You make good exercised to me. LOL!!!
    Anyways, in the production or process order the unplanned MIC does the same task of job what it used to de in QE51N or any other RR work sheet. And you can assign the Unplanned MIC to Pro. Order itself to the relevant operation. Let it be gray there, you just follow the steps to attach an unplanned MIC to Operation in the Order, and the same will be reflated to RR screen also.
    - Select the operation line item.
    - Now follow the path,,, Operation->Function for phase / for operation->Unplanned Inspection characteristics.
    - Now it will lead you to the same screen for unplanned characteristic as you can have in other RR work lists.
    Pls revert if there is any query.
    Regards,
    Shyamal

  • HKONG: ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능할 때 처리방법

    PURPOSE
    ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능할 때 처리방법
    Problem Description
    ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능함
    Workaround
    N/A
    Solution Description
    원인>
    Bills form does not allow 'operation pull' when there is no routing for the assembly.
    This cause done as a fix for Bug 4247916
    해결책>
    The patch#4689976 will do the following:
    1. Revert the changes that are made in Bug 4247916.
    만약, BOMFMBM1.pld의 version이 " 115.75.115100.5" 보다 낮을 경우, 다음과 같이 patch를 TEST환경에
    적용하여, Test하여 주시기 바랍니다.
    -- To implement the solution, please execute the following steps::
    1. Please download and review the readme and pre-requisites for Patch 4689976 .
    2. Please apply Patch 4689976 in a test environment.
    3. Please confirm the following file versions:
    BOMFDBOM.fmb - 115.245.115100.17
    BOMFMBM1.pld - 115.75.115100.5
    4. Please retest the issue.
    5. If the issue is resolved, please migrate the solution as appropriate to other environments.
    Reference Documents
    -------------------

  • Change UoM of on routing operations.

    Hi PP Experts,
    Please someone help me on my problem regarding changing UoM on routing operation. I have to change or convert the labor time and machine time from CTS (cents of second) to S(second). How can i change that and i have to consider the impact on report such as routing check, standard time checking report and finacial cost.
    Thanks for your help.
    Edited by: yatch0325 on Oct 13, 2010 7:58 AM

    Hi,
    1. In the routing change the UOM for standard value to S and eneter the calculated machine time in S.
    2.Change the Base qty and the operation unit.
    3.Activity type and the cost needs to be checked.
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 13, 2010 8:25 AM

Maybe you are looking for

  • Free goods - No stock for main item , GI happens for Free goods

    Hello gurus, While creating sales order, main item is entered. The free goods gets created as sub item. Now even though there is no stock of main item, during creation of delivery, system brings the free goods in the delivery without getting the main

  • Using another web browswer until you get rid of Firefox 4. What a disaster! When do you plan to fix it.!!!

    What a nightmare Firefox 4 have been. I have warned everyone else not to upgrade to this horrible browser. Which is sad, since I used to recommend it to everyone. I don't like IE or Safari, but I like them better than Firefox 4 so I will be using ano

  • Show/Hide conditional text at a book level

    I am using TCS2 on Windows XP. FM 9.0 p250 I have several files as part of a large FM book. Each file has the same text conditional tags. Can I, at a book level, set my conditions to show/hide, etc. and then update the book? So far, I only know how t

  • CS6 Bridge not opening in my laptop and windows!

    hey guys.. i have problem with bridge cs6 only! all program of adobe working fine.... when i click bridge give me erorr... my laptop is LENOVO Y-580 I HAVE WINOWS 7 i use the last update of bridge but not fix... plz help me....

  • From trial to full version?

    Hope this is the right forum for this question. My Adobe Acrobat XL Pro trial version has expired and I wanted to upgrade it. There was a "buy" button and from that point everything got very confusing. I can choose to buy a full version for 6371sek (