Hi experts,
I'm having some trouble with routing selection when using ECN in routing creation.
I tested a case where I have 3 routings without ECN, and the Order asked me which one of the 3 I want to use.
Then I created a routing with ECN. The order asked only one routing without ECN and the new routing with ECN.
Do you know if there is any relation about using the ECN in Routings and using at the same time Routings without ECN, when selecting the routing in production order?
Anybody can help?
Thank you,
Caio.
Hi Ayoub,
All the 4 routings are valid from Oct.2014 to 31.12.9999.
The Order date is from Apr.2015.
I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
Thanks,
Caio.
Similar Messages
-
BOM and routing selection during production order creation
I am having a material which is having only one BOM and one routing. Now for this material in the material master in the selection method indicator i have put as 3 as selection only by production version. But i have not maintained any production versions in the work scheduling view for checking purpose. now when I am creating a production order for this material manually through CO01 system is allowing to create production order. when is the selection is only by production version how system is allowing to create production order when there is no version is maintained.
Hi Kumar,
Looking into scenario as u have maintained,if you have define the selection id and not maintained the production version then it should ask for the production version and show the following
Since the production version is missing, you cannot execute the desired processing step.
As well as pls look into OPL8 ,what Production Version is maintained.
Thanks,
Mohit
Edited by: Mohit Sharma on Feb 4, 2011 5:35 PM -
Sequence Selection in Production Order
Hi All,
I am having following problem related to the sequence selected in production order...
In my scenario there are multiple sequences in a routing for a material.In the production Order Type I have made setting of manual selection of sequence while creation of production order.When I create production order the system ask for selection of the alternate sequence and after selecting the alternate sequence the system copies all the data related to that sequence <b>But</b> when I go and see the operation overview the system still displays the standard sequence. How can I correct this problem because when I am doing confirmation the system throws error message than the standard sequence 0 does not exist.
Please help me correct this problem.
Regards,
Anup DubeyHi,
As i have mentioned the system is asking me select alternate sequence it means that the tick is there.
Please lemme know why the system is displaying the standard sequenec in operation overview though all the details related to operation are of alternate sequence.
Regards,
Anup Dubey -
How to restrict the GR for Production Order when Goods Issue is not done
Hi Gurus
How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
Pls suggest best solution.
Abhijit.Hi,
You can club together the GI nad GR at the time of confirmation..
I.e Backflush for the components and auto GR for the Product.
So that you can stream line the Process.
The best Option would be to use the User Exit:
Enhancement - MBCF0002
Functional Module - EXIT_SAPMM07M_001
Include - ZXMBCU02
Refer below link for further details..
How to stop the goods receipt before issueing the goods for production orde
Regards,
Siva -
User Exit to Create Production Order when creating of Purchase Order
Hi Guru's,
I want to create the Production Order when creating the Purchase Order. i want to know is there any user exit exists for that??
My scenario is as follows.
we are converting the Purchase Requisition to the Purchase Order , while doing this we want to create the Production Order.. Is this possible??
If possible how can we do that???Please suggest me the possible solution.
Thanks in advance.
Thank you,
Adi.Teja,
My Scenario is as follows.
P1- Manufacturing Plant
P2 - WareHouse Plant (Procures Material from P1 using STO)
When we run the MRP in P2, it creates a Purchase Requisition, that Purc.Req is going to be convert as STO (Stock Transport Order) in P1 Plant.
When converting the Purchase Req to STO, we need to create a Production Order in P1 Plant.
we know that system will creae the Purchase Order only, is there any possibility that,For creating the Production Order is there any user Exit/BADI or any other procedure while creating the Purchase Order????
Thanks,
Adi. -
Why pop up is shown to ask for inputing sales order when using COR1
I want to create a process order with order type PI01, but pop up window is shown to ask for sales order when using COR1. I suppose there is something wrong with material master setting, but I've never set classification to this material.
Please help.Hi Nichole
Is the material assigned to any MRP group , if yes then check the config settings on t-code OPPR, if stg group is assigned. also check the matrial type to default MRP group assignment settings in SPRO>production>mrp>MRPgroup> Define MRP Group for Each Material Type.
regards
Prasad
reward if useful -
Batch for production order when released
Hello Guru,
I have a question, we on created production order, when change (CO02) to be released (green flag) new batch will be created upon saving this change for the order Change Batch display will prompt, displaying the batch number for the FG material on the order, with its Production Date (set as the date of start of order) and the Shelf Life expiration (depend on the SLED date in master data for material) this to date was automatically proposed by SAP. We would like this two date of the batch of the production order to be blocked on all modification possible, is there any set-up way we can do in order to block those date for future modifcation by some user? please help and guide us to do this.
ThanksHello R>brahmankar,
AM interested on this An OPKP there is setting for create batch while releasing assign this profile to material master -
i already check OPKP for our plant, in the batch management portion BATCH CLASSIFICATION was set to 1 (classification was carried out in background-all batches) and the AUTOMATIC BATCH CREATION IN THE ORDER was set to 2 (auto batch creation at order release). EXTENDED CLASSIFICATION and ALWAYS BATCH SPLIT was not tick, please how can we do this in OPKP and assign for the material master profile? please guide.
Any help
Edited by: Ryan on Mar 12, 2009 6:35 AM -
Vc - routing not being selected in production order
Hi PP Gurus,
We are working on variant.
Steps followed -
1. KAMAT material created.
2. Variant created for KMAT material.
3. Maintained configurable profile.
4. Super BOM made in CS01 for KMAT.
5. Dependency maninted in BOM.
6. Maintained relationship between Kmat and variant in CS40.
7. Super routing created for KMAT.
8. Dependency maninted in Routing.
9. sales order created for variant.
10. MRP run taken
11. Planned orders created during MRP run.
12 BOM exploed as per dependency defined in BOM.
Problem - When we are converting planned order into production order system is giving error message saying that rounting does not exists.
Please guide me if any thing is missing in above mentioned process.
Regards,
AbhayHi,
1. Routing is created in CA01
2. OPL8 parameters for routing is
Applicaion = P , ALt task list Application = Blank
Selection ID = 01 , Routing selection = 3
Sequence exchange = 0 ,
Task list type = N
3. Error Message during conversion is
Popup opened saying No routing found mentioning material code, plant, qty and explosion date
3 tabs are also there 1. ref operation selection 2. Change selection 3. exit. -
Input routing on production order creation using BAPI_PRODORD_CREATE
Hi experts,
I have created one program for creating production using BAPI_PRODORD_CREATE it is working fine. I am trying to input the routing and alternate grp counter along with this but it is not updated in production order.
How to input the routing details for production order ?
Is there any BAPI/FM to update the routing details in production order ?
Thanks & Regards,
KarthiHi Sree,
Routing for the material already exists. I don't know the reason why its not picking.
If i maintain routing as mandatory in OPL8 tcode.
BAPI_PRODORD_CREATE giving error as "Order type YG01 requires a routing (transaction terminated)"
Thanks & regards,
Karthi
Edited by: karthi keyan on Aug 24, 2011 10:51 AM -
Dyanmic work center selection in production order based on material
Hi ALL,
We’ve a business requirement to support the following functionality.
There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
Please provide your valuable feedback to support the above requirements.
Regards,
Satya.Hi Satyanarayan,
Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
Resource Classification in Master Recipe for Planning
Regards
Kalyan -
User Exit For Production Order Confirmation Using CO15 or COGI
Hi all,
I need user exit for the production order confirmation so that i can set
AFPO-ELIKZ and AUFM-ELIKZ (delivery completedu2019 status flag) to Blank......
Thankshi,
check these exits.
CONFPP01 PP order conf.: Determine customer specific default values
CONFPP02 PP order conf.: Customer specific input checks 1
CONFPP03 PP order conf.: Cust. specific check after op. selection
CONFPP04 PP order conf.: Customer specific input checks 2
CONFPP05 PP order conf.: Customer specific enhancements when saving
CONFPP06 PP Order Confirmations: Actual Data Transfer
CONFPP07 Single Screen Entry: Inclusion of User-Defined Subscreens
CONFPS01 PS confirmation: Determine customer specific default values
CONFPS02 PS confirmation: Customer specific input checks 1
CONFPS03 PS confirmation: Customer specific check after op. selection
CONFPS04 PS confirmation: Customer specific input checks 2
CONFPS05 PS confirmation: Customer specific enhancements when saving
CONF0001 Enhancements in order confirmation
CONFPI01 Process order conf.: Calculate cust.specific default values
CONFPI02 Process order confirmation: Customer spec. input checks 1
CONFPI03 Process order conf.: Cust. spec. check after op. selection
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when saving
CONFPI06 Process order confirmation: Actual data transfer
CONFPM01 PM/SM order conf.: Determine cust. specific default values
CONFPM02 PM/SM order confirmation: Customer specific input checks 1
CONFPM03 PM/SM order conf.: Cust. spec. check after op. selection
CONFPM04 PM/SM order conf.: Customer specific input check 2
CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
use the exit which contains both structures AFPO,AUFM. -
Automatic creation of Production order when credit limit lock got released
It seems that production order will be created only when the sales order is created without credit lock error from the first.
Once credit lock happened, even if user release the lock, production order will not be created automatically anymore.
Is there a way to change the setting so that production order will be created automatically after credit unlock?
don't want to create production order manually every time when credit lock happensHello Manish
If you have used Standard Requirement 102 in Config T code OVB5 (Maintain Requirements For Transfer Of Requirements) , then it should behave as you wish, that is once you release the credit block, system should create Purchase Reqs/ Planned/production orders in the background. Check what you have there and/or choose appropriately here. While here, check out OVB8 (Maintain Requirements For Purchase And Assembly Orders) if anything needs to be done there.
Also ensure that there are no required fields ( for production order) missing, i.e., required entry fields that cannot be supplied automatically for this process.
For conceptual clarity, check out OSS note 396791 - Credit release of sales orders with third-party items which deals with 3rd party transactions but draws a parallel and mentions 'Production orders' also. -
Production order confirmation using CO15
Hi ,
When i am confirming production order with reference to sales order using CO15 , material document is being posted only for assembly material , but not for components.
Please let me know how i can correct this.
Thanks in advance.
Regards,
sudheerSudheer,
You can display confirmation using transaction CO14, here you click the goods movement tab, and if you find GI items highlighted in Blue then these goods movement error needs to be reprocessed. Execute transaction CO1P and save the records there, then execute transaction COGI and clear the error records.
Regards,
Prasobh -
Direct production order when saving sales order.
Hi,
How to create a production order from sales order.ie. When a sales order is saved production order automatically created.
Thaks and regards
HarishHi
For the product that you need to have the production order once the sales order is saved
Maintain the planning strategy 82 Assembly processing w. production orders in material master / mrp 3 view
So once the sales order is created, system automatically do the bom explotion and availability check, routing in background and create the Prodcution order.
so in Md04, you can see the production order for you sales order qty. -
Automatic creation of Production order when PP/DS planned order is CIFed.
Hi PP Gurus,
The requirement is when PP/DS Planned order is created and CIFed to ECC R/3, Automatically system should create Production order for that planned order. In this case, is Trigger points will serve the purpose or need to adopt for some other way? I think since APO PP/DS is in sync with ECC R/3, something SAP might have given in this regard?
Thanks & Regards,
Abu ArbabDear Abu,
In SPRO PPDS global parameters and defaults, you can set "create transfer events from conversion indicator".
After this the planned order is transferred to R/3 only when a conversion indicator is set against planned order.The conversion indicator can be set through RRP3 or RRP4. You can put mass conversion indicator.
When such planned order is transferred, it will automatically create production order.
Regards,
Nitin Thatte
Edited by: Nitin Thatte on Apr 20, 2009 4:59 PM
Maybe you are looking for
-
Generic Object Services (HR Master Overview Screen)
Hi, i need to incorporate the Generic Object Services functionality to the HR Master Data linking it at three levels, namely, Scenarios 1) GOS at Employee Level 2) GOS at Employee-Infotype Level 3) GOS at PD Object Level. I've managed
-
Html from flash 9 WAY different than flash MX
Does flash 9 do something majorly different with ActiveX or something? After "publishing" a flash 9 slide show to html, it shows NO swf content in dreamweaver. Yet this show plays. Problem is, it wont align and now there is no alignment options, even
-
Problem with keyborad functionality, key pad doesn...
i face a problem with my n81 2 gb. sometime not all time the right top, red and 'c' button not working properly, if i press red button it works as the down arrow button, the right top button works the 'c' button and 'c' button doesnt work..... it see
-
Errors with VI after down converting from 2009 to 8.x and porting from Windows to Linux
Hi All, I'm pretty new to Labview so I've been trying to learn along the way. I've been tasked with porting a .VI that my supervisor developed on Windows to a Linux machine. The ultimate goal would be to build an executable that would be able to run
-
Convert text to mp3 using festival
Here is an interesting link that I found regarding converting pdf, html, etc to mp3 using festival http://linuxgazette.net/117/anonymous.html I installed festival, one voice, and ghostscript, but the above method gave me the following error while con