Dear  pp gurus,
In routing  , I have defined the operations .
Although i know that in operation the set up , machine time, labour time is define, which helps in costing.
but wat exactly is  set up, machine  and labour time?
If suppose  10 people work  for  8 hrs and make 50 pc of a product in one day. how should i define the above parameter
thanks in advance

Hi,
Set Up time = The time required for "Machine" to be in Workable Condition, this initial time is setup,
Like If you are using Oven for Drying, Your initial time would start from pushing start Button, making temperature settings required, and probably wait for the Oven to reach the temp. and then start the operation. So this Time is Set Up time. AND this time is only Once in Scheduling per Order.
If your work center is Labor work center, as said in ur ex here. you dont need the setup time for labors except if it is required to make them workable by making them feed TEA .. jocks apart, we dont use set up time for labors.
As per ur eg now:
" If suppose 10 people work for 8 hrs and make 50 pc of a product in one day. how should i define the above parameter"
Here 10 is Your No of capacities, Time available 8 Hrs (Work Center), and quantity is 50 Pc (In routing)"
When we say quantity, is your Base quantity is 1 or 50 ? if it  is 1, in operation of routing, you need to put the time to process according to your base quantity.
Machine time is to process each base quantity every time, used by Machine,
Labor Time is the time labor used this machine to process base quantity.
Regards
Raghu

Similar Messages

  • Need to select all equipments (PRT) for a plan (routing) operation (PLPO)

    hi,
    I need to select all assigned equipments (PRT) for a plan (routing) operation (PLPO).
    Can anybody tell me the database table relation or is there a function module or a BAPI or something like this !?
    Thanks
    Olaf
    Edited by: Olaf Krüger on Feb 20, 2008 12:03 PM:  BADI to BAPI

    I suppose you have every PLPO needed (else look at function module WOSTS_TASKLIST_READ_FROM_DB)
    Then read
    PLMZ Allocation of bill of material items to operations
    STPO BOM item
    SELECT * FROM plmz INTO TABLE t_plmz
        FOR ALL ENTRIES IN t_plpo
        WHERE plnty = t_plpo-plnty
          AND plnnr = t_plpo-plnnr
          AND plnkn = t_plpo-plnkn.
      SELECT * FROM stpo INTO TABLE t_stpo
        FOR ALL ENTRIES IN t_plmz
        WHERE stlty = t_plmz-stlty
          AND stlnr = t_plmz-stlnr
          AND stlkn = t_plmz-stlkn.
    Regards

  • BAPI to update Routing operations

    Hi
    I want to update inspection characterstics in routing operations,
    can you plz suggest any BAPI to update.
    Regards,
    kranti

    Hi Dhirendra,
      I want to update Char.number,Material Insp characterstics,method and sampling Procedure.
    as u mentioned in that BAPI,    BAPI_QPMK_SAVEREPLICA,i have found,Material Insp characterstics,method these two parameters,
    so how can i uplopad Characterstic no and sampling procedure?
    Regards,
    Kranti

  • Routing operation validity

    I can find out the operation Valid from date from table PLPO or PLAS, but from which table can I find out the Valid to date of the routing operation ?

    Hi Amit,
    There is no seprate valid from date for operation, routing operation will take from header valid from date
    check table PLKO fields DATUV
    Regards,
    Sankaran

  • Classification for Routing Operation (PLPOD-KLAKZ)

    Hi experts,
    I have to check if a routing operation (CA03) is classified. In CA03 there is an indicator that shows if a classification exists.
    (PLPOD-KLAKZ) I already checked function group CPCL but I didn't find any function module which fits to my needs.
    If there is any function module or database table this information is stored please help me to find it.
    Thanks.
    CJ

    Dear,
    The classification data of the resource has not yet been converted.
    So that the same classes can be used for defining the selection conditions as for classifying resources, a conversion must be carried out for class type 019.
    Please start report RCCLUKA2 in SE38  with the following parameters: Object table:      CRHD
    Class type:        019
    Regards,
    R.Brahmankar

  • Load Program to Assign Class to Routing Operation

    Hello Experts,
       I used the standard batch direct input program to load Routings/operations/bom component allocation etc.
    We also have a requirement to assign Class(for class type 018) to each of these operations.
    Please suggest a standard load program to assign classification to a routing operation.
    Thanks
    Kishore

    Found the answer

  • Routing Operation item field update in configurable material

    Hi All
    Material is a configurable material ,which is having a selection options in a sales order and based on the selection options there is characteristics BOM quantity gets updated based on the formulae.
    If you go to routing and double click on the operation to see the details , you will see the unit of measure conversion with the header and Operation fields. I want BOM quantity should get updated in the operation field (UMREN).
    I was using the Reference characteristics with PLPOD table and UMREN field to update the value in the UMREN field. And i created a procedure with a logic and is assigned to configuration profile and the Routing operation.
    Process is MTO process, Production order is generated when the sales order is created. i checked in production order after creating a sales order, UMREN field is not updated and dont know what where i am doing mistake and i also checked in the Routing Master Data there also its not updating.
    Above mentioned is not an requirement but to calculate the costs accurately, we have to approach this way.
    Please suggest.
    Thanks,
    Quantum

    hi all,
    this problem is solved...its was a simple thing...go to extra in operation tab of routing, then go to references and there is an option of unlock....
    and bingo...the problem is solved.
    best regards,
    Maulin

  • Tables for knowing depedencies associated to routing operations

    Hi everyone,
    I have created a routing with some operations which I have assigned to a configurable material.
    Some of these operations have an associated dependency.   
    I would be very grateful if someone could explain me which tables should I review to know which dependency is associated to each routing operation.
    I have also the same problem with BOM positions.
    Thanks a lot in advance and best regards.
    Ben.

    Hi,
    Most of routing related informations are stored in the following tables, pl check
    PLPO, CRHD, PLKO
    Regards
    Merwyn

  • Unplanned Inspection Characteristics in Routing - Operation

    Hi experts,
    What is the use of  the function Unplanned Inspection Characteristics in Routing - Operation ? Its normally grayed off.
    I am aware of the same in RR of the Inspection Lot.
    Thanx
    George

    Hello Jomy,
    Ok so you were asking the same for Production order. You wrote routing operation and my mind stuck there since I read it. I was searching for it. You make good exercised to me. LOL!!!
    Anyways, in the production or process order the unplanned MIC does the same task of job what it used to de in QE51N or any other RR work sheet. And you can assign the Unplanned MIC to Pro. Order itself to the relevant operation. Let it be gray there, you just follow the steps to attach an unplanned MIC to Operation in the Order, and the same will be reflated to RR screen also.
    - Select the operation line item.
    - Now follow the path,,, Operation->Function for phase / for operation->Unplanned Inspection characteristics.
    - Now it will lead you to the same screen for unplanned characteristic as you can have in other RR work lists.
    Pls revert if there is any query.
    Regards,
    Shyamal

  • HKONG: ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능할 때 처리방법

    PURPOSE
    ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능할 때 처리방법
    Problem Description
    ROUTING 이 없으면 하위 품목에 대해 OPERATION PULL 지정이 불가능함
    Workaround
    N/A
    Solution Description
    원인>
    Bills form does not allow 'operation pull' when there is no routing for the assembly.
    This cause done as a fix for Bug 4247916
    해결책>
    The patch#4689976 will do the following:
    1. Revert the changes that are made in Bug 4247916.
    만약, BOMFMBM1.pld의 version이 " 115.75.115100.5" 보다 낮을 경우, 다음과 같이 patch를 TEST환경에
    적용하여, Test하여 주시기 바랍니다.
    -- To implement the solution, please execute the following steps::
    1. Please download and review the readme and pre-requisites for Patch 4689976 .
    2. Please apply Patch 4689976 in a test environment.
    3. Please confirm the following file versions:
    BOMFDBOM.fmb - 115.245.115100.17
    BOMFMBM1.pld - 115.75.115100.5
    4. Please retest the issue.
    5. If the issue is resolved, please migrate the solution as appropriate to other environments.
    Reference Documents
    -------------------

  • Change UoM of on routing operations.

    Hi PP Experts,
    Please someone help me on my problem regarding changing UoM on routing operation. I have to change or convert the labor time and machine time from CTS (cents of second) to S(second). How can i change that and i have to consider the impact on report such as routing check, standard time checking report and finacial cost.
    Thanks for your help.
    Edited by: yatch0325 on Oct 13, 2010 7:58 AM

    Hi,
    1. In the routing change the UOM for standard value to S and eneter the calculated machine time in S.
    2.Change the Base qty and the operation unit.
    3.Activity type and the cost needs to be checked.
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 13, 2010 8:25 AM

  • Select query in routing(operation,sequence)

    Hello frds,
         i am into change routing BDC actually i want a select query .....for like existing of operation for a particular sequence in routing....
    if i will found operation for particular sequence i will run the bdc code lese i will exit...any one can help me...
         just provide me a query....to check existnece of operation for a particular sequence......ASAP...

    Why on earth would you want to keep the queries separate? As Tom Kyte would say, databases are born to join!
    Providing emp_id has an index on it (and it should, assuming it's the table's primary key!) your "complex" (or, what I would call simple*), it'll most likely be faster than doing it separately. You've not got the context switches for one thing.
    If you want to see what the optimizer does with your query, you should run a trace on the query. An explain plan would give you an idea of what it's going to do, too.
    In general, doing something like this procedurally is going to almost certainly be worse than doing it in SQL (and by worse, I mean slower).
    * I'd hate to see what you'd call some of the monster queries I work with, if you think that query is complex!

  • How to determine the value of a Standard Value in a routing operation

    Dear Experts,
    Kindly guide me on how to detemine the value of my Standard Value in the  operation of my routing, or in the phase of my Master Recipe.
    I mean what determines the value that I enter for the Standard Values: Machine  and Labor in the phase of my Master Recipe?

    Hi,
    In the Routing / Master Recipe, the standard values are based on the lot size.
    For Example, if you have the lot of 100 KG, then in recipe the machine time will be 2 hr and labor time will be 2 hours, it means to make 100 KG we require 2 hrs of machine and 2 hrs of labor.
    Normaaly all production manager / supervisor will have the date for the hours. The system will calculate will respect to batch / lot size.
    If you have order for 1000 KG, then the system will assign 20 hrs for Machine and 20 hrs for labor.
    This will be used for Capacity planning and Costing.
    Capacity plan here your requirement is 20 hrs for machine and labor. If you have a reacto which wil run for 24 hrs a day, then the order will be completed in a day.
    Costing is concerned, all std. valur key will be assigned with an activity type in work center / Resources and the prices for activity type / cost center will be maintained in KP26.
    Based on the cost and hours, the system will allocate cost for the order (it will be planned cost). When you are confirming the order you will enter the actual time for the operation, then that will be your actual cost.
    Pl do a sample test scenario in your sand box, and surely you will understand more.
    The data for Routing / Recipe will be provided by the production manager of the plant and activity price will be provided by the finance team.
    Thanks,
    JK

  • Select Routing Operation

    Dear All,
    I want to use routing oerations in program. I am using plpo table, but I have one problem, eg. in ca03 tcode for material 37 it is displaying 4 operaions like  20, 30, 40, 50. But in table plpo there is 10 operation also I want to avoid this operaion(10). Please tell me how to do it?
    Thanks & Regards,
    Roshani

    after you select PLPO into an internal table:
    delete internatablename where operation eq 10?

  • Text of Std. Text Key in Routing operation

    Hi friends,
    I am facing a problem in the operation in Routing.
    I have defined a standard text key in CA10. If I assign the standard key in the Default tab in Work center and select the Work center in routing against the particular operation, the std. text key is coming automatically BUT the text in the std. text key is not getting displayed in the Description section against the operation.
    But if I do not assign the std. text key in the work center and manually select the std. text key in the operation..... the text maintained in the std. text key, is getting displayed in the Description section against the operation.
    I failed to make out the reason for this difference. If the std. text key maintained in the WC is getting picked up along with the WC in the opration then why the text is not getting dispalyed in the DESCRIPTION section ?
    secondly, There is no where, where  the text of the Work Center ( name of the WC) is getting reflected against the operation.
    Is there any report where we can get the description of the WC or that of the Std. text key against the operation ?
    Kindly help.
    Regards,
    Abhra Bose

    Abhra,
    >
    > I have defined a standard text key in CA10. If I assign the standard key in the Default tab in Work center and select the Work center in routing against the particular operation, the std. text key is coming automatically BUT the text in the std. text key is not getting displayed in the Description section against the operation.
    >
    > But if I do not assign the std. text key in the work center and manually select the std. text key in the operation..... the text maintained in the std. text key, is getting displayed in the Description section against the operation.
    >
    Its a simple problem you have maintained the standard text key and its description, but not the long text. All that you need to do is in CA10 transaction enter the standard text key and click the pencil like Icon for change, then in the next screen which appears like a word pad maintain the text which you want to appear in the operation description when used.
    Example:
    Standard Text Key:
    XXXXXXX - Turning Operation
    Turning operation using CNC Machine.
    Hope this helps....
    Regards,
    Prasobh

  • Bapi to change Routing Operations

    Hi Gurus,
    Could you please tell me whether this Bapi Can be used to do Mass Change for an operation.
    I have found this Bapi : /SAPMP/BAPI_ROUTING_PROCESS
    But it is throwing exception Routing Entry is missing.
    I have filled only operations table and the importing parameters.
    Do I have to fill any other table.
    Please help me in the same.
    Best Regards,
    Navin Fernandes.

    NAVIN FERNANDES wrote:
    Hi Amber,
    >
    > I have created an LSMW and filled respective values with mapping but it giving me error saying
    > ****************************************************************************
    > "Data Transfer of Routings via Direct Input
    >
    >     Error_di_exp         From    To      Obj   Index       Plnnr
    >
    > E    1     1                             M     0000000001
    >
    > E                           1     1      M     0000000001
    >
    > C\ 045 V
    >    You cannot edit the task list object with activity type V
    > *******************************************************************************
    > Could you please help me in the same.
    > I want to change the standard values in the operation.
    >
    > Best Regards,
    > Navin Fernandes.
    this looks to be a functional error. Can you check again with your functional consultant.

Maybe you are looking for

  • Loading versions 4.3 & 4.2SP2, error message: "not a valid Win32 app"

    Hello, I've been trying to install two versions of BDS, and both download fine, but upon clicking on the icon to install, I get the error message: "(name of app) is not a valid Win32 application".....does anyone know what the heck this means and how

  • KEPM copy fucntion error

    Hi Please see the error;;;;;;;;;;;in COPA planning You tried to assign characteristic value "0000031207" for characteristic "Partner Profit Ctr" to another characteristic value more than once. This action is not supported for the current planning met

  • Client Export Help

    I would like to experiment for the first time with a client export from SBX to DEV. I would like to know the exact steps as I am a bit confused with what I have read. Do I need to have considerable space available on the target as well as the source

  • URGENT Mod Help needed please. Hacked account and ...

    Please help. My sons account has been hacked and live porn was sent to all his friends along with files that we don't know what is inside. We have informed the police because of the porn content but now the hacker is hacking my sons friends and deman

  • Problem with very slow scale, rotate and translate

    Hi - Here is the basic problem. I want to take a bufferedImage (read from a jpeg earlier on) and then rotate it according to an angle value (radians) and then resize it to fit within a specifically sized box. My code works fine, but... I have to do t